Anda di halaman 1dari 10

M.S.E.T.C.

L
EHV CONSTRUCTION CIRCLE,
132 KV LINE
Route length: Km say Km
Total locations:
132 KV towers:
N
+3m
2 deg.
15 deg.
30 deg.
60 deg.
SH(Z1,Z2,Z3 Z4)
Total :
SR.
NO.

DESCRIPTION

+6m

UNIT

+9m

QTY.

SUPPLY
ERRECTION
UNIT RATE AMOUNT UNIT RATE AMOUNT

1 Fabrcation ,Galvanising, Supply of


132 KV D/C towers 2deg,15deg,
30deg, 60deg,normal,with extention,
wirh stub, super structures, templets
step bolts, Ubolts, D shackales,
links etc..complete. as per Board's
approved drawing and design.
Wt. for super stucture & stub

M.T

65000.00

2 Supply of Galvanised Nut bolts


with spring wasers, plain washer.

M.T

80000.00

3 Survey:
a) Preliminary survey
b) Detail survey
c)Check Survey

KM.
KM.
KM.

4 Excavation of pits for tower footing


in earth soil of all types including
removing of excavated material
beyond tower limits up to 50 mtrs.
lead and all lifts.shoring, shutering,
prepearing bed for fdn.and back
filling with ramming etc. complete
as per drawing & direction of Engr.
in charge.
a) Normal soil
b) Hard murum/ Soft rock
c) B C soil/submerged soil
d) Dry fissured rock
e) Hard rock by chiseling

cum.
cum.
cum.
cum.
cum.

1500.00
3000.00
700.00

0
0
0

75.00
150.00
100.00
360.00
600.00

0
0
0
0
0

5 Stub setting in all types of soil with


help of template including
transportation of templates from

259843162.xls

Page 1

SR.
NO.

DESCRIPTION

stores to locations and locations to


locations. fixing in position with
stubs, leveling, alingment etc. as
per drawing and as directed by
engineer in charge.
a) 2 deg D/C
b) 15 deg D/C
c) 30 deg D/C
d) 60 deg D/C
e) 30 deg Hz

UNIT

QTY.

SUPPLY
ERRECTION
UNIT RATE AMOUNT UNIT RATE AMOUNT

nos
nos
nos
nos
nos

1000.00
1500.00
2000.00
2500.00
2000.00

0
0
0
0
0

6 Providing and casting in situ cement


concrete of mix 1:2:4 of trap metal
of std. Grade as per the
requirement including cost of
cement sand metal and water
encluding finishing coping and
curring complete as per the drawing
and directives of engr. in charge.

cum

3200.00

7 Providing and casting in situ cement


concrete of mix 1:3:6 of trap metal
of std. Grade as per the
requirement including cost of
cement sand metal and water
including finishing coping and
curring complete as per the drawing
and directives of engr. in charge.

cum

3000.00

8 Providing and fixing position of MS


bar reinforcement of various sizes
including supply of steel cutting,
bending,hooking, binding with wire
or tack welding etc.complete as per
drawing and as per direction of
engineer in charge.

MT

20000.00

9 Pipe type earthing including exca.


of pits/trenches, laying of earthing
strips,flats,pipes,supplying and
laying of salt and coke as per
drawing,and back filling in all
respect complete as per direction
of engineer in charge.

No.

3000.00

1000.00

No.

3000.00

1200.00

10 Counter Poise type earthing includ.


excavation of pits/trenches, laying
of earthwire and fitting plates to
tower legs as per the drawing and
back filling in all respect complete
as per direction of engineer in charge.

259843162.xls

Page 2

SR.
NO.

DESCRIPTION

11 Erection of towers with extensions &


tightening punching fixing of all tower
accessories and anticlimbing devices
including transportation of towers
from various stores to work site.
12 Benching
a) Normal soil / B C soil
b) H M / S R / F R
13 Protection of tower footing
i) Excavation for Fdn. of revetment
wall in alll types of soil ,
lead and all lifts.shoring, shutering,
as per drawing & direction of Engr.
in charge and construction of UCR
masonary (1:5) in cement mortar
with bottom pad of PCC 1:3:6 & top
seal cover (copping) with 1:2:4
concrete with weep holes at suitable
points & with back filling & levelling.
All activities are to be done as per
drg. & directives of field incharge.
iii)Filling in plinth with excavated or
borrowed soil beyond 50 mtrs
14 Tower accessories
a) Danger Board
b) Number Plate
c) Phase Plate RYB
d) Circuit Plate C1
e) Anticlimbing devices with BB
f) Bird guard
15 Electric tack welding for two
sections and painting.
a) For D/C Tower

UNIT

QTY.

SUPPLY
ERRECTION
UNIT RATE AMOUNT UNIT RATE AMOUNT

MT

2200.00

cum
cum

75.00
125.00

0
0

cum

1200.00

cum

100.00

nos
nos
set
set
set
set

165.00
130.00
250.00
250.00
2800.00
325.00

0
0
0
0
0
0

per
tower

included
in erction
of tower

1000.00

16 Insulators
a) 70KN
b) 120KN

nos
nos

500.00
610.00

0
0

17 Supply of conductor of 0.2 ACSR

kms

90000.00

18 Conductor hardwares
a) S.S.N.
b) D.S.N.
c) S.S.A.
d) D.S.A.
e) S.T N.
f) D.T.N.

set
set
set
set
set
set

850.00
1500.00
850.00
1500.00
1100.00
2500.00

0
0
0
0
0
0

259843162.xls

included in
stringing

included in
stringing

Page 3

SR.
NO.

DESCRIPTION

g) S.T.A.
h) D.T.A.

UNIT

QTY.

SUPPLY
ERRECTION
UNIT RATE AMOUNT UNIT RATE AMOUNT

set
set

1100.00
2500.00

0
0

19 Conductor accessories
a) M S Joints
b) Repair sleeve
c) P A Rod
d) Vibration dampers

set
nos
set
nos

270.00
80.00
370.00
230.00

0
0
0
0

20 Supply of 7/3.15 mm Earth wire

kms

17000.00

21 Earth wire hardwares


a) Tension clamps
b) Suspention clamps
c) M S joints
d) Earth bonds

set
set
nos
nos

250.00
250.00
100.00
250.00

0
0
0
0

included in
stringing

included in
stringing

22 Stringing of S/C conductor including


transportation of required material
from store to site locations, paving,
rough sagging , final sagging,
clipping,fixing of accessories,
hosting of insulators,jumpering,etc
complete as per the directives on
D/C tower

kms

21600

23 Stringing of Earth wire including


transportation of required material
from store to site locations, paving,
rough sagging , final sagging,etc.
complete as per the directives.

kms

6000

Total Rs.
Transportation 5 %
Insurance
1%
Sales Tax
4%

Total

0 Total II Rs.

10%

Total I Rs

Total I + II

3% conte.

TOTAL
(Total estimated amount is Rs.

10.75% cent

ESTIMATE
RS.

with centages)

259843162.xls

Page 4

SR.
NO.

DESCRIPTION

Prepared By,

J.E.
EHV-CC, Pune

UNIT

QTY.

SUPPLY
ERRECTION
UNIT RATE AMOUNT UNIT RATE AMOUNT

Checked by,

Recommended by,

DyEE
Executive Engineer
EHV-CC, Pune
EHV-CC, Pune

Superintending Engineer
EHV-CC, Pune

Approved

Chief Engineer,
EHV Const. Zone, Pune

259843162.xls

Page 5

SR.
NO.

DESCRIPTION

UNIT

QTY.

SUPPLY
ERRECTION
UNIT RATE AMOUNT UNIT RATE AMOUNT

0
0

259843162.xls

Page 6

Working sheet for weights of Towers &


nut-bolts for132 KV D/C towers:
Sr.
No.

Type of
tower

Qty. of
Tower

Wt. Of
tower
(MT)

Wt. Of
nut-bolts

Total
wt. Of
Towers

Total
wt. Of
nut-bolts

1 2 deg.
+3m extn.
+6m extn.
+9m extn.

2.653
0.39
0.813
1.415

0.102
0.016
0.03
0.54

0
0
0
0

0
0
0
0

2 15 deg.
+3m extn.
+6m extn.
+9m extn.

3.471
0.581
1.033

0.138
0.026
0.031

0
0
0

0
0
0

3 30 deg.
+3m extn.
+6m extn.
+9m extn.

3.725
0.682
1.257

0.139
0.025
0.034

0
0
0

0
0
0

4 60 deg.
+3m extn.
+6m extn.
+9m extn.

4.898
1.234
2.008

0.158
0.041
0.048

0
0
0

0
0
0

0
Say 285 MT

259843162.xls

0
11 MT

132 KV line

Statement for excavation, concreting and steel quantity.


Type

Total no.

N.S.

DFR

B.C.

20
15 0
30 0
60 0
30 0 Hz

Details of Normal foundations:


SR.
NO.

TYPE
OF
TOWER

TOTAL
QTY
REQD.

132 KV D/C
2 DEG
15 DEG
30 DEG
60 DEG

QYT.
QTY/TOWER FOR
CONSIDER
NORMAL FOUNDATION
FOR NORM EXCAVATION
CONCRATING
FDN.
1:3:6
1: 2 : 4
0
0
0
0

0
0
0
0

Total excavation qty.:

N.S.
SR

0
0

90%
10%

13.794
15.335
24.8
49.93

-----

TOTAL QTY.FOR
NORMAL FOUNDATION
STEEL EXCAVATION
CONCRATING
STEEL
1:3:6
1: 2 : 4

1.456
-2.269
-3.414
-5.11
-TOTAL QTY ----------

259843162.xls

0
0
0
0
0

----0

0
0
0
0
0

-----

Details of B.C. foundations:


SR.
NO.

TYPE
OF
TOWER

TOTAL
QTY
REQD.

QYT.
QTY/TOWER FOR
CONSIDER
BLACK COTTON SOIL
FOR BC
EXCAVATION
CONCRATING
FDN.
1:3:6
1: 2 : 4

TOTAL QTY.FOR
BLACK COTTON SOIL
STEEL EXCAVATION
CONCRATING
STEEL
1:3:6
1: 2 : 4

132 KV D/C
2 DEG
15 DEG
30 DEG
60 DEG

0
0
0
0

0
0
0
0

Total excavation qty.:

N.S.
B.C.

0
0

5%
95%

126.95
159.87
204.683
227.155

1.78
2.665
3.411
3.724

10.948
0.378
15.832
0.704
19.97
1.098
22.29
1.324
TOTAL QTY ----------

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

Details of DFR foundations:


SR.
NO.

TYPE
OF
TOWER

TOTAL
QTY
REQD.

QYT.
QTY/TOWER FOR
CONSIDER
D F R SOIL
FOR DFR EXCAVATION
CONCRATING
FDN.
1:3:6
1: 2 : 4

TOTAL QTY.FOR
D F R SOIL
STEEL EXCAVATION
CONCRATING
STEEL
1:3:6
1: 2 : 4

132 KV D/C:
2 DEG
15 DEG
30 DEG
60 DEG
30 DEG Hz

0
0
0
0
0

0
0
0
0
0

Total excavation qty.:

N.S.
FR
H.M/S.R.
H.R.

0
0
0
0

15%
55%
20%
10%

15.868
34.576
39.51
43.682
7.252

------

4.904
-13.64
-7.854
-14.864
-2.21
TOTAL QTY ----------

259843162.xls

0
0
0
0
0
0

-----0

0
0
0
0
0
0

-----0

Total excavation quantities:


N.S.
B.C.
SR/HM
FR
HR

0
0
0
0
0

Say
Say
Say
Say
Say

325
1220
345
950
175

Cum
Cum
Cum
Cum
Cum

Total 1:2:4 concrete

Say 655 Cum

Total 1:3:6 concrete

Say 20 Cum

Total reinforcement

Say 5.6 MT

259843162.xls

Anda mungkin juga menyukai