Anda di halaman 1dari 26
German Universty of Teemology In Oman Deparment of rgneering— Process Engnering Punt Engineering Semester Project 3° Energy balance Done by Alisabt s.0156 ‘Aull A yori 11.0069 Faisal Al Busaid 32-0004 Supervisor: Or. Ayham AlRahawi Date: 04 December 2014, E-mail 11.0156@student gutecheduom 11.0069@student gutech.eduom 12-0004@ student gutech.eduiom ‘Summary ‘The project demonstrates the energy balance around the each unit of the urea plant ‘operating ata steady state, The energy balance was based on the material blance done in the previous project. The concept used thatthe enthalpes ofthe inlet components at 2 spect temperatures and pressures will be equal to the enthalpies of the outlet ‘components at certain temperatures and pressures. Cooling water streams at 25°, 1 bar ere used to remove excess heat. Saturated steam at 25 bar was utilized incase external heat source is necessary fr the component. Inthe piling tower, the temperature ofthe alr used was 30°C as it Is the average temperature in Oman throughout the year. The calculations were done and summarized in tables. Vital data like specific hes and heat of ‘vaporization values were taken fom the references mentioned at the end secon. Block Diagram and Energy Pyalance.

Anda mungkin juga menyukai