LIFTING PLAN

Page

EQUIPMENTS

ACTIVITY
1. Loading of materials

Mobile crane

2. Crane mobilization

Lifting Tackles (loose gears)

3. Positioning of Crane

Slings / Shackles

Truck

4. Positioning / Preparation / Lifting


5. Offloading / Placing
6. Demobilizing

Task (Step Break


down of Task)

Nature of Hazard

SR

Existing Safeguards

Minor
1. Loading of
materials /
equipments

2. Crane
mobilization
SR- Severity,

Slip / Trip / Fall


Pinch points
Crane failure
Vehicle failure

Traffic block
Over head damage

PR- Probability,

PTW-Permit to work,

PR

Rare

Risk
Ranking

Recommendations to reduce
residual risk

Low

Follow lifting Procedure


Checklist
Competent personnel
Certified Crane /
Colour coded loose gears
Follow traffic rules

PTW, TBT, PPE


Banks man

TBT- Tool box talk,

Coordination and
communication
Close supervision

. Coordination and
communication

PPE- Personal Protective Equipment

HSE

LIFTING PLAN
Task (Step Break
down of Task)

3. Positioning of
Crane

4. Preparation /
Lifting

Nature of Hazard

SR- Severity,

Existing Safeguards

Vehicle accident
Access block

Signalling system
Traffic diversion
Escort service

Access block
Property Damage
Collapse
Electrocution
Soil condition

Property damage
Material fall
Over load
Lifting tool and tackles
failure
Wind speed
Personal injury as a
result of
Slip / Trip / Fall

Caught by
Hit by
Crushed by
Poor visibility
Lifting Tools failure

5. Off loading /
Erection

SR

PR- Probability,

PTW-Permit to work,

Page

PR

Risk
Ranking

Recommendations to reduce
residual risk

Maintain slow movement to


avoid oscillation

PTW, TBT, PPE


Procedure
Warning signs
Barriers

Coordination and
communication
Close supervision

PTW, TBT
Barricading. Sign boards
No man entry under
suspended load
Clear access
Rigging techniques
Correct lifting tackles
Correct lifting techniques
Certified loose gears

Clear access
PTW,TBT,PPE
Barricading. Sign boards
No man entry under
suspended load
Tag lines

TBT- Tool box talk,

Check the third party


certificate for the crane and
lifting tools and tackles
Coordination and
communication
Close supervision
Lifting operation within the
allowable wind speed limit
(max 33 km / hr)
Additional rigger / signal
man when required
Adopt signal convey
system / use radios if
necessary
No lifting during dark

PPE- Personal Protective Equipment

HSE

LIFTING PLAN
Task (Step Break
down of Task)

Nature of Hazard

SR

Existing Safeguards

6. Demobilizing
Equipment
(crane)

Traffic
Access block
House keeping

Page

PR

Risk
Ranking

Recommendations to reduce
residual risk

Slow lowering practice


More signal men (when
required)
Correct rigging practice

PTW, TBT
Warning signs
Escort service

SR- Severity,

PR- Probability,

PTW-Permit to work,

TBT- Tool box talk,

Coordination and
communication
Close supervision

Ensure good house keeping


before leaving the area
Coordination and good
communication
Close supervision

PPE- Personal Protective Equipment