Anda di halaman 1dari 3

Gener al

Section complete

Update Time Summary


Job
Job type

Primary

Contractor

SCHLUMBERGER

Cement Engineer

VICTOR CUECA

Arrival date/time

06/05/2013 14:36

Copy To Library

Cement job start date/time 05/20/2006 14:50


Job end date/time

06/05/2013 15:55

Copy From Library

N2 used

Ground temp.

Zone isolated

Air temp

CO2

Seabed temp.

F
F
F

Geothermal gradient

1.20 F/100ft

BHCT

80.00 F

WOC time

9.00 hr

BHST

80.00 F

Activity phase
Job Description
CEMENTACION
Casing details
Assembly

Hole size

SURFACE CASING

MD landed

453.0 ft

Float Shoe Depth

453.0 ft

Assembly set date

12.250 in
06/05/2013

Tubing/Casing size

9.625 in

Rathole length

ft

Depths
Float Shoe TVD

453.0 ft

Packer TVD

ft

Pipe movement

Initial rotating TQ

ft-lbf

Reciprocating drag up

kip

Rotating start date/time

Average rotating TQ

ft-lbf

Reciprocating drag down

kip

Pipe rotating end date/time

Max. rotating TQ

ft-lbf

Reciprocating SPM

spm

Reciprocating stroke length

ft

Pipe Movement

Rotating RPM

Reciprocating pipe start date/time

rpm

Reciprocating pipe end date/time

F lu i d s

Section complete

Cementing Fluids

Fluid name
1 TAIL

Fluid type
SLURRY

Class
CLASS G

Density (ppg)
15.60

Description

Fluid Details
Slurry Additives Tests Dial
Slurry
Slurry top TVD

0.0 ft

Slurry base TVD

453.0 ft

Cement used volume

Excess measurement type GAUGE HOLE


Excess slurry percent

Other amount used

bbl
0.0 bbl

CASING SUPPORT

Excess slurry volume

bbl

Total slurry volume

Type

TAIL

Mix water ratio

gal/sk94

Total slurry in well

Class

CLASS G

Mix method

Purpose

Density

15.60 ppg

Yield

bbl

Total water volume used

ON THE FLY
ft/sk

Source water location

Description

bbl

0.0 bbl

Calc. sacks used

100.00 94lb sacks

Sacks used

100.00 94lb sacks

Source water temp.

Sack size

95.00 lbm

80.00 s/qt

Rheology
RPM

rpm

Funnel viscosity

Fluid name

Fluid density
TAIL

9.50 ppg

Density temp

PV

Fluid type

SLURRY

Rheology temp.

YP

API WL

cc/30min

Gels 10 sec.

Density at press.

ppg

Mud type

Density measure method

Deflection

16.00 cp
14.000 lbf/100ft
5.000 lbf/100ft

Gels 10 min.

8.000 lbf/100ft

Gels 30 min.

10.000 lbf/100ft

St a g e s

Section complete

Cementing Stages

Stage no.
1

Type
PRIMARY 1

Cemented wellbore name


CASABE 1452

Stage Details
Stage Information
MD top

18.5 ft

CT used

Circulate prior

hr

TVD top

18.5 ft

MD CTU

ft

Circulate flow rate

gpm

MD base

453.0 ft

TVD CTU

ft

Circulate press.

psi

TVD base

453.0 ft

Initial CTU press.

psi

Tool contractor

Hole size

12.250 in

Final CTU press.

psi

Tool description

MD tool top

ft

Top plug used

Returns

TVD cement tool

ft

Bottom plug

Vol. returns

20.0 bbl

MD plug circ.

ft

Bumped plug

Volume lost

bbl

TVD plug circ.

ft

Plug catcher used

WOC time

hr

Annular flow

Press. held

psi

Tool desc.
MD stage tool

ft

Ann press held

Pressure remaining

psi

TVD stage tool

ft

Float held

Pressure held duration

min

Initial casing press.

psi

Pill spotted below plug

Bump press.

psi

Final casing press.

psi

Plug bumped

Press. prior bump

psi

Init TBG press.

psi

Float held

Hesitation

Final TBG press.

psi

Pumping Schedule

Hesitation reason

Fluid pumped

Rate

Volume

Pumping start date/time

Pumping end date/time

Operation

Schedule Details

Foam Details

Placement method

Foam job

Slurry top MD

Disp rate max.

Foam gas type

Slurry base MD

Disp rate final

Foam gas vol. used

Shut down time

Disp rate avg.

Length

Top of fluid

Disp pressure final

Density

Top of fluid TVD

Surface mix temp.

Quality

Strokes

Bh static temp.

Stroke rate

BH circ. temp.

Gas rate no.


Constant Gas Ratio Method

Bulk cement

Flowline temp.

GL ratio

Date start mixing

Vol. back wash

Avg. foam density

Mixing rate

Overflush vol.

Constant Density Ratio Method

Date start slurry

Preflush vol.

Foam density

Date start displace

Initial ratio

Date end pumping

Final ratio

T est s

Section complete
Liner Top Test

Casing Test
Test pressure

Comments

1,200.00 psi

Duration

15 min

Test date

06/05/2013 17:04

Test MD top

ft

Test section TVD top

ft

Test MD btm.

ft

Packer depth

ft

Test section TVD base

ft

Fluid density

ppg

Liner overlap

ft

Time before test

hr

Float Shoe Depth

453.0 ft

Negative test tool

Cement found

Negative test EMW

ppg

Positive test tool


Log/Survey Evaluation

Positive test EMW

CET run

CET quality

CBL run

CBL quality

CBL press.

psi

Time prior to log

hr

ppg

Cmt. found on tool


Shoetrack Cement

BHT log run

Shoe Test

Shoetrack top MD

ft

Shoetrack top TVD

ft

Shoetrack drill date/time

Shoe test press.

ppg

Tool

Open hole length

ft

Time before shoe test

hr

Shoetrack drill MD

ft

Shoetrack drill TVD

ft

Interpretation Survey
MD TOC

ft

TOC TVD

ft

Interpreter
Interpretation

TOC sufficient
Remedial cement required
No. squeezes
TOC locate method
Job rating
Detection indicator

In t e r m e d i a t e C i r c u l a t i o n s
Circulation type

Md (ft)

Flow rate (bbl/min)


453.0

Manufacturer

Equipment type

1 SCHLUMBERGER

Equipment name

PUMP UNIT

MD top (ft)

CEMSTREAK

MD base (ft)

0.0

Objective
4.00

453.0

Caliper (in)
12.250

Successful

Section complete

Pressure (psi) Time of circulation


100.00 06/05/2013 16:42

P u mp E q u i p me n t s

Section complete

Is o l a t e d In t er v a ls

Section complete

Wo r k St r in g s

Section complete

Measured
efficiency (%)
95.00

Evaluation date
06/05/2013 16:44

Work String Summary


Create New From Copy
ST no.

BHA no.

Copy Work String To Library

Create New Work String From Library

Assembly name

Summary Components
General
BHA no.

Assembly name

RIH time

MD in

Date/Time in

POOH time

MD out

Date/Time out

Pilot hole size

Min. ID

Hole size

Left in well

Purpose

Create Obstruction

Predicted Performance

Actual Performance

BHA Run Comments

J o b Ac t i v i t y

Date/Time from
1 06/05/2013 14:44

Date/Time to
06/05/2013 16:44

Duration
Activity class
(hr)
2.01 CEMENTING

Activity code
2500

Activity subcode
2512

Section complete

MD from (ft)

MD to (ft)
453.0

Total hours

R e ma r k s

Operation
0.0

Operation success

Service compa
SCHLUMBERGER

2.01 hr
Section complete

REALIZO CEMENTACION DE CASING DE 9 5/8 ASI: PROBO LINEA CON 2500PSI DURANTE 5MIN,OK. BOMBEO 10BBL DE AGUA FRESCA DE 8.3PPG A 3BPM. MEZCLO Y BOMBEO 79 BBL DE LECHADA PRINCIPAL CONVENCIONAL DE 15PPG A 4 BPM. LAVO LINEAS Y DESLAZO
CON 33.6BBL DE AGUA A 3BPM. ULTIMA PRESION DE CIRCULACION 168PSI. RETORNARON 20 BBL DE LECHADA DE 15PPG, BACK FLOW 0.2BBL. 300 SACOS USADOS