Questions 1 to 4 refer to the figures given below:

The input-output curves for two units with supply in parallel a common load are shown in the
figure
Q 1.
When a load of 10 MW is equally shared by the two generators, the combined
input must be
(A) 250 x 105 kcal / hr
(B) 350 x 105 kcal / hr
(C) 500 x 105 kcal / hr
(D) 600 x 105 kcal / hr

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 2.
If the two generators have individual ratings of 10 MW each, a system load of 16
MW should be shared as
(A) 8 MW on each generator
(B) 10 MW on A and 6 MW on B
(C) 10 MW on B and 6 MW on A
(D) 9 M W on A and 7 MW on B
Q 3.
Load shedding is done
(A) To reduce heat demand
(B) To improve power factor
(C) To run the equipment efficiency
(D) To repair the machine
Q 4.
If both generators have 2 MW load each then which of the following statements is
correct?
(A) Generator A runs at higher speed as compared to generator B
(B) Generator B runs more efficiently as compared to generator A
(C) Input to generator A is less than 75% of the input to generator B
(D) Input to generator B is less than the input to generator A by about 23%
Questions 5 and 6 refer to the data given below:
A bulk supply was taken by a large industrial consumer at the rate of Rs 80 per KW plus 2
5 paisa per KWh

Q 5.

Q 6.

The average charge per KWh when the load factor is 20%
(A) 3 cents
(B) 5 cents
(C) 7 cents
(D) cannot be determined on the basis of the information provided

will be

The average charges per KWh will be least when the plant load factor is
(A) 100%
(B) 75%
(C) 50%
(D) 20%

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 7.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Which statement about the daily load curve is valid?


(A) The area under the curve gives the average demand
(B) The ratio of the area under the curves to the total area of rectangle in which it is
contained gives the load factor for the day
(C) The peak of the curve gives the 'installed capacity of the plant
(D) The area of the curves divided by the number of hours gives load factor

Q 8.
An Equipment purchased for Rs10, 000 two years ago has a market value of Rs
12500 at present. It can be concluded that
(A) the value has depreciated according to straight line method
(B) the value has depreciated according to diminishing value method
(C) the value has depreciated according to sinking fund method
(D) the value has appreciated with the time
Q 9.

In a steam power plant which component needs maximum maintenance attention?


(A) Condenser
(B) Boiler
(C) Turbine
(D) Water treatment plant

Questions 10 to 14 refer to the following data:

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Four loads as shown in figure given below are connected to a power station Abscise is time from
0 to 24 hrs in all cases, Ordinate represents the load in KW
Q 10.

Which load has the lowest average demand?


Load A
Load B
Load C
Load D

Q 11.

Which loads offer the identical average load?


(A) A and B
(B) B and C
(C) C and D
(D) A, B and D

Q 12.

The peak load on the plant is

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) 3000 KW
(B) 3500 KW
(C) 4000 KW
(D) 4250 KW
Q 13.

The load factor of the plant supplying power to these loads will be nearly
(A) 11%
(B) 15%
(C) 18%
(D) 21%

Q 14.

The diversity factor of the plant supplying these loads will be


(A) 0.5
(B) 1.0
(C) 1.5
(D) 0.2

Define the equations


Q 15.
n

PGiP D P Loss=0
i=1

(A) Real Power balance constraints


(B) Generation capacity constraint
(C) Both A and B
(D) None of them

Q 16.

max
Pmin
Gi P Gi P Gi , i=1,2, . , N

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(A) Real Power balance constraints


(B) Generation capacity constraint
(C) Both A and B
(D) None of them

Q 17.

Sli Smaxli, i = 1, ..., NL


(A) Real Power balance constraints
(B) Generation capacity constraint
(C) Security constraints
(D) None of them

Q 18.

F ( PGi )= ai +bi PGi + c i P2Gi W h ere i=1, , N


i=0

(A) Real Power balance constraints


(B) Generation capacity constraint
(C) Security constraints
(D) None of them

Q 19.

Following power plant has instant starting


(A) nuclear power plant
(B) hydro power plant
(C) diesel power plant
(D) both (b) and (c)

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 20.

(B) Hydro
(C) Thermal
(D) Diesel
This curve is showing?

(A) Increment Fuel Cost Curve


(B) Input Output Curve
(C) Operating cost curve
(D) None of these
Q 22.

Optimal system operation involved


(A) Economy of operation
(B) System security
(C) Emissions at certain fossil- fuel plants
(D) All of above

Q 23.

B. TECH. 4 Th YEAR 8Th

Which of the following generating station has minimum ruining cost?


(A) Nuclear

Q 21.

POWER SYSTEM

Optimal system operation may say as


(A) Economy of operation of Power System
(B) Emission of operation of Power System

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(C) Both A and B


(D) None of them

Q 24.

The economic dispatch problem is use to calculate


(A) Minimize the total cost of generating real power
(B) Minimize the total cost of generating reactive power
(C) Both A and B
(D) None of them

Q 25.

Optimal system operation involved


(A) Economy of operation
(B) System security
(C) Both A and B
(D) None of them

Q 26.

Which power plant is neglecting operating cost


(A) Hydro plant
(B) Thermal plants
(C) Nuclear plant
(D) None of them

Q 27.

Which power plant is considering operating cost


(A) Hydro plant
(B) Thermal plants
(C) Nuclear plant
(D) Both B and C

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 28.

Input-output curve of a generating unit draw in between


(A) Operating cost and power generation
(B) Power Generation And Operating Cost
(C) Both Of Above
(D) None Of These

Q 29.

Operating cost consist of


(A) Fuel cost
(B) Maintenance cost
(C) Both A and B
(D) Only A

Q 30.

Incremental cost curve is


(A) Slope of Input output curve
(B) Slope of load curve
(C) Both A and B
(D) None of above

Q 31.

A generating station is not economical at


(A) Above the PGi min
(B) Equal to the PGi
(C) Below the PGi max
(D) Below the PGi min

Q 32.

A generating station is not economical at


(A) Equal to the PGi min
(B) Equal to the PGi
(C) Above the PGi max
(D) Above the PGi min

Q 33.

A generating station is economical at


(A) Equal to the PGi min
(B) Equal to the PGi
(C) Below the PGi max

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) All the above


Q 34.

Incremental fuel cost( IC) define as


d Ci
d PGi
d PGi
(B) IC=
d Ci
(A) IC=

2
(C) IC= a i+ bi PGi +c i PGi
i=0

(D) None of these


Q 35.

The system constraint are


(A) Equality Constraint
(B) Inequality constraint
(C) Both A and B
(D) None of these

Q 36.

Increment the IC value by IC in case of


n

(A)

PGiP D <0
i=1
n

(B)

PGiP D >0
i=1
n

(C)

PGiP D =0
i=1

(D) None of these


Q 37.

Increment the IC value by IC in case of


n

(A)

PGiP D <0
i=1
n

(B)

PGiP D >0
i=1
n

(C)

PGiP D =0
i=1

(D) None of these


Q 38.
Its loading from now on is held fixed at this value and the balance load is then
shared between the remaining generators on equal incremental cost basis. This theory
knows

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) Pattons security theory


(B) Kuhn-Tucker theory
(C) Both A and B
(D) None of these

Q 39.

Incremental fuel costs in rupees per MWh for a plant consisting of two units are:

IC 1=0.20 PG 1+ 40
IC 2=0.25 PG 2 +30
Where PG 1 and PG 2 (in MW) are power generated by both the units for a total demand of
250 MW, The total shared by the two units are
(A) PG 1=

350
400
PG2=
3
3

(B) PG 1=100PG 2=250


(C) PG 1=125PG 2=125
(D) PG 1=150PG 2=100

Q 40.
Its loading from now on is held fixed at this value and the balance load is then
shared between the remaining generators on equal incremental cost basis. This theory
knows
(A) Pattons security theory
(B) Kuhn-Tucker theory
(C) Both A and B
(D) None of these
Q 41.

Dynamic programming method equation is


(A)
(B)
(C)
(D)

min

F N (x )= Y {F N ( y ) + F N 1 ( x y ) }
min
F N (x )= Y {F N ( y ) + F N 1 ( x+ y ) }
min
F N (x )= Y {F N 1 ( y ) + F N ( x y ) }
min
F N (x )= Y {F N ( y ) + F N +1 ( x y ) }

Questions 42 to 44 refer to the data given below:

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

The input-output curve of a 0.5 MW generating stations is defined by


I = 30 + 0.8 L + 0.5 L2
Where I is in MKcal and L is in megawatts
Q 42.

The input when the plant was running on no load was


(A) 0.5 kcal
(B) 31.3 kcal
(C) 30 x 106 kcal
(D) zero

Q 43.

Total input when the plant was generating 35 MW was


(A) 181 x 106 kcal/hr
(B) 250 x 106 kcal/hr
(C) 362.5 x 106 kcal/hr
(D) 582xl26 kcal/hr

Q 44.
When the load on the generator was 25 MW the heat rate in kcal / MW hr was
nearly
(A) 16 x 106
(B) 20 x 106
(C) 30 x 106
(D) 31.3 x 106
Questions 45 to 48 refer to the data given below:
Manufacturer A offers his equipment costing Rs 150,000 + 45 x KW
guaranteed to give the following operating cost Rs 18 + 0.007 KWh

the equipment is

Manufacturer B offers his equipment costing Rs 1, 12000 + 50 x KW The operating cost is


guaranteed as Rs 16.50 + 0.0072 KWh

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

KW indicates machine rating and KWh indicates output


Q 45.

Which machine is cheaper to own in 5000 KW range


(A) Machine supplied by manufacturer A
(B) Machine supplied by manufacturer B
(C) Both have identical initial cost
(D) Both have identical operating cost

Q 46.

At what KW rating the initial cost of the two machines will be identical?
(A) 5500 KW
(B) 6000 KW
(C) 7600 KW
(D) 8500 KW

Q 47.

At what rating in KWh the two sets will be equally economical to operate?
(A) 5000 KWh
(B) 7500 KWh
(C) 75000 KWh
(D) 50,000 KWh

Q 48.

Power factor is given by


(A) KWh / KW
(B) active power / reactive power
(C) reactive power / active power
(D) KW / KWh

Q 49.
For the same cylinder dimensions and speed, which engine will produce least
power?
(A) Petrol engine

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(B) Diesel engine


(C) Super charged engine
(D) All will produce same power
Q 50.

For under water movement Submarines are powered by?

(A) Diesel engines


(B) Air motors
(C) Batteries
(D) Steam accumulators
Q 51.

Ships are generally powered by

(A) Diesel engines


(B) Hydraulic turbines
(C) Nuclear power plants
(D) Steam accumulators

Q 52.

A turbojet aero plane has

(A) No blades
(B) Two blades
(C) Three blades
(D) Four blades
Q 53.

An interconnected system has the following plants

run off the river plant

II

Nuclear power plant

III

Steam power plant

IV

Hydro-electric plant with storage

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Diesel engine plant

Which two plants can be exclusively used for base load?


(A) I and II
(E) II and III
(F) II and IV
(G) II and V
Q 54.

Which plant can be used exclusively for peak load?


(A) I
(B) III
(C) IV
(D) V

Q 55.

Direct conversion of beat into electrical energy is possible through


(A) Magneto hydrodynamic generators
(B) Solar cells
(C) Fuel cells
(D) not possible

Q 56.

In a fuel cell electricity is produced by


(A) Combustion of fuel in absence of oxygen
(B) Oxidation of fuel
(C) Thermionic action
(D) Any of the above

Q 57.
A certain plant has fixed cost of Rs 40,000 and a salvage value of Rs 4000 at the
end of a useful life of 20 years The depreciated value of the plant at the end of 10 years
will be least (interest rate being 6% compounded annually) when calculated by
(A) Straight line method
(B) Sinking fund method

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(C) Diminishing value method

Q 58.

In the above problem the value will be highest when calculated by

(A) Straight line method


(B) Sinking fund method
(C) Diminishing value method
Q 59.

Low power factor is usually not due to

(A) Incandescent lamp


(B) Induction motors
(C) Arc lamps
(D) Fluorescent tubes
Q 60.

Which type of plant has the least running cost per KWh of energy generated?

(A) Hydro-electric plant


(B) Thermal power plant
(C) Nuclear power plant
(D) Diesel power plant

Q 61.

Base load plants have

(A) High capital cost, high operating cost and high load factor
(B) High capital cost, low operating cost and high load factor
(C) Low capital cost, low operating cost and low load factor
(D) Low capital cost, high operation cost and high load factor

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 62.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Which alternator will have more number of poles

(A) Coupled to hydraulic turbine


(B) Coupled to steam turbine
(C) Coupled to gas turbine
(D) All will have same number of poles

Q 63.

Which alternator usually runs at slow speed as compared to others

(A) Coupled to gas turbine


(B) Coupled to steam turbine
(C) Coupled to hydraulic turbine
(D) Coupled to diesel engine

Q 64.
In a thermal power station of moderate size, the electrical power is generated at a
voltage of
(A) 115 V
(B) 230 V
(C) 440 V
(D) 11 kV

Q 65.
The resistance of the dry skin of human body, between the tip of the left hand
finger and right hand finger, is of the order of
(A) 100 ohms
(B) 1000 ohms

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(C) 10,000 ohms


(D) 100,000 ohms

Q 66.
If the resistance of dry skin of human body is 100,000 ohms, the resistance of the
wet body will be
(A) 100,000 ohms
(B) 200,000 ohms
(C) 5000,000 ohms
(D) 5000 ohms

Q 67.

The effect of electric shock on human, body depends on

(A) Voltage
(B) Current
(C) Duration of contact
(D) All of the above

Q 68.

A current of 10 mill amperes through human body

(A) Will cause mild sensation


(B) Will affect muscle control
(C) Will affect breathing
(D) Will cause death

Q 69.

Death is almost certain when the current through human body is

(A) 10 mill amperes

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(B) 20 mill amperes


(C) 40 mill amperes
(D) 100milliamperes

Q 70.

For extinguishing electrical fires

(A) Water should be used


(B) Carbon dioxide fire extinguisher should be used
(C) Foam type fire extinguisher should be used
(D) Carbon tetrachloride fire extinguisher should be used

Q 71.

First aid for electric shock victim is

(A) Bandage
(B) Massage
(C) Pouring water on body
(D) Artificial respiration

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Multiple Choice Questions of Economics of Power Generation (168-182):


Q 72.

When a power plant is not able to meet the demand of consumers it will resort to

(A) Penalizing high load consumers by increasing the charges for electricity
(B) Power factor improvement at the generators
(C) Efficient plant operation
(D) Load shedding.
Q 73.

Load shedding is possible through

(A) Voltage reduction


(B) Frequency reduction
(C) Switching off the loads
(D) Any of the above.

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 74.
Which of the following power plants can generate power at unpredictable or
uncontrollable times?
(A) Wind power plant
(B) Tidal power plant
(C) Solar power plant
(D) Any of the above.

Q 75.

Direct conversion of heat into electrical power is possible through

(A) Thermionic converter


(B) Fuel cell
(C) Batteries
(D) all of the above.

Q 76.

In a fuel cell positive electrode is of

(A) Oxygen
(B) Ammonia
(C) Hydrogen
(D) Carbon monoxide.

Q 77.

All of the following are sources of borrowing money EXCEPT

(A) Debentures
(B) Bonds
(C) Share
(D) Fixed deposits.

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 78.
Ideally depreciated value of the plant plus the accumulation in the depreciation
fund should be equal to
(A) Salvage value
(B) Obsolescence rate
(C) Sinking fund
(D) Original invested capital.

Q 79.

In power plants insurance cover is provided for

(A) Equipment only


(B) Skilled workers only
(C) Unskilled workers only
(D) all of the above.

Q 80.

Debenture : Interest::

(A) Capital: Depreciation


(B) Insurance: Mishap
(C) Sinking fund: Amortization
(D) Shares: Dividend.

Q 81.

Maximum demand tariff is generally not applied to domestic consumers because

(A) They cannot afford today


(B) They consume less power
(C) Their load factor is low

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) Their maximum demand is low.

Q 82.
How much must be deposited at the end of each year in a sinking fund for 15
years to accumulate Rs 1000 if interest is at 5 percent?
(A) Rs 46.34
(B) Rs 54.55
(C) Rs 59.50
(D) Rs 60.00.

Q 83.
If Rs. 50 were deposited at the end of each year for 12 years in a sinking fund
earning 6%,the total accumulation would be
(A) Rs 1000
(B) Rs 925.50
(C) Rs 843.50
(D) Rs 799.75.

Q 84.

An advantage of static capacitor for power factor improvement is

(A) Low losses


(B) Little maintenance cost
(C) Case in installation
(D) All of the above.

Q 85.
(A) Bonds

All of the following are repayable after some time EXCEPT

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(B) Shares
(C) Cash certificates
(D) Fixed deposits

Q 86.

The usual value of

(A) Diversity factor is less than one and demand factor is more than one
(B) Diversity factor more than one and demand factor is less than is one
(C) Diversity factor as well as demand factor is less than demand
(D) Diversity factor as well as demand factor is more than one.

Multiple Choice Questions of Economics of Power Generation (183-197)


Q 87.
The amount repaid to a person at the end of 15 years, who invests Rs 12,000 at 4
percent interest compounded annually, will be
(A) Rs 12,400
(B) Rs 16,120
(C) Rs 21,612
(D) Rs 26,121.
Q 88.
What is the present worth of receiving Rs 1000 twenty years from now if money
can earn 5% interest compounded annually?
(A) Rs 376.93
(B) Rs 445.50
(C) Rs 500.00
(D) Rs 617.27.

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Questions 185 to 187 refer to data given below:

Rs 10,000 are invested for 20 years at 6 percent.

Q 89.

The amount accumulated, when the interest is compounded annually will be

(A) Rs 27,020
(B) Rs 30,270
(C) Rs 32,070
(D) Rs 35,600.

Q 90.

The amount accumulated when the interest is compounded semi-annually will be

(A) Rs 32,070
(B) Rs 32,474
(C) Rs, 32,620
(D) Rs 32,888.

Q 91.

The amount accumulated when the interest is compounded monthly will be

(A) Rs 32,070
(B) Rs 32,620
(C) Rs 32,898
(D) Rs 33,100.

Q 92.
As the load factor approaches unity, the shape of load duration curve will be
nearly

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) L shaped
(B) Inverted T shaped
(C) Triangular
(D) Rectangular.

Q 93.

When maximum and average loads are equal, the load factor will be

(A) Zero
(B) 0.01
(C) 0.5
(D) 1.0

Q 94.

Which of the following relation is incorrect?

(A) Capacity factor = Utilization factor x Load factor


(B) Load factor x Maximum load = Average load
(C) Demand factor x Connected load = Maximum demand
(D) None of the above.

Q 95.

Capacity factor and load factor become identical when

(A) Peak load is equal to the capacity of the plant


(B) Average load is half the capacity of the plant
(C) Average load is same as peak load
(D) Group diversity factor is equal to peak diversity factor.

Q 96.

A low utilization factor for a plant indicates that

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) Plant is under maintenance


(B) Plant is used for base load only
(C) Plant is used for stand by purpose only
(D) Plant is used for peak load as well as base load.

Questions 95 to 96 refer to the following data:

Power plants considered are


I. Diesel
II. Thermal
III. Hydro
IV. Nuclear.
Q 97.

Plants in ascending order of capital cost per MW are

(A) I, II, III, IV


(B) II, III, IV, I
(C) III, IV, I, II
(D) IV. III, I, II

Q 98.

Plants in descending order of their expected useful life are

(A) I, III, II, IV


(B) II, I, III, IV
(C) III, II, IV, I
(D) IV, I, II, III.

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 99.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Plants in ascending order of their operating cost per MWH generated are

(A) IV, I, II, III


(B) III, II, IV, I
(C) II, I, III, IV
(D) I, III, II, IV

Q 100.

Sinking fund is

(A) Initial value - Salvage value


(B) Capital cost - Operating cost
(C) Periodical maintenance - Breakdown maintenance
(D) Capital cost / Useful life.

1
2
3
4
5
6
7

D
B
A
C
C
A
D

21
22
23
24
25
26
27

A
D
A
A
C
A
D

41
42
43
44
45
46
47

A
C
C
A
B
C
C

61
62
63
64
65
66
67

B
A
C
D
D
D
D

81
82
83
84
85
86
87

D
A
C
D
B
B
C

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

8
9
10
11
12
13
14
15
16
17
18
19
20

D
B
C
D
D
A
B
A
B
C
C
D
B

28
29
30
31
32
33
34
35
36
37
38
39
40

A
C
A
D
C
D
A
C
A
B
B
A
B

48
49
50
51
52
53
54
55
56
57
58
59
60

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

B
A
C
A
A
A
D
A
B
C
B
A
A

Unit - 2
Q 101.

Load curve helps in deciding

(A) Sizes of the generation units


(B) Total installed capacity of the plant
(C) Operating schedule of generating units

68
69
70
71
72
73
74
75
76
77
78
79
80

A
D
D
D
D
D
D
A
A
C
D
D
D

88
89
90
91
92
93
94
95
96
97
98
99
100

A
C
C
D
D
D
D
A
C
A
C
B
A

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) all of the above.


Multiple Choice Questions of Economics of Power Generation (91-106):
Q 102.

Major share of power produced is through

(A) Thermal power plants


(B) Hydro electric power plants
(C) Nuclear power plants
(D) Diesel power plants
Q 103.

Essential requirement of peak load plant

(A) It should be capable of standing quickly


(B) It should be run at high speed
(C) It should provide at high voltage
(D) It should be small in size
Q 104.

Which of the following plants is almost inevitably used as base load plant?

(A) Gas turbine plant


(B) Diesel engine plant
(C) Pumped storage plant
(D) Nuclear power plant
Q 105.
A thermal power station was designed to bum coal containing 12% ash
When the plant actually started operating coal having 22% ash was made available
Which unit of the plant will need major modifications ?
(A) Water treatment plant
(B) Pulverizing unit
(C) Ash handling unit
(D) Cooling towers

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 106.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Efficiency is secondary consideration in case of

(A) peak load plants


(B) Base load plants
(C) Both peak load and base load plants
(D) None of the above

Q 107.
Which of the following plants will take least time in starting from cold conditions
to full load operation?
(A) Nuclear power plant
(B) Steam power plants
(C) Hydro-electric plant
(D) Gas turbine plant

Q 108.

During load shedding

(A) System voltage is reduced


(B) System frequency is reduced
(C) Some loads are switched off
(D) System power factor is changed

Q 109.

For the same plant size, initial cost of which plant is the highest?

(A) Steam power plant


(B) Diesel engine plant
(C) Nuclear power plant

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) Gas turbine plant

Q 110.
A consumer takes a steady load of 200 kW at a power factor of 0.85 lagging for 8
hours per day and 315 days per annum. The annual payment under the tariff of Rs80 per
annum per kA plus 10 cents per kWh will be
(A) Rs 5040
(B) Rs 50,400
(C) Rs 69,200
(D) Rs 88,400

Questions 111 to 115 refer to the data given below:


The estimated total annual operating cost and capital charges for two proposed power stations
are given by the following expressions
Annual cost of station A = Rs (600,000 + 3.0 kW + 0.015 kW hr) Annual cost of station B = Rs
(750,000 + 5.0 kW + 0.014 kW hr)
Where kW represents the capacity of the station and kWh represents the total annual output
Load duration curve of the plant is shown in the figure given below

Q 111.
(A) Station A
(B) Station B

Which station may be selected for base load?

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(C) Any of the above

Q 112.

Base load plant should be operated annually for

(A) 500 hrs


(B) 1000hrs
(C) 2000 hrs
(D) 5000 hrs

Q 113.

The capacity of the base load plant should not be less than

(A) 3860 kW
(B) 4180 kW
(C) 5000 kW
(D) 5500 kW
Q 114.

Total kWh supplied by the plant is

(A) 10.l x 106


(B) 15 x 106
(C) 18 x 106
(D) 21.9 x 106

Q 115.

Total kWh to be supplied by base plant must be

(A) 19 .76 x 106


(B) 15.34 x 106
(C) 14.1 x 106
(D) 10.3 x 106

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 116.
For a load flow solution the quantities normally specified at a voltage controlled
bus are:
(A) P and Q
(B) P and I V I
(C) Q and I VI
(D) P and

Q 117.
For a 15-bus power system with 3 voltage controlled bus, the size of Jacobian
matrix is (a) 11 x 11 (b)12 x 12 (c) 24 x 24 (d) 28 x 28.
In the solution of load-flow equation, Newton-Raphon (NR) method is superior to the GaussSeidal (GS) method, because the
(A) time taken to perform one iteration in the NR method is less when compared to
the time taken in the GS method
(B) number of iteration required in the NR method is more when compared to that in
the GS method
(C) number of iterations required is not independent of the size of the system in the
NR method
(D) convergence characteristic of the NR method are not affected by the selection of
slack bus.

Q 118.
Which one of the following matrices reveals the topology of the power system
network ?
(A) Bus incidence matrix
(B) Primitive impedance matrix
(C) Primitive admittance matrix
(D) Bus impedance matrix.
Q 119.

In load-flow analysis, the load at a bus is represented as

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) a constant current drawn from the bus


(B) a constant impedance connected at the bus
(C) constant real and reactive powers drawn from the bus
(D) a voltage-dependent impedance at the bus.
(E)
Q 120.
In Gauss-Seidel method of power flow problem, the number of iterations may be
re-duced if the correction in voltage at each bus is multiplied by
(A) Gauss constant
(B) Acceleration constant
(C) Deceleration constant
(D) Blocking factor.

Q 121.
Consider the following statements : 1. It is easier to construct the YBus matrix as
compared to ZBus. 2. ZBus is a full matrix while Ybus is sparse. 3. Y-bus can be easily
modified whenever the network changes as compared to the ZBus. Which of these
statements are correct ?
(A) 1 and 2
(B) 2 and 3
(C) 1 and 3
(D) 1, 2 and 3.

Q 122.

In load flow studies of a power system, a voltage control bus is specified by

Real power and reactive power


Real power and voltage magnitude
Voltage and voltage phase angle

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Reactive power and voltage magnitude.


Q 123.

At slack bus, which one of the following combinations of variables is specified ?

(A) I V I,
(B) P, Q
(C) P, I V I
(D) Q, I V I.

Q 124.
Consider the following quantities : 1. Real power 3. Power factor 5. Bus voltage
magnitude
2. Reactive power 4. Input current 6. Bus voltage phase-angle.
For the purpose of the load flow studies of a power system, each bus or node is associated with
which one of the combinations of the above four quantities ?
(A) 1, 3, 4 and 5
(B) 1, 2, 3 and 4
(C) 2, 3, 5 and 6
(D) 1, 2, 5 and 6.
Q 125.

Normally ZBUS matrix is a


(A) Null matrix
(B) Full matrix
(C) Sparse matrix
(D) Unity matrix.

Q 126.

Gausss - Seidel iterative method can be used for solving a set of


(A) Linear differential equations only

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(B) Linear algebraic equations only


(C) Both linear and nonlinear algebraic equations
(D) Both linear and nonlinear differential equations
Q 127.
A power system consists of 300 buses out of which 20 buses are generator buses,
25 buses are the ones with reactive power support and 15 buses are the ones with fixed
shunt capacitors. All the other buses are load buses. It is proposed to perform a load flow
analysis for the system using Newton - Raphson method. The size of the Newton Raphson Jacobian matrix is
(a) 553 x 553
(b) 540 x 540
(c) 555 x 555
(d) 554 x 554
Q 128.

In load - flow analysis, the load at a bus is represented as

(a) A constant current drawn from the bus


(b) A constant impedance connected at the bus
(c) Constant real and reactive powers drawn from the bus
(d) A voltage - dependent impedance at the bus

Q 129.

Economic scheduling of generation is performed for a period of

(a) 1/2 hr
(b) 24 hr
(c) 1 sec
(d) 1 week
Q 130.

The input - output characteristic is plotted

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(a) Fuel input Vs power output


(b) Fuel input Vs time
(c) Fuel rate Vs power output
(d) Fuel rate Vs energy output
Q 131.

Hear rate curve is plotted in

(a) k-cal/kwhr Vs KW
(b) K-cal/hr Vs KW
(c) k-cal/KW Vs Kw
(d) K-cal Vs KW

Q 132.

Incremental production cost and incremental fuel cost are

(a) both the same


(b) IPC > IFC
(c) IPC < IFC
(d) They are not related

Q 133.

In power system each bus is associated with how many quantities.


(a) 4
(b) 3
(c) 5
(d) none

Q 134.

If real and reactive power components are specified then it is which type of bus.
(a) PQ bus

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(b) PV bus
(c) slack bus
(d) none
Q 135.
For which bus in the power system the voltage magnitude corresponding to the
generation voltage and real power corresponding to its ratings are specified.
(a) PQ bus
(b) PV bus
(c) slack bus
(d) none
Q 136.
Which bus is in the power system is made to take additional real and reactive
power to supply transmission losses.
(a) PQ bus
(b) PV bus
(c) slack bus
(d) none
Q 137.
For which bus we have to find out the voltage magnitude and phase angle of the
bus through the load flow solution.
(a) PQ bus
(b) PV bus
(c) slack bus
(d) none
Q 138.
For which bus we have to find out the reactive power generation and phase angle
of the bus through the load flow solution
(a) PQ bus
(b) PV bus

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(c) slack bus


(d) none

Q 139.

Diagonal element of the YBUS matrix is self admittance.


(a) True
(b) false

Q 140.
I BUS= YBUS VBUS ,is the equation for n bus system, in this the matix size of YBUS is
nXn.
(A) True
(B) False
(C) None possible
Q 141.
I BUS= YBUS VBUS ,is the equation for n bus system, in this the matix size of YBUS is
nX1.
(a) True
(b) False

Q 142.

I BUS= YBUS VBUS ,is the equation for n bus system, in this the matix size of YBUS is

(a) nXn
(b) 1Xn
(c) nX1
(d) 1X1
Q 143.

I BUS= YBUS VBUS ,is the equation for n bus system, in this the matix size of IBUS is

(A) nXn

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(B) 1Xn
(C) nX1
(D) 1X1
Q 144.
I BUS= YBUS VBUS ,is the equation for n bus system, in this the matix size of
VBUS is
(a) nXn
(b) 1Xn
(c) nX1
(d) 1X1
Q 145.

YBUS is the nXn matrix, where n is the number of buses.

(a) true
(b) false
Q 146.

YBUS is the symmetric matrix

(a) true
(b) false
Q 147.

Diagonal element of the YBUS matrix is

(a) self admittance


(b) transfer admittance
(c) both
(d) none
Q 148.

off-Diagonal element of the YBUS matrix is

(a) self admittance


(b) transfer admittance
(c) both

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(d) none
Q 149.

ZBUS is a full matrix

(a) true
(b) false
Q 150.

For convenience which bus is considered as slack bus.

(a) First bus


(b) last bus
(c) middle bus
(d) none.
Q 151.

Slack bus is also called Swing bus

(a) true
(b) false
Q 152.

slack bus is also called Reference bus

(a) true
(b) false
Q 153.

Load bus is also called PV bus

(a) true
(b) false
Q 154.

Load bus is also called PQ bus

(a) true
(b) false
Q 155.

generator bus is also called PQ bus

(a) true
(b) false

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 156.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

generator bus is also called PV bus

(a) true
(b) false
Q 157.

Load flow solution is the solution under which condition

(a) steady state condition


(b) transient condition
(c) both
(d) none
Q 158.

Load flow solution for power network can be worked out operation under

(a) balanced condition


(b) unbalanced condition
(c) both
(d) none
Q 159.

In power system each bus is associated with


(a) four quantities
(b) three quantities
(c) five quantities
(d) none

Q 160.

If real and reactive power components are specified then it is which type of bus.
(a) load bus
(b) generator bus
(c) slack bus
(d) none

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 161.
For which bus in the power system the voltage magnitude corresponding to the
generation voltage and real power corresponding to its rating s are specified
(a) load bus
(b) generator bus
(c) slack bus
(d) none
Q 162.
Which bus is in the power system is made to take additional real and reactive
power to supply transmission losses.
(a) load bus
(b) generator bus
(c) slack bus
(d) none
Q 163.
For which bus we have to find out the voltage magnitude and phase angle of the
bus through the load flow solution.
(a) load bus
(b) generator bus
(c) slack bus
(d) none
Q 164.
For which bus we have to find out the reactive power generation and phase angle
of the bus through the load flow solution
(a) load bus
(b) generator bus
(c) slack bus
(d) none
Q 165.
slack bus is in the power system is made to take additional real and reactive
power to supply transmission losses.

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(a) true
(b) false
Q 166.
For generator bus we have to find out the voltage magnitude and phase angle of
the bus through the load flow solution
(a) True
(b) False
Q 167.
For generator bus we have to find out the reactive power generation and phase
angle of the bus through the load flow solution.
a) true
b) false
Q 168.
The voltage controlled bus is treated as a load bus in subsequent iteration when its
Voltage limit is violated.
(a) True
(b) False
Q 169.
The voltage controlled bus is treated as a load bus in subsequent iteration when
its:active power limit is violated.
(a) true
(b) false
Q 170.

The load flow solution is always assured in case of Newton-Raphson method.

(a) True
(b) False

Q 171.
(a) true
(b) false

The bus admittance matrix (Ybus) of a power system is Symmetric matrix.

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 172.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

The bus admittance matrix (Ybus) of a power system is Sparse matrix.

a) true
b) false
Q 173.

The bus admittance matrix (Ybus) of a power system is equal to Zbus matrix.

(a) True
(b) False

Q 174.
its:

The voltage controlled bus is treated as a load bus in subsequent iteration when

a) Voltage limit is voilated


b) active power limit is voilated
c) Reactive power limit is voilated
d) Phase angle limit is voilated

Q 175.

The load flow solution is always assured in case of:

(a) Newton-Raphson method


(b) Gauss method
(c) Gauss -Seidel method
(d) None of these method guarantees
Q 176.

Compared to Gauss-Seidel method, Newton-Raphson method takes:

(a)less number of iterations


(b)more number of iterations
(c)equal number of iterations
none of these

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 177.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Compared to Gauss-Seidel method, Newton-Raphson method takes:

(a)less time per iteration


(b)more time per iteration
(c)equal time per iteration
(d)none of these

Q 178.

At slack bus, which one of the following combination of variables is specified?


(a) |V|,
(b) P,
(c) P, |V|
(d) ,|V|

Q 179.
At Generator bus, which one of the following combination of variables is
specified?
(a) |V|,
(b) P, |V|
(c) P,
(d) , |V|
Q 180.

At Load bus, which one of the following combination of variables is specified?

(a) P,
(b) , |V|
(c) |V|,
(d) P, Q
Q 181.
Which of the following quantity is associated with each bus or node for the
purpose of load flow studies of a power system

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(a) Real power


(b) power factor
(c) Input current
(d) frequency

Q 182.

The bus admittance matrix (Ybus) of a power system is not

(a) Symmetric
(b) a square matrix
(c) a full matrix
(d) generally having dominant diagonal elements
Q 183.
If a voltage controlled bus is treated as load bus, then which of the following
limits would be violated?
(a) Volatge
(b) Active power
(c) Reactive power
(d) phase angle
Q 184.
For a 15-bus power system with 3 voltage controlled bus, the size of Jacobian
matrix is
(a) 11 X 11
(b) 12 X 12
(c) 24 X 24
(d) 28 X 28
Q 185.

The diagonal elements of a nodal admittance matrix are strengthen by adding

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(a) Shunt inductances


(b) shunt capacitances
(c) loads
(d) Generators

Q 186.

The load flow solution is always assured in case of:

a. Newton-Raphson method
b. Gauss method
c. Gauss-Seidel method
d. None of these methods guarantees
Q 187.
In which of the following methods of load flow analysis the convergence of
solution does not depend upon choice of slack bus
a. Newton-Raphson method
b. Gauss method
c. Gauss-Seidel
d. none of these

Q 188.

In aYbus matrix the diagonal element of each node is obtained by

a. Multiplying the admittances connected to it


b. Adding the admittances connected to it
c. Subtracting the admittances connected to it
d. None of these

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 189.
Which fundamental law is applied at each node in a multi bus system to obtain
Ybus matrix
a. KVL
b. KCL
c. both
d. one of the above
Q 190.

In a large system of 100 nodes, the non-zero elements may be as small as


a. 20%
b. 22%
c. 2%
d. 9%

Q 191.

The Bus admittance matrix Ybus is


a. Singular matrix
b. Symmetric matrix
c. Sparse matrix
d. All of the above

Q 192.

In load flow studies of a power system, a voltage control bus is specified by


a. Real power and reactive power
b. Real power and voltage magnitude
c. Voltage and voltage phase angle
d. Reactive power and voltage magnitude

Q 193.
In Gauss-Seidel method of power flow problem, the number of iterations may be
reduced if the correction in voltage at each bus is multiplied by

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

a. Gauss constant
b. Acceleration constant
c. Deceleration constant
d. Blocking factor
Q 194.

Load flow study is carried out for

a. Fault calculations
b. stability studies
c. System planning
d. Load frequency control
Q 195.

Transient in electric circuits normally disappears within a time equal to

(a) 4 * time constant


(b) 2* time constant
(c) 8* time constant
(d) time constant

Q 196.
The convergence characteristic of the Netwon Rophson method of solving a
load flow problem is
a) quadratic

b) linear

C) geometric

d) cubic

Q 197.
1. Load bus
2. PV bus(b)
3. Slack bus
Q 198.

Buses for load flow studies are classified as

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 199.

B. TECH. 4 Th YEAR 8Th

The principal information obtained from load flow studies in a power system are

1. magnitude and phase angle of the voltage at each bus

2. reactive and real power flows in each of the lines

3. total power loss in the network

4. transient stability limit of the system

Select the correct answer using the codes given below :


(A) 1 and 2
(B) 3 and 4
(C) 1, 2 and 3

(D) 2 and 4

POWER SYSTEM

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 200.
Direction : The following two items consist of two statements, one labelled as
Assertion A and the other labelled as Reason R. You are to examine these two
statements carefully and decide if the Assertion A and the Reason R are individually true
and if so, whether the Reason is a correct explanation of the Assertion. Select your
answers to these items using the codes given below.

Codes :

(A) Both A and R are true and R is the correct explanation of A


(B) Both A and R are true but R is NOT the correct explanation of A
(C) A is true but R is false
(D) A is false but R is true
Assertion (A) : Bus admittance matrix is a sparse matrix.
Reason (R) : In load flow studies, one of the buses is take as a slack bus.
Consider the following statements in respect of load flow studies in power systems :
1. Bus admittance matrix is a sparse matrix
2. Gauss-Seidel method is preferred over Newton-Raphson method for load flow studies
3. One of the buses is taken as slack bus in load flow studies

Which of the statements given above are correct ?


(A) 1, 2 and 3
(B) 1 and 2
(C) 1 and 3
(D) 2 and 3

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120

D
A
A
D
C
A
D
C
C
C
B
C
A
D
A
B
D
D
A
C

121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140

B
D
B
A
D
B
B
B
C
A
A
A
B
A
A
B
C
A
B
A

141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

A
A
A
C
A
A
A
A
B
A
A
A
A
B
A
B
A
A
C
A

161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180

A
B
C
A
B
A
B
A
B
A
B
A
A
B
B
D
A
B
A
B

181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

D
A
C
C
D
A
D
A
B
B
C
D
B
B
C
C
A
B
C
C

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Unit- 3
Q 201.

Q 202.
The YBUS matrix of a 100-bus interconnected system is 90% sparse. Hence the
number of transmission lines in the system must be
(A) 450

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(B) 500
(C) 900
(D) 1000

Q 203.

Q 204.

Q 204.
At a particular unbalanced node, the real powers specified
are: Leaving the node 20 MW, 25 MW
Entering the node 60 MW, 30 MW The
balancing power will be:
(a) 30 MW leaving the node
(b) 45 MW leaving the node

(c) 45 MW entering the node


(d) 22.5 MW entering the node and 22.5 MW leaving the node.
Q 205.

The loss coefficients for a two-bus system are given as follows:]


(a) B11 = 0.02, B22 = 0.05, B12 = 0.01, B21 = 0.015.
(b) B11 = 0.02, B22= 0.04, B12 = -0.01, B21 = - 0.001.
(c)B11 = 0.03, B22= 0.005, B12 = - 0.001, B2I= - 0.001.

(d) B11= 0.03, B22 = 0.05, B12 = 0.001, B21 = - 0.001.

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 206.
For economic operation, the generator with highest positive incremental
transmission loss will operate at:
(a) The lowest positive incremental cost of production
(b) The lowest negative incremental cost of production
(c) The highest positive incremental cost of production
(d) None of the above.

Q 207.

The maximum permissible change in power frequency is


(A) 5 Hz
(B) 0.5 Hz
(C) 0.6 Hz
(D) 0.05 Hz

Q 208.
automatic generation and voltage regulation equipment is installed on each
generator
(A) Load frequency
(B) Excitation voltage
(C) Both A and B
(D) None of these
Q 209.

they take care of small changes in load demand


(A) Without change in frequency and voltage
(B) Without change in Power and voltage
(C) Without change in Real Power and Reactive power
(D) None of these

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 210.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

The change in load demand, this will change in alternator


(A) Power angle
(B) Excitation angle
(C) Firing angle
(D) None of these

Q 211.

The change in load demand, this will meet out by alternator


(A) Excitation voltage
(B) Speed of turbine
(C) Both A and B
(D) None of them

Q 212.

The change in load demand, this will change in alternator


(A) Excitation voltage
(B) Speed of turbine
(C) Both A and B
(D) None of them

Q 213.
Maintain network frequency constant so that the powers so that the power station
are satisfactorily parallel on the system run at the desired speed correct time is obtained
from
(A) Synchronoscope
(B) Two lamp method
(C) Three method
(D) None of these
Q 214.

Power angle will change in controlled formet

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) Momentarily Small change in speed


(B) Large change in speed
(C) Medium change in speed
(D) None of them
Q 215.

power frequency control is slow due to


(A) turbine and generator moment of inertia
(B) turbine and generator troque
(C) turbine and generator force
(D) All of the above

Q 216.

Change in load demand can be identified as


(A) slow varying changes in mean demand
(B) fast random variations around the mean
(C) A and B
(D) None of them

Q 217.

What should be at question mark from picture


(A) frequency

(B) Voltage

(C) Real power


?

(D) Speed
Q 218.

Pilot piston is used for


(A) Providing to help change in main piston

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(B) Providing change in main Valve


(C) Providing to flow in hydraulic oil
(D) All of them
Q 219.

These are part of LFC system


(A) Fly ball speed governor
(B) Hydraulic amplifier
(C) Linkage mechanism
(D) All of them

Q 220.

Fly ball speed governor is used for


(A) frequency
(B) Voltage
(C) Real power
(D) Speed

Q 221.

This modal may named as

(A) Turbine Model


(B) Model of Speed Governing System
(C) generator-load model
(D) All of them
Q 222.

This modal may named as

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(A) Turbine Model


(B) Model of Speed Governing System
(C) generator-load model
(D) All of them
Q 223.

This modal may named as

(A) Turbine Model


(B) Model of Speed Governing System
(C) generator-load model
(D) All of them

Give the answer all below questions

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 224.

The value at position 1 in above modal


(A) Pc ( s)
(B) P D (s)
(C) PG ( s)
(D) F (s )

Q 225.

The value at position 2 in above modal


(A) Pc ( s)
(B) P D (s)
(C) PG ( s)
(D) F ( s )

Q 226.

The value at position 3 in above modal


(A) Pc ( s)
(B) Y E ( s)
(C) PG ( s)
(D) F (s )

Q 227.

The value at position 4 in above modal


(A) Pc ( s)
(B) P D (s)
(C) PG ( s)
(D) F ( s )

Q 228.

The value at position 6 in above modal


(A) Pc ( s)
(B) P D (s)

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(C) PG ( s)
(D) F (s )
Q 229.

The final value at above modal


(A) Pc ( s)
(B) P D (s)
(C) PG ( s)
(D) F ( s )

Q 230.

The input value at above modal


(A) Pc ( s)
(B) P D (s)
(C) PG ( s)
(D) F (s )

Q 231.

speed regulation of the governor


(A) K1KC/K2
(B) K1KC K3/K4
(C) 1/K5 K4
(D) none of them

Q 232.

gain of speed governor


(A) K1KC/K2
(B) K1KC K3/K4
(C) 1/K5 K4
(D) none of them

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 233.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

time constant of speed governor


(A) K1KC/K2
(B) K1KC K3/K4
(C) 1/K5 K4
(D) none of them

Q 234.

The droop slope may define as


(A)

1
1
B+
R

( )

(B) B+

(C)

( 1R )

( R1 )

(D) None of them


Q 235.

For 250 MW machine with an operating load of 125 MW. let the change in load
P
be 1% for 1% change in frequency (scheduled frequency = 50 Hz). Then
f
(A) 2.5 MW/Hz
(B) 5.0 MW/Hz
(C) 2.6 MW/Hz
(D) 3.5 MW/Hz

Q 236.

For 250 MW machine with an operating load of 125 MW. let the change in load
P
be 1% for 1% change in frequency (scheduled frequency = 50 Hz). Then
f
(A) 0.001 pu MW/Hz
(B) 0.01 pu MW/Hz
(C) 0.1 pu MW/Hz

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) 1 pu MW/Hz
Q 237.
A 100 MVA synchronous generator operates on full load at frequency of 50 Hz.
The load is suddenly reduced to 50 MW. Due to time lag in governor system, the steam
valve begins to close after 0.4 seconds. Given H = 5 kW-sec/KVA of generator capacity.
Determine the change in frequency that occurs in this time.
(A) 51 Hz
(B) 50 Hz
(C) 48 Hz
(D) 49 Hz
Q 238.
A 100 MVA synchronous generator operates on full load at frequency of 50 Hz.
The load is suddenly reduced to 50 MW. Due to time lag in governor system, the steam
valve begins to close after 0.4 seconds. Given H = 5 kW-sec/KVA of generator capacity.
Determine Excess power input to generator
(A) 50 MW
(B) 52 MW
(C) 53 MW
(D) 40 MW
Q 239.
A 100 MVA synchronous generator operates on full load at frequency of 50 Hz.
The load is suddenly reduced to 50 MW. Due to time lag in governor system, the steam
valve begins to close after 0.4 seconds. Given H = 5 kW-sec/KVA of generator capacity.
Determine Kinetic energy stored in rotating parts of generator and turbine
(A) 0.5 MW
(B) 5.0 MW
(C) 3.0 MW
(D) 1.6 MW
Q 240.
A 100 MVA synchronous generator operates on full load at frequency of 50 Hz.
The load is suddenly reduced to 50 MW. Due to time lag in governor system, the steam

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

valve begins to close after 0.4 seconds. Given H = 5 kW-sec/KVA of generator capacity.
Determine Excess energy input to rotating parts in 0.4 sec
(A) 21000 KW-Sec
(B) 20000 KW-Sec
(C) 19000 KW-Sec
(D) Not calculated
Q 241.
Two generators rated 200 MW and 400 MW are operating in parallel. The droop
characteristics of their governors are 4% and 5%, respectively from no load to full load.
Assuming that the generators are operating at 50 Hz at no load, Assume free governor
operation, how would a load of 600 MW be shared between them?
(A) 230, 370
(B) 229, 371
(C) 231, 369
(D) Not calculated
Q 242.
Two generators rated 200 MW and 400 MW are operating in parallel. The droop
characteristics of their governors are 4% and 5%, respectively from no load to full load.
Assuming that the generators are operating at 50 Hz at no load, What will be the system
frequency at this load? Assume free governor operation.
(A) 51.59 Hz
(B) 47.69 Hz
(C) 48.99 Hz
(D) 49.00 Hz
Q 243.

This modal is showing


(A) 1st order LFC modal
(B) 2nd order LFC modal
(C) Multiple order LFC modal

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) None of these


Q 244.

central economic dispatch computer is abbreviated


(A) CEDC
(B) CEC
(C) EDC
(D) None of them

Q 245.

synchronizing coefficient is
(A)

(B)

(C)

|V 1||V 2|
PX

|V 1||V 2|
P r 1 X 12

|V 1||V 2|
P

sin ( 01 01 )

sin ( 1 2)

(D) None of them


Q 246.
Maintain network frequency constant so that the powers so that the power station
are satisfactorily parallel on the system run at the desired speed correct time is obtained
from
(A) Synchronoscope
(B) Two lamp method
(C) Three method
(D) None of these
Q 247.

Power angle will change in controlled format


(A) Momentarily Small change in speed
(B) Large change in speed
(C) Medium change in speed

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(D) None of them


Q 248.

power frequency control is slow due to


(A) turbine and generator moment of inertia
(B) turbine and generator troque
(C) turbine and generator force
(D) All of the above

Q 249.

Two area control means


(A) One power system are involved
(B) two or more power system are involved
(C) A and B
(D) None of them

Q 250.

This equation shows

K sg
1+T sg s

(A) Turbine Model


(B) Model of Speed Governing System
(C) generator-load model
(D) All of them
Q 251.

This equation shows

Kt
1+T t s

(A) Turbine Model


(B) Model of Speed Governing System
(C) generator-load model
(D) All of them
Q 252.

This equation shows

K ps
1+T ps s

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) Turbine Model


(B) Model of Speed Governing System
(C) generator-load model
(D) All of them

201
202
203
204
205
206
207
208
209
210
211
212

D
C
C
B
C
A

B
C
A
A
C
C

221
222
223
224
225
226
227
228
229
230
231
232

B
A
C
B
A
B
C
D
D
A
B
B

241
242
243
244
245
246
247
248
249
250
251
252

C
B
A
A
B
A
A
A
B
C
C
C

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

213
214
215
216
217
218
219
220

A
A
A
C
A
D
D
A

233
234
235
236
237
238
239
240

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

C
A
A
B
A
A
A
B

Unit=4
Q 253.

Zero power factor method of an alternator is used to find its


(A) field resistance
(B) armature resistance
(C) efficiency
(D) voltage regulation

Q 254.

The power factor of an alternator is obtained from its


(A) excitation
(B) speed
(C) load
(D) none of the above

Q 255.

For parallel operation, alternators must have

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) same speed


(B) same kva rating
(C) same voltage rating
(D) none of the above
Q 256.

For alternation having fractional pitch of 5/6 the coil span is


(A) 90
(B) 120
(C) 150
(D) 180

Q 257.

Fractional pitch to eliminate 7th harmonic from alternator emf is


(A) 7/6
(B) 6/7
(C) 6/5
(D) 3/5

Q 258.
Consider the following statements about a three-phase synchronous generator
synchronized to an infinite bus when its mechanical input is increased gradually with
field current held constant:
1

The power factor of the current supplied becomes more lagging

The power factor of the current supplied improves

The power factor remains unity

The load angle is increased

Of these statements
(A) 1 alone is correct
(B) 2 alone is correct

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(C) 2 and 4 are correct


(D) 3 and 4 are correct
Q 259.
A 3-phase synchronous generator, with its armature resistance and the leakage
reactance being neglected, is synchronized to an infinite bus and its field excitation is
kept constant thereafter
Now the machine is loaded by Supplying mechanical input
to the shaft so that the load-angle reaches a value of 60 Under this condition, the
operating power-factor would be
(A) 0.866 leading
(B) 0.866 lagging
(C) 0 .5 leading
(D) 0.5 lagging
Q 260.
A round rotor synchronous generator has a leakage reactance of 10%, armature
reaction reactance of 90% and negligible armature resistance with the machine initially
running at rated speed and terminal voltage of 1.0 pu, a 3-phase short-circuit is applied
The sustained armature current will be
(A) 1.25 pu
(B) 1.11 pu
(C) 1.0 pu
(D) 0.9 pu
Q 261.
Following a sudden short-circuit at the terminals of a 3-phase unloaded
synchronous generator, the initial effect of the pole-face damper windings, is to
(A) establish the armature flux through the direct-axis magnetic circuit of the
machine
(B) allow only partial linkage of the armature flux with the main field winding
(C) confine the armature flux to completely link the damper winding
(D) repel the armature flux and confine it to the leakage flux path in the air-gap
Q 262.
In a synchronous generator operating at zero pf lagging, the effect of armature
reaction is

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) magnetizing
(B) demagnetizing
(C) cross-magnetizing
(D) both magnetizing and cross-magnetizing
Q 263.
Which of the following limit the reactive power output of a synchronous
generator ?
1

Armature current

Field current

Load angle

Prime mover input

Select the correct answer using the codes given below:


Codes
(A) 1 and 2
(B) 2 and 3
(C) 3 and 4
(D) 1 and 4
Q 264.

The steady-state stability limit of a synchronous generator can be increased by


(A) an increase in its reactance
(B) an increase in the excitation of the machine
(C) a decrease in the moment of inertia of the machine
(D) an increase in the moment of intertia of the machine

State whether the following statements related to Synchronous Generator are true (T) or
false (F):
Q 265.

Synchronous reactance can be determined from open circuit and short circuit tests

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these
Q 266.

Voltage regulation can be determined by synchronous impedance method


(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these

Q 267.
Percentage resistance is the resistance drop at rated current and frequency
expressed as the percentage of the rated voltage
(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these
Q 268.
MMF method for regulation does not use data available from open circuit and
short circuit tests
(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these
Q 269.

In short-pitch windings fractional number of slots per pole can be used


(A) TRUE
(B) FALSE

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(C) Not Possible


(D) None of these
Q 270.

One of the advantage of short pitch windings is saving in copper


(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these

Q 271.

Large scale power generation is done by synchronous generators


(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these

Q 272.

The angle between Eg and Vt is called the power angle


(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these

Q 273.

Synchronous reactance is determined by synchronous reactance method


(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these

Q 274.
Synchronous generator must operate at the correct speed as it determines the
frequency since the number of poles is fixed for any given machine

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these
Q 275.
The voltage regulation of an ac generator is defined as the rise in voltage when
the load is reduced from full-rated load value to zero, speed and field current remaining
constant
(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these
Q 276.

Armature reaction in an alternator affects generated voltage/phase


(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these

Q 277.

Armature reaction in an alternator is magnetizing at lagging loads


(A) TRUE
(B) FALSE
(C) Not Possible
(D) None of these

Q 278.

Maximum demand on a power plant is


(A) The greatest of all "short time interval averaged" demand during a period
(B) Instantaneous maximum value of KVA supplied during a period

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(C) Both (a) or (b)


(D) None of the above
Q 279.

In an alternator, the frequency per revolution is equal to


(A) Number of poles
(B) Number of pairs of poles
(C) Number of armature conductors
(D) Forty

Q 280.
Squirrel cage bars placed in the rotor pole faces of an alternator help reduce
hunting
(A) Above synchronous speed only
(B) Below synchronous speed only
(C) Above and below synchronous speeds both
(D) None of the above
Q 281.

Stationary alternator should not be connected to live bus-bars because it


(A) Is likely to run as synchronous motor
(B) Will get short circuited
(C) Will decrease bus - bar voltage though momentarily
(D) Will disturb generated emf's of other alternators connected in parallel

Q 282.
With a unity load p
of an alternator is
(A) Distortional
(B) Magnetizing
(C) Demagnetizing
(D) Nominal

f, the effect of armature reaction on the main field flux

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 283.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

At lagging loads, armature reaction in an alternator is


(A) Cross-magnetising
(B) Demagnetizing
(C) Non-effective
(D) Magnetizing

Q 284.
The frequency of voltage generated by an alternator having 4 poles and rotating at
1800 rpm is
(A) 60 Hz
(B) 7200 Hz
(C) 120 Hz
(D) 450 Hz
Q 285.

The main disadvantages of using short pitch winding in alternators is that it


(A) Reduces harmonics in the generated voltage
(B) Reduces the total voltage around the armature coils
(C) Produces asymmetry in the three phase windings
(D) Increases Cu of end connections

Q 286.

Zero power factor method of an alternator is used to find its


(A) Efficiency
(B) Voltage regulation
(C) Armature resistance
(D) Synchronous impedance

Q 287.

Armature reaction in an alternator mainly affects


(A) Rotor speed

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(B) Terminal voltage per phase


(C) Frequency of armature current
(D) Generated voltage per phase
Q 288.

The effect of increasing air gap length in the induction motor will increase the
(A) Power factor
(B) Speed
(C) Magnetizing current
(D) Air gap flux

Q 289.

The principle of operation of a 3 phase induction motor is most similar to that of a


(A) Synchronous motor
(B) Repulsion start induction motor
(C) Transformer with a shorted secondary
(D) Capacitor start, induction run motor

Q 290.
Squirrel cage bars placed in the rotor pole faces of an alternator help reduce
hunting
(A) Above synchronous speed only
(B) Below synchronous speed only
(C) Above and below synchronous speeds both
(D) None of the above
Q 291.

The stationary alternator should not be connected to live bus-bars because it


(A) Is likely to run as synchronous motor
(B) Will get short circuited
(C) Will decrease bus - bar voltage though momentarily

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) Will disturb generated emf's of other alternators connected in parallel


Q 292.
With a unity load pf, the effect of armature reaction on the main field flux of an
alternator is
(A) Distortional
(B) Magnetizing
(C) Demagnetizing
(D) Nominal
Q 293.

At lagging loads, armature reaction in an alternator is


(A) Cross-magnetising
(B) Demagnetizing
(C) Non-effective
(D) Magnetizing

Q 294.
The frequency of voltage generated by an alternator having 4 poles and rotating at
1800 rpm is
(A) 60 Hz
(B) 7200 Hz
(C) 120 Hz
(D) 450 Hz
Q 295.

The main disadvantages of using short pitch winding in alternators is that it


(A) Reduces harmonics in the generated voltage
(B) Reduces the total voltage around the armature coils
(C) Produces asymmetry in the three phase windings
(D) Increases Cu of end connections

Q 296.

Zero power factor method of an alternator is used to find its

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) Efficiency
(B) Voltage regulation
(C) Armature resistance
(D) Synchronous impedance
Q 297.

Armature reaction in an alternator mainly affects


(A) Rotor speed
(B) Terminal voltage per phase
(C) Frequency of armature current
(D) Generated voltage per phase

Q 298.

The effect of increasing air gap length in the induction motor will increase the
(A) Power factor
(B) Speed
(C) Magnetizing current
(D) Air gap flux

Q 299.

The principle of operation of a 3 phase induction motor is most similar to that of a


(A) Synchronous motor
(B) Repulsion start induction motor
(C) Transformer with a shorted secondary
(D) Capacitor start, induction run motor

Q 300.

Two alternators are paralleled___


(A) So that one isn't overworked

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(B) Because of a rising load demand


(C) To ease the work load
(D) Because of the declining load demand
Q 301.

To parallel alternators, it's necessary to match___


(A) Voltages
(B) Frequencies
(C) Voltages & frequencies
(D) Voltages, frequencies, & instantaneous polarities

Q 302.

The output voltage of an alternator is controlled by___


(A) Adjusting the prime mover
(B) Adjusting the direct current of the field circuit
(C) Synchronizing lamps
(D) A synchroscope

Q 303.
Alternators shouldn't be paralleled unless the synchronizing lamps are lighting &
dimming ___
(A) In rotation
(B) In reverse rotation
(C) In unison
(D) Alternately
Q 304.
Three lights flashing rapidly in unison while paralleling alternators means that
____
(A) The machines are not polarized
(B) The phase sequences are wrong
(C) The paralleling switch should be closed

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) The frequencies differ by a large amount


Q 305.

The most reliable method of synchronizing alternators is to use __________


(A) A synchroscope
(B) The three dark method
(C) The three light method
(D) The two bright, one dark method

Q 306.
When the pointer of a synchroscope is stationary & points upward during the
paralleling operation, the ____
(A) Alternators are in synchronism
(B) Alternators are not in synchronism
(C) Incoming alternator frequency is too slow
(D) Incoming alternator frequency is too fast
Q 307.
The division of load between alternators operating in parallel is accomplished by
changing the
(A) Field excitation
(B) Speed of the prime movers
(C) Power factor of the load
(D) Machine characteristics
Q 308.

What is the V/Hz ratio?


(A) To develop rated torque
(B) To develop rated Current
(C) To develop rated Power
(D) To develop rated frequency

Q 309.
The power output of an alternator is 40 kW and KVAR component is 25.What
will be the value of tan ( being the power factor angle) ?

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) 0 .625 lagging


(B) 0 .625 leading
(C) 0.375 lagging
(D) 0 .375 leading
Q 310.
A 120 MW turbo alternator is supplying power to 80 MW load at pf lagging
Suddenly the steam supply to the turbine is cut off and the alternator remains connected
to the supply network and the field supply also remains on
What will happen to the
alternator ?
(A) The stator winding of the alternator will get burnt
(B) The rotor winding of the alternator will get burnt
(C) The alternator will continue to run as a synchronous motor rotating in the same
direction
(D) The alternator will continue to run as a synchronous motor rotating in the
opposite direction
Q 311.
The figure shows the characteristics of an alternator. Which curve represents
synchronous impedance?

(A) curve A
(B) curve B
(C) curve C

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) curve D
Q 312.

In the above figure (Figure of Question 49) which curve represents short circuit ?
(A) curve A
(B) curve B
(C) curve C
(D) curve D

Q 313.

In the above figure which curve represents open circuit voltage ?


(A) curve A
(B) curve B
(C) curve C
(D) curve D

Q 314.
For a peripheral speed of 314 m/s, a 2 pole cylindrical machine will have
maximum diameter of
(A) 255 cm
(B) 235 cm
(C) 200 cm
(D) 170 cm
Q 315.
The rotor of the salient pole alternator has 24 poles. The number of cycles of emf
in one revolution would be
(A) 24
(B) 12
(C) 6
(D) 4
Q 316.
Two alternators A and B are sharing an inductive load equally
excitation of alternator A is increased

If the

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) alternator B will deliver more current and alternator A will deliver less current
(B) alternator B will deliver less current and alternator A will deliver more current
(C) both will continue to share load equally
(D) both will deliver more current
Q 317.

Desirable feature for the parallel operation of two alternators is


(A) both should have same resistance
(B) both should have same reactance
(C) both should have less of resistance as compared to synchronous reactance
(D) both should have more of resistance as compared to synchronous reactance

Q 318.

Alternators used in aircraft systems usually have frequency of


(A) 25 Hz
(B) 50 Hz
(C) 100 Hz
(D) 400 Hz

Q 319.

High frequency on aircraft alternators is selected in order to


(A) free the systems from external disturbance
(B) compensate for high speeds
(C) compensate for high altitudes
(D) reduce the bulk

Q 320.
A 20 pole ac generator rotates at 600 rpm
seconds per cycle is
(A) 0.009
(B) 0. 004
(C) 0 .008

The periodic time of current in

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) 0. 01
Q 321.

What kind of rotor is most suitable for turbo alternators ?


(A) salient pole type
(B) non-salient pole type
(C) both (A) and (B) above
(D) None of the above

Q 322.
The synchronizing power developed in one of the alternators, when two
alternators are running in parallel, will load the same alternator in which it is developed
and reduce its speed
(A) True
(B) False
(C) None of these
(D) This is wrong
Q 323.
If the input to the prime mover of an alternator is kept constant but the excitation
is changed then the
(A) reactive component of the output is changed
(B) active component of the output is changed
(C) power factor of load remains constant
(D) None of them
Q 324.
If two machines are running in synchronism and the voltage of one machine is
suddenly increased
(A) the machines will burn
(B) both machines will stop
(C) synchronising torque will be produced to restore further synchronism
(D) None of them

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 325.
In an alternator, at 0.8 lagging power factor, the generated voltage per phase is
240 V to give a rated terminated voltage ' V ' . If the power factor of load increases to
unity, the generated voltage per phase must be
(A) 260 V
(B) 250 V
(C) 240 V
(D) 225 V
Q 326.

The advantage of salient poles in an alternator is


(A) reduce noise
(B) reduced windage loss
(C) adoptability to low and medium speed operation
(D) reduce bearing loads and noise

Q 327.
Magnetization curves for no load and full load unity power factor are shown in
figure below
Which is the magnetization curve for full load 0
8 power
factor?

(A) curve A
(B) curve B
(C) curve C
(D) curve D

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 328.
At a particular instant a turbo alternator is generating 80 MW at 0.8 power factor
lagging
Now if the steam supply valve to the steam turbine is further opened and
the excitation is not changed
(A) the speed of the alternator will increase but kW delivered will remain unchanged
(B) the speed of the alternator will increase and kW delivered will also increase
(C) the speed of the alternator will remain unchanged but it can meet more kW
demand
(D) the speed of the alternator will remain unchanged but it will deliver more kVA
Q 329.
Two alternators A and B are sharing a resistive load (P f = 1 ) equally. Now if
the excitation of alternator A is increased
(A) alternator A will become lagging and alternator B will become leading
(B) alternator A will become leading and alternator B will become lagging
(C) both alternators will continue to operate on unity power factor
(D) both alternators will operate on lagging power factor
Q 330.

The advantage of providing damper winding in alternators is


(A) elimination of harmonic effects
(B) provide a low resistance path for the currents due to unbalancing of voltage
(C) oscillations are provided when two alternators operate in parallel
(D) All of the above

Q 331.
When two alternators are running in exactly synchronism, the synchronising
power wil be
(A) zero
(B) sum of the output of two
(C) unity
(D) 0.707
Q 332.

Questions 70 to 72 refer to the figure given below :

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 333.
Load characteristic curves for an alternator are shown. The curves are drawn for
0. 8 pf lagging, 0.8 pf leading, 0.7 p f leading and 0. 9 pf lagging. Which curve
represents the characteristics for 0 .8 p f leading ?
(A) curve A
(B) curve B
(C) curve C
(D) curve D
Q 334.

Which curve represents the data for 0.8 p .f lagging ?


(A) curve A
(B) curve B
(C) curve C
(D) curve D

Q 335.

Which curve represents the data for 0.9 p f lagging ?


(A) curve A
(B) curve B
(C) curve C
(D) curve D

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 336.
The balanced short circuit current of a three phase alternator is 25 amperes at
1500 rpm
For the same field current, the balanced short current at 1400 rpm will
be
(A) 18.00A
(B) 27 . 00 A
(C) 20.00 A
(D) 28.28A
Q 337.
A three phase alternator has a phase sequence of RYB for its three output
voltages, for clockwise rotation
Now if the alternator is rotated anticlockwise, the
phase sequence will be
(A) RYB
(B) RBY
(C) BYR
(D) none of the above
Q 338.
In a synchronous machine, if the field flux axis is ahead of the armature field
axis, in the direction of rotation, the machine working as
(A) asynchronous motor
(B) asynchronous generator
(C) synchronous motor
(D) synchronous generator
Q 339.
In synchronous alternator, which of the following coils will have emf closer to
sine waveform ?
(A) concentrated winding in full pitch coils
(B) concentrated winding in short pitch coils
(C) distributed winding in full pitch coils
(D) distributed winding in short pitch coils.

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Q 340.
An alternator has rated field current of 4 A. The alternator develops 180 V while
drawing a field current of 2 A at 750 rpm. If the field current is made 4 A at 750 rpm
generated voltage could be
(A) 400 V
(B) 380 V
(C) 60V
(D) 330 V.
Q 341.
The armature reaction of an alternator will be completely magnetizing in case the
load power factor is
(A) unity
(B) 0.707
(C) zero lagging
(D) zero loading.
Q 342.

Which of the following is not an integral part of synchronous generator system ?


(A) prime mover
(B) distribution transformer
(C) excitation system
(D) protection system.

Q 343.

For turbo generators the range of excitation voltage is


(A) 10 to 20 V
(B) 30 to 100 V
(C) 100 to 800 V
(D) 1000 to 1800 V.

Q 344.

In case of low speed hydrogenerators, the short circuit ratio is usually


(A) 0.1 to 0.5

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(B) 0.5 to 0.6


(C) 0.6 to 1.0
(D) 1.0 to 1.5.
Q 345.
The permissible duration for which a generator of rated frequency 50 Hz can run
at 46 Hz is
(A) zero
(B) one cycle
(C) one second
(D) one minute.
Q 346.

The permissible duration in supply . frequency is


(A) 2 %
(B) 5 %
(C) 10 %
(D) 25 %.

Q 347.

84. The regulation of an alternator is likely to be negative in case of


(A) high speed alternators
(B) slow speed alternators
(C) lagging power factor of the load
(D) leading power factor of the load.

Q 348.

Questions 85 to 88 refer to the data given below:

A phase, 50 Hz, 6600 V, alternator is rated at 6600 kW at 0.8 power factor and a full
load efficiency of 90%.
Q 349.

85. kVA is rating of the alternator is


(A) 750 kVA

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(B) 7500 kVA


(C) 75000 kVA
(D) 750000 kVA.
Q 350.

The current rating of the alternator is


(A) 65.63 A
(B) 656.3 A
(C) 6563 A
(D) 65630 A.

Q 351.

The input to the alternator is


(A) 666.6 kW
(B) 6666 kW
(C) 66660 kW
(D) 666,600 kW.

Q 352.
If the input. to an alternator remains unaltered, but excitation is changed then
which of the following will not change ?
(A) kVA output
(B) kW output
(C) power factor
(D) all of the above.

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272

D
C
C
C
B
B
B
B
B
B
B
B
A
A
A
B
A
A
A
A

273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292

A
A
A
A
B
A
A
C
B
A
D
A
B
B
D
C
C
C
B
A

293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

D
A
B
B
D
C
C
B
D
B
C
C
A
A
B
B
D
C
A
C

313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332

D
C
B
B
C
D
D
D
B
A
A
C
D
C
D
C
A
D
A
C

333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352

A
B
C
B
D
D
D
D
B
C
D
C
A
D
B
C
B
B
A
B

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Unit - 5
Q 353.

SCO full name


(A) Security constrained power system optimization
(B) Security constrained optimization
(C) System constrained power system optimization
(D) None of these

Q 354.

System security involves


(A) Economizing on fuel cost and
(B) Minimizing emission of gases
(C) Both above
(D) None of these

Q 355.

EMS say in full name


(A) Energy management system
(B) Energy management security
(C) Economic management system
(D) None of these

Q 356.
System security can be said to comprise of three major functions that are used in
an energy control centre:
(A) system monitoring
(B) Contingency Analysis

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(C) Corrective action analysis.


(D) All of above
Q 357.

System monitoring system supplies some info which helps


(A) Power system operators
(B) Power system Dispatcher
(C) Both A and B
(D) None of them

Q 358.

System monitoring system supplies some info which contains


(A) Real time basis as load change
(B) Real time basis as Generation change
(C) Both A and B
(D) None of them

Q 359.

SCADA is known as
(A) Supervision Control And Data Access
(B) Supervisory Control And Data Access
(C) Supervisory Communication And Data Acquisition
(D) Supervisory Control And Data Acquisition

Q 360.

State estimation means


(A) Best estimation of data
(B) Best economy data
(C) SCADA data
(D) None of them

Q 361.

contingency analysis may define


(A) forecasting possible power system Dispatch

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(B) forecasting possible system troubles


(C) forecasting possible system Requirement
(D) none of them
Q 362.

Corrective action analysis means


(A) Solve Predicted a serious problem
(B) Maintenance
(C) Both A and B
(D) None of these

Q 363.

Energy Management System is contains


(A) Secure,
(B) Correctable emergency
(C) Restoration
(D) All of above

Q 364.

SECURITY ANALYSIS may divided into


(A) Security assessment
(B) Security control
(C) Both of above
(D) Not divided

Q 365.

Security assessment involves


(A) system monitoring
(B) contingency analysis
(C) Both of above
(D) Not divided

Q 366.

Power system static security Level are

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(A) 4
(B) 5
(C) 6
(D) 2
Q 367.

Power system static security Level 6th is


(A) Alert
(B) Correctable emergency
(C) Non-Correctable emergency
(D) Restorative

Q 368.

Power system static security Level 5th is


(A) Correctively secure
(B) Alert
(C) Correctable emergency
(D) Non-Correctable emergency

Q 369.

Power system static security Level 4th is


(A) Correctively secure
(B) Alert
(C) Correctable emergency
(D) Non-Correctable emergency

Q 370.

Power system static security Level 3rd is


(A) Correctively secure
(B) Alert
(C) Correctable emergency
(D) Non-Correctable emergency

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 371.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Power system static security Level 2nd is


(A) Correctively secure
(B) Alert
(C) Correctable emergency
(D) Non-Correctable emergency

Q 372.

Power system static security Level 1st is


(A) Correctively secure
(B) Secure
(C) Correctable emergency
(D) Non-Correctable emergency

Q 373.

Power system static security Level is not


(A) Correctable emergency
(B) Non-Correctable emergency
(C) Restorative
(D) EMS

Q 374.

OPF full name


(A) Optimal power flow
(B) Operational power flow
(C) Optimal power field
(D) None of them

Q 375.
As the load factor approaches unity, the shape of load duration curve will be
nearly
(A) L shaped
(B) Inverted T shaped

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(C) Triangular
(D) Rectangular.
Q 376.

contingency analysis may define


(A) forecasting possible power system Dispatch
(B) forecasting possible system troubles
(C) forecasting possible system Requirement
(D) none of them

Q 377.

Corrective action analysis means


(A) Solve Predicted a serious problem
(B) Maintenance
(C) Both A and B
(D) None of these

Q 378.

Energy Management System is contains


(A) Secure,
(B) Correctable emergency
(C) Restoration
(D) All of above

Q 379.

SECURITY ANALYSIS may divided into


(A) Security assessment
(B) Security control
(C) Both of above
(D) Not divided

Q 380.

Generation Shift factor written as

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

(A) li=

fl
PGi

(B) li=

PGi
fl

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(C) Both A and B


(D) None of these
Q 381.

contingency selection may also known as


(A) contingency screening
(B) Solve Predicted a serious problem
(C) Security control
(D) Correctable emergency

Q 382.

Effective counter Measures to prevent or contain voltage Instability


(A) Generator terminal voltage shourd be raised.
(B) Generator transformer tap value may be increased
(C) Load-end OLTC (on-load tap changer) should be suitably used
(D) All of them

Q 383.

Effective counter Measures to prevent or contain voltage Instability


(A) Q-injection should be carried out at an appropriate location.
(B) Load-end OLTC (on-load tap changer) should be suitably used.
(C) For under voltage conditions, strategic load shedding should be resorted
(D) All of them

Q 384.

Effective counter Measures to prevent or contain voltage Instability


(A) Q-injection should be carried out at an appropriate location.
(B) Load-end OLTC (on-load tap changer) should be suitably used.

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(C) Both A and B


(D) None of all
Q 385.

Effective counter Measures to prevent or contain voltage Instability


(A) Load-end OLTC (on-load tap changer) should be suitably used.
(B) For under voltage conditions, strategic load shedding should be resorted
(C) Both A and B
(D) None of all

Q 386.

Effective counter Measures to prevent or contain voltage Instability


(A) Generator terminal voltage should be raised.
(B) Generator transformer tap value may be increased
(C) Q-injection should be carried out at an appropriate location
(D) All of them

Q 387.

When a power plant is not able to meet the demand of consumers it will resort to
(A) Penalizing high load consumers by increasing the charges for electricity
(B) power factor improvement at the generators
(C) efficient plant operation
(D) Load shedding.

Q 388.

Load shedding is possible through


(A) voltage reduction
(B) frequency reduction
(C) switching off the loads
(D) All of the above.

Q 389.
Which of the following power plants can generate power at unpredictable or
uncontrollable times?

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) Wind power plant


(B) Tidal power plant
(C) Solar power plant
(D) All of the above
Q 390.

Direct conversion of heat into electrical power is possible through


(A) thermionic converter
(B) fuel cell
(C) batteries
(D) all of the above.

Q 391.

Power system static security Level 3rd is


(A) Correctively secure
(B) Alert
(C) Correctable emergency
(D) Non-Correctable emergency

Q 392.

Power system static security Level 2nd is


(A) Correctively secure
(B) Alert
(C) Correctable emergency
(D) Non-Correctable emergency

Q 393.

Power system static security Level 1st is


(A) Correctively secure
(B) Secure
(C) Correctable emergency
(D) Non-Correctable emergency

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

Q 394.

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

Effective counter Measures to prevent or contain voltage Instability


(A) Q-injection should be carried out at an appropriate location.
(B) Load-end OLTC (on-load tap changer) should be suitably used.
(C) For under voltage conditions, strategic load shedding should be resorted
(D) All of them

Q 395.

Effective counter Measures to prevent or contain voltage Instability


(A) Q-injection should be carried out at an appropriate location.
(B) Load-end OLTC (on-load tap changer) should be suitably used.
(C) Both A and B
(D) None of all

Q 396.

SECURITY ANALYSIS may divided into


(A) Security assessment
(B) Security control
(C) Both of above
(D) Not divided

Q 397.

Generation Shift factor written as


(A) li=

fl
PGi

(B) li=

PGi
fl

(C) Both A and B


(D) None of these
Q 398.

Voltage collapse is the process is happen due to


(A) System phase sequence is changed

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(B) Sudden change in load


(C) A and B both
(D) None of them
Q 399.
A generating station has a maximum demand of 50 Mw, a load factor of 60%, a
plant capacity factor of 45% and if the plant while running as per schedule were fully
loaded. The daily energy produced will be
(A) 400 MW
(B) 720 MW
(C) 500 MW
(D) 600 MW
Q 400.
A three-phase, 33kV oil circuit breaker is rated 1200A, 2000MVA, 3s. The
symmetrical breaking current is
(A) 1200A
(B) 3600A
(C) 35kA
(D) 104.8Ka
Q 401.

Effective counter Measures to prevent or contain voltage Instability


(A) Generator terminal voltage should be raised.
(B) Generator transformer tap value may be increased
(C) Load-end OLTC (on-load tap changer) should be suitably used
(D) All of them

Q 402.

Effective counter Measures to prevent or contain voltage Instability


(A) Q-injection should be carried out at an appropriate location.
(B) Load-end OLTC (on-load tap changer) should be suitably used.
(C) For under voltage conditions, strategic load shedding should be resorted

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(D) All of them


Q 403.

Effective counter Measures to prevent or contain voltage Instability


(A) Q-injection should be carried out at an appropriate location.
(B) Load-end OLTC (on-load tap changer) should be suitably used.
(C) Both A and B
(D) None of all

Q 404.

Effective counter Measures to prevent or contain voltage Instability


(A) Load-end OLTC (on-load tap changer) should be suitably used.
(B) For under voltage conditions, strategic load shedding should be resorted
(C) Both A and B
(D) None of all

Q 405.

Effective counter Measures to prevent or contain voltage Instability


(A) Generator terminal voltage should be raised.
(B) Generator transformer tap value may be increased
(C) Q-injection should be carried out at an appropriate location
(D) All of them

Q 406.

When a power plant is not able to meet the demand of consumers it will resort to
(A) Penalizing high load consumers by increasing the charges for electricity
(B) power factor improvement at the generators
(C) efficient plant operation
(D) Load shedding.

Q 407.

Load shedding is possible through


(A) voltage reduction
(B) frequency reduction

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(C) switching off the loads


(D) All of the above.
Q 408.
Which of the following power plants can generate power at unpredictable or
uncontrollable times?
(A) Wind power plant
(B) Tidal power plant
(C) Solar power plant
(D) All of the above
Q 409.

Direct conversion of heat into electrical power is possible through


(A) thermionic converter
(B) fuel cell
(C) batteries
(D) all of the above.

Q 410.

Power system static security Level 3rd is


(A) Correctively secure
(B) Alert
(C) Correctable emergency
(D) Non-Correctable emergency

Q 411.

Power system static security Level 2nd is


(A) Correctively secure
(B) Alert
(C) Correctable emergency
(D) Non-Correctable emergency

Q 412.

Power system static security Level 1st is

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

(A) Correctively secure


(B) Secure
(C) Correctable emergency
(D) Non-Correctable emergency
Q 413.

Effective counter Measures to contain voltage Instability


(A) Q-injection should be carried out at an appropriate location.
(B) Load-end OLTC (on-load tap changer) should be suitably used.
(C) For under voltage conditions, strategic load shedding should be resorted
(D) All of them

Q 414.

Effective counter Measures to prevent voltage Instability


(A) Q-injection should be carried out at an appropriate location.
(B) Load-end OLTC (on-load tap changer) should be suitably used.
(C) Both A and B
(D) None of all

Q 415.

SECURITY ANALYSIS may disuses in part


(A) Security assessment
(B) Security control
(C) Both of above
(D) Not divided

353
354
355
356
357

A
C
A
D
C

373
374
375
376
377

D
A
A
B
C

393
394
395
396
397

B
D
C
C
A

413
414
415

D
C
C

MEWAR UNIVERSITY
OPERATION AND CONTROL
DEPARTMENT OF ELECTRICAL ENGINEERING
SEMESTER

358
359
360
361
362
363
364
365
366
367
368
369
370
371
372

C
D
A
B
C
D
C
C
C
D
D
C
B
A
B

378
379
380
381
382
383
384
385
386
387
388
389
390
391
392

D
C
A
A
D
D
C
C
D
D
C
D
A
B
A

POWER SYSTEM
B. TECH. 4 Th YEAR 8Th

398
399
400
401
402
403
404
405
406
407
408
409
410
411
412

C
B
C
D
D
C
C
D
D
C
D
A
B
A
B

Anda mungkin juga menyukai