Anda di halaman 1dari 56

Contract Administration System

Index of Sample Documents


Doc ID

Title

SD-001

Powers and Duties Not delegated to Superintendent's


Representative

27 Jan 2005

SD-003

Duty Statement for

27 Jan 2005

SD-004

Duty Statement for Inspector

27 Jan 2005

SD-006

Principal's Quarterly Report

27 Jan 2005

SD-007

Measured Quantity Report

27 Jan 2005

SD-008

Agenda for End of Project Debrief

05/2002

SD-009

As Constructed Design Changes

27 Jan 2005

SD-010

Post Construction Report

27 Jan 2005

SD-013

Superintendent's Surveillance Plan Pro Forma

8 Dec 2004

SD-015

Record File Numbers

Standard Documents List

Date

05/2002

May 2006

Page 1 of 1

Contract Administration System

SD-001: POWERS AND DUTIES NOT DELEGATED TO THE SUPERINTENDENT'S


REPRESENTATIVE
It is noted that generally the responsibilities for the Superintendent and Superintendent's
Representatives are defined / delegated. This list is intended to simplify and assist in the listing of
delegated responsibilities.
In accordance with Clause 24 of the General Conditions of Contract the Superintendent may delegate
certain powers and duties to the Superintendent's Representative. The following powers and duties
are NOT delegated.
Clause

Power to:

8.1

Interpretation on and valuation of any ambiguity.

9.2

Approve sub-contractors.

12

Determine if Latent conditions exist. Value additional costs and determine any extension
of time.

14.2

Direct variations due to a change in statutory requirements. Value the effects where
a variation is not applicable.

24

Delegate powers or revoke delegation.

26

Remove Contractor's employees.

27.5

To assess the Contractor's cost of taking precautions against loss in relation to minerals,
fossils, relics etcetera.

30.4 &
30.5

Acceptance of defective materials and valuation.

32

Approve working hours

33.1

Declare a default under the Contract due to unsatisfactory progress.

33.3

Order acceleration of the work.

34.1

Suspend the Progress of the Works.

35.5

Grant extension to Period for Construction on account of an unreasonable delay.

35.6

Assess liquidated damages on partially completed works.

36

Determine adjustment to Contract Price on account of delay or disruption costs.

37

Reduce Defects Liability Period.

39

Determine responsibility for costs of emergency works carried out by Principal.

40.1

Order variation:

a)

To change quality,

b)

For additional work,

c)

To vary program,

d)

To work outside agreed working hours.

40.5/

Agree or determine adjusted rate for work which is in excess of 110%, or less than 90%,

SD - 001

27/01/2005

Page 1 of 2

Contract Administration System

3.2

of scheduled quantity.

40.5

Agree or assess rate for unscheduled work.

41 (c)

Approve plant hire charges where they are not invoiced or Contract plant hire rates.

42.5

Issue Certificate of Practical Completion.

42.8

Issue Final Certificate.

44.6

Adjust costs in the event of default or bankruptcy of Contractor.

47

Make decisions on claims, or refer claims to arbitration.

SD - 001

27/01/2005

Page 2 of 2

Contract Administration System

SD-003: Duty Statement for _____________


(customise the table as required)
Site Engineer Functions / Activities for General Conditions of Contract
Clause Number
/ Key Area

Activity / Function

Duties / Responsibilities

Area 1

Area 2

SD - 003

27/01/2005

Page 1 of 1

Contract Administration System

SD-004: Duty Statement for Inspector


Project Name:

Job No.:

Contractor:

Position

INSPECTOR (ID) CONTRACTS

Reports to

PRINCIPAL ENGINEER (ID) CONTRACTS / ENGINEERS (ID)

Subordinates

Refer to Organisational Structure [STRUCTURE]

Financial Delegation

Refer to Unit's Financial Delegation Extract

Resource Delegation

Refer to Human Resource Delegation

Authority Delegation

Refer to Instrument of Delegation

Key Areas

Responsibilities

Quality System

Be proactive and report any deficiencies or possible improvements in this


quality system or work practices to management.

Act on Quality Audit reports and ensure the implementation of corrective action
(if delegated).
Perform incoming inspections on purchased goods, services and materials.
Develop procedures and processes for critical activities in area of responsibility
(if requested).
Develop procedures and processes for critical activities in area of responsibility
Contract Surveillance (if requested)

Delegations

SD - 004

Undertake the role of Inspector on construction and maintenance works carried


out by Private Contractors, RoadTek and Local Governments.
Carry out inspection of works undertaken by contract to ensure that processes
and procedures described in the quality manual and quality plan are adhered to
and that the works are being constructed in accordance with the Principal's
requirements (specifications and drawings).
Carry out administrative functions in respect to conformance and nonconformance reports, checklists, data transfer and maintenance of these
records.
Keep the Engineer's Representative informed of progress, quality of works and
problems as they occur.
Monitor safety procedures on specific works to ensure compliance with the
Workplace Health and Safety Legislation.
Provide assistance to the Infrastructure Delivery Unit on matters relating to the
inspection of contracts, construction practice, and the development and
implementation of Infrastructure Delivery Unit's contract administration quality
system.
As stated in delegations letter.

27/01/2005

Page 1 of 1

Contract Administration System

SD-006: Principals Quarterly Report

Principals Quarterly Report No.


Project Name and Description
Job No. .
Period (...) To (...)
(insert photo)

(insert photo)

(insert photo)

(insert photo)

SD - 006

27/01/2005

Page 1 of 5

Contract Administration System

Contents
1.0 INTRODUCTION ........................................................................................................................................ 3
2.0 PROJECT COSTS ..................................................................................................................................... 3
3.0 PROJECT STATUS ................................................................................................................................... 3
4.0 PROGRAM AND PROGRESS................................................................................................................... 4
5.0 CONSTRUCTION PROGRAM.................................................................................................................... 4
6.0 EXTENSIONS OF TIME ............................................................................................................................. 4
7.0 CLAIMS ...................................................................................................................................................... 4
8.0 QUALITY .................................................................................................................................................... 4
9.0 BLASTING ................................................................................................................................................. 4
10.0 WEATHER................................................................................................................................................ 4
11.0 TRAFFIC MATTERS................................................................................................................................ 4
12.0 ENVIRONMENTAL .................................................................................................................................. 4
13.0 SAFETY.................................................................................................................................................... 4
14.0 PUBLIC RELATIONS/ COMMUNITY CONSULTATION ........................................................................ 4
15.0 DESIGN ISSUES...................................................................................................................................... 4
16.0 PRINCIPAL SUPPLIED MATERIALS ..................................................................................................... 5
17.0 CONCLUSION......................................................................................................................................... 5

Appendices
o
o
o
o
o
o

SD - 006

Extension of Time Register


Variation Register
Corrective Action Register
Non-Conformance Register
Cost Forecast Spreadsheet
Construction Program

27/01/2005

Page 2 of 5

Contract Administration System

1.0 Introduction

2.0 Project Costs


The table below shows a summary of actual project costs to date.
Progress Payments to
date
Approved Variations
SUB-TOTAL
Principals materials at
(date)
Variations to Principals
materials
Departmental Costs
TOTAL TO DATE
Table 1 - Summary of Project Costs at
See Appendices for Variation Register and Forecast Cash Flow.

3.0 Project Status


The construction time status summary is as follows:
Date of Acceptance of Tender
Period of Construction
Date for Completion
Approved Extensions of Time to
Approved Date for Completion
Anticipated Date for Completion

SD - 006

27/01/2005

Page 3 of 5

Contract Administration System

4.0 Program and Progress


Works commenced onsite

and are summarised as follows:

Works in total are estimated at being complete


estimate)

(Contractors percentage

5.0 Construction Program

6.0 Extensions of Time


7.0 Claims
8.0 Quality

9.0 Blasting
.

10.0 Weather

11.0 Traffic Matters

12.0 Environmental

13.0 Safety

14.0 Public Relations/ Community Consultation

15.0 Design Issues

SD - 006

27/01/2005

Page 4 of 5

Contract Administration System

16.0 Principal Supplied Materials


See Appendix for forecast cash flow.

17.0 Conclusion
The anticipated completion date for this contract based upon works completed to date and
the delays
Staffing levels for administration of this contract.
Total project cost estimates for this project are listed below:
$

Original
Estimat
e

Actual to
(date)

Forecast
Total

Program
Approval

Contract
Costs
Principals
Materials
Departmental
Costs
TOTAL

SD - 006

27/01/2005

Page 5 of 5

Contract Administration System

SD-007: Measured Quantity Report


In order to develop consistency between projects it is recommended that the measured
quantity report show the following details:

Progress pay number


Schedule
Item number
Variation number
Quantity this period
Quantity previous period
Unit rate
Amount
Total value for each schedule (excluding GST)

PROJMAN is an IT financial management tool which supports the measurement of


quantities. Assistance is available through DIT Help (refer QDoT address Book) or call
3834 8079.

SD - 007

27/01/2005

Page 1 of 1

Contract Administration System

SD-008: Agenda for End of Project Debrief


As Constructed Plans
The as-constructed plan should consist of any changes to the design and a copy of the annotated
drawings.
It is suggested that these changes are handed to the Superintendent at each monthly meeting.

Project Debrief
Project Finalisation Reporting
Agenda for Project Debrief

This procedure outlines the steps and discussion points for the Finalisation of Construction
Projects undertaken by Roadworks Performance Contracts (RPC) or Road Construction Contracts
(RCC).
This report card is to be completed at the debrief meeting for all designated projects.

Section
Question
Preconstruction Was the project scope controlled during the
preconstruction process?
What significant issues were identified during
consultation?

Comments

Were these issues adequately addressed in


the design?
Was the preconstruction cost managed
successfully in this phase?
What is the percentage difference between
budget and actual preconstruction cost?
Was preconstruction timely (i.e. was scheme
available 2 months prior to tender/ offer)?
Were any significant issues identified in the
design safety audit?
Are these applicable for related projects?
Were any significant issues identified during
the constructability check?
Were any maintenance issues identified?
Have these issues been communicated to the
planning/ design staff for future
understanding?
Was preconstruction managed by a project
team approach?

SD - 008

05/2002

Page 1 of 3

Contract Administration System

Section

RIP Delivery

Project
Delivery

Question
Were there significant pavement design
issues?

Comments

How would you rate the overall quality of


design? Is this based on feedback from
Delivery or Contractor staff?
Were all environmental issues successfully
managed during the phase?
Were resumptions completed prior to
Tendering/Offers?
Was the project delivered within the original
RIP programmed timeframe?
What is the comparison between the initial
RIP figure (years 3-5) to the final project
cost?
What was the final project cost as compared
to the approved RIP amount?
What was the roughness (NRM or subjective
comment) and was a bonus or penalty
applied?
Were any lots rejected or accepted at a
reduced level of service. If yes, why and what
lessons were learned?
What was the value of the rejected works or
the value of the reduced level of service?
Do you consider the delivery method was
appropriate (i.e. tender, RPC etc)? Why?
Were there significant variations in the
project? Why and what have we learned?
Please attach variations register/listing.
What value of the contract is the total cost of
the variations?
What were the contractual relationships like
(list partnering scores if available)?
Are there any unresolved relationship issues?
Were there any consultations (eg property
owners, motorists etc) issues during
construction?
Did the Contractor carry out the required
public consultation issues adequately?
Was the project delivered within the contract
timeframe?
Were extensions of time (EOT) handled in a
timely manner?
What innovation occurred on this project?
Were there any significant findings from a
pre-opening road safety audit?
Were there any traffic management issues
during construction?
Are there any potential ongoing/future
maintenance issues that need to be
addressed?

SD - 008

05/2002

Page 2 of 3

Contract Administration System

Section

Outcome

Question
Was an Environmental Management Plan
approved and was it followed?
Was an Environmental audit carried out?
Did the District Workplace Health and Safety
Officer visit site and carry out an audit?
Was the delivered project as fit for purpose;
e.g. overdesigned/ underdesigned?
Did the outcome align with our investment
strategies for this road?
Did the delivered project align with the
approval project scope?
Does this project contribute to any specific
Main Roads outcomes (eg extension of FEV
route; 110 km zone; flood immunity)?
Has there been any feedback received from
stakeholders/communities about this project?
Does it look and feel like a project you are
proud of?

Comments

ASSOCIATED DOCUMENTATION
C6015
C6119

General Conditions of Contract - Works by Local Government


Contractor Performance Report
Job Construction Procedures
SL-029 Certificate of Practical Completion
SL-031 Final Payment Certificate
SL-072 Notice that Practical Completion has not been Reached
SL-053 Notice for Rectification of Defects
SD-011
Contractor Performance Report Memorandum

SD - 008

05/2002

Page 3 of 3

Contract Administration System

SD-009: As Constructed Design Changes


No.

SD - 009

Description

Chainage

27/01/2005

Plan No.

Page 1 of 1

Contract Administration System

SD-010: Post Construction Report

Post Construction Report


<Project description>
<Shire>
<Road Name>
<Project chainage>
Job No. <####>
<Contractor>

Date <******>

<<<INSERT PROJECT IMAGE HERE>>>

SD - 010

27/01/2005

Post Construction Report


Project Name: <<DESCRIPTION>>
Job Number: <<NUMBER>>

TABLE OF CONTENTS
1

INTRODUCTION

1.1

Project Description

1.2

Contract Type

PROJECT RESOURCES

2.1

Main Roads Staff

2.2

Contract Staff

DETAILS OF CONTRACT

3.1

Possession of Site

3.2

Date for and of Completion

3.3

Contract Duration

3.4

Extensions of Time

3.5

Project Costs

CONSTRUCTION ASPECTS

4.1

Working Platform

4.2

Wearing Course

4.3

Pavement Configuration

4.4

Screening Sizes

PROGRAM AND PROGRESS

5.1

Performance of Contractor

5.2

Design Issues

5.3

Public Relations & Consultation

5.4

Material Sources

5.5
Quality, NCRs & CARs
5.5.1
Quality
5.5.2
Contractors NCRs
5.5.3
Departments CARs

5
5
5
5

SD - 010

27/01/2005

Post Construction Report


Project Name: <<DESCRIPTION>>
Job Number: <<NUMBER>>

5.6
Financial Performance
5.6.1
Contractor
5.6.2
Departmental

6
6
6

AREAS REQUIRING IMPROVEMENT

6.1

Environment

6.2

Drainage

6.3

Revegetation

6.4

Provision for Traffic

6.5

Service Issues

6.6

Geotechnical

6.7

Specifications

ATTACHMENTS

7.1

Performance Reports

7.2

As Constructed Plans

7.3

Financial Data

7.4

Monitor Registers

7.5

Other

SD - 010

27/01/2005

ii

Post Construction Report


Project Name: <<DESCRIPTION>>
Job Number: <<NUMBER>>

1 Introduction
1.1

Project Description

1.2

Contract Type

SD - 010

27/01/2005

Post Construction Report


Project Name: <<DESCRIPTION>>
Job Number: <<NUMBER>>

2 Project Resources
2.1

Main Roads Staff

2.2

Contract Staff

SD - 010

27/01/2005

Post Construction Report


Project Name: <<DESCRIPTION>>
Job Number: <<NUMBER>>

3 Details of Contract
3.1

Possession of Site

3.2

Date for and of Completion

3.3

Contract Duration

3.4

Extensions of Time

3.5

Project Costs

SD - 010

27/01/2005

Post Construction Report


Project Name: <<DESCRIPTION>>
Job Number: <<NUMBER>>

4 Construction Aspects
4.1

Working Platform

4.2

Wearing Course

4.3

Pavement Configuration

4.4

Screening Sizes

SD - 010

27/01/2005

Post Construction Report


Project Name: <<DESCRIPTION>>
Job Number: <<NUMBER>>

5 Program and Progress


5.1

Performance of Contractor

5.2

Design Issues

Post "Implementation Report on Designer": refer to the latest version on


Main Roads Junction under the Manual for Use and Engagement of Consultants
on Engineering Projects Appendix K and Clause 11.4.

5.3

Public Relations & Consultation

5.4

Material Sources

5.5

Quality, NCRs & CARs

5.5.1 Quality

5.5.2 Contractors NCRs

5.5.3 Departments CARs

SD - 010

27/01/2005

Post Construction Report


Project Name: <<DESCRIPTION>>
Job Number: <<NUMBER>>

5.6

Financial Performance

5.6.1 Contractor

5.6.2 Departmental

6 Areas Requiring Improvement


6.1

Environment

6.2

Drainage

6.3

Revegetation

6.4

Provision for Traffic

6.5

Service Issues

6.6

Geotechnical

SD - 010

27/01/2005

Post Construction Report


Project Name: <<DESCRIPTION>>
Job Number: <<NUMBER>>

6.7

Specifications

7 Attachments
7.1

Performance Reports
Contractor Performance Report
Refer MRPDS Vol. 3

Sub Contractor Performance Report (s)

Specialist Supplier Report (s)


Eg. Asphalt, Steel, Precast Concrete

7.2

As Constructed Plans

7.3

Financial Data
Actuals

CMS Reports

FiMS Reports

7.4

Monitor Registers
Certifications

Contact Details

Milestones

Correspondence Register

Action Register

Non-Conformance Register

SD - 010

27/01/2005

Post Construction Report


Project Name: <<DESCRIPTION>>
Job Number: <<NUMBER>>

7.5

Variations to Time Register

Variations/Claims Register

Principals Materials Variation Register

As Constructed Register
Other
Final Project Records Checklist

SD - 010

27/01/2005

Superintendent's Surveillance Plan


(SD-13)

Project name
Contract Number

Location

Name
Job title
Branch/District
Division/Region
Floor, street, city

Version no.
Revision date

2
8 December 2004

Status

Draft/Final review/Sign off (delete 2 of)


DMS reference number
File number/document number

Prepared by
Title
Branch/District
Division/Region

DMS ref. no.


File/Doc no.

Superintendent's Surveillance Plan


Project -

Document control sheet


Contact for enquiries and proposed changes
If you have any questions regarding this document or if you have a suggestion for improvements,
please contact:
Superintendent

Insert Superintendent's name here

Phone

Insert phone number here

Version history
Version no.

Date

Changed by

Nature of amendment

09/24/2004

DC

Initial draft.

8/12/2004

DC

Draft for Comment

Project Plan Endorsement


The following officers have deemed this plan suitable.

Name
Position

Manager (Infrastructure Delivery) or ID (Project Manager)

Signature

Date

Name
Position

District Director

Signature

Main Roads
SD-013

Date

8 Dec 2004

Page 2 of 25

Superintendent's Surveillance Plan


Project -

Contents
1

Introduction................................................................................................................ 5

Definitions ................................................................................................................... 5

Project Details ............................................................................................................ 5

Superintendents Surveillance Team......................................................................... 5

Stakeholders (affecting Surveillance)....................................................................... 6

Contract control ......................................................................................................... 6

6.1

Integration / Management ............................................................................................ 6

6.2

Procedures and Forms .................................................................................................. 7

6.3

Product Quality ............................................................................................................ 7

6.4

Communication management ...................................................................................... 7

6.4.1
6.4.2
6.4.3
6.4.4

Internal communication ........................................................................................................... 7


External communication .......................................................................................................... 7
Meetings................................................................................................................................... 7
Records Management............................................................................................................... 8

6.5

Procurement management............................................................................................ 8

6.6

Environment................................................................................................................. 8

6.7

Safety Management...................................................................................................... 8

6.8

Traffic Management..................................................................................................... 8

Risk Assessment Management .................................................................................. 8

7.1

Monitoring and Review ............................................................................................... 9

Surveillance Performance Measurement................................................................. 9

References ................................................................................................................... 9

Appendix A Project Definition........................................................................................... 10


Appendix B Responsibility assignment matrix................................................................. 11
Appendix C Surveillance schedule..................................................................................... 13
Model 1: Schedule for Gantt Chart ...................................................................................... 13
Model 2: Table........................................................................................................................ 14
Appendix D1: Site Contact Details (SF007)......................................................................... 15
Appendix D2: Support and Specialist Personnel - Contact Details (SF002) .................... 16
Appendix E Project budget ................................................................................................ 17
Appendix F1 Risk management plan ................................................................................ 18
Main Roads
SD-013

8 Dec 2004

Page 3 of 25

Superintendent's Surveillance Plan


Project Appendix F2 Risk management table................................................................................ 19
Appendix G Internal communication management plan ................................................ 20
Appendix H External Communications Plan ................................................................... 22
Appendix I Records Management (example) ................................................................... 23
Appendix J - Forms and Procedures relevant to project ................................................... 25

Main Roads
SD-013

8 Dec 2004

Page 4 of 25

Superintendent's Surveillance Plan


Project -

Introduction
This is the management plan for the Superintending team. It sets out the relevant
information for the provision of surveillance and administration of the project,
commensurate with the risks associated with the project.

Definitions
Terms, abbreviations and acronyms

Meaning

ID

Infrastructure Delivery

DBS

District Business System

QES

Quality, Environment and Safety

RS&E

Road Systems and Engineering

RoadTek

Commercial Operations Unit Of Main Roads

EOT

Extension Of Time

EHM

Extreme, High and Medium Risks

CAR

Corrective Action Report

NCR

Non Conformance Report

DMS

Document Management System (Records


and Archiving)

ATP

Approval to Proceed

RFI

Request for Information

EMP

Environmental Management Plan

TMP

Traffic Management Plan

Project Details
Describe the project in summary, for example:
"The highway is to be widened to six lanes, with provision of noise barriers, fencing,
and upgrading of drainage and traffic structures within the site."
Refer Appendix A for a more detailed outline of project.

Superintendents Surveillance Team


Recommend inclusion of Organisational Chart

Main Roads
SD-013

8 Dec 2004

Page 5 of 25

Superintendent's Surveillance Plan


Project -

Superintendent / Principal's Agent


Name
Superintendent's Representative
Name

Package 1: Inspector

Package 2: Inspector

Package 3: Inspector

Name

Name

Name

Other Support Staff: Refer Appendix D2. (Modified CAS Form SF02)
Consider standard documents SD-01, SD02 to assist in defining delegations.
The Responsibility Matrix is defined in Appendix B.
The Contact List for the Project is shown in Appendix D1. (Modified SF07)

Stakeholders (affecting Surveillance)


Stakeholder

Location

Interest/context

Communication issues are considered in "Communication"

Contract control

6.1

Integration / Management
This plan is aligned with the contractors Contract Plan and the risk assessment
undertaken by the Superintendent's team.
Consider pre award activities: see Contract Administration / SurveillanceEstablishment (P-002).
Other considerations for effective surveillance of the contract by the Superintending
team may include:

Main Roads
SD-013

Risk Assessment (refer Appendix F).

Project specific forms and procedures that may be used refer Appendix J.

Frequency of Reviews

8 Dec 2004

Page 6 of 25

Superintendent's Surveillance Plan


Project -

6.2

Frequency of regular, and timing of specific, surveillance activities. This


includes changing to suit changing risks - See Section 4.1 of "Superintendent
surveillance Plan - Guideline for Development".

Used of CAR's, Issues Management, Incident Reporting and NCR/


Improvement notices (within the team)

Procedures and Forms


Detail use of locally derived, District or Main Roads based procedures or forms
Refer Appendix J.

6.3

Product Quality
Surveillance Activities
The Surveillance schedule is located in Appendix C. This will be impacted by the
assessed risks such as:

Hold Points

Materials and construction processes

Material supply and quality

Safety, environmental or traffic issues

Community Issues

Issues arising are captured on the "Issues Register" (see Guideline P-028). This is
maintained on site, tabled at the monthly site meeting, and attached to form part of
the minutes.

6.4

Communication management

6.4.1 Internal communication


Communications Plan See Appendix G.

6.4.2 External communication


See Appendix H
Consider:

Contractor

Service Authorities

Community

6.4.3 Meetings
Describe the various major meetings. These may include:

Main Roads
SD-013

Pre start Meeting

Monthly Site Meetings


8 Dec 2004

Page 7 of 25

Superintendent's Surveillance Plan


Project

Post Construction Conference

6.4.4 Records Management


Develop a table for "Records Management" see Appendix I.

6.5

Procurement management
Suppliers (List / Date) To Be Confirmed???

6.6

Environment
Surveillance activities may well be incorporated within the general surveillance
schedule.
Incident management may be incorporated in general incident management, or
described separately. Integration is recommended.
Detail specific activities and contacts in the event of environmental incidents. The
latter may be included in the general Contacts list (SF-007). Appendix D1 includes a
copy.

6.7

Safety Management
Considerations may include:

6.8

Superintendent's Site Office

Construction Site Induction

Site Safety / Incidents

Risk Activities and Dangerous Incidents

Traffic Management
Surveillance activities may well be incorporated within the general surveillance
schedule.
Incident management may be described separately, while still using much of the
standard Incident reporting processes.
Detail specific activities and contacts deemed appropriate in the event of (dangerous)
traffic incidents. The latter may be included in the general Contacts list (Form SF007). Appendix D1 includes a copy.

Risk Assessment Management


The risk analysis process is to be carried out by the relevant members of the project
team. The analysis is attached in Appendix F.
Issues that are identified as having a significant risk will be managed through
assigning appropriate levels of surveillance. This influences timing, frequency and
the skill set requirement of the surveillance officer.

Main Roads
SD-013

8 Dec 2004

Page 8 of 25

Superintendent's Surveillance Plan


Project -

7.1

Monitoring and Review


Reviews are part of the site meeting with the contractor. Identified changes to the
risk profile of the contract are managed through aligning the surveillance
programme.
Reports are forwarded (monthly) to the principal identifying progress, issues arising
and forecast.

Surveillance Performance Measurement


Success criteria

Responsibility

Measurement KPI
method

Target

Surveillance Plan
development

Superintendent

Review

Completed

Developed

Implementation of
Surv. Plan
management of
associate risks for
the principal.

Superintendent

Review

(Risk)
practices /
activities
undertaken

Principal
related
risks
effectively
managed

Relationships

Superintendent

Review /
assessment

Relationship Sound
Measurement

Team satisfaction

Superintendent

Team Review

Team
Satisfaction

Sound

See Guideline document for additional notes.

References
Contract Administration Manual
Contractor's Contract Plan
District based contract management documentation refer
----- ooooo-----

Main Roads
SD-013

8 Dec 2004

Page 9 of 25

Superintendent's Surveillance Plan


Project -

Appendix A Project Definition


Job Number:
Local Authority:
Road:
Location:
Scope of Work:
The existing highway is to be widened to six lanes, with provision of noise barriers, fencing, and
upgrading of drainage and traffic structures within the site. (Copy this into Scope statement in
Main Project)
The scope includes:

Asphalt overlay of the existing highway from

Ch3308 to Ch4500 (approx)

Ch5120 (approx) to Ch5650 (approx)

Ch6300 (approx) to Ch10500 (approx)

Full reconstruction of the existing highway including lowering of the gradeline from

Ch4500 to Ch5120 (approx) (Brays Road)

Ch5650 (approx) to Ch6300 (Anzac Avenue)

Minor widening into the median using full depth asphalt pavements

Installation of silt ponds

Upgrade of electrical installations

Contractor:
Date of the Letter of Acceptance:
Period for Practical Completion:
Original Date for Practical Completion:
Contract Amount:

$XXXXXXXXXXXXX

Out of Scope:
Assumptions: for example, Foundations, services

Main Roads
SD-013

8 Dec 2004

Page 10 of 25

Superintendent's Surveillance Plan


Project

Appendix B Responsibility assignment matrix


Legend
PD

Principal's Delegate

EO

Superintendent

SR

Contractor

DSO Safety Officer (District)

ST

Soil Tester

Superintendent's Rep.

SS

Survey Services

AT

Asphalt Tester

SI

Senior Inspector

CC

Cost Clerk

CT

Concrete Tester

Inspector

RSE

Speciality surveillance <name>

A Assist

C Consult

Environmental Officer

O Coordinate

Primary responsibility

R Review

Sign off

ROLE <EXAMPLE ONLY>


Task

Financial Approval

Project Staff
S

SR

SI

Surveillance Audits

Issues Registers

Survey Compliance Audits

Material Compliance Audits

Task

PD

EO

CC

DSO

SS

Others
RSE

ST

AT

P
P
ROLE <EXAMPLE ONLY>

Project Staff
Main Roads
SD-013

Support Staff

8 Dec 2004

Support Staff
Page 11 of 25

Others

CT

Superintendent's Surveillance Plan


Project
S

SR

SI

PD

EO

CC

DSO

SS

RSE

ST

Compaction Compliance
Audits
Concrete Compliance Audits
(Material)
Asphalt Compliance Audits
(Laying and test procedure)

Pile Driving Records

Construction Diary (Hand)

Computerised Diary & Entry


into P3 Expedition
CARs

Site Meetings

Hold Point Release


(Approval to Proceed)
Photographic/video/voice file
Records
Marking up As Constructed
Drawing
Forward As Constructed
Drawings to Manager
(Transport Planning)
Approval of Inspector Time &
Dissection Sheets

Site Office Safety Audit


Site Office Inductions

P
S

P
P

Site Induction
Formal Process Audits
Main Roads
SD-013

P
P

8 Dec 2004

AT

Page 12 of 25

CT

Superintendent's Surveillance Plan


Project

Appendix C Surveillance schedule


Model 1: Schedule for Gantt Chart
ID

WBS ID

Activity name

Resources

Duration

1
2
3
4
5
6
7
8
9
10
11
12

Match Activity to Contract Programme

Main Roads
SD-013

8 Dec 2004

Page 13 of 25

Depend.

Start

Finish

Superintendent's Surveillance Plan


Project

Model 2: Table
ID

Risk
Activity name
Factor

Resources
(See Responsibility
Matrix)

Surveillance
Mechanism

Duration and Frequency of Surveillance Activity


(Match to Contract Programme)

1
2
3
4
5
6
7
8
9
10
11
12

This has more information and may also lead to a Gantt Chart for the Surveillance Schedule.

Main Roads
SD-013

8 Dec 2004

Page 14 of 25

Superintendent's Surveillance Plan


Project

Appendix D1: Site Contact Details (SF007)


The site contact list is to be kept up to date as people join or leave the project.

Project Name:

Contractor:

Job No:
Date of Contact List:

Name:

Office Number:

Position:

Mobile Number:

Location:

Fax Number:

Postal Address:

After Hours Number:


eMail:

Name:

Office Number:

Position:

Mobile Number:

Location:

Fax Number:

Postal Address:

After Hours Number:


eMail:

Name:

Office Number:

Position:

Mobile Number:

Location:

Fax Number:

Postal Address:

After Hours Number:


eMail:

Name:

Office Number:

Position:

Mobile Number:

Location:

Fax Number:

Postal Address:

After Hours Number:


eMail:

Main Roads
SD-013

8 Dec 2004

Page 15 of 25

Superintendent's Surveillance Plan


Project

Appendix D2: Support and Specialist Personnel - Contact Details


(SF002)
Project Name:

Description:

Contractor:

Contract Number:

This register is designed to list support services such as a list of technical contacts, consultants and
companies that provide specialist services.

Number

Description

Admin Services

Design

IT Support

Geotechnical Issues

Bitumen supply

Contractual Supply

Environmental
Support

Main Roads
SD-013

Name

Telephone

8 Dec 2004

e- mail

Page 16 of 25

Superintendent's Surveillance Plan


Project

Appendix E Project budget


ID

WBS
ID

Activity name

Resources

Frequency Start

Duration

Internal
labour
Days or % cost
of Time

Contract
labour
cost

1
2
3
4
5
6
7
8
9
10
11
12

Main Roads
SD-013

8 Dec 2004

Page 17 of 25

External Other
services costs
and
material
costs

Other
costs

Total costs

Superintendent's Surveillance Plan


Project

Appendix F1 Risk management plan


Broad strategy for risk management
Type here

A summary of significant risk factors


Type here

Overall assessment of project risk


Type here

Main Roads
SD-013

8 Dec 2004

Page 18 of 25

Superintendent's Surveillance Plan


Project

Main Roads
SD-013

8 Dec 2004

Risk rating

Risk factor

Impact

No.

Likelihood

Appendix F2 Risk management table


Proposed response / mitigation action

Revised Risk Rating


Liklhd

Page 19 of 25

Imp

Rtg

Related
activity
number

Superintendent's Surveillance Plan


Project

Appendix G Internal communication management plan


Introduction
Type here

Exception reports
Type here

Team Meetings
Team Meetings are held <frequency> in the Site Office Conference Room. Agendas and Minutes
are published < >.
Staff Satisfaction Surveys
Surveys are distributed at the end of each month. Survey results and comments are addressed at
Team Meetings. Results are included in the monthly report

Management of information systems


Refer - Information / Records Management procedure (P- ) for correspondence management,
daily diary, photographic records and general document control.

Project office procedures


Examples may include:
Mail Procedures for Site Office
Mail procedures for the site office are as follows:
Email
Email is utilised for phone messages and where necessary to record communication
between team members. Team Members are to consider emails received as priority and
ensure appropriate action.
Timesheets
Tadpole is completed by individuals and submitted for approval on a weekly basis.
Timesheets are then printed and stored in the folder at reception.
Telephone
If calls arent taken they will automatically divert to reception. If team members are out
of the office, they are to ensure their phones are diverted to mobiles, where possible. If
team members are unavailable, telephone messages will be advised via email.
Staff Rosters
There is a white board located at reception for recording staff rosters. Approved
Holidays & RDOs are also to be recorded here. A 6 month look ahead, flexible roster
records staff leave and scheduled RDO's and is available from reception. The reception
Lotus Notes Calendar is utilised for site activities / meetings / events, all team members
have access to this calendar and can update accordingly.
Main Roads
SD-013

8 Dec 2004

Page 20 of 25

Superintendent's Surveillance Plan


Project

Designer / RFI
All RFIs (request for information) are forwarded to the designer, with a copy logged and maintained on
site (RFI Register). Response times are to be provided to the designer. A copy is also forwarded to the
Design Project Manager. Refer to Appendix C Contact Details.

References
Refer Appendix C for contacts List

Main Roads
SD-013

8 Dec 2004

Page 21 of 25

Superintendent's Surveillance Plan


Project

Appendix H External Communications Plan


Contractor
Site meeting schedule
Contacts See App D

Service Authorities
What services may require discrete and / or emergency contact.
Contacts see App D

Community
This may include a community consultation plan.

Standard project reporting


Refer - Procedure Reporting for Principal / Principal Related Correspondence (P-010).

Main Roads
SD-013

8 Dec 2004

Page 22 of 25

Superintendent's Surveillance Plan


Project

Appendix I Records Management (example)


 Stored

 logged
Location
DBS

Communication Description

P3
Expedition

Paper Based
Data base

DMS

Contractor

Reference

Folder No.

14

Evidence of insurance

Notices to tenderers

Project Plans

20

Schedule

27

Extension Of Time

19

Extras

Partnering documents

13

13

17

CD05F02

17

CD05F03

17

CD05F04

18

18

18

26

Financial Approvals
Notification of possession of
site

Requests/agreement/rejection
Variation
requests/approval/rejections

Site Issues resolution


(Partnering)
Prestart Meeting minutes
Quality Prestart Meeting
Minutes
Monthly Site Meeting
Contractors approved Traffic
Management Plan
Contractors Initial set out of
individual installations (TMP)
M994
Working Risk Management
Plan
Surveillance Audits

Main Roads
SD-013

8 Dec 2004

Page 23 of 25

Superintendent's Surveillance Plan


Project
Inward correspondence from

Request for information

16

Corrective Action Reports

Non Conformance Reports

12

Computerised daily diary

As Constructed Program




17

21

Designer (Cardno)
Outward correspondence from
Designer (Cardno)

Contractors Statused
construction program
Construction Diary (hand)
Photographs

Videos

Voice Files

Main Roads
SD-013

8 Dec 2004

Page 24 of 25

Superintendent's Surveillance Plan


Project

Appendix J - Forms and Procedures relevant to project


Procedures
Number

Forms

Description / Location

Number

Description / Location

Main Roads
SD-013

8 Dec 2004

Page 25 of 25

Contract Administration System

SD-015: Record File Numbers


DMS Storage

Name of File

Documents contained within file

Are
docs.scanned

Location of
scanned docs.

Paper Copy Storage


Is paper copy
kept

Paper File
No.

Paper File
Location

Yes, except emails Correspondence

Yes, except
emails

A1

Compactus

Yes, except emails Correspondence

Yes, except
emails

A2

Compactus

CORRESPONDENCE
Incoming Correspondence
Outgoing Correspondence

Letter, Reports, Memo's, Faxes, Emails, Minutes and Correspondence


Letter, Reports, Memo's, Faxes, Emails, Minutes and Correspondence

ADMINISTRATION
Contracts
Tender Documents
Invoices
Financial
Employee Relations
Partnering Team
Insurance

Minor Works, Plant Hire, Supply, Works, Contract Letter, Progress Claims/Payments,
Contractor Variations
Tender Documents & Dead Tenders
Creditor Invoices A-Z
Monthly Progress Claims, Monthly Claim Audit File, Petty Cash Claims, Credit
Applications/Agreements, Creditor Purchase Orders, Salary Staff Leave, Final Release &
Waivers
Employee Details, Weekly Timesheets, Employee Leave, Employee WorkCover Claims,
Employee Classification Changes, Project Certified Agreement, Commerce Queensland,
Training
Minutes, Handouts
Insurance

Legal Documents

Yes

Administration

Yes

A3

Compactus

Yes

Administration

Yes

A4

Compactus

No

Yes

A5

Compactus

No

Yes

A6

No

Yes

A7

Compactus

Yes, except
general info

Correspondence

Yes

A8

Compactus

Yes

Administration

Yes

A10

Compactus

No

Yes

A11

Compactus

Yes, at end of
month

Management
System Doc.

Yes

M1

Yes

Management
System Doc.

Yes

M2

Yes

Management
System Doc.

Yes

M3

Yes, at end of
month

Management
System Doc.

Yes

M4

No

Yes

M5

No

Yes

M6

MANAGEMENT SYSTEM
NCR

Non Conformance Reports

Audits

Audit Reports, Supplier Audits, Audit Schedules

Approved Documents
Request for Information
Position Descriptions
Calibration
SD - 015

Plans, Manuals, Procedures, Inspection & Test Plans, Forms, Check Lists, Construction
Method Statements, Safe Work Method Statements, Review & Approval Forms
Forms, Register, RFI
Position Descriptions
Test Methods/Inspection Measurement Test Equipment (IMTE) Register

05/2002

Page 1 of 4

Contract Administration System

DMS Storage

Name of File

Documents contained within file

Paper Copy Storage

Are
docs.scanned

Location of
scanned docs.

Is paper copy
kept

Paper File
No.

Paper File
Location

Yes

Construction

Yes

C1

Compactus

No

Yes

C2

Compactus

No

Yes

C3

Compactus

No

Yes

C4

Compactus

No

Yes

C5

Compactus

Yes

Construction

Yes

C6

Compactus

No

Yes

C7

Compactus

Yes

Construction

Yes

C8

No

Yes

C9

No

Yes

C10

Compactus

No

Yes

C11

Compactus

No

Yes

C13

Compactus

No

Yes

C14

Compactus

Yes

Construction

Yes

C15

No

Yes

C16

CONSTRUCTION
Meetings

Safety Inspections

Incidents
Inductions

Other Safety Records


Lot Records
Manufacturer's Data &
Technical Queries
External Quality & Safety
Records
Survey Records
Plant & Equipment (a)
Construction Program
Safety Alerts
Construction Minutes
Traffic

(a)Tool Box Meeting Minutes


(b) Prestart Meetings
(c) Safety Committee
(a) Operators Daily Check Sheets
(b) Daily Site Safety Checks
(c) Weekly Site Safety Checks
(d) Senior Management Site Safety Checks
(e) Pre Commencement Crane Check, Plant Condition Report
(f) Electrical Equipment Register, First Aid Kit Checks, Fire Extinguisher Checks
Register of Injuries, Incident Reports and Investigations
(a) Site Induction / Register
(b) Short Term Inductions
(c) Non Permanent Site Personnel
(a) Operators Certificates, Confined Space Entry, Permits/Information Excavation Permits
Completed
(b) Safety Equipment Issue
(c) Delivery & Pick up Instructions Various Companies
(a) Process Control Plans, Inspection & Test Plans, Forms & Checklist Test Results, Traffic
Control Plans, Lot Completed Records
(b) Work Method, Risk Assessments
(a)
(b)

Technical Queries, Safety Alerts


Material Safety Data Sheets, Hazardous Substances Register

Quality Assurance & Safety Procedures


Survey Records, Quantities
(a) General
(b) Major Plant Checklist Crane
(c) Major Plant Checklist - Plant
Construction Program, Short Term Rolling Program, Fortnightly Program, Extension of Time,
Extension of Time Register
Safety Alerts
Minutes from Civil Works and Structures Meetings
Service Authority Design Approvals

Personnel Surveys

SD - 015

Personnel Surveys (Field Personnel and Project Staff)

05/2002

Compactus

Page 2 of 4

Contract Administration System

DMS Storage

Name of File

Documents contained within file

Paper Copy Storage

Are
docs.scanned

Location of
scanned docs.

Is paper copy
kept

Paper File
No.

Paper File
Location

Yes

Design

Yes

D1

Compactus

Yes

Design

Yes

D2

Compactus

Yes

Design

Yes

D3

Compactus

Yes

Design

Yes

D4

Compactus

Yes

Design

Yes

D5

Compactus

No/Electronic

Transmittal

Yes

D6

Compactus

No

Yes

D7

Yes

D8
D9
D10
D11
D12
D13

DESIGN
External Drawings
Master Control Drawings
Design Reports
Brief & Specifications
Designer Site Notes
Transmittals

Design Calculations

Landscape Files

External Drawings
Internal Drawings
Concept Preliminary & Final Design Reports
Briefs & Standard & Supplementary Specifications
Designer Site Notes
Transmittals
(a) Geometry
(b) Drainage
(c) Structures
(d) Pavements
(e) Noise
(f) Settlement
(a) Landscape Design Programs / Actions and Requests
(b) Landscape Specification
(c) Soil Tests and Landscape Trials
(d) Landscape Contractor and Landscape Suppliers
(e) Landscape Cost Estimates
(f) Plant Species List and Seed Information

No

ENVIRONMENTAL AND STAKEHOLDER


(a)

Environmental Reports

Environmental Meetings &


Training
Environmental Inspections

SD - 015

(b)
(c)
(d)
(e)
(a)
(b)
(c)
(a)
(b)
(c)

Historical environmental information e.g. IAS, Environmental Reports compiled preproject


Pre-construction e.g. Environmental Design Report, EMP (Planning)
Environmental Work Method Statements, Risk Analysis
Monthly Environmental Reports
Key Performance Indicator reporting
Toolbox Talk Minutes
Environmental Steering Committee Minutes
Environmental Training information, attendance records
Daily inspections
Weekly inspections
Audits (internal & external)

05/2002

No
Yes
Yes
Yes
Yes
Yes
Yes
No
No
Yes
Yes

ES1
Stakeholder
Yes

Stakeholder

Yes

Stakeholder

Yes

ES2
ES3
ES4
ES5
ES6
ES7
ES8
ES9
ES10
ES11

Page 3 of 4

Contract Administration System

DMS Storage

Name of File

Environmental Monitoring

Environmental Incidents &


Complaints (a)

Documents contained within file


(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(l)

Baseline Water Quality


Baseline Noise
Baseline Air Quality
Baseline Vibration
Baseline Contaminated Land
Baseline Acid Sulfate Soil
Construction Water Quality
Construction Noise
Construction Air Quality
Construction Vibration
Construction Contaminated Land
Construction Acid sulfate soil

(a)
(b)
(c)

Complaints Complaints register, follow up actions


Incidents notification of incident, incident report, follow up action
Non-conformances non-conformance report, corrective action

Cultural Heritage
Licenses & Permits
Newsletters
Record of Consultation
Media

Licenses & Permits


Newsletters and distribution details
Record of Consultation, Minutes of Meetings, Ministerial
Advertisements, Articles,

SD - 015

05/2002

Paper Copy Storage

Are
docs.scanned

Location of
scanned docs.

Is paper copy
kept

Yes only
summary
spreadsheet

Stakeholder

No
No
Yes

Stakeholder

Yes

Stakeholder

Yes

Yes

Stakeholder

Yes

No (Newsletters
only)

Stakeholder

Yes

No (Minutes only)

Yes

No

Yes

Yes

Paper File
No.
ES12
ES13
ES14
ES15
ES16
ES17
ES18
ES19
ES20
ES21
ES22
ES23

Paper File
Location

ES24
ES25
ES26
ES27
ES28
ES29
ES30
ES31

Page 4 of 4

Anda mungkin juga menyukai