Enel Group
Document
PROJECT
P12QR07003
of
TITLE:
CLIENT:
JOB no :
Doc. no.
Employer submittal
System :
00A
50
-------------------------------------
for approval
Document type :
not requested
PG
Discipline :
File : P12QR07003-00
REV
REVISION DESCRIPTION
.
0A
First Draft for EPFI Consortium Agreement
0B
0C
(a)
August
2001
QA/QC Coordinator
REV
DATE
PREPARED BY
QAM
FI
COOPERATIONS
(a)
QAM
EP
PM / FI
PM / EP
CHECKED
Project Director
APPROVED
ES
Issue
Scope
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
of
50
INDEX OF CONTENT
GENERAL............................................................................................3
1.1 Scope............................................................................................3
1.2 Definitions and Abbreviations.........................................................3
1.3 Approval/Authorization...................................................................4
1.4 Distribution and Control.................................................................5
TYPES OF IDENTIFICATION...................................................................6
PROCESS-RELATED IDENTIFICATION......................................................7
3.1 Breakdown Level 0 - TOTAL PLANT..................................................7
3.2 Breakdown Level 1 - SYSTEM..........................................................7
3.3 Breakdown Level 2 . EQUIPMENT UNIT.............................................9
3.4 Breakdown Level 3 - COMPONENTS...............................................10
LOCATION IDENTIFICATION.................................................................13
5.1 Breakdown Level 0 (Total Plant)....................................................13
5.2 Breakdown Level 1 (Structure code)..............................................13
5.3 Breakdown Level 2 (Room code)....................................................14
10
ATTACHMENT..................................................................................24
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
GENERAL
1.1
Scope
Document
P12QR07003
Rev. 0
on
August 01
Sheet
of
50
The companies Enelpower S.p.A. and Fisia Italimpianti S.p.A. have constituted a Consortium, hereinafter
named EPFI Consortium, and will jointly co-operate for the realization of Ras Laffan Power and Desalination
Project, an approximately 750 MW Combined Cycle Power Plant and a 40 MIGD Desalination Plant,
associated with relevant facilities, at Ras Laffan Industrial Area, QATAR.
This Project Procedure, according to the provisions set forth in the Project Quality Plan, defines the
identification system for equipment and components constituting both the power plant and the desalination
plant of Ras Laffan Project. The system adopted is based on KKS.
1.2
1.2.1
The definition of common terms are set forth in the Engineering, Procurement and Construction Contract
EPC Contract as per clause 1. Hereinafter the more used definitions are reported.
Client
means the KAHRAMAA Qatar General Electricity and Water Corporation and
any successor or assignee of KAHRAMAA including any pursuant to a novation to a
new entity or entities assuming certain obligations of KAHRAMAA in respect of power
and water in Qatar. KAHRAMAA has issued a request for the development,
construction and operation of the Ras Laffan Project on IPWP basis, that includes the
turn-key EPC Contract.
Employer
means AES Oasis Energy Inc. a company incorporated under the laws of DUBAI
having its postal address at P.O. Box 62843, DUBAI - United Arab Emirates, and its
legal successors in title.
Lenders
means the Banks and/or Financial Institutions and/or other persons that are party to
any of the Financing Agreement.
Engineer
means the Technical Adviser, if any, appointed by the Lenders to act as Engineer for
the purposes of the EPC Contract and designated and notified to the EPC Contractor.
Engineers Representative
means any representative of the Engineer appointed from time to
time by the Engineer.
EPC Contractor
means the Consortium EPFI between Enelpower SpA and Fisia Italimpianti SpA
whose tender has been accepted by the Employer and whom has been awarded the
EPC Contract for the Ras Laffan Project implementation.
EPC Contract
means the agreement between Employer and the EPC Contractor for the execution of
the Ras Laffan Project incorporating the Clauses from 1 to 51 (inclusive), the
Schedules and Appendices (including the Outline Design Specification) and all
Technical Documentation prepared by the EPC Contractor complying with the
requirements of Technical Documentation and Information (EPC Contract clause 21)
to be submitted to the Employer.
Plant
means a gas/oil fuelled combined cycle power generating and desalinated water
producing plant with a designated electric generating capacity of 750 MW and with a
designated desalinated water production capacity of 40 MIGD to be constructed at
Ras Laffan Industrial Area, QATAR as an integrated whole, comprising the Power
Facilities and the Desalination Facilities, whether taken-over or at any stage of
development and construction as part of the Works, including, regardless of the level
of development. Land, buildings, engineering and design documents, all energy
producing equipment and its auxiliary equipment, fuel storage and receiving and
handling facilities and equipment, Metering System, waste treatment and disposal
facilities, Interfaces and Terminal Points and all other installations.
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
of
50
means the land, spaces, waterways, roads, wells and any rights acquired or to be
acquired by the Employer at or in the region of Ras Laffan, QATAR for the purpose of
the Plant, through or below the ground in which the Works are to be carried out
including, those areas on which no part of the Plant is to be permanently laid-out or
constructed but which are provided or made available by the Employer for the EPC
Contractors use, including villages, townships and camps for the accommodation of
employees, offices, storage of the EPC Contractors equipment or assembly or prefabrication, all rights-of-way and access from public highways, and seaward access if
applicable as specified in the Outline Design Specification.
Sub-Contract
means any contract for any part of the Works awarded by the EPC Contractor to a
Subcontractor in accordance with the Contract.
Key Procurement Sub-Contracts means those Sub-Contracts to be entered into for the provision of the
specific item detailed in Schedule 12.
Subcontractor
means any person, including Vendors and Suppliers, to whom the EPC Contractor
has sub-contracted any part of the Works pursuant to a Subcontract.
Works
GTG Block
means the assembly consisting of : one GT with relevant Generator, their auxiliary
and associated systems for the simple cycle operation.
Power Block
means the assembly consisting of : two GTG Blocks, their HRSGs, one ST with
relevant Generator, associated systems and any other auxiliaries.
Facility
means the assembly consisting of : two Power Blocks, four desalination units and one
remineralization plant.
Dependable Capacitymeans the generating capacity expressed in MW of the GTG Block, Power Block,
Facility (power) and the gross water production expressed in m 3/day of the Facility
(water) at the reference conditions available at the delivery points.
1.2.2
AES
EPFI
EP
FI
Abbreviations
AES Oasis Energy Inc.
Enelpower Fisia Italimpianti Consortium
Enelpower SpA
Fisia Italimpianti SpA
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
QP
PE
PM
QA
QC
1.3
Approval/Authorization
Document
P12QR07003
Rev. 0
on
August 01
Sheet
of
50
This Project Procedure has been prepared by the Enelpower QA Project Coordinator, reviewed by the
Consortium Partner QA Managers, checked by the two Project Managers, and approved by the Project
Director.
1.4
The Project Procedure is distributed according the following distribution list. Holders of Project Procedure
copies are responsible for its circulation, together with project specific procedures, within their
departments/discipline and ensure that all personnel working on Ras Laffan Project are familiar with the
contents.
Enelpower Project Key Personnel
Project Director
Project Manager
Project Engineer
Project Control Coordinator
Procurement Coordinator
QA/QC Coordinator
Site Manager
Construction Manager
Commissioning Manager
H&S Coordinator
Site Archive Section
Project Manager
Project Engineer
Project Planner
Procurement Coordinator
QA Coordinator
QC Coordinator
Material Coordinator
Site Manager
Commissioning Manager
H&S Coordinator
Site Archive Section
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
1 copy
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
Document
P12QR07003
Rev. 0
on
August 01
Sheet
of
50
TYPES OF IDENTIFICATION
hierarchically structured format with 4 breakdown levels (0 to 3) and fixed alphanumeric data character;
separate identification methods with engineering discipline specific rules by means of an uniform code
format for the three types of identification:
Process-related code
Process-related identification of systems and items of equipment according to their functions in
mechanical, civil, electrical, control and instrumentation engineering.
Point of installation code
Identification of point of installation of electrical, control and instrumentation devices in installation
units (e.g. in cabinets, panels, consoles, racks, etc.)
Location identification
Identification of location in structures, on floors and in rooms and also of free areas and
topographical stipulations (surface area grid)
These three types of code use the same identification scheme, which is subdivided into the following
breakdown levels.
Breakdown Level
Title of Breakdown
Level
Total Plant
Function
Equipment
Unit
Component
The titles of the breakdown levels for the three type of codes will be as follows:
Process-related
Identification
Total Plant
System Code
Point of installation
Identification
Total Plant
Installation
Unit Code
Total Plant
Location Identification
Structure Code
Equipment
Unit Code
Component
Code
Installation
Space Code
Room Code
Prefix symbol
Breakdown symbol
NOTES:
- The prefix symbols is normally omitted if the information content of the codes remain unambiguous.
- No breakdown level 3 shall be used for point of installation and location identification.
- The full stop breakdown symbol for point of installation identification shall always be written.
- Format and data characters for each field of the three identification types are defined in the following
chapters.
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enelpower
Enel Group
Document
P12QR07003
Rev. 0
on
August 01
Sheet
of
50
PROCESS-RELATED IDENTIFICATION
The Identification Code is divided into different breakdown levels with different meanings, from left to right
in increasing order, starting from the Total Plant up to the Component.
In this way, depending on the kind of level (Plant, Function, Equipment Group, Process Equipment)
complete or part of the identification code can be used.
The structure of the identification code is the following, normally only up to the level 2 is used. Level 3 and
the field A3 of level 2 will be used only if required a complete unique identification at component level.
only if required
Breakdown level
TOTAL PLANT
FUNCTION / SYSTEM
EQUIPMENT UNIT
COMPONENT
Data designation
Character type
F0
F 1F 2F 3
FN
A 1A 2
AN
A3
B 1B 2
BN
AAA
NN
AA
NNN
AA
NN
Where:
Prefix symbol () for
Process-related code
Project Plant identification
Project Plant Unit
System classification
System numbering
Equipment Unit classification
Equipment Unit numbering
Equipment Unit additional code
Component classification
Component numbering
() The prefix symbol may be omitted if the code remain unique (when the point of installation code is not used).
The prefix symbol = is used for process related identification; for point of installation and location identification, the prefix
symbol to be used is + , see next chapters.
3.1
It represents the code of the major parts in which the overall Ras Laffan Project is subdivided.
For Ras Laffan Power and Desalination Project shall be:
Common parts to the overall Project
0
Power Plant
1
Desalination Plant
2
Common Ancillaries
9
3.2
It is divided in two parts: the first (F 0) for the identification for the plant unit group; the second (F 1F2F3 + FN)
for the identification of the systems, subsystems and building structures and for subdivision and numbering
of subsystems pertaining to the same system.
Enelpower
Enel Group
3.2.1
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
of
50
If two or more identical systems are to be identified in an entire plant (e.g. 4 HRSG plants, 4 Gas Turbines,
4 GT Generators, 2 Steam Turbines, 4 Desalination Units etc.) these are distinguished by means of the plant
unit group (prefix F0).
Systems common to the plants are identified with the plant unit group (prefix F 0) =0 (zero).
Each plant unit group only applies in the area of the function concerned and always relates to alphabetical
digits (F1 F2) following it.
The codes to be used for Plant Unit Groups are the following.
Plant
"G"
Unit
"F0"
Total Plant
Common Systems
Total Plant
Ancillaries
Power Plant
Common Systems
Gas Turbine 1
1 1 MB_
HRSG 1
1 1 H__
GT Generator 1
1 1 MK_
Step Up TR 1
1 1 BAT
Gas Turbine 2
1 2 MB_
HRSG 2
1 2 H__
GT Generator 2
1 2 MK_
Step Up TR 2
1 2 BAT
Gas Turbine 3
1 3 MB_
HRSG 3
1 3 H__
GT Generator 3
1 3 MK_
Step Up TR 3
1 3 BAT
Gas Turbine 4
1 4 MB_
HRSG 4
1 4 H__
GT Generator 4
1 4 MK_
Step Up TR 4
1 4 BAT
Steam Turbine 1
1 5 MA_
ST Generator 1
1 5 MK_
Step Up TR 5
1 5 BAT
Steam Turbine 2
1 6 MA_
ST Generator 2
1 6 MK_
Step Up TR 6
1 6 BAT
Power Plant
Ancillaries
Desalination Plant
Common Systems &
Remineralization Plt.
Desalination Plant
Unit 1 Systems
Desalination Plant
Unit 2 Systems
Desalination Plant
Unit 3 Systems
Desalination Plant
Unit 4 Systems
Enelpower
Enel Group
3.2.2
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
of
50
The three alphabetical characters of this breakdown level are used to identify the Main Groups F 1, the
Groups F2 and the Subgroups F 3 of systems and building structures; relevant codes are listed in the
Attachment 1.
The structure of this field may vary its length starting from 1 digit for the main groups, up to 3 digit for the
subgroups or structures. For the main groups and groups of systems the code fields concerning the missing
digits are really filled with the blank character (_), e.g. the main group POWER TRANSMISSION AND
AUXILIARY POWER SUPPLY is identified with the code B__, and the group STEAM TURBINE PLANT is
identified with the code MA_.
Codes used for the Main Group F 1 are the following:
A Grid and Distribution System
B Power Transmission and Auxiliary Power Supply
C Instrumentation and Control Equipment
E Conventional Fuel Supply and Residues Disposal
G Water Supply and Disposal
H Conventional Heat Generation
L
Water, Steam, Gas Cycle
M Main Machine Set
N Process Energy Supply for External Users
P Cooling Water System
Q Auxiliary Systems
S Ancillary Systems
U Structures
X Heavy Machinery
Z
Workshop and Office Equipment
3.2.3
The two numerical digits (F N) are of no significance as far as classification is concerned, but number and
subdivide the subsystem coded within the alphabetical digit (F 3).
In order to guarantee univocal numbering for all the items included within the power block systems for which
more than one Supplier is responsible (i.e. steam, water and so on)), the numbering code field can be
divided and settled in ranges: this subdivision must be part of an agreement.
3.3
The first two alphabetical characters (A 1A2) are used to identify apparatus, equipment, circuits, etc.
For the main groups of the Equipment Units (A 1)shall be used the following codes :
A Equipment Units (mechanical)
B Apparatus (mechanical)
C Direct measuring circuits
D Closed loop control circuits
E Analog and binary signal conditioning
F
Indirect measuring circuits
G Electrical equipment
H Subassemblies of main and heavy machinery
The codes for the secondary groups (A 2) are defined in the Attachment 2.
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
10
of
50
3.4
This breakdown level identifies components of the Equipment Unit (e.g. switches, pushbuttons, relays etc.);
the code is made up by two alphanumeric characters and by two numeric digits.
The first alphanumerical character, as well as for Level 2, identify the Main Groups of Components for which
shall be used the following codes:
K Mechanical components
M Mechanical components
Q Instrumentation and control components
Electrical components
X Signal origins
Y Signal applications
The codes for the secondary groups are defined in the Attachment 3.
The last two numerical digits are used, if necessary, for counting.
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
Document
P12QR07003
Rev. 0
on
August 01
Sheet
11
of
50
The Codes to be used for identification of the point of installation of electrical, control and instrumentation
devices mounted in installation units (e.g. cabinets, racks, panels, consoles, etc.) are structured in the
following three levels.
Breakdown level
Data designation
Character type
TOTAL PLANT
INSTALLATION UNIT
INSTALLATION SPACE
F0
F 1F 2F 3
FN
A 1A 2
AN
A3
AAA
NN
A(A)
(N)(N)N
(A)
where:
Prefix symbol for point
of installation code
Project Plant identification
Project Plant
Unit
Installation Units classification
Installation Units numbering
Breakdown symbol full
stop
Installation space code
Vertical subdivision
(rows)
Installation space code
Horizontal subdivision (columns)
Additional code for installation space identification
The array of characters used for installation point identification shall always include the prefix symbol +
and the breakdown symbol full stop. The digits of level 2 between parenthesis may be omitted if not
necessary.
4.1
This field assumes the same value as defined for process-related identification.
For Ras Laffan Power and Desalination Project shall be:
Common parts to the overall Project
0
Power Plant
1
Desalination Plant
2
Common Ancillaries
9
4.2
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
12
of
50
A
Grid and distribution system
B
Power transmission and auxiliary power supply
C
Instrumentation and control equipment
Coding letters and designation to be used for the characters F 1F2F3 are listed in Attachment 1.
The third part (F N) is constituted by two numerical digits used for numbering subdivision of installation units,
starting from 01 up to 99 (redundant zeros shall be written).
Numbering subdivision begins anew every time one of the preceding codes F 0 or F1F2F3 change.
4.3
Installation space is identified by mean of the associated planar coordinates of installation unit place where
devices are installed.
It is constituted by a vertical coordinate (field A 1A2) identifying the installation row and by a horizontal
coordinate (field AN) identifying the installation column in which the unit has been subdivided.
The field A3 is normally not necessary and is used only when further subdivision, e.g. spatial distribution,
shall be added for a unique identification.
Code A1A2 is an alphabetical array of one or two digits, normally only one digit is used starting from letter
A.
Code AN is a numeric array from one up to three digits, as necessary, depending on the number of columns
to be identified. Up to 9 columns only one digit is used; if two or three digits are used the redundant zeros
shall be written (e.g. 01, 02 ; 001, 002, ).
Code A3 is an alphabetical digit; when used the counting starts from letter A up to Z.
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
Document
P12QR07003
Rev. 0
on
August 01
Sheet
13
of
50
LOCATION IDENTIFICATION
The Codes to be used for location identification in structures, on floors, in rooms and for fire areas are
structured in the following three levels.
Breakdown level
TOTAL PLANT
STRUCTURE CODE
ROOM CODE
Data designation
Character type
F0
F 1F 2F 3
FN
A 1A 2
AN
A3
AAA
NN
(A)
(N)NN
(A)
where:
Prefix symbol for location code
Project Plant identification
Project Plant Unit
Structure Classification
Floor Numbering
Room classification
Room Numbering
Additional code for room number subdivision
As per installation point, the array of characters used for location identification shall always include the
prefix symbol +, on the contrary the breakdown symbol full stop is not used. The digits of level 2 between
parenthesis may be omitted if not necessary for unique identification.
Location identification will be applied only to the buildings and rooms where the KKS classified equipment or
components will be installed. Location identification for Logistic and General Service Structures will not be
used.
5.1
This field assumes the same value as defined for process-related identification.
For Ras Laffan Power and Desalination Project shall be:
Common parts to the overall Project
0
Power Plant
1
Desalination Plant
2
Common Ancillaries
9
5.2
Structures
The third part (FN) is constituted by two numerical digits used for numbering subdivision of structures into
floors, storeys, platforms, elevations, etc., starting from 01 up to 99 (redundant zeros shall be written).
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
14
of
50
The direction of numbering is vertical, from the lowermost floor to the upwards.
Numbering subdivision begins anew for each structure.
5.3
The room code is used to identify physically separated or fictitious rooms and place in structures and
Station areas.
It is constituted by the following three fields code:
Code A1A2 is an alphabetical array of one digit for the room or place classification; the following letters shall
be used:
R = Room physically separated
F = Fictitious room
S = Fire area
Code AN is a numeric array of two or three digits, as necessary, depending on the number of rooms/places
to be identified. Up to 99 rooms/places only two digits are used. The redundant zeros shall be written (e.g.
01, 02 ; 001, 002, ).
The field A3 is normally not necessary and is used only when further subdivision of room number is needed.
Code A3 is an alphabetical digit; when used the counting starts from letter A up to Z.
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enelpower
Enel Group
6.1
Document
P12QR07003
Rev. 0
on
August 01
Sheet
15
of
50
The automation system is divided into functional groups/subgroups according to functionally associated
process sections.
The structure of the automation functional groups is showed in the following figure 6.1 and is made by :
Level 0 Total Plant
(see 3.1);
Level 1 - Function / System
(see 3.2), where:
the field F1F2F3 identifies the process system as defined in Attachment 1;
the field FN, to be used as appropriate, identifies and numbers the systems and subsystems
coded with the last digit F 3 .
Level 2 Group / Subgroup Control
(see 3.3), where:
the field A1A2 identifies group or subgroup control as defined in Attachment 2;
the field AN is used to number group and subgroup control;
the field A3 is used as additional digit, if necessary, to number group and subgroup control
(normally is omitted).
Figure 6.1
0
Total Plant
Function / System
Group Control
F0
F1 F2 F3
FN
AAA
NN
A1A
2
AA
AN
A3
NNN
(A)
In the following figure is represented a typical situation for automation system functional groups and
sub-groups identification.
1 2 LAC 01 EB 001
Feedwater pumps
Group Control
e.g.
1 2 LAC 01 EC 001
1 2 LAC 01 EC 002
1 2 LAC 01 EC 003
1 2 LAC 01 EC 004
LAC 01 EB001
LAC 01 EC001
6.2
Component identification
The process-related identification of the plant coding system KKS forms the base of the classification and
identification of all control and instrumentation components.
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enelpower
Enel Group
Document
P12QR07003
Rev. 0
on
August 01
Sheet
16
of
50
ELECTRONIC ROOM
CONTROL ROOM
All control room boards, consoles, video stations, computer units, printer
units will be identified. All control and instrumentation components mounted
on the control room boards will also be identified.
The structure of the component identification code is showed in the following figure 6.2 and is made by:
Level 0 - Total Plant
(see 3.1);
Level 1 Function / System (see 3.2);
Level 2 - Equipment Unit
(see 3.3);
Level 3 - Component
(see 3.4).
Figure 6.2
0
Total Plant
Function / System
Equipment Unit
Component
F0
F1 F2 F3
AAA
FN
A1A
AN
NN
AA
NNN
A3
B1 B2
BN
(A)
AA
Function / System
The Equipment Unit Code (A 1A2 AN A3) identifies electrical and control component, such as: open-loops,
closed loops, measuring loops. The equipment unit code is defined normally according to P&IDs.
For the alphabetical field A1A2 shall be used the following codes.
a) The use of character A1
C
D
Density
Electrical variables (e.g. current, voltage, power, frequency)
Flow
Position
Level
Pressure
Analysis (conductivity, humidity)
Enelpower
Enel Group
S
T
U
Y
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
17
of
Speed, acceleration
Temperature
Combined variable (multipoints recorder) and other variables
Vibration, expansion
Process Component
The Process Component (B1B2 BN) fields identify single component within control loop ( if necessary).
For the alphabetical field B1B2 shall be used the following codes.
a) The use of character B1
Q Instrumentation and control component (non-electrical)
Electrical components
b) The use of character B2
b1
Instrumentation and control component (non electrical)
QP Measuring instrument, testing equipment (pressure gauge, thermometer, level indicator)
QN Positioner for control pneumatic valve (if its necessary to identify)
QB Sensors metering orifices
QT Thermo-wells
b2
Electrical components
- B Traducers for non-electrical to electrical variables and vice versa
- D Digital switches
- P Control room conventional measuring instrument
- S Switches, selectors, hand stations
- U Converters from electrical to other electrical variables (e.g. temperature transmitter)
- Y Power switch, solenoids.
b2.1
Range application -B
-B01 Two wires analogical transmitter
-B10 Four wires analogical transmitter (supply + signal)
-B40 Current to pressure converter (I/P)
-B50 Single thermocouple
-B60 Double thermocouple
-B70 Single resistance thermometer
-B80 Double resistance thermometer
b2.2
Range application -D
-D01 Process switch element with 1 SPDT contact
-D11 Process switch element with 2 SPDT contacts
-D22 Limit switch for open valve
-D25 Limit switch for intermediate position
-D32 Limit switch for close valve
b2.3
Range application -P
-P01 Indicator tile (current motor or valve position)
-P02 Single indicator
-P03 Digital indicator
-P11 Multiple indication station
-P21 Two or three pens recorder
-P22 Multi-points recorder
-P30 Totalizers
b2.4
Range application -S-S01 Signalling and command tile for motor
-S02 Signalling and command tile for pneumatic valve/solenoid
50
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enelpower
Enel Group
-S15
-S20
-S21
-S24
-S32
-S33
-S34
-S36
-S50
-S51
-S52
-S70
-S71
-S82
-S90
b2.5
-Y01
-Y10
-Y50
b2.6
-U01
6.3
Document
P12QR07003
Rev. 0
on
August 01
Sheet
18
of
50
Signal identification
every signal that requires the planning of the electrical wiring and thus all of the interface signals with
the terminal board;
all of the information that will be displayed to the operator by the advanced interface operator;
all the information from/to other control system (local package) by serial link.
In the development of the functional planning of the automation system the signal code extension will be
omitted and reference to typical connection diagrams will be marked.
The structure of the signal identification code is showed in the following figure 6.3 and is made by :
Level 0 - Total Plant
(see 3.1);
Level 1 Function / System
(see 3.2);
Level 2 - Equipment Unit
(see 3.3);
Level 3 - Signal Designation Code (see 6.3.3).
Figure 6.3
0
Total Plant
Function / System
Equipment Unit
Signal Code
F0
F1 F2 F3
AAA
FN
A1A
AN
NN
AA
NNN
A3
B1 B2
BN
(A)
AA
(signal direction)
signal range
signal number
6.3.1
Function
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
6.3.2
Document
P12QR07003
Rev. 0
on
August 01
Sheet
19
of
50
Equipment Unit
The Equipment Unit fields (A 1A2 AN) identify electrical and control components as defined in 3.3.
6.3.3
Signal Designation
The signal direction, if required for a unique signal identification, is identified using the field (A 3) of
Equipment Unit level.
The (B1B2 BN) fields are used to identify single signal within automation and control systems.
For the alphabetical field B1B2 shall be used the following codes.
a)
The use of the character B1
X Input signal to automation system (Signal origins)
Y Output signal from automation system (Signal applications)
b)
The use of the character B2
A Functional group control / sub-loop control
B Control interface
C Closed-loop control
G Digital signal from instrument (only as XG-Signal)
H Binary limit signals derived from analog process signals (only as XH-Signal)
J
Signals from non-standard areas
K Equipment unit / component protection
L
Control room and control stations signals not assigned to specific control systems
M Higher level static individual and group alarm signals (only as XM-Signal)
N Video commands
P Video supervision
Q Analog signal
S Functional group control step signals (only as XS-Signal)
T
Turbine Generator I&C
V Free logic signals (only as XV-Signal)
W Hard wired alarm
Using of signals shall be identified as per DCS manufacturer standard.
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enelpower
Enel Group
Document
P12QR07003
Rev. 0
on
August 01
Sheet
20
of
7.1
50
The code for the pipelines identification is made up by the Plant and the Function / System codes (level 0
and 1) as defined in the previous chapter 3 and a level 2 code that identifies the line number.
Breakdown level
TOTAL PLANT
FUNCTION / SYSTEM
LINE NUMBER
Data designation
Character type
7.1.1
F0
F 1F 2F 3
FN
A 1A 2
AN
AAA
NN
AA
NNN
Line number
The code is made up by two alphabetical characters (A 1A2) that identify the equipment, and three numeric
digits (AN) for the line counting.
The following examples show types of pipeline identification codes for Power Plant and for Desalination
Plant.
Data designation
F0
F 1F 2F 3
FN
A 1A 2
AN
Power Plant
LBA
20
BR
026
Desalination Plant
GDK
10
BR
010
7.2
Line attributes
Line attributes are additional information following the line identification code, that are not part of the line
identification code but are useful to give the complete characterization of the line.
Line attributes are represented by mean of the level 3 of function-related code as follow:
Breakdown level
TOTAL PLANT
FUNCTION / SYSTEM
LINE NUMBER
LINE ATTRIBUTES
Data designation
Character type
F0
F 1F 2F 3
FN
A 1A 2
AN
B1
B2
AAA
NN
AA
NNN
NNNN
A (N)
Where:
B1 = Line Diameter
B2 = Piping design specification
On drawings line attributes are printed close to the pipeline identification code.
7.2.1
Line diameter
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enelpower
Enel Group
Document
P12QR07003
Rev. 0
on
August 01
Sheet
21
of
50
Line diameter code (B1) shall be indicated following line number, and is made up to four numeric digits that
represent the nominal diameter in millimeters.
7.2.2
Piping design specification code (B 2) is made of one or two alpha-numerical digits and assume the same
values used in the piping design specification to identify design conditions, mechanical characteristics and
class of the piping.
For Power Plant is constituted by one alphabetic digit starting from A letter and is related to the level 1
Function / System code (F 1 F2 F3).
For Desalination Plant is constituted by two digits, one alphabetical plus one numerical, referring to the
piping class used
Examples for line attributes identification are the following.
Data designation
Power Plant
F0
F 1F 2F 3
FN
A 1A 2
AN
B1
B2
LBA
20
BR
026
80
The example is related to a ND 80 mm pipe, pertaining to the Power Plant Section 1 Main Steam System, which piping design specification is LBA-B
Desalination Plant
GDK
10
BR
010
1600
D2
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
Document
P12QR07003
Rev. 0
on
August 01
Sheet
22
of
8.1
Cables
50
The structure of the cables identification code is based on process-related code with a numbering part as
per the following:
Breakdown level
Data designation
Character type
TOTAL PLANT
FUNCTION / SYSTEM
EQUIPMENT UNIT
CABLE
F0
F 1F 2F 3
FN
A 1A 2
AN
B1
BN
B2
AAA
NN
AA
NNN
NNN
Where:
Level 0 - Total Plant
(see 3.1);
Level 1 - Function / System
(see 3.2);
Level 2 - Equipment Unit
(see 3.3);
For level 1 and level 2 will be used the following codes:
Power Plant
code of equipment connected;
Desalination Plant
code of switchgear module
Level 3 Cable Identification
The cable identification code is made by the following fields:
B1 = one alphabetical digit for vertical subdivision
this field is optional; when vertical subdivision is not operated the field assume the value #
BN = four numeric digits for cable numbering and used for grouping in respect of cable application area.
Redundant zeros must be written in order to make effective the grouping. (e.g. : #0003; #2015; etc.)
B2 = one alphabetical digit to identify redundant or parallel cables
The first digit of BN field, used to identify the cable application area, assumes the following values:
Numbering Range
0001 0999
1000 1999
2000 3999
4000 7999
8000 8999
9000 9999
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enelpower
Enel Group
8.2
Document
P12QR07003
Rev. 0
on
August 01
Sheet
23
of
50
Cable Raceways
The structure of the cable raceways identification code is based on process-related identification of
structures including outdoor areas, as per the following:
Breakdown level
Data designation
Character type
TOTAL PLANT
FUNCTION / SYSTEM
CABLE RACEWAY
F0
F 1F 2F 3
FN
B1
BN
B2
AAA
NN
AA
NN
Where:
Level 0 - Total Plant
(see 3.1);
Level 1 - Function / System
(see 3.2);
For the Cable Raceways identification the field F 1F2F3 identifies the structure code as defined for
Main Group U, and the field F N identifies the floors subdivision;
Level 3 Cable Raceway identification
The cable raceways identification code is made by:
B1 = two alphabetical digits for raceways assembly identification;
BN = two numeric digits for raceways assembly parts numbering;
B2 = one alphabetical digit for network identification
For the network code shall be used the following characters:
A
for MV power cables
B
for LV power cables
C
for control cables
D
for low level signal cables
E
(hold)
T
for telecommunication cables
S
for special cables (coaxial, Distributed Control Systems Bus, etc.)
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
24
of
50
Referring to the above relevant chapters some electrical components (e.g. switchgears, distribution boards,
etc.) are identified with the Process-Related Code plus the Point of Installation Code.
The Point of Installation Code identification is divided into different breakdown levels (like the ProcessRelated Code) with different meanings, from right to left in diminishing order, starting from the TOTAL
PLANT up to the Installation Space Code.
The following example illustrates how to solve the problem of allocating the Incoming/tie Feeders of
distribution boards in the process-related code. The system BBA has two destinations, namely BBE and
BCA, which both receive BBA as process-related codes. Unique identification can only be provided by
supplementing the code.
The structure of the Point of Installation Code is the following:
BCT
BBT
11 KV
+BBA
Cub 4
Cub. 7
=BBE..
+BBA04
11 KV
Cub. 1
=BCA ..
+BBA07
=BBA..
+BCA01
=BBA..
+BBE02
+BBE
Cub. 2
10
ATTACHMENT
+ BCA
Enelpower
Enel Group
ATTACHMENT 1
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
25
of
MAIN GROUPS - F1
AUXILIARY SYSTEMS
ANCILLARY SYSTEMS
STRUCTURES
50
Enelpower
Enel Group
ATTACHMENT 2
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
26
of
11 KV SWITCHBOARD
MV DISTRIBUTION BOARDS
MV AUXILIARY POWER TRANSFORMERS
MV DISTRIBUTION BOARDS
START-UP, OFFSITE, GENERAL PURPOSE TRANSFORMER
BJ_
BJA
BJE
BJT
BL_
BLA
BLL
BLT
BATTERIES 220 V
BATTERIES 110 V
BATTERIES 48 V
50
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
ATTACHMENT 2
BTL
BTM
BTN
Document
P12QR07003
Rev. 0
on
August 01
Sheet
27
of
CE_ ANNUNCIATION
CEA
CEJ
CEK
CJ_
CJA
CJD
CJF
CJJ
CJP
CJU
50
Enelpower
Enel Group
ATTACHMENT 2
CWC
CWF
CWG
CWK
CWQ
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
28
of
50
RECEIVING EQUIPMENT
TANK FARM
PUMP SYSTEM
PIPING SYSTEM
CONTROL AND PROTECTION EQUIPMENT
Enelpower
Enel Group
ATTACHMENT 2
GBJ
GBK
GBL
GBN
GBP
GBQ
GBR
GBS
GBT
GBX
GBY
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
29
of
50
TREATMENT SYSTEM
FILTERING. MECHANICAL CLEANING SYSTEM
AERATION, GAS INJECTION SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID PROPORTIONING SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ION EXCHANGE, REVERSE OSMOSIS SYSTEM
EVAPORATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
DEAERATION, DRYING SYSTEM
PREHEATING, COOLING SYSTEM
PIPING SYSTEM, TEMPORARY STORAGE SYSTEM, PUMP SYSTEM FOR MAIN FLUID
STORAGE SYSTEM OUTSIDE FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
CHEMICALS SUPPLY SYSTEM
REGENERATION, FLUSHING EQUIPMENT
INJECTION SYSTEM FOR MAIN FLUID
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
HEATING, COOLING AND FLUSHING FLUID DISTRIBUTION SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT
GDP
GDQ
GDR
GDS
GDT
GDU
GDW
GDX
GDY
STEAM SYSTEM
CONDENSATE SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID CLEANING SYSTEM
ION EXCHANGE, REVERSE OSMOSIS SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
MULTIFLASH SYSTEM, EVAPORATION SYSTEM (E.G. FOR DEMINERALISATION)
DEAERATION, DRYING SYSTEM
PREHEATING, COOLING SYSTEM
BRINE SYSTEM
PRODUCT WATER SYSTEM
CHEMICAL SUPPLY SYSTEM
10-40 ANTISCALE
50-80 ANTIFOAM
90
CAUSTIC TRANSFER SYSTEM
SEA WATER SYSTEM
INJECTION SYSTEM FOR MAIN FLUID
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
SERVICE WATER SYSTEM
GAS EXTRACTION SYSTEM
ON LOAD CLEANING SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT
Enelpower
Enel Group
ATTACHMENT 2
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
30
of
50
GM
GMA
GMB
GMC
GMJ
GMJ
RECEIVING POINT
STORAGE, FORWARDING AND DISTRIBUTION SYSTEM
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
ATTACHMENT 2
GRP
GRQ
GRR
GRS
GRT
GRX
GRY
Document
P12QR07003
Rev. 0
on
August 01
Sheet
31
of
MAIN BURNERS
RETARDED COMBUSTION GRATE
GRATE COMBUSTION SYSTEM
OTHERS BURNER EQUIPMENT (E.G. VAPOUR BURNER, FLUE DUST BURNER)
PULVERIZED COAL BIN, FORWARDING AND DISTRIBUTION SYSTEM
OIL TEMPORARY STORAGE PUMP AND DISTRIBUTION SYSTEM
GAS PRESSURE REDUCTON, DISTRIBUTION SYSTEM
TEMPORARY STORAGE, FORWARDING AND DISTRIBUTION SYSTEM FOR OTHER FUELS
COMBUSTION AIR SUPPLY SYSTEM
ATOMIZED MEDIUM SUPPLY SYSTEM (STEAM)
ATOMIZED MEDIUM SUPPLY SYSTEM (AIR)
COOLANT SUPPLY SYSTEM (STEAM)
COOLANT SUPPLY SYSTEM (AIR)
PURGING MEDIUM SUPPLY SYSTEM (STEAM)
PURGING MEDIUM SUPPLY SYSTEM (AIR)
HEATING MEDIUM SUPPLY SYSTEM (STEAM)
HEATING MEDIUM SUPPLY SYSTEM (HOT WATER)
ELECTRIC HEATING SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT
50
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
Document
P12QR07003
Rev. 0
on
August 01
Sheet
32
of
50
ATTACHMENT 2
FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3
HL_ COMBUSTION AIR SYSTEM
HLA
HLB
HLC
HLD
HLY
DUCTING SYSTEM
FAN SYSTEM, FORCED-DROUGHT FAN SYSTEM
EXTERNAL AIR HEATING SYSTEM (NOT FLUE-GAS-HEATED)
AIR HEATING SYSTEM (FLUE-GAS-HEATED)
CONTROL AND PROTECTION EQUIPMENT
DUCTING SYSTEM
INDUCED-DROUGHT FAN SYSTEM
SMOKE STACK SYSTEM (CHIMNEY)
FLUE GAS RECIRCULATION SYSTEM
CONTROL AND PROTECTION EQUIPMENT
LB_
FEEDWATER SYSTEM
STORAGE DEAERATION (INCLUDING FEEDWATER TANK)
FEEDWATER PIPING SYSTEM (EXCL.. FEEDWATER PUMP AND FEEDWATER HEATING SYSTEM)
FEEDWATER PUMP SYSTEM
HP FEEDWATER HEATING SYSTEM
HP DESUPERHEATING SPRAY SYSTEM
IP DESUPERHEATING SPRAY SYSTEM
START-UP AND SHUTDOWN PIPING SYSTEM
START-UP AND SHUTDOWN PUMP SYSTEM
EMERGENCY FEEDWATER PIPING SYSTEM INCL. STORAGE (EXCL. EMERGENCY FEEDWATER
PUMP SYSTEM)
EMERGENCY FEEDWATER PUMP SYSTEM
BACK-UP EMERGENCY FEEDWATER SYSTEM
FEEDWATER SEALING WATER SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT
STEAM SYSTEM
LBA
LBB
LBC
LBD
LBE
LBF
LBG
LBH
LBJ
LBK
LC_
LCA
LCB
CONDENSATE SYSTEM
MAIN CONDENSATE PIPING SYSTEM (EXCL. MAIN CONDENSATE PUMP SYSTEM, LP
FEEDWATER HEATING SYSTEM, CONDENSATE POLISHING PLANT)
MAIN CONDENSATE PUMP SYSTEM
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
ATTACHMENT 2
LCC
LCE
LCF
LCG
LCH
LCJ
LCL
LCM
LCN
LCP
LCQ
LCR
LCS
LCT
LCW
LCX
LCY
LF_
Document
P12QR07003
Rev. 0
on
August 01
Sheet
33
of
50
LFC
LFG
LFJ
LFN
HP TURBINE
IP TURBINE
LP TURBINE
BEARINGS
CONDENSING SYSTEM
MOTIVE WATER SYSTEM (IF SEPARATE FROM MAJ)
AIR REMOVAL SYSTEM
TRANSMISSION GEAR BETWEEN PRIME MOVER & DRIVEN MACHINE INCLUDED TURNING
GEAR
DRAIN AND VENT SYSTEM
LEAK OFF STEAM SYSTEM
TURBINE BYPASS STATION, INCLUDED DESUPERHEATING SPRAY SYSTEM
LP TURBINE BYPASS
VENTING SYSTEM (IF SEPARATE FROM MAL)
LUBRICANT SUPPLY SYSTEM
SEALING, HEATING AND COOLING STEAM SYSTEM
NON ELECTRIC CONTROL AND PROTECTION EQUIPMENT, INCLUDED FLUID SUPPLY SYSTEM
ELECTRICAL CONTROL AND PROTECTION EQUIPMENTS
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
ATTACHMENT 2
MBO
MBP
MBQ
MBR
MBS
MBT
MBU
MBV
MBW
MBX
MBY
MBZ
Document
P12QR07003
Rev. 0
on
August 01
Sheet
34
of
50
Enelpower
Enel Group
ATTACHMENT 2
PBH
PBJ
PBK
PBL
PBN
PBP
PBQ
PBR
PBS
PBT
PBX
PBY
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
35
of
50
DISCHARGE FROM FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
FILTERING, MECHANICAL CLEANING SYSTEM
AERATION, GAS INJECTION SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID PROPORTIONING SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ION EXCHANGE SYSTEM (E.G. FOR DEMINERALISATION)
EVAPORATION SYSTEM (E.G. FOR DEMINERALISATION)
DEAERATION, DRYING SYSTEM
PREHEATING, COOLING SYSTEM
PIPING SYSTEM, TEMPORARY STORAGE SYSTEM, PUMP SYSTEM FOR MAIN FLUID
STORAGE SYSTEM OUTSIDE FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
CHEMICALS SUPPLY SYSTEM
REGENERATION, FLUSHING EQUIPMENT
INJECTION SYSTEM FOR MAIN FLUID
FLUSHING WATER AND RESIDUES REMOVAL SYSTEM INCLUDED NEUTRALIZATION
SLUDGE THICKENING SYSTEM
HEATING, COOLING AND FLUSHING FLUID DISTRIBUTION SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT
DISCHARGE FROM FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
FILTERING, MECHANICAL CLEANING SYSTEM
AERATION, GAS INJECTION SYSTEM
PRECIPITATION SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ACID PROPORTIONING SYSTEM (E.G. FOR CARBONATE HARDNESS REMOVAL)
ION EXCHANGE SYSTEM (E.G. FOR DEMINERALISATION)
EVAPORATION SYSTEM (E.G. FOR DEMINERALISATION)
DEAERATION, DRYING SYSTEM
PREHEATING, COOLING SYSTEM
PIPING SYSTEM, TEMPORARY STORAGE SYSTEM, PUMP SYSTEM FOR MAIN FLUID
STORAGE SYSTEM OUTSIDE FLUID TREATMENT SYSTEM (IF NOT PART OF ANOTHER SYSTEM)
Enelpower
Enel Group
ATTACHMENT 2
PHN
PHP
PHQ
PHR
PHS
PHT
PHX
PHY
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
36
of
PRESSURE SYSTEM
SUPPORT STRUCTURE AND ENCLOSURE
FIRESIDE HEAT TRANSFER SURFACE CLEANING EQUIPMENT
ASH AND SLAG REMOVAL
BLOWDOWN SYSTEM FLASH DRAIN SYSTEM
BUNKER, FEEDER ALD PULVERIZING SYSTEM
BOILER WATER CIRCULATION SYSTEM (ALSO DOR ELECTRODE STEAM BOILER)
MAIN FIRING SYSTEM (ALSO FOR ELECTRIC HEATING)
IGNITION FIRING EQUIPMENT (IF SEPARATE)
COMBUSTION AIR SYSTEM
GAS HEATING SYSTEM (FOR CLOSED CYCLE)
FUEL GAS EXHAUST (WITHOT GAS TREATMENT)
MECHANICAL DUST HANDLING SYSTEM
ELECTROSTATIC PRECIPITATOR
CHEMICAL FLUE GAS TREATMENT SYSTEM, INCLUDED RESIDUES REMOVAL, ABSORPTIV
PROCESS
CHEMICAL FLUE GAS TREATMENT SYSTEM, INCLUDED RESIDUES REMOVAL, CATALYTIC
PROCESS
CHEMICAL FLUE GAS TREATMENT SYSTEM, INCLUDED RESIDUES REMOVAL, ABSORPTIV
PROCESS
FLUE GAS REHEATING SYSTEM
FLUID SUPPLY SYSTEM FOR CONTROL AND PROTECTION
CONTROL AND PROTECTION EQUIPMENT
50
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
37
of
ATTACHMENT 2
FUNCTION KEY MAINGROUPS F1, SYSTEMS F2, SUBSYSTEMS F3
QL_ FEEDWATER STEAM CONDENSATE CYCLE OF AUXILIARY STEAM GENERATING AND
DISTRIBUTION
QLA
QLB
QLC
QLD
QLF
QLY
FEEDWATER SYSTEM
STEAM SYSTEM
CONDENSATE SYSTEM
CONDENSATE POLISHING PLANT
COMMON EQUIPMENT FOR AUXILIARY STEAM GENERATION AND DISTRIBUTION SYSTEMS
CONTROL AND PROTECTION EQUIPMENT
50
Enelpower
Enel Group
ATTACHMENT 2
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
38
of
SN_ ELEVATORS
SNC
SNH
SNY
SWITCHGEAR BUILDING
IN BOILER HOUSE
CONTROL AND PROTECTION EQUIPMENT
U__ STRUCTURES
UA_ STRUCTURES FOR GRID AND DISTRIBUTION SYSTEM
UAA
UAB
UAC
UAG
UAX
SWITCHYARD STRUCTURE
INDOOR GIS SWITCHGEAR BUILDING
SUBSTATION BUILDINGS
STRUCTURE FOR TRANSFORMERS
SPECIAL STRUCTURE (PLANT SPECIFIC)
SWITCHGEAR BUILDING
STRUCTURE FOR OFFSITE SYSTEM TRANSFORMERS
STRUCTURE FOR GENERATOR TRANSFORMERS
STRUCTURE FOR TRANSFORMER TRACKS
TRANSFORMER MAINT. BUILD
SPECIAL STRUCTURE (PLANT SPECIFIC)
DESALINATION PLANT
DESALINATION PLANT CONTROL BUILDING
50
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
ATTACHMENT 2
UGZ
Document
P12QR07003
Rev. 0
on
August 01
Sheet
39
of
DUCTING STRUCTURE
UL_
ULA
ULC
ULV
ULX
CONDITION BUILDING
FIRE PUMP HOUSE
DIRTY OIL PUMP
WORKSHOP AND STORES BUILDING
CHLORINATION PLANT STORE
LABORATORIES BUILDING
SERVICE BUILDING
AMENITIES BUILDING
ADMINISTRATION BUILDING
LOCKERS AND CANTEEN BUILDING
CAR PORT & GARD HOUSE
50
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
ATTACHMENT 2
UYF
UYG
UYH
UYJ
UYP
UYR
UYS
UYY
Document
P12QR07003
Rev. 0
on
August 01
Sheet
40
of
Y__ SITE
YA_
YAE
YAG
YAP
YAS
YAZ
GROUND WORKS
GROUND PREPARATION / ESCAVATION
GEOGNOSTIC SURVEY
PILING (I/A)
STRUCTURES FOR SITE PREPARATION
DUCTS (TEMPORARY PROVISION FOR GROUND PREPARATION)
50
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
ATTACHMENT 3
Document
P12QR07003
Rev. 0
on
August 01
Sheet
41
of
50
ELECTRICAL EQUIPMENT
MECHANICAL EQUIPMENT
BB
BE
BF
Enelpower
Enel Group
ATTACHMENT 2
BN
BP
BQ
BR
BS
BT
BU
P12QR07003
Rev. 0
on
August 01
Sheet
42
of
DENSITY
ELECTRICAL VARIABLES (E.G. CURRENT, VOLTAGE, POWER, ELECTRICAL FREQUENCY)
FLOW, RATE
DISTANCE, LENGTH, POSITION, DIRECTION OF ROTATION
MANUAL INPUT (AS MANUALLY OPERATED SENSOR/E.G. FIRE DETECTOR)
POWER (MECHANICAL, THERMAL)
TIME
LEVEL (ALSO FOR DIVIDING LINE)
MOISTURE, HUMIDITY
PRESSURE
QUALITY VARIABLES (ANALYSIS MATERIAL PROPERTIES OTHER THAN "CD", "CM", "CV")
RADIATION VARIABLES
VELOCITY,SPEED,FREQUENCY (MECHANICAL), ACCELERATION
TEMPERATURE
COMBINED AND OTHER VARIABLES
VISCOSITY
WEIGHT, MASS
VIBRATION, EXPANSION
Document
RAS LAFFAN
POWER AND DESALINATION PROJECT
DENSITY
ELECTRICAL VARIABLES (E.G. CURRENT,VOLTAGE,POWER, ELECTRICAL FREQUENCY)
FLOW RATE
DISTANCE, LENGHT,POSTION, DIRECTION OF ROTATION
POWER (MECHANICAL,THERMAL)
TIME
LEVEL (ALSO FOR DIVIDING LINE)
MOISTURE, HUMIDITY
PRESSURE
QUALITY VARIABLES (ANALYSIS,MATERIAL PROPERTIES OTHER THAN "DD","DM","DV")
VELOCITY,SPEED,FREQUENCY (MECHANICAL) ACCELERATION
TEMPERATURE
COMBINED AND OTHER VARIABLES
VISCOSITY
WEIGHT, MASS
VIBRATION EXPANSION
50
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
ATTACHMENT 2
EY
EZ
Rev. 0
on
August 01
Sheet
43
of
50
DENSITY
ELECTRICAL VARIABLES (E.G. CURRENT, VOLTAGE, POWER, ELECTRICAL FREQUENCY)
FLOW, RATE
DISTANCE, LENGTH, POSITION, DIRECTION OF ROTATION
POWER (MECHANICAL, THERMAL)
TIME
LEVEL (ALSO FOR DIVIDING LINE)
MOISTURE, HUMIDITY
PRESSURE
QUALITY VARIABLES (ANALYSIS,MATERIAL PROPERTIES OTHER THAN "FD", "FM", "FV")
VELOCITY,SPEED, FREQUENCY (MECHANICAL), ACCELERATION
TEMPERATURE
COMBINED AND OTHER VARIABLES
VISCOSITY
WEIGHT, MASS
VIBRATION, EXPANSION
ELECTRICAL EQUIPMENT
GA
GB
GC
GD
GE
GF
GG
GH
GK
GM
GP
GQ
GR
GS
GT
GU
GV
GW
GX
GY
GZ
P12QR07003
Document
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS (FOR DRIVE RELATED BINARY)
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS (FOR NON DRIVE RELATED BINARY
TRANSMITTERS)
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS(FOR ANALOG SAFETY I&C
TRANSMITTERS SILT)
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS (FOR POWER CABLES > 1 KV)
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS (FOR POWER CABLES < 1 KV)
JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS GENERAL PURPOSE < 60V)
PENETRATIONS/CABLE COVERS
ELECTRICAL AND INSTRUMENTATION AND CONTROL INSTALLATION UNITS IDENTIFIED AS
PER PROCESS SYSTEM (E.G. CUBICLES, BOXES WITHOUT INSTALLATION SPACE CODE)
INFORMATION DISPLAY AND OPERATOR CONTROL EQUIPMENT FOR PROCESS COMPUTERS
AND AUTOMATION SYSTEM
JUNCTION BOXES FOR LIGHT CURRENT SYSTEMS OF NATIONAL TELECOMMUNICATIONS
SERVICES
JUNCTION BOXES FOR LIGHTING
SUBDISTRIBUTION FOR POWER SOCKETS
DC GENERATING EQUIPMENT, BATTERIES
SWITCHGEAR EQUIPMENT IF NOT IDENTIFIED UNDER PROCESS EQUIPMENT
TRANSFORMER EQUIPMENT
CONVERTER EQUIPMENT
STRUCTURE RELATED EARTHING AND LIGHTNING PROTECTION EQUIPMENT SURGE ARRESTS
CABINET POWER SUPPLY EQUIPMENT
ACTUATING EQUIPMENT FOR ELECTRICAL VARIABLES
JUNCTION BOXES FOR LIGHT CURRENT SYSTEM (NOT NATIONAL COMMON.)
HANGERS, SUPPORTS AND RACKS FOR ELECTRICAL AND INSTRUMENTATION AND CONTROL
EQUIPMENT)
Enelpower
Enel Group
ATTACHMENT 2
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
44
of
50
Enelpower
Enel Group
ATTACHMENT 3
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
45
of
MECHANICAL COMPONENTS
MECHANICAL COMPONENTS
ELECTRICAL COMPONENTS
SIGNAL ORIGINS
SIGNAL APPLICATIONS
MECHANICAL COMPONENTS
KA
KB
KC
KD
KE
KF
KJ
KK
KM
KN
KP
KT
KV
KW
MECHANICAL COMPONENTS
MB
MF
MG
MK
MM
MP
MR
MS
MT
MU
BRAKES
FOUNDATIONS
GEARBOXES
CLUTCHES, COUPLINGS
ENGINES, NOT ELECTRICAL
PIPING SUPPORTS
PIPING COMPONENTS, DUCTWORK COMPONENTS
POSITIONERS, NOT ELECTRICAL
TURBINES
TRANSMISSION GEAR, NON ELECTRICAL, CONVERTER AND BOOSTERS OTHER THAN
COUPLING AND GEARBOXES
50
Enelpower
Enel Group
ATTACHMENT 3
QA
QB
QN
QP
QR
QS
QT
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
46
of
50
- ELECTRICAL COMPONENTS
-
A
B
C
D
E
F
G
H
K
L
M
N
P
Q
R
S
T
U
V
W
X
Y
Z
SIGNAL ORIGINS
XA
XB
XC
XD
XE
XF
XG
XH
XJ
XK
XL
XM
XN
XP
XQ
XR
XS
XT
XU
XW
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
47
of
50
ATTACHMENT 3
FUNCTION KEY COMPONENTS MAINGROUP B1, SUBGROUPS B2
SIGNAL APPLICATIONS
YA
YB
YC
YD
YE
YF
YJ
YN
YP
YQ
YR
YT
YV
YW
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
48
of
E
- CF001
- CF001B
- CF001C
- CT003
- CP001
- CP002
- CP003
- DT002
- CT021
- CP011
Temperature control
signal difference
Calculation
Circuit
- DT901
- CU010
50
Enelpower
Enel Group
RAS LAFFAN
POWER AND DESALINATION PROJECT
Project Procedure PP03
Equipment and Components
Identification System KKS based
Document
P12QR07003
Rev. 0
on
August 01
Sheet
49
of
- CT901
- CF001
analogue
- CF001A
- CF001B
AWG
- CF901
- CF001C
E
g) 2 out of 3 with segregated tapping points
E
E
E
analogue
- CP001
- CP002
AWG
- CP901
- CP003
E
E
E
binary
- CP125
- CP126
2/3
- CP127
AA 501
- CP921
50
Enelpower
RAS LAFFAN
POWER AND DESALINATION PROJECT
Enel Group
ATTACHMENT 5
Document
P12QR07003
Rev. 0
on
August 01
Sheet
50
of
Number range
Pipelines
001 999
Number range
001 099
101 199
201 399
Control Valves
401 459
460 499
Safety Valves
501 599
600 699
700 799
Number range
Analog Measurement
001 099
Binary Switches
101 199
201 299
501 599
Limiting Devices
701 799
901 999