Procurement of
INFRASTRUCTURE
PROJECTS
CONSTRUCTION OF EXTERNAL WATER
SUPPLY SYSTEM
(New Bohol Airport Construction and Sustainable
Environment Protection Project)
DESCRIPTION
TOTAL PRICE
SUMMARY
PART I
GENERAL REQUIREMENTS
A.
B.
Provide and maintain one ( 1) rented service vehicle for the use of the Resident Engineer
C.
Provide and Install three (3) Project Signboards and one (1) COA Signboard
D.
PART II
A.
Pipelines
B.
Valves
C.
Assemblies
D.
E.
F.
Miscellaneous
Total " Part II "
PART III
CIVIL WORKS
A.
Pipe Crossings
B.
Structures
Total " Part III"
PART IV
ELECTRO-MECHANICAL WORKS
Pumping Equipment
B.
Chlorination Facilities
C.
Electrical Works
Total " Part IV"
PHP_______________
Date: ________________
VIII -1
PART I
for
GENERAL REQUIREMENTS
VIII -1
DESCRIPTION
UNIT
QTY.
UNIT PRICE
TOTAL PRICE
LS
B.
Provide and maintain one ( 1) rented service vehicle for the use of the
Resident Engineer.
MOS.
C.
Provide and Install three (3) Project Signboards and one (1) COA
Signboard
LS
D.
LS
PHP _______________
Date: _____________________
VIII -1
PART II
for
VIII -1
DESCRIPTION
A.
A.1
Note 1 :
Note 2 :
Note 3 :
Note 4 :
QTY.
UNIT PRICE
TOTAL PRICE
TRANSMISSION PIPELINES
ST-A
UNIT
LM
8,796
PHP _______________
Date: _____________________
VIII -1
ITEM
B.
B.1
B.1.1
ST-B
150 mm
UNIT
QTY.
SETS
UNIT PRICE
TOTAL PRICE
PHP _______________
Date: __________________
VIII -1
DESCRIPTION
C.
ASSEMBLIES
- Furnish and install the items hereunder
described with all necessary joints and appurtenances and perform
excavation and concrete construction including thrust blocks as per
Specifications and Drawings.
C.1
Air Vacuum / Air Release Valves - Furnish and instal air vacuum
/ air relase valve laterals, vandal proof steel casing, thrust blocks
and fittings as specified and as shown on the Drawings.
C.1.1 25 mm diameter
C.2
SETS
16
SETS
SETS
UNIT PRICE
TOTAL PRICE
ST-C
QTY.
C.2.1 75 mm diameter
C.3
UNIT
PHP _______________
VIII -1
ITEM
UNIT
QTY.
SQ.M.
SQ.M.
100
SQ.M.
20
SQ.M.
30
LM
10
D.
D.1
UNIT PRICE
TOTAL PRICE
Note 1 : Cost for the supply and preparation of the base course when
required shall be included in the bid unit price.
Note 2 : Payment will be based on the volume of concrete or asphalt
pavement restored considering the maximum allowable trench
width as tabulated under standard drawings CT-18.
D.2.1 Asphalt Pavement including base course
CM
10
CM
30
CM
10
ST-D
PHP _________________
Date: _____________________
VIII -1
DESCRIPTION
E.
E.1
UNIT
QTY.
CU.M.
10
E.2
CU.M.
10
E.3
Over 2.5 m
CU.M.
10
ST-E
UNIT PRICE
TOTAL PRICE
PHP _______________
Date: _____________________
VIII -1
ITEM
F.
MISCELLANEOUS
F.1
UNIT
QTY.
CU.M.
2250
F.2
CU.M.
10
F.3
CU.M.
10
10
CU.M.
10
Rock Excavation
CU.M.
765
F.4
F.5
F.6
ST-F
UNIT PRICE
TOTAL PRICE
PHP _______________
Date: _____________________
VIII -1
PART III
for
CIVIL WORKS
VIII -1
DESCRIPTION
A.
A.1
A.2
A.3
A.4
A.5
A.6
A.7
A.8
A.9
A.10
A.11
ST-A
UNIT
QTY.
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
1
1
1
1
1
1
1
1
1
1
1
UNIT PRICE
TOTAL PRICE
PHP _______________
Date: _____________________
VIII -1
DESCRIPTION
B.
B.1
LS
LS
B.2
TOTAL PRICE
`
ST-B
PHP _______________
Date: _____________________
VIII -1
PART IV
for
ELECTRO-MECHANICAL EQUIPMENT
VIII -1
DESCRIPTION
UNIT
QTY.
UNIT PRICE
TOTAL PRICE
A.1
LS
`
ST-A
PHP _______________
Date: _____________________
VIII -1
DESCRIPTION
B.
B.1
UNIT
QTY.
UNIT PRICE
TOTAL PRICE
LS
`
ST-B
PHP _______________
Date: _____________________
VIII -1
C.1
DESCRIPTION
UNIT
QTY.
UNIT PRICE
TOTAL PRICE
C.2
C.2.1
LS
LS
C.3
Underground Distribution
LS
C.4
LS
`
ST-C
PHP _______________
Date: _____________________
VIII -1