Report No :FB/RS/1
Date :
Work Location :
Sr. no.
Fabriation Factory
Particulars
Actual
Bolt
Torque
Remarks
(m / N.m.)
Remarks to be complied
Ok / Not Ok
1
2
3
4
(Name & Signature)
Date :
For KIRBY
FINAL TIGHTENING CHECK PROCEDURE
Please ensure the following procedue & standard for Bolt Tightening
1. Marking Rules
Reference Photo
Sr. no.
Actual
Bolt
Torque
Remarks
(m / N.m.)
Remarks to be complied
1
2
3
4
Date :
Ok / Not Ok
Report No :FB/RS/1
Remarks
Reference Photo
Remarks
Inspection Checklist-version-R0
Location : ( For Location / Grid Please refer Plan given on backside of this page)
Sr.
No.
Inspection Items
Date / Time of
Checking
1.0
1.1
1.2
1.3
1.4
1.5
1.6
2.0
2.1
2.2
Inspection Checklist-version-R0
2.3
2.4
2.5
3.0
3.1
3.2
3.3
3.4
P.T.O
Inspection Checklist-version-R0
Inspection Items
Date / Time of
Checking
ELEVATION SHOWING ROLLING SHUTTER LOCATIO Rolling Shutter Type : RS-03 / RS-04
Inspection Checklist-version-R0
Inspection Checklist-version-R0
Date :
Person In-Charge :
Checking Record
Checking Status
Signature
KIPL
Ok
Ok
Rectfi
cation
Requi
red
Rectfi
cation
Requir
ed
Ok
Rectfi
cation
Requir
ed
Ok
Rectfi
cation
Requir
ed
Ok
Rectfi
cation
Requir
ed
Ok
Ok
Ok
Rectfi
cation
Requir
ed
Rectfi
cation
Rectfi
Requir
cation
ed
Rectfi
Requir
cation
ed
Requir
ed
CECL
Rectfi
cation
Ok
Rectfi
Requir
cation
ed
Ok
Rectfi
Requir
cation
ed
Ok
Rectfi
Requir
cation
ed
Ok
Ok
Ok
Ok
P.T.O
Inspection Checklist-version-R0
Requir
ed
Rectfi
cation
Rectfi
Requir
cation
ed
Rectfi
Requir
cation
ed
Requir
ed
Retesting
Required
Inspection Checklist-version-R0
Checking Record
Checking Status
Signature
CECL
KAJIMA
Inspection Checklist-version-R0