ProductDataSheet
HIFLOWRENOVATION
FLOORINGSCREEDSANDUNDERLAYMENTS
Description
upon the porosity of the substrate and the amount of primer dilution
2
materials.
surface must be primed with a 1:1 water diluted acrylic primer and
Uses
then lightly blinded with 14/25 sand whilst the primer is wet. When the
primer has fully dried a glass fibre mesh scrim must be fixed to the
hospitals.
Application
Sub-Floor Preparation
Installation
Levelling work is best carried out at room temperatures between 15C
and 25C and less than 75% relative air humidity. The minimum
temperature at which the product should be laid is 6C with a
maximum of 30C. Indoor and floor temperatures should exceed 6C
Substrates should be hard, sound and free from dust, dirt, oil, grease,
for one week after the application. The relative humidity of the concrete
Drying
Setting and hardening times will be shortened at high temperatures
and extended at low temperatures but generally Hi-Flow Renovation
o
Priming
Joints
The screed should be separated from all walls, columns and other
upstands by a strip of compressible foam material. The minimum
Standards
clear of the ground, sheeted or under cover and stacked not more
than two pallets high. The product should be used on a first in first
Yield
out basis. Shelf life is minimum 3 months when properly stored but
For every 1.0mm thickness approximately 1.62kg of dry powder per
Typical Performance
Fresh Properties :
Pot Life:
25 30 mins
(temperature dependant)
235 - 255mm
(65mm ,
40mm High Flow Ring)
Hardened Properties:
2
Flexural
1 day
13.0
1 day
3.5
7 days
22.0
7 days
5.0
28 days
30.0
28 days
8.5
Controlled Expansion
ASTM C490
7
days
0.015%
28 days
0.025%
Quality Control