System Process Document

Assigning Setup Times to Resources

Department
Responsibility/Role
File Name 27759748.doc
Revision
Document Generation Date 18/01/2010 09:35:00
Date Modified 1/18/2010 09:35:00 AM
Last Changed by
Status

Assigning Setup Times to Resources


Trigger:

Concept
You can create a performance model for machine and resource setups to include time from one
setup to another, including the time required to perform the work. If one of your scheduling
objectives is to sequence or group jobs based on their required setup, you can also include a
penalty factor in the scheduling calculation.

Any two setup types within a resource can have a transition time and a transition penalty, which
means that the scheduler needs the specified time for transition from the former setup to the latter.

In this topic, you will assign setup times to resources.

Required Field(s) Comments

Output - Result(s) Comments

Additional Information

Last changed on: 1/18/2010 09:35:00 AM Page 1


System Process Document
Assigning Setup Times to Resources

Procedure

Step Action
1. Begin by navigating to the Resources page.

Click the vertical scrollbar.

Page 2 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
2. Click the Manufacturing and Distribution Manager link.

Last changed on: 1/18/2010 09:35:00 AM Page 3


System Process Document
Assigning Setup Times to Resources

Step Action
3. Click the vertical scrollbar.

Step Action
4. Click the Resources link.

Page 4 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
5. Use the Organizations page to select your organization.

Last changed on: 1/18/2010 09:35:00 AM Page 5


System Process Document
Assigning Setup Times to Resources

Step Action
6. Click the M1 Seattle Manufacturing list item.

Step Action
7. Click the OK button.

or Press [Alt+O].

Page 6 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
8. Use the Resources page to find the resource that you had already defined.

Last changed on: 1/18/2010 09:35:00 AM Page 7


System Process Document
Assigning Setup Times to Resources

Step Action
9. Click in the Resource field.

Step Action
10. Press [F11].

Page 8 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
11. Enter the desired information into the Resource field. Enter "CDMOLD".

Last changed on: 1/18/2010 09:35:00 AM Page 9


System Process Document
Assigning Setup Times to Resources

Step Action
12. Press [Ctrl+F11].

Step Action
13. Click the Setups button.

Page 10 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
14. Use the Setups page to select the setups for which you want to define changeovers.

Use the arrow button to move the setup from the Available column to the Selected
column.

Use the double arrow button to move all setups from the Available column to the
Selected column.

Last changed on: 1/18/2010 09:35:00 AM Page 11


System Process Document
Assigning Setup Times to Resources

Step Action
15. Click the CM66711 list item.

Page 12 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
16. Click the > button.

Step Action
17. Click the CM66712 list item.

Last changed on: 1/18/2010 09:35:00 AM Page 13


System Process Document
Assigning Setup Times to Resources

Step Action
18. Click the > button.

Page 14 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
19. Click the CM66713 list item.

Step Action
20. Click the > button.

Last changed on: 1/18/2010 09:35:00 AM Page 15


System Process Document
Assigning Setup Times to Resources

Step Action
21. Click the Save button.

Page 16 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
22. Click the Changeovers button.

or Press [Alt+C].

Step Action
23. Use the Changeover Times page to enter the time it will take to perform the
changeover and assign a penalty to the changeover if there is one.

Last changed on: 1/18/2010 09:35:00 AM Page 17


System Process Document
Assigning Setup Times to Resources

Step Action
24. Click the Select button.

or Press [Alt+S].

Page 18 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
25. Use the Select Setup Types page to select the setup from the list of available setup
types.

Step Action
26. Click the >> button.

Last changed on: 1/18/2010 09:35:00 AM Page 19


System Process Document
Assigning Setup Times to Resources

Step Action
27. Click the OK button.

or Press [Alt+O].

Page 20 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
28. Click the Select button.

or Press [Alt+c].

Step Action
29. Click the >> button.

Last changed on: 1/18/2010 09:35:00 AM Page 21


System Process Document
Assigning Setup Times to Resources

Step Action
30. Click the OK button.

or Press [Alt+O].

Page 22 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
31. Use the Refresh List of Changeovers button to automatically generate a list of all
potential changeover combinations in the From and To fields.

Step Action
32. Click the Refresh List of Changeovers button.

or Press [Alt+R].

Last changed on: 1/18/2010 09:35:00 AM Page 23


System Process Document
Assigning Setup Times to Resources

Step Action
33. Click the Update option.

Page 24 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
34. Click the Update option.

Step Action
35. Click in the Duration field.

Last changed on: 1/18/2010 09:35:00 AM Page 25


System Process Document
Assigning Setup Times to Resources

Step Action
36. Enter the desired information into the Duration field. Enter "2".

Page 26 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
37. Click the Update option.

Step Action
38. Click in the Duration field.

Last changed on: 1/18/2010 09:35:00 AM Page 27


System Process Document
Assigning Setup Times to Resources

Step Action
39. Enter the desired information into the Duration field. Enter "2".

Page 28 Last changed on: 1/18/2010 09:35:00 AM


System Process Document
Assigning Setup Times to Resources

Step Action
40. Click the Save button.

Step Action
41. You have completed the Assigning Setup Times to Resources procedure.
End of Procedure.