4
General Objectives : Understand the record of
How maintenance
to produce a maintenance record
Specific Objectives : After learned this unit, you
should be
able to explain about :-
Discus
sion
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
E4101 / E4120
MAINTENANCE
Cost of Maintenance
Why it is important?
MAINTENANCE
Cost of Maintenance
33
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
E4101 / E4120
MAINTENANCE
Cost of Maintenance
(Preventive)
MAINTENANCE
MAINTENANCE
Ø For examples :-
6
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
E4101 / E4120
MAINTENANCE
7
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
E4101 / E4120
MAINTENANCE
Exercises
Ø Explain what is preventive
maintenance cost.
Ø Give 2 examples of preventive
maintenance cost.
8
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
E4101 / E4120
MAINTENANCE
Cost of Maintenance
(Corrective)
MAINTENANCE
Cost of Maintenance
(Corrective)
Ø The cost is used in
emergencency condition
because the failure is
unpredictable.
Ø It is also known as a cost
that is used for a breakdown
machine
that cannot operate.
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
o edit Master text styles E4101 / E4120
level MAINTENANCE
rd level
ourthThe
level corrective
cost of maintenance is
Fifth level
important to makesure daily planned
task can be implement. The example of
budget is as below :-
For biomedical equipment like a x-ray
machine that are facing a failure at one
of it’s cable. So budget will be made to
buy a new cable to operate the
machine.
HOME
1111
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
E4101 / E4120
MAINTENANCE
Exercises
Ø Explain what is preventive
maintenance cost.
Ø Give 2 examples of preventive
maintenance cost.
HOME
12
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
o edit Master text styles
E4101 / E4120
level
rd level MAINTENANCE
ourth level
Fifth level Maintenance Schedule
1313
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
o edit Master text styles
E4101 / E4120
level
rd level MAINTENANCE
ourth level
Fifth level
1414
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
o edit Master text styles
E4101 / E4120
level
rd level MAINTENANCE
ourth level
Fifth level
Level of Maintenance Schedule
It can be divided to a certain level such as :-
a) Maintenance schedule for 25 to 50 hours
or per months.
b) Maintenance schedule for 300 to 500
hours or 6 months
c) Maintenance schedule for 1000 hours or
per year.
d) Other maintenance schedule (if needed).
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
edit Master text styles E4101 / E4120
evel MAINTENANCE
d level
urth level
ifth level
a)Maintenance schedule for 25
to 50 hours or per months.
Clean the VCR playback head.
Check VCR playback head.
Check the connector socket.
1616
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
E4101 / E4120
MAINTENANCE
MAINTENANCE
HOME
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
E4101 / E4120
MAINTENANCE
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
E4101 / E4120
MAINTENANCE
Exercises
Ø State FOUR (4) purposes of
maintenance record for a
machine in the plant.
20
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
● Rekod bertulis yg mencatat
data berkaitan pemilikan
mesin.
● Rekod bertulis yg mencatat
segala bentuk kerosakan &
kerja pembaikan yg telah
dijalankan.
● Rekod bertulis yg boleh
dianalisa untuk asas
pembelian baru.
● Rekod bertulis yg mencatat
kos @ perbelanjaan yg telah
dikeluarkan.
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ
E4101 / E4120
MAINTENANCE
Discussion
Ø In a group of 3, discuss
on how to produce a
good maintenance report
based on a maintenance
schedule.
HOME
™ﺷﻬﺮﻭﺍﻟﻨﻴﻈﺎﻡ