Anda di halaman 1dari 27

BSNL CDR2 Rollout O&M,Offline

Broadband Order Processing


Version 1.0

User Manual, July, 2010


Tcs Internal, Gurgaon, India

BSNL CDR2 Rollout O&M,Offline


Broadband Order Processing
Version 1.0

User Manual, July, 2010

Tcs Internal, Gurgaon, India

Notice

This is a controlled document. Unauthorised access, copying, replication or usage


for a purpose other than for which it is intended, are prohibited.
All trademarks that appear in the document have been used for identification
purposes only and belong to their respective companies.

Confidential

PF3020

Document Release Note


Notice No.:
Customer: BSNL
Project: BSNL CDR2 Rollout Telcom

Document details
Name

Version no.

Offline Broadband
Order Processing

Version 1.0

Description
Initial Version

Revision details
Action taken
(add/del/change)

Previous
page no.

New page
no.

Revision description

Change Register serial numbers covered:


The documents or revised pages are subject to document control.
Please keep them up-to-date using the release notices from the distributor of the document.
These are confidential documents. Unauthorised access or copying is prohibited.

Approved by:

Authorised by:

Date:

Date:

Confidential

ii

PF2060C

Document Revision List


Customer: BSNL
Project: BSNL CDR2 Rollout Telcom
Document Name:Offline Broadband Order Processing

Release Notice Reference (for release)


Rev.
No.

Revision
date

Confidential

Revision
description

iii

Page
no.

Previous
page no.

Action
taken

Addenda/
New page

Release
notice
reference

About this Manual


This User Manual has been developed to facilitate the end users of BSNL CRM application in
understanding the concepts, features and navigational flow of various processes involved in the
Offline Broadband Order Process to BSNL Customers.

Purpose
This manual has been written to help you understand and use the Offline Broadband Order Process.
It presents the functional capabilities and operational details of Offline Broadband Order Process and
contains the procedures that you should know for performing your business tasks using Offline
Broadband Order Processing. Additionally, this manual provides information on the system
requirements and installation Offline Broadband Order Process.

Organisation of the Manual


Information in this manual has been organized as follows:
Table 1: Organisation of this Manual

Chapter

Description

Introduction

Introduction to Offline Broadband Order Processing

Process Flow

Detail of individual scenarios

Typographical Conventions
The following table gives the details of the typographical conventions used in the document:
Table 2: Typographical Conventions

Convention

Indicates

Example

Italics

Drop downs or pick applets

Select Connection Type

Bold face

Buttons or links to be selected

Click SUBMIT

Confidential

iv

Contents
1Introduction....................................................................................................................................... vi
2Getting Started................................................................................................................................... 7

Confidential

1 Introduction
CDR project currently supporting Offline Broadband orders entry in the systems. BSNL require this
functionality to capture the data into CDR system where Broadband services have already
provisioned without capturing the order in CDR for the following reasons like provisions made during
CDR migration and some urgent/VIP connections. Such connections can later be updated in the CDR
systems by raising back dated orders.

1.1 User Roles


This section describes the roles and responsibilities of the various users that Offline Broadband Order
supports.
CSR

YCSR - BSNL CSR Role

Confidential

vi

2 Getting Started
2.1 Offline Broadband Order Processing
Access to Offline Broadband Order Process limited only to authorised users. To use it, you must first
log into Application using your user id and password. On logging in, Offline Broadband Order
Processing. you can start any of the modules to which you have user rights.

2.2 Offline Broadband Order Processing Support the following process


1. New Landline connection with broadband.(Follow on Case)
2. Broadband on Existing Landline

1. New Landline connection with broadband.(Follow on Case)


1. Login with YCSR (BSNL CSR Role)

Figure 1: Creating Customer Account

Confidential

2. Go to Homepage Click Account Management. The Individual Account view appears.


Click Individual Account in create view. A new view appears for creating the customer
account.

Figure 2: Creating Customer Account

Confidential

3. Provide value of all mandatory fields, Click New button to insert new addresses.

Figure 3: Contact Screen

Confidential

4. Provide value of all mandatory fields, Click Next button to save the address and go to the
Contact Screen and Save.

Figure 4: Address Screen

Confidential

10

5. Click on Create Customer account

Figure 5: Create Customer

Confidential

11

6. Check the Offline flag, Enter the Billing Creation Date (it should not allow to enter the system
date and the future date)

Figure 6: Customer Screen

Confidential

12

7. Offline flag and Billing Creation date will be disable,Billing Creation Date copied from
Customer Account.

Figure 7: Billing Account Screen

Confidential

13

8. Create a new Sales order with Offline flag Customer Account and corresponding Billing
Account, Select Broadband Required YES
Check the Offline Order Flag and enter the Indoor Completion Date (it should be always
greater than BA creation date), The remaining process is similar like new order creation
process.

Figure 8: Sales Order Screen

Confidential

14

9.

Click on Create Broadband Creation , the selection transaction type view appears

Figure 9: Sales Order Screen

Confidential

15

10. Click on Broadband Order, the Broadband order screen appears

Figure 10: Sales Order Screen

Confidential

16

11. Offline Flag and Indoor Completion Date get copied to Broadband Order and it will in Display
mode ( remaining process is similar like new Braodband Order creation process.

Figure 11: Broadband Order Screen

Confidential

17

12. A zero amount dummy demand note will get generated for Offline Broadband Order in CRM,
even if order contain committed plan.

Figure 12: Broadband Order Screen

Confidential

18

2. Broadband on existing Landline


13. Data about the existing Landline connection can be searched through the Ibase.
Go to Home page Master Data. The Accounts & Products view appears. Click Customer
Assets.

Figure 13: Account & Products

Confidential

19

14. Go to Install Base, In the Search Criteria, enter the Telephone Number. Click Search. The
search results appear as a line item. Click Asset ID to open the Ibase

Figure 14: Search Installed Bases

Confidential

20

15. Click Modify link,The Selection Transaction Type view appears.

Figure 15: Search Installed Bases

Confidential

21

16. Select Broadband Order. The Broadband Order screen appears.

Figure 16: Service Order

Confidential

22

17. Check the Offline Order Flag and enter the Indoor Completion Date (it should be always
greater than BA creation date and Landline Instaltion date), The remaining process is similar
like new order creation process.

Figure 17: Broadband Order Screen

Confidential

23

18. A zero amount dummy demand note will get generated for Offline Broadband Order in CRM,
even if order contain committed plan.

Figure 18: Broadband Order Screen

Confidential

24

Anda mungkin juga menyukai