BASIS OF DESIGN PHARMACEUTICAL BUILDING WAREHOUSE ADDITION

Date: August 2014

Project Name: PHARMACEUTICAL BUILDING WAREHOUSE ADDITION Project #: 2014-08 Prepared By: Reader

Revision date:

BUILDING

4Addition square feet:60,000


o New Construction o Renovation o

No. of floors below grade: 1 No. of floors at and above grade:

Above grade

UTILITIES
Electrical: o New o Upgrade

Existing Gas: o New o Upgrade

4Existing
o

Steam: o New o Upgrade

4Existing
Chilled Water: o New o Upgrade o

4Existing
Hot Water: o New o Upgrade o
4Gas o District energy steam o
4Existing
4Electric o
Services from Utility for: o
4None
Campus Power Plant: o Electric o Gas o Steam o CHWS o CWS o Hot Water o
UTILITY DESIGN PARAMETERS

4120/1/60 o 208/3/60 o 277/3/60 o


4480/3/60 o
Electrical: o

/3/60

4None Gas: o
4Design parameters by plumbing engineer
Emergency Power: o New o Diesel oil o Gas o Existing o
4Design parameters by Plumbing Engineer
Plumbing & Process: o

Steam Pressure: o Low @

psig o Medium @

psig o High @

4CHWS @ 42F o CHWR @ 56F o None


Chilled Water Temperature: o
4None
Condenser Water Temperature: o CWS @ F o CWR @ F o
4HWS @ 160F & HWR @ 120F when 9F OAT and HWS @ 90F & HWR 70F when OAT is 60F o Fixed HWS @
Hot Water Temperature: o

psig o High @

F & HWR @

F o None

ASHRAE APPLICATION HANDBOOK


ASHRAE 2011 Handbook: Chapter {18}

ASHRAE 2012 Handbook: Chapter {1} {4} {5}

OWNER MECHANICAL DESIGN PARAMETERS

4In central equipment room(s) o


Equipment Location: o On floor being served o

4Away from building


o In Basement o In penthouse o On-Roof o

4Yes serving primary HVAC equipment o No


Maintenance Outside Occupied Space: o
4No
Redundancy: o For (List Equipment) o N+? o
4No
Equipment/System Expansion: o Increase equipment size by % o
Indoor Air Quality at: o MERV rating of {8} and { } for pre-filters MERV rating of {15} for final filters
Acoustic & Vibration Criteria: o Design parameters by acoustic consultant
Specialty Room(s): o (List Room)

4None
o

4None
o

424-7-365 o Occupied/Unoccupied with manual over-ride (List Hours of Occupancy)


Occpancy Schedule: o
DESIGN CRITERIA
Outdoor Dry Bulb & Wet Bulb: 9F Heating season

88F/74F Cooling season

424-Hour Occupied period o Occupied-Unoccupied period o Warm-up & cool down


Public/Common Area, Warehouse, Administration Space: o
Set Points: 68F Heating Season & 78F Cooling season 60%RH Space pressure: {+} {-} {=}
424-Hour occupied period o Occupied-Unoccupied period o Warm-up & cool down
Mechanical & Electrical Space and Back of the House Area: o
Set Points: 68F Heating season and 78F < 65%RH Cooling season Space pressure: {+} {-} {=}
ENERGY & ENVIRONMENT CRITERIA
LEED Certification: o Yes

4No o Other certification (List the Program)


o

Annual Operating Budget: o With energy budget

o With organization structure

Refer To The Facility Files For Additional Operation & Maintenance Design Criteria

SPECIAL CONDITIONS & REQUIREMENTS


1. ISPE Guidelines (http://www.ispe.org) associated with design, construction, operation, maintenance, and commissioning.
2. ISPE Guidelines required by this specific Cambridge pharmaceutical company for basis of design requirements.
3.