DAILY REPORT (29/01/2015)

PROJECT: BK-TNG WELLHEAD PLATFORM


ITEM: FABRICATION OF PRESSURE VESSEL

No
1
1.1
1.2
1.3
1.5
1.6
1.4
1.7
1.8
1.9
1.10
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13

2.14
2.15
2.16
2.17
2.18
2.19
3
3.1
3.2
3.3
3.4
3.3
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.13
3.16
3.17
3.18
3.19
3.20
4
4.1
4.2
4.3
4.4
4.5
4.4
4.7
4.8
4.9
4.10
4.11
4.12
4.13

4.14
4.15
4.14
4.17
4.18
4.19
4.20
5
5.1
5.2
5.5
5.3
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
5.13
6
6.1
6.2
6.6
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.16
7
7.1
7.2
7.3
7.4
7.5

7.6
7.7
7.8

Imagine

DAILY REPORT (29/01/2015)


PROJECT: BK-TNG WELLHEAD PLATFORM
ITEM: FABRICATION OF PRESSURE VESSEL

TASK NAME
TEG CONTACTOR VESSEL 23C01
Shell Cuttting & Bevelling
Shell Rolling
Shell Fit-up
Heads bevelling
Heads & Shell fit-up
Shell & 01 Head welding
Head fit-up & welding
Cutting of Manhole neck, Skirt
Flange fit-up to Neck pipe & welding
Skirt fit-up & welding
Fabrication of Davit
Nozzle, Manway... Fit-up to Shell
Nozzle, Manway Welding to Shell
Fit-up Skirt to Shell & Welding
NDT (RT, UT, MT)
Pressure test
Painting
Delivery
TEG SURGE VESSEL 24RQ01-V02
Head & Shell cutting
Head Forming
Shell Rolling
Shell Fit-up
Shell welding
Head Inspection & bevelling
Heads & Shell fit-up
Head & Shell welding
Cutting of Manhole neck, Skirt
Flange fit-up to Neck pipe & welding
Skirt fit-up & welding
Fabrication of Davit
Nozzle, Manway... Fit-up to Shell

Nozzle, Manway Welding to shell


Fit-up Skirt to Shell & Welding
NDT (RT, UT, MT)
Pressure test
Painting
Delivery
TEG FLAT DRUM 24RQ01-V01
Head & Shell cutting
Head Forming
Shell Rolling
Shell Fit-up
Shell welding
Head Inspection & bevelling
Internal Baffle Fit -up
Heads & Shell fit-up
Head & Shell welding
Cutting of Manhole neck, Skirt
Flange fit-up to Neck pipe & welding
Skirt fit-up & welding
Fabrication of Davit
Nozzle, Manway... Fit-up to Shell
Nozzle, Manway... Welding
Fit-up Skirt to Shell & Welding
NDT (RT, UT, MT)
Pressure test
Painting
Delivery
TEG REBOILER 24RQ01-F01 & STRIPPING COLUNM (24RQ01-C02)
Head & Shell cutting
Head Forming
Shell rolling
Shell Fit-up
Shell welding
Head Inspection & bevelling
Heads & Shell fit-up
Head & Shell welding
Fit-up head of Heater, Stripping & Welding
Cutting of Manhole neck, Skirt
Flange fit-up to Neck pipe & welding
Skirt fit-up & welding
Fabrication of Davit

Nozzle, Manway, Heater, Stripping Fit-up to Shell


Nozzle, Manway, Heater, Stripping welding
Fit-up Skirt to Shell & Welding
NDT (RT, UT, MT)
Pressure test
Painting
Delivery
TEG CARBON FILTER 24RQ01-S02
Head & Shell cutting
Head Forming
Head Inspection & bevelling
Shell Rolling
Fit-up of Head, Shell & Flange
Welding of Head, Shell & Flange
Fabrication of Leg & Davit
Fit up Nozzle to Shell & Welding
Leg firt-up & welding
NDT (RT, UT, MT)
Pressure test
Painting
Delivery
TEG PARTICULATE FILTERS (24RQ01-S01A/B)
Head & Shell cutting
Head Forming
Head Inspection & bevelling
Shell cutting & rolling
Head, shell & Flange Fit-up
Head, shell & Flange Welding
Nozzle Fit-up & Welding
Leg firt-up & welding
Davit Fabrication & Fit-up
NDT (RT, UT, MT)
Pressure test
Painting
Delivery
TEG STILL COLUNM (24RQ01-C01)
Shell cutting & rolling
Shell & Flange Fit-up
Shell & Flange Welding
Nozzle Fit-up & Welding
NDT (RT, UT, MT)

Pressure test
Painting
Delivery

TIME
Duration

26/1-7/2
5/2-10/2
11/2-14/2
9/2-12/2
23/2-25/2
26/2-7/3
9/3-11/3
2/2-10/2
9/2-28/2
2/3-7/3
9/3-12/3
12/3-17/3
18/3-28/3
30/3-2/4
6/3-4/4
6/4-7/4
8/4-14/4
15/4-17/4

1/1-2/1
5/1-8/1
12/1-13/1
14/1-20/1
21/1-28/1
29/1-4/2
26/1-31/1
2/2-4/2
5/2-10/2

1/29/2015
40%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
60%
0%
30%
0%
0%

11/2-28/2
9/2-4/3
26/1-28/2
5/3-7/3
9/3-14/3
16/3-17/3

1/1-2/1
8/1-10/1
12/1-15/1
26/1-26/1
26/1-28/1
29/1-31/1
2/2-7/2
5/2-11/2
11/2-14/2
2/2-4/2
12/2-25/2
26/2-4/3
5/3-7/3
2/2-28/2
9/3-10/3
11/3-17/3
18/3-19/3

5/1-7/1
8/1-10/1
12/1-17/1
16/1-27/1
20/1-31/1
23/2-28/2
2/2-7/2
9/2-14/2
9/2-12/2
2/2-4/2

0%
0%
25%
0%
0%
0%
100%
100%
100%
100%
100%
100%
30%
50%
50%
0%
0%
0%
0%
0%
0%
0%
20%
0%
0%
0%
80%
80%
100%
100%
100%
100%
70%
70%
0%
0%
0%
0%
0%

2/3-7/3
9/3-18/3
24/2-26/2
2/2-20/3
23/3-24/3
25/3-31/3
1/4-2/4

0%
0%
0%
30%
0%
0%
0%

9/1-10/1

0%
20%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

30/1-31/1
2/2-4/2
4/2-7/2
9/2-11/2
12/2-25/2
26/2-28/2
2/3-4/3
9/3-10/3
12/3-17/3
18/3-19/3
9/2-10/2

11/2-12/2
23/2-25/2
25/2-28/2
2/3-4/3
5/3-7/3
9/3-10/3
2/3-11/3
13/3-14/3
16/3-19/3
20/3-21/3

100%
20%
100%
100%
50%
0%
0%
0%
0%
0%
0%
0%
0%

2/3-3/3
4/3-6/3
7/3-13/3
14/3-18/3
13/3-19/3

0%
0%
0%
0%
0%

20/3-21/3
23/3-26/3
27/3-28/3

0%
0%
0%

Anda mungkin juga menyukai