PROCEDURE
SHEET :
PREPARED BY
Darmawan B
DBS
CHECKED BY
Darmawan B
DBS
APPROVED BY
Shawn
SPD
OF
REV
DATE
PAGES
9/20/01
ALL
15/5/02
ALL
DESCRIPTION
PREPD
CHKD
APPD
DBS
DBS
SPD
Team
Team
Team
TABLE OF CONTENT
1.
GENERAL...................................................................................................................................... 2
1.1.
Scope................................................................................................................................... 2
1.2.
References........................................................................................................................... 2
1.3.
Terminology ........................................................................................................................ 2
2.
TEST REQUIREMENT................................................................................................................ 3
3.
4.
EXECUTION ................................................................................................................................. 3
4.1.
4.2.
4.3.
Data Collecting................................................................................................................... 4
4.4.
Result of PDA...................................................................................................................... 4
4.5.
1.
GENERAL
1.1.
Scope
This Construction Procedure covers the general requirement for pile testing by Pile Driving
Analyzer (PDA) method.
1.2.
References
1.2.1.
Related Specification
The following specifications and procedures shall be used as part of this
procedure:
PP-QC-GG-002
QA/ QC Procedure
SP-CI-SS-002
Steel Pipe Pile Specification
SP-CI-CC-002
Concrete Piles Specification
1.2.2.
1.3.
Terminology
In this specification, the following words and terms shall have the meanings hereby
assigned to them, unless noted otherwise.
1.3.1.
COMPANY
Refers to PT. CALTEX PACIFIC INDONESIA, as the ultimate user and owner,
the authorized representative of COMPANY or COMPANY third party
inspection.
1.3.2.
CONTRACTOR
Refers to company selected by COMPANY, which may be responsible for the
detailed engineering design, material and equipment procurement, and
construction as specified in Contract, Scope of Work, or Work Order.
1.3.3.
Vendor
Refers to the company selected by COMPANY or CONTRACTOR, which is
responsible for the purchase agreement or purchase order of the goods/services
specified in this specification.
May, 2002
Page 2 of 4
Note:
1.4.
Conflicting Requirements
1.4.1.
1.4.2.
Should conflicts exist between this specification and other documents, the
following order of precedence shall govern:
Scope of Work
Data Sheets.
This Specification
Other COMPANY Specifications
Other Referenced Publications
Approved for Construction Drawings
2.
Vendors Code
TEST REQUIREMENT
The load test up and testing shall conform to ASTM D4945 for High-Strain Dynamic Testing of
Pile, as specified herein.
3.
4.
EXECUTION
4.1.
May, 2002
PDA tools
Page 3 of 4
4.2.
4.3.
4.4.
4.5.
Accelerometer, which will be used to measure the acceleration in pile element (PDA
will process it to become velocity)
Strain transducer, which will be used to measure strain in pile point (PDA will process
it to become force)
Connection cable
Wrench
Preparation Work
Data Collecting
Driving of pile will be monitored until the appropriate embedment has been reached.
Re-drive Pile
For driven piles, re-driving will be done only for several blows, therefore the ultimate
bearing resistance of the soil is not fully mobilized. By doing this way, the pile capacity
can be identified accurately.
Result of PDA
Nine variables can be seen directly on PDA screen. The velocity (V) and force (F)
graph can also be seen on the monitor. To print the velocity and force, connect this
PDA to the printer.
By processing the PDA result, Case Pile Wave Analysis Program (CAPWAP) will
shows the distribution of pile resistance along the pile length.
Safety requirement
All operations in relation with pile load testing shall be carried out in such a manner so as to
minimize, avoid or eliminate the exposure of people to hazards.
May, 2002
Page 4 of 4