Preliminary Report on Short Circuit

Study

DOCUMENT TITLE:

ELECTRICAL SYSTEM STUDIES SHORT


CIRCUIT
DOCUMENT NO:

Client:
Location:
Project No:
Contract No:

Issued for Client

RIP

RL

DESCRIPTION

ORIG.

CHKD

EBATECH
REV

DATE

PAGES

CLIENT

APPROVED BY

Summary_rev.000.docx

Page 1 of 4

Preliminary Report

No. 0001

ELECTRICAL SYSTEM STUDIES Short Circuit

Rev. 0

TABLE OF CONTENTS
1.
1.1
1.2

EXECUTIVE SUMMARY .................................................................................. 3


Summary ................................................................................................................ 3
Appendix ................................................................................................................ 4

Summary_rev.000.docx

Page 2 of 4

Preliminary Report

No. 0001

ELECTRICAL SYSTEM STUDIES Short Circuit

1.

Rev. 0

EXECUTIVE SUMMARY
1.1

Summary
1.1.1

Study Objectives
The studies are required to size preliminary ratings for substation
equipment (circuit breaker, disconnect switches, bus bar and etc.)

1.1.2

Scope and Limitations


The result that is shown here only includes ANSI Short Circuit Study.
Load Flow Calculations for nominal ratings are not included due to the
lack of loading data. It is also assumed that equipments nominal
ratings are provided together with the short circuit rating.

1.1.3

Assumptions
The following were assumed in this preliminary report:

1.1.4

All generator impedances that were included in the study used


typical values according to the softwares capability (using
IEEE standard)
All transformer impedances used typical values according to
the softwares capability (IEEE standard)
Transmission lines also used typical configuration for the
calculation of its impedance matrix but using the softwares
library for the wires specifications.
Simplified SLD was used; taken note the bus fault would be
the same through all devices in that bus configuration.
The recommended bus configuration as indicated in the Scope
of Works and Specifications was used.
All generating plants were in-service during fault as this would
give the greatest fault level in the faulted bus. This is the only
one case considered in this study.
Future plant G1B in Sangi S/S was included.
The short circuit calculation used follows the IEEE standard
used in ETAP Powerstation.

Faulted Buses:
The following were assumed to be the faulted bus in this study (please
refer to Appendix 1):

Summary_rev.000.docx

SANGI 34.5kV Substation Bus


CARCON 34.5kV Substation Bus
SIGPIT 34.5kA Substation Bus
SIGPIT 138kV Substation Bus

Page 3 of 4

Preliminary Report

No. 0001

ELECTRICAL SYSTEM STUDIES Short Circuit

1.1.5

Rev. 0

Other information:
This section is provided to understand the softwares report in contrast
with the typical breaker rating. The tabulation of important terms for
short circuit is given below:
ETAP ANSI
Duty Report
Interrupting Symmetrical
kA rms
Interrupting Adjusted kA
rms

1.2

Typical ANSI
Breaker Rating
Rated Interrupting kA
Maximum Interrupting
kA

Momentary
Asymmetrical kA rms

Close and Latch rms

Momentary
Asymmetrical kA peak

Close and Latch peak

Description
Rated short circuit
interrupting kA in rms
Maximum short circuit
interrupting kA in rms
Close and latch
capability in
asymmetrical kA rms
Close and latch
capability in
asymmetrical kA peak

Appendix
1.2.1

List of Appendix
Below are the descriptions of Appendices that are included in this
document:
Appendix 1 Single Line Diagram
Appendix 2 SLD with ANSI Duty Result
Appendix 3 Short Circuit Report
Appendix 4 ANSI Duty Report

Summary_rev.000.docx

Page 4 of 4

Anda mungkin juga menyukai