LIFTING PLAN
Page
EQUIPMENTS
ACTIVITY
1. Loading of materials
Mobile crane
2. Crane mobilization
3. Positioning of Crane
Slings / Shackles
Truck
Nature of Hazard
SR
Existing Safeguards
Minor
1. Loading of
materials /
equipments
2. Crane
mobilization
SR- Severity,
Traffic block
Over head damage
PR- Probability,
PTW-Permit to work,
PR
Rare
Risk
Ranking
Recommendations to reduce
residual risk
Low
Coordination and
communication
Close supervision
. Coordination and
communication
HSE
LIFTING PLAN
Task (Step Break
down of Task)
3. Positioning of
Crane
4. Preparation /
Lifting
Nature of Hazard
SR- Severity,
Existing Safeguards
Vehicle accident
Access block
Signalling system
Traffic diversion
Escort service
Access block
Property Damage
Collapse
Electrocution
Soil condition
Property damage
Material fall
Over load
Lifting tool and tackles
failure
Wind speed
Personal injury as a
result of
Slip / Trip / Fall
Caught by
Hit by
Crushed by
Poor visibility
Lifting Tools failure
5. Off loading /
Erection
SR
PR- Probability,
PTW-Permit to work,
Page
PR
Risk
Ranking
Recommendations to reduce
residual risk
Coordination and
communication
Close supervision
PTW, TBT
Barricading. Sign boards
No man entry under
suspended load
Clear access
Rigging techniques
Correct lifting tackles
Correct lifting techniques
Certified loose gears
Clear access
PTW,TBT,PPE
Barricading. Sign boards
No man entry under
suspended load
Tag lines
HSE
LIFTING PLAN
Task (Step Break
down of Task)
Nature of Hazard
SR
Existing Safeguards
6. Demobilizing
Equipment
(crane)
Traffic
Access block
House keeping
Page
PR
Risk
Ranking
Recommendations to reduce
residual risk
PTW, TBT
Warning signs
Escort service
SR- Severity,
PR- Probability,
PTW-Permit to work,
Coordination and
communication
Close supervision