The Shifts page enables you to assign the shifts available to the resource. The shifts are those
assigned to the workday calendar that are assigned to the organization.
In this topic, you will assign shift information for the resource.
Additional Information
Procedure
Step Action
1. Begin by navigating to the Departments page.
Step Action
2. Click the Manufacturing and Distribution Manager link.
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Departments link.
Step Action
5. Use the Organizations page to select your organization.
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OK button.
or Press [Alt+O].
Step Action
8. Use the Departments page to select a department.
Step Action
9. Click in the Departments field.
Step Action
10. Press [F11].
Step Action
11. Enter the desired information into the Department field. Enter "ASSEMBLY".
Step Action
12. Press [Ctrl+F11].
Step Action
13. Click the Resources button.
or Press [Alt+o].
Step Action
14. Use the Resources page to select a resource to which you want to enter a shift
number.
Step Action
15. Click in the DL-LBR2 Resource field.
Step Action
16. Click the Shifts button.
or Press [Alt+i].
Step Action
17. Use the Shifts page to assign shifts available to the resource DL-LBR2.
The shifts available are those assigned to the workday calendar assigned to the
organization.
Step Action
18. Click in the Shift Num field.
Step Action
19. Enter the desired information into the Shift Num field. Enter "1".
Step Action
20. Click in the Description field.
Step Action
21. Click in the Units field.
Step Action
22. Enter the desired information into the Units field. Enter "1".
Step Action
23. Click in the Shift Num field.
Step Action
24. Enter the desired information into the Shift Num field. Enter "2".
Step Action
25. Click in the Description field.
Step Action
26. Click in the Units field.
Step Action
27. Enter the desired information into the Units field. Enter "1".
Step Action
28. Click the Save button.
Step Action
29. You have completed the Assigning Shift Information for the Resource procedure.
End of Procedure.