Title
SD-001
27 Jan 2005
SD-003
27 Jan 2005
SD-004
27 Jan 2005
SD-006
27 Jan 2005
SD-007
27 Jan 2005
SD-008
05/2002
SD-009
27 Jan 2005
SD-010
27 Jan 2005
SD-013
8 Dec 2004
SD-015
Date
05/2002
May 2006
Page 1 of 1
Power to:
8.1
9.2
Approve sub-contractors.
12
Determine if Latent conditions exist. Value additional costs and determine any extension
of time.
14.2
Direct variations due to a change in statutory requirements. Value the effects where
a variation is not applicable.
24
26
27.5
To assess the Contractor's cost of taking precautions against loss in relation to minerals,
fossils, relics etcetera.
30.4 &
30.5
32
33.1
33.3
34.1
35.5
35.6
36
37
39
40.1
Order variation:
a)
To change quality,
b)
c)
To vary program,
d)
40.5/
Agree or determine adjusted rate for work which is in excess of 110%, or less than 90%,
SD - 001
27/01/2005
Page 1 of 2
3.2
of scheduled quantity.
40.5
41 (c)
Approve plant hire charges where they are not invoiced or Contract plant hire rates.
42.5
42.8
44.6
47
SD - 001
27/01/2005
Page 2 of 2
Activity / Function
Duties / Responsibilities
Area 1
Area 2
SD - 003
27/01/2005
Page 1 of 1
Job No.:
Contractor:
Position
Reports to
Subordinates
Financial Delegation
Resource Delegation
Authority Delegation
Key Areas
Responsibilities
Quality System
Act on Quality Audit reports and ensure the implementation of corrective action
(if delegated).
Perform incoming inspections on purchased goods, services and materials.
Develop procedures and processes for critical activities in area of responsibility
(if requested).
Develop procedures and processes for critical activities in area of responsibility
Contract Surveillance (if requested)
Delegations
SD - 004
27/01/2005
Page 1 of 1
(insert photo)
(insert photo)
(insert photo)
SD - 006
27/01/2005
Page 1 of 5
Contents
1.0 INTRODUCTION ........................................................................................................................................ 3
2.0 PROJECT COSTS ..................................................................................................................................... 3
3.0 PROJECT STATUS ................................................................................................................................... 3
4.0 PROGRAM AND PROGRESS................................................................................................................... 4
5.0 CONSTRUCTION PROGRAM.................................................................................................................... 4
6.0 EXTENSIONS OF TIME ............................................................................................................................. 4
7.0 CLAIMS ...................................................................................................................................................... 4
8.0 QUALITY .................................................................................................................................................... 4
9.0 BLASTING ................................................................................................................................................. 4
10.0 WEATHER................................................................................................................................................ 4
11.0 TRAFFIC MATTERS................................................................................................................................ 4
12.0 ENVIRONMENTAL .................................................................................................................................. 4
13.0 SAFETY.................................................................................................................................................... 4
14.0 PUBLIC RELATIONS/ COMMUNITY CONSULTATION ........................................................................ 4
15.0 DESIGN ISSUES...................................................................................................................................... 4
16.0 PRINCIPAL SUPPLIED MATERIALS ..................................................................................................... 5
17.0 CONCLUSION......................................................................................................................................... 5
Appendices
o
o
o
o
o
o
SD - 006
27/01/2005
Page 2 of 5
1.0 Introduction
SD - 006
27/01/2005
Page 3 of 5
(Contractors percentage
9.0 Blasting
.
10.0 Weather
12.0 Environmental
13.0 Safety
SD - 006
27/01/2005
Page 4 of 5
17.0 Conclusion
The anticipated completion date for this contract based upon works completed to date and
the delays
Staffing levels for administration of this contract.
Total project cost estimates for this project are listed below:
$
Original
Estimat
e
Actual to
(date)
Forecast
Total
Program
Approval
Contract
Costs
Principals
Materials
Departmental
Costs
TOTAL
SD - 006
27/01/2005
Page 5 of 5
SD - 007
27/01/2005
Page 1 of 1
Project Debrief
Project Finalisation Reporting
Agenda for Project Debrief
This procedure outlines the steps and discussion points for the Finalisation of Construction
Projects undertaken by Roadworks Performance Contracts (RPC) or Road Construction Contracts
(RCC).
This report card is to be completed at the debrief meeting for all designated projects.
Section
Question
Preconstruction Was the project scope controlled during the
preconstruction process?
What significant issues were identified during
consultation?
Comments
SD - 008
05/2002
Page 1 of 3
Section
RIP Delivery
Project
Delivery
Question
Were there significant pavement design
issues?
Comments
SD - 008
05/2002
Page 2 of 3
Section
Outcome
Question
Was an Environmental Management Plan
approved and was it followed?
Was an Environmental audit carried out?
Did the District Workplace Health and Safety
Officer visit site and carry out an audit?
Was the delivered project as fit for purpose;
e.g. overdesigned/ underdesigned?
Did the outcome align with our investment
strategies for this road?
Did the delivered project align with the
approval project scope?
Does this project contribute to any specific
Main Roads outcomes (eg extension of FEV
route; 110 km zone; flood immunity)?
Has there been any feedback received from
stakeholders/communities about this project?
Does it look and feel like a project you are
proud of?
Comments
ASSOCIATED DOCUMENTATION
C6015
C6119
SD - 008
05/2002
Page 3 of 3
SD - 009
Description
Chainage
27/01/2005
Plan No.
Page 1 of 1
Date <******>
SD - 010
27/01/2005
TABLE OF CONTENTS
1
INTRODUCTION
1.1
Project Description
1.2
Contract Type
PROJECT RESOURCES
2.1
2.2
Contract Staff
DETAILS OF CONTRACT
3.1
Possession of Site
3.2
3.3
Contract Duration
3.4
Extensions of Time
3.5
Project Costs
CONSTRUCTION ASPECTS
4.1
Working Platform
4.2
Wearing Course
4.3
Pavement Configuration
4.4
Screening Sizes
5.1
Performance of Contractor
5.2
Design Issues
5.3
5.4
Material Sources
5.5
Quality, NCRs & CARs
5.5.1
Quality
5.5.2
Contractors NCRs
5.5.3
Departments CARs
5
5
5
5
SD - 010
27/01/2005
5.6
Financial Performance
5.6.1
Contractor
5.6.2
Departmental
6
6
6
6.1
Environment
6.2
Drainage
6.3
Revegetation
6.4
6.5
Service Issues
6.6
Geotechnical
6.7
Specifications
ATTACHMENTS
7.1
Performance Reports
7.2
As Constructed Plans
7.3
Financial Data
7.4
Monitor Registers
7.5
Other
SD - 010
27/01/2005
ii
1 Introduction
1.1
Project Description
1.2
Contract Type
SD - 010
27/01/2005
2 Project Resources
2.1
2.2
Contract Staff
SD - 010
27/01/2005
3 Details of Contract
3.1
Possession of Site
3.2
3.3
Contract Duration
3.4
Extensions of Time
3.5
Project Costs
SD - 010
27/01/2005
4 Construction Aspects
4.1
Working Platform
4.2
Wearing Course
4.3
Pavement Configuration
4.4
Screening Sizes
SD - 010
27/01/2005
Performance of Contractor
5.2
Design Issues
5.3
5.4
Material Sources
5.5
5.5.1 Quality
SD - 010
27/01/2005
5.6
Financial Performance
5.6.1 Contractor
5.6.2 Departmental
Environment
6.2
Drainage
6.3
Revegetation
6.4
6.5
Service Issues
6.6
Geotechnical
SD - 010
27/01/2005
6.7
Specifications
7 Attachments
7.1
Performance Reports
Contractor Performance Report
Refer MRPDS Vol. 3
7.2
As Constructed Plans
7.3
Financial Data
Actuals
CMS Reports
FiMS Reports
7.4
Monitor Registers
Certifications
Contact Details
Milestones
Correspondence Register
Action Register
Non-Conformance Register
SD - 010
27/01/2005
7.5
Variations/Claims Register
As Constructed Register
Other
Final Project Records Checklist
SD - 010
27/01/2005
Project name
Contract Number
Location
Name
Job title
Branch/District
Division/Region
Floor, street, city
Version no.
Revision date
2
8 December 2004
Status
Prepared by
Title
Branch/District
Division/Region
Phone
Version history
Version no.
Date
Changed by
Nature of amendment
09/24/2004
DC
Initial draft.
8/12/2004
DC
Name
Position
Signature
Date
Name
Position
District Director
Signature
Main Roads
SD-013
Date
8 Dec 2004
Page 2 of 25
Contents
1
Introduction................................................................................................................ 5
Definitions ................................................................................................................... 5
6.1
6.2
6.3
6.4
6.4.1
6.4.2
6.4.3
6.4.4
6.5
Procurement management............................................................................................ 8
6.6
Environment................................................................................................................. 8
6.7
Safety Management...................................................................................................... 8
6.8
Traffic Management..................................................................................................... 8
7.1
References ................................................................................................................... 9
8 Dec 2004
Page 3 of 25
Main Roads
SD-013
8 Dec 2004
Page 4 of 25
Introduction
This is the management plan for the Superintending team. It sets out the relevant
information for the provision of surveillance and administration of the project,
commensurate with the risks associated with the project.
Definitions
Terms, abbreviations and acronyms
Meaning
ID
Infrastructure Delivery
DBS
QES
RS&E
RoadTek
EOT
Extension Of Time
EHM
CAR
NCR
DMS
ATP
Approval to Proceed
RFI
EMP
TMP
Project Details
Describe the project in summary, for example:
"The highway is to be widened to six lanes, with provision of noise barriers, fencing,
and upgrading of drainage and traffic structures within the site."
Refer Appendix A for a more detailed outline of project.
Main Roads
SD-013
8 Dec 2004
Page 5 of 25
Package 1: Inspector
Package 2: Inspector
Package 3: Inspector
Name
Name
Name
Other Support Staff: Refer Appendix D2. (Modified CAS Form SF02)
Consider standard documents SD-01, SD02 to assist in defining delegations.
The Responsibility Matrix is defined in Appendix B.
The Contact List for the Project is shown in Appendix D1. (Modified SF07)
Location
Interest/context
Contract control
6.1
Integration / Management
This plan is aligned with the contractors Contract Plan and the risk assessment
undertaken by the Superintendent's team.
Consider pre award activities: see Contract Administration / SurveillanceEstablishment (P-002).
Other considerations for effective surveillance of the contract by the Superintending
team may include:
Main Roads
SD-013
Project specific forms and procedures that may be used refer Appendix J.
Frequency of Reviews
8 Dec 2004
Page 6 of 25
6.2
6.3
Product Quality
Surveillance Activities
The Surveillance schedule is located in Appendix C. This will be impacted by the
assessed risks such as:
Hold Points
Community Issues
Issues arising are captured on the "Issues Register" (see Guideline P-028). This is
maintained on site, tabled at the monthly site meeting, and attached to form part of
the minutes.
6.4
Communication management
Contractor
Service Authorities
Community
6.4.3 Meetings
Describe the various major meetings. These may include:
Main Roads
SD-013
Page 7 of 25
6.5
Procurement management
Suppliers (List / Date) To Be Confirmed???
6.6
Environment
Surveillance activities may well be incorporated within the general surveillance
schedule.
Incident management may be incorporated in general incident management, or
described separately. Integration is recommended.
Detail specific activities and contacts in the event of environmental incidents. The
latter may be included in the general Contacts list (SF-007). Appendix D1 includes a
copy.
6.7
Safety Management
Considerations may include:
6.8
Traffic Management
Surveillance activities may well be incorporated within the general surveillance
schedule.
Incident management may be described separately, while still using much of the
standard Incident reporting processes.
Detail specific activities and contacts deemed appropriate in the event of (dangerous)
traffic incidents. The latter may be included in the general Contacts list (Form SF007). Appendix D1 includes a copy.
Main Roads
SD-013
8 Dec 2004
Page 8 of 25
7.1
Responsibility
Measurement KPI
method
Target
Surveillance Plan
development
Superintendent
Review
Completed
Developed
Implementation of
Surv. Plan
management of
associate risks for
the principal.
Superintendent
Review
(Risk)
practices /
activities
undertaken
Principal
related
risks
effectively
managed
Relationships
Superintendent
Review /
assessment
Relationship Sound
Measurement
Team satisfaction
Superintendent
Team Review
Team
Satisfaction
Sound
References
Contract Administration Manual
Contractor's Contract Plan
District based contract management documentation refer
----- ooooo-----
Main Roads
SD-013
8 Dec 2004
Page 9 of 25
Full reconstruction of the existing highway including lowering of the gradeline from
Minor widening into the median using full depth asphalt pavements
Contractor:
Date of the Letter of Acceptance:
Period for Practical Completion:
Original Date for Practical Completion:
Contract Amount:
$XXXXXXXXXXXXX
Out of Scope:
Assumptions: for example, Foundations, services
Main Roads
SD-013
8 Dec 2004
Page 10 of 25
Principal's Delegate
EO
Superintendent
SR
Contractor
ST
Soil Tester
Superintendent's Rep.
SS
Survey Services
AT
Asphalt Tester
SI
Senior Inspector
CC
Cost Clerk
CT
Concrete Tester
Inspector
RSE
A Assist
C Consult
Environmental Officer
O Coordinate
Primary responsibility
R Review
Sign off
Financial Approval
Project Staff
S
SR
SI
Surveillance Audits
Issues Registers
Task
PD
EO
CC
DSO
SS
Others
RSE
ST
AT
P
P
ROLE <EXAMPLE ONLY>
Project Staff
Main Roads
SD-013
Support Staff
8 Dec 2004
Support Staff
Page 11 of 25
Others
CT
SR
SI
PD
EO
CC
DSO
SS
RSE
ST
Compaction Compliance
Audits
Concrete Compliance Audits
(Material)
Asphalt Compliance Audits
(Laying and test procedure)
Site Meetings
P
S
P
P
Site Induction
Formal Process Audits
Main Roads
SD-013
P
P
8 Dec 2004
AT
Page 12 of 25
CT
WBS ID
Activity name
Resources
Duration
1
2
3
4
5
6
7
8
9
10
11
12
Main Roads
SD-013
8 Dec 2004
Page 13 of 25
Depend.
Start
Finish
Model 2: Table
ID
Risk
Activity name
Factor
Resources
(See Responsibility
Matrix)
Surveillance
Mechanism
1
2
3
4
5
6
7
8
9
10
11
12
This has more information and may also lead to a Gantt Chart for the Surveillance Schedule.
Main Roads
SD-013
8 Dec 2004
Page 14 of 25
Project Name:
Contractor:
Job No:
Date of Contact List:
Name:
Office Number:
Position:
Mobile Number:
Location:
Fax Number:
Postal Address:
Name:
Office Number:
Position:
Mobile Number:
Location:
Fax Number:
Postal Address:
Name:
Office Number:
Position:
Mobile Number:
Location:
Fax Number:
Postal Address:
Name:
Office Number:
Position:
Mobile Number:
Location:
Fax Number:
Postal Address:
Main Roads
SD-013
8 Dec 2004
Page 15 of 25
Description:
Contractor:
Contract Number:
This register is designed to list support services such as a list of technical contacts, consultants and
companies that provide specialist services.
Number
Description
Admin Services
Design
IT Support
Geotechnical Issues
Bitumen supply
Contractual Supply
Environmental
Support
Main Roads
SD-013
Name
Telephone
8 Dec 2004
e- mail
Page 16 of 25
WBS
ID
Activity name
Resources
Frequency Start
Duration
Internal
labour
Days or % cost
of Time
Contract
labour
cost
1
2
3
4
5
6
7
8
9
10
11
12
Main Roads
SD-013
8 Dec 2004
Page 17 of 25
External Other
services costs
and
material
costs
Other
costs
Total costs
Main Roads
SD-013
8 Dec 2004
Page 18 of 25
Main Roads
SD-013
8 Dec 2004
Risk rating
Risk factor
Impact
No.
Likelihood
Page 19 of 25
Imp
Rtg
Related
activity
number
Exception reports
Type here
Team Meetings
Team Meetings are held <frequency> in the Site Office Conference Room. Agendas and Minutes
are published < >.
Staff Satisfaction Surveys
Surveys are distributed at the end of each month. Survey results and comments are addressed at
Team Meetings. Results are included in the monthly report
8 Dec 2004
Page 20 of 25
Designer / RFI
All RFIs (request for information) are forwarded to the designer, with a copy logged and maintained on
site (RFI Register). Response times are to be provided to the designer. A copy is also forwarded to the
Design Project Manager. Refer to Appendix C Contact Details.
References
Refer Appendix C for contacts List
Main Roads
SD-013
8 Dec 2004
Page 21 of 25
Service Authorities
What services may require discrete and / or emergency contact.
Contacts see App D
Community
This may include a community consultation plan.
Main Roads
SD-013
8 Dec 2004
Page 22 of 25
logged
Location
DBS
Communication Description
P3
Expedition
Paper Based
Data base
DMS
Contractor
Reference
Folder No.
14
Evidence of insurance
Notices to tenderers
Project Plans
20
Schedule
27
Extension Of Time
19
Extras
Partnering documents
13
13
17
CD05F02
17
CD05F03
17
CD05F04
18
18
18
26
Financial Approvals
Notification of possession of
site
Requests/agreement/rejection
Variation
requests/approval/rejections
Main Roads
SD-013
8 Dec 2004
Page 23 of 25
16
12
As Constructed Program
17
21
Designer (Cardno)
Outward correspondence from
Designer (Cardno)
Contractors Statused
construction program
Construction Diary (hand)
Photographs
Videos
Voice Files
Main Roads
SD-013
8 Dec 2004
Page 24 of 25
Forms
Description / Location
Number
Description / Location
Main Roads
SD-013
8 Dec 2004
Page 25 of 25
Name of File
Are
docs.scanned
Location of
scanned docs.
Paper File
No.
Paper File
Location
Yes, except
emails
A1
Compactus
Yes, except
emails
A2
Compactus
CORRESPONDENCE
Incoming Correspondence
Outgoing Correspondence
ADMINISTRATION
Contracts
Tender Documents
Invoices
Financial
Employee Relations
Partnering Team
Insurance
Minor Works, Plant Hire, Supply, Works, Contract Letter, Progress Claims/Payments,
Contractor Variations
Tender Documents & Dead Tenders
Creditor Invoices A-Z
Monthly Progress Claims, Monthly Claim Audit File, Petty Cash Claims, Credit
Applications/Agreements, Creditor Purchase Orders, Salary Staff Leave, Final Release &
Waivers
Employee Details, Weekly Timesheets, Employee Leave, Employee WorkCover Claims,
Employee Classification Changes, Project Certified Agreement, Commerce Queensland,
Training
Minutes, Handouts
Insurance
Legal Documents
Yes
Administration
Yes
A3
Compactus
Yes
Administration
Yes
A4
Compactus
No
Yes
A5
Compactus
No
Yes
A6
No
Yes
A7
Compactus
Yes, except
general info
Correspondence
Yes
A8
Compactus
Yes
Administration
Yes
A10
Compactus
No
Yes
A11
Compactus
Yes, at end of
month
Management
System Doc.
Yes
M1
Yes
Management
System Doc.
Yes
M2
Yes
Management
System Doc.
Yes
M3
Yes, at end of
month
Management
System Doc.
Yes
M4
No
Yes
M5
No
Yes
M6
MANAGEMENT SYSTEM
NCR
Audits
Approved Documents
Request for Information
Position Descriptions
Calibration
SD - 015
Plans, Manuals, Procedures, Inspection & Test Plans, Forms, Check Lists, Construction
Method Statements, Safe Work Method Statements, Review & Approval Forms
Forms, Register, RFI
Position Descriptions
Test Methods/Inspection Measurement Test Equipment (IMTE) Register
05/2002
Page 1 of 4
DMS Storage
Name of File
Are
docs.scanned
Location of
scanned docs.
Is paper copy
kept
Paper File
No.
Paper File
Location
Yes
Construction
Yes
C1
Compactus
No
Yes
C2
Compactus
No
Yes
C3
Compactus
No
Yes
C4
Compactus
No
Yes
C5
Compactus
Yes
Construction
Yes
C6
Compactus
No
Yes
C7
Compactus
Yes
Construction
Yes
C8
No
Yes
C9
No
Yes
C10
Compactus
No
Yes
C11
Compactus
No
Yes
C13
Compactus
No
Yes
C14
Compactus
Yes
Construction
Yes
C15
No
Yes
C16
CONSTRUCTION
Meetings
Safety Inspections
Incidents
Inductions
Personnel Surveys
SD - 015
05/2002
Compactus
Page 2 of 4
DMS Storage
Name of File
Are
docs.scanned
Location of
scanned docs.
Is paper copy
kept
Paper File
No.
Paper File
Location
Yes
Design
Yes
D1
Compactus
Yes
Design
Yes
D2
Compactus
Yes
Design
Yes
D3
Compactus
Yes
Design
Yes
D4
Compactus
Yes
Design
Yes
D5
Compactus
No/Electronic
Transmittal
Yes
D6
Compactus
No
Yes
D7
Yes
D8
D9
D10
D11
D12
D13
DESIGN
External Drawings
Master Control Drawings
Design Reports
Brief & Specifications
Designer Site Notes
Transmittals
Design Calculations
Landscape Files
External Drawings
Internal Drawings
Concept Preliminary & Final Design Reports
Briefs & Standard & Supplementary Specifications
Designer Site Notes
Transmittals
(a) Geometry
(b) Drainage
(c) Structures
(d) Pavements
(e) Noise
(f) Settlement
(a) Landscape Design Programs / Actions and Requests
(b) Landscape Specification
(c) Soil Tests and Landscape Trials
(d) Landscape Contractor and Landscape Suppliers
(e) Landscape Cost Estimates
(f) Plant Species List and Seed Information
No
Environmental Reports
SD - 015
(b)
(c)
(d)
(e)
(a)
(b)
(c)
(a)
(b)
(c)
05/2002
No
Yes
Yes
Yes
Yes
Yes
Yes
No
No
Yes
Yes
ES1
Stakeholder
Yes
Stakeholder
Yes
Stakeholder
Yes
ES2
ES3
ES4
ES5
ES6
ES7
ES8
ES9
ES10
ES11
Page 3 of 4
DMS Storage
Name of File
Environmental Monitoring
(a)
(b)
(c)
Cultural Heritage
Licenses & Permits
Newsletters
Record of Consultation
Media
SD - 015
05/2002
Are
docs.scanned
Location of
scanned docs.
Is paper copy
kept
Yes only
summary
spreadsheet
Stakeholder
No
No
Yes
Stakeholder
Yes
Stakeholder
Yes
Yes
Stakeholder
Yes
No (Newsletters
only)
Stakeholder
Yes
No (Minutes only)
Yes
No
Yes
Yes
Paper File
No.
ES12
ES13
ES14
ES15
ES16
ES17
ES18
ES19
ES20
ES21
ES22
ES23
Paper File
Location
ES24
ES25
ES26
ES27
ES28
ES29
ES30
ES31
Page 4 of 4