SUMMARY
IDENTIFIKASI BAHAYA PEKERJAAN PADA DAERAH
BERTEGANGAN SWITCHYARD 150 kV DENGAN
PENDEKATAN JOB SAFETY ANALYSIS (JSA) DAN
HAZARD IDENTIFICATION RISK ASSESSMENT AND RISK
CONTROL (HIRARC) (Studi Kasus: PT. PJB Unit Pembangkitan Gresik)
HAZARD IDENTIFICATION WORKING AT VOLTAGE AREA
SWITCHYARD 150 kV APPROACH BY JOB SAFETY
ANALYSIS (JSA) AND HAZARD IDENTIFICATION RISK
ASSESSMENT AND RISK CONTROL (HIRARC)
(Case Study: PT. PJB Unit Pembangkitan Gresik)
Novi Marhaendra
Created by PUTRANTO, NOVI MARHAENDRA
Subject

: manajemen risiko

Subject Alt

: Risk management

Keyword :

: maintenance ; switchyard 150 kV ; Job Safety Analysis (JSA) ; Hazard Identification Risk
Assessment and Risk Control (HIRARC) ; unsafe action ; alat pelindung diri (APD)

Description :
Switchyard di PT. PJB UP Gresik berfungsi sebagai tempat peletakan peralatan listrik bertegangan dari pembangkit
yang akan disalurkan ke pelanggan atau disebut dengan gardu induk terbuka/konvensional. Switchyard mempunyai
potensi bahaya yang sangat besar saat melakukan perawatan seperti tersengat arus listrik dari kabel line yang
bertegangan sehingga dapat menimbulkan kematian. Switchyard dapat menghantarkan tegangan dengan kapasitas 150
kV. Resiko dari kegiatan perawatan switchyard dapat diminimalkan dengan pembuatan preventive maintenance.
Penelitian ini membahas perencanaan kegiatan perawatan dengan metode Job Safety Analysis (JSA) dan penilaian
resiko berdasarkan pada matriks resiko. Perhitungan kualitatif diberikan untuk menentukan perawatan optimal agar
meminimalkan kecelakaan dari para pekerja dan peralatan, sehingga proses perawatan switchyard berjalan lancar.
Sedangkan Hazard Identification Risk Assessment and Risk Control (HIRARC) digunakan untuk mengidentifikasi
bahaya pada saat maintenance switchyard 150 kV. Dalam pembuatan JSA menunjukkan bahwa faktor yang berasal dari
unsafe action dan penggunaan APD yang tidak tepat dapat mengganggu proses produksi PT.PJB UP Gresik. Penilaian
resiko menunjukkan bahwa perawatan yang perlu mendapatkan prioritas dalam pekerjaannya adalah saat kondisi
penormalan tegangan. Saat penonaktifan
PMS Ground nilai resiko yang diberikan adalah 3 (likely) untuk K (tingkat kemungkinan) dan 3 (extremely harmfull)
untuk D (tingkat keparahan) sehingga nilai resikonya 9 (intolerable). Bahayanya yang dapat terjadi yaitu tersengat listrik
arus AC peralatan. Risiko bahayanya yaitu dapat menyebabkan luka bakar dan menyebabkan kematian. Analisa resiko
berdasarkan HIRARC menunjukkan bahwa hampir semua kegiatan dari pelepasan, perawatan dan penormalan tegangan
memiliki resiko yang tinggi (high).

Description Alt:
Switchyard at PT. PJB UP Gresik functions as place of electric instrumental situating get tension of generating who will
be channelled to customer or called by gardu induk is opened / conventional. Switchyard having lurching potency that
greatly while do care as aculeated as electric current of cable line one that gets tension so get to evoke death. Switchyard
having capacity delivers tension reach 150 kV. Risk of care activity switchyard can at minimization with makings
preventive maintenance. This research work through care activity planning by methodics Job Safety Analysis (JSA) and

Page 1

risk estimation up on risk matrix. kualitative\\\'s count is given to determine that optimal care minimization accident of
employs and equipment, so care process switchyard well-oiled. Meanwhile Hazard Identification Risk Assessment and
Risk Control (HIRARC) utilized to identify danger upon maintenance switchyard 150 kV. Up on makings JSA points
out that one can trouble production process from PT. PJB UP Gresik which is factor which comes from unsafe action
that own and imprecise APD purpose. Risk estimation points out that care that needs to get priority in its work is while
tension normalization condition. While non-actived PMS Ground assess risk that is given is 3 (likely) to (possible zoom)
and 3 (extremely harmfull) to (very danger) so its risk point 9 (intolerable). Breakdown of danger which is aculeated
AC\\\'s current electricity equipment. Its danger risk which is gets to cause singe and causes death. Risk analysis bases
HIRARC points out that nearly all activity of release, care and tension normalization have tall risk (high).

Contributor

: Edy Prasetyo Hidayat, ST. MT

Date Create

: 25/08/2010

Type

: Text

Format

: pdf

Language

: Indonesian

Identifier

: ITS-Undergraduate-3100010040958

Collection

: 3100010040958

Call Number

: RSPP 658.155 Put i

Source

: Undergraduate Thesis, Occupational Safety and Health Engineering, RSPP 658.155 Put i, 2010

COverage

: ITS Community

Right

: Copyright @2010 by ITS Library. This publication is protected by copyright and per obtained
from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form
or by any means, electronic, mechanical, photocopying, reco For information regarding
permission(s), write to ITS Library

Full file - Member Only


If You want to view FullText...Please Register as MEMBER

Contact Person :
Administrator (timit_perpus@its.ac.id)
Taufik Rachmanu (taujack@its.ac.id)
Dewi Eka Agustina (dee@its.ac.id)
Ansi Aflacha Putri (ansi@its.ac.id)
Tondo Indra Nyata (tondoindra@gmail.com)
Aprillia Tri Wulansari (rezha_la2@ymail.com)
Moh. Fandika Aqsa (fandikaaqsa@yahoo.co.id)

Thank You,

Nur Hasan ( hassane@its.ac.id )