CONCEPTO
% Total
Aporte Empleador
PRESTACIONES SOCIALES
Cesanta
8.33%
8.33%
Intereses Cesanta
1.00%
1.00%
Prima Legal
8.33%
8.33%
Vacaciones
4.17%
4.17%
Salud
12.50%
8.50%
Pensiones
15.50%
11.625%
8.70%
8.70%
58.53%
50.66%
Subsidio Familiar
4.00%
4.00%
Sena
2.00%
2.00%
FIC
2.50%
2.50%
I.C.B.F.
3.00%
3.00%
11.50%
11.50%
5.28%
5.28%
75.31%
67.44%
Riesgos Profesionales
SUBTOTAL
APORTES PARAFISCALES
SUBTOTAL
Vestido de Labor **
TOTAL
4%
3.88%
7.88%
7.88%
Mensual
Auxilio de transporte mensual
Salario mnimo mensual
Diario
72,000
616,000
2,400
20,533
OFICIAL DE CONSTRUCCIN
Salario pacto
30,000.00
Auxilio de transporte
2,400.00
Vestido y calzado
1,584.00
33,984.00
Cuadrillas 1- MAMPOSTERIA
HH
33,984.00 $
4,248.00
24,017 $
3,002.19
58,001.49 $
7,250.19
43,680.92 $
5,460.12
101,682.42 $
12,710.30
Cuadrillas 1- MAMPOSTERIA
HH
33,984.00 $
4,248.00
72,052.48 $
9,006.56
106,036.48 $
13,254.56
79,856.07 $
9,982.01
185,892.55 $
23,236.57
Prestaciones Sociales
Aportes Parafiscales
Otros Aportes
Valor Total P.
Cuadrillas 1- HIDRAULICOS
HH
40,000.00 $
5,000.00
30,000 $
3,750.00
70,000.00 $
8,750.00
52,717.00 $
6,589.63
122,717.00 $
15,339.63
DE COSTOS DE PERSONAL
AYUDANTE DE OBRA
Salario mnimo legal
20,533
Auxilio de transporte
2,400
Vestido y calzado
1,084
24,017
DE VALORES DE CUADRILLAS
58.53%
11.50%
5.28%
75.31%
Cuadrillas 1- MAMPOSTERIA
1-B. Cuadrilla Tipo 1: Un Oficial - Dos Ayudantes
Jornal Diario Oficial
33,984.00
48,034.99
82,018.99
61,768.50
143,787.49
Cuadrillas 1- MAMPOSTERIA
1-D. Cuadrilla Tipo 1: Dos Oficiales - Dos Ayudantes
Jornal Diario Dos Oficiales
67,968.00
48,034.99
116,002.99
87,361.85
203,364.84
58.53%
11.50%
5.28%
75.31%
Cuadrillas 3- ELECTRICOS
3-A. Cuadrilla Tipo 1:TECNICO ELECTRICO - Un AYUDANTE E,
Jornal Tecnico Electrico.
43,000.00
28,000.00
71,000.00
53,470.10
124,470.10
UNIVERSIDAD COOPERATIVA DE
COLOMBIA SEDE NEIVA
MATERIA CONSTRUCCION 2
ITEM
1.
DESCRIPCION
UNIDAD
CANTIDAD
M2
73.80
ACTIVIDADES PRELIMINARES
1.1
1.2
Cerramiento
h=2m
ML
36.30
1.3
Localizacion y replanteo
M2
73.80
1.4
Campamento
GB
1.00
2.1
Excavacion Zapatas
M3
20.28
2.2
M3
2.61
M3
4.41
M3
6.08
2.
EXCAVACIONES
3.
CIMENTACIONES
3.1
ZAPATAS CONCRETO
3.2
VIGAS CONCRETO
4.
3000 P.S.I
3000 P.S.I
ESTRUCTURA
4.1
vigas
M3
19.03
4.2
Columnas
ML
10.30
4.3
Muros
M2
271.24
4.4
Placa Entrepiso
M3
33.76
5.1
PISOS
M2
157.99
5.2
PAETE
M2
542.48
5.
ACABADO
6.
INSTALACIONES ELECTRICAS
6.1
UND
16.00
6.2
UND
3.00
ML
82.00
7.
INSTALACIONES HIDROSANITARIAS
7.1
TOTAL DIARIO
TOTAL SEMANA
TOTAL ACOMULADO
RENDIMIENTO
COSTO DIRECTO
ACTIVIDAD
TIEMPO EN DIAS
14
698,053.77
11
713,511.89
40
244,318.82
0.1
10
12,465,901.85
2.6
1,318,901.57
1.1
401,204.32
2.2
3,848,468.69
2.4
6,715,165.38
2.4
15,714,871.34
1.26
10,543,803.33
13.5
21
15,470,646.24
13
68,438,328.81
15
11
12,665,622.32
32
17
11,831,183.61
116,342.29
5,930,536.00
615,591.00
10
1,525,093.40
IO
NA
LADO
116,342.29
116,342.29
SEMANA 1
2
116,342.29
116,342.29 $
116,342.29 $
116,342.29
285,404.76
107,026.78 $
107,026.78 $
107,026.78
6,232,950.92 $
623,295.09 $
623,295.09
401,747.05
6,456,320.00 $
846,664.17 $
846,664.17
9,514,40
$
518,089.35
6,974,409.35 $
7,821,073.52 $
8,667,737.69
FLUJO DE C
SEMANA 2
6
116,342.29
107,026.78
122,159.41 $
122,159.41
623,295.09 $
623,295.09 $
623,295.09 $
623,295.09
164,862.70 $
164,862.70 $
164,862.70
846,664.17 $
9,514,401.86
$
910,317.20 $
910,317.20 $
788,157.79
10,424,719.06 $
11,335,036.26 $
12,123,194.04
9,514,401.86 $
O DE CAJA Y PROGRAMACI
SEMANA 2
4
623,295.09 $
623,295.09 $
623,295.09 $
623,295.09
164,862.70 $
164,862.70 $
164,862.70 $
164,862.70
133,734.77 $
133,734.77
788,157.79 $
788,157.79 $
921,892.56 $
5,107,000.33
$
12,911,351.83 $
13,699,509.62 $
921,892.56
14,621,402.19 $
15,543,294.75
MACION CONSTRUCCION
SEMANA 3
2
164,862.70
133,734.77
1,924,234.34
641,411.45 $
641,411.45
641,411.45
3,357,582.69
$
$
2,222,831.81 $
641,411.45 $
3,558,321.60
67,781.93
1,556,467.49 $
7,625,097.67
915,056.04
14,451,2
$
17,766,126.56 $
18,407,538.01 $
19,964,005.50 $
27,589,103.16
1,119,194.23 $
1,119,194.23 $
1,119,194.23
7,857,435.67
5,271,901.67 $
585,766.85 $
585,766.85
6,188,258.50 $
442,018.46
296,526.80 $
296,526.80 $
296,526.80 $
296,526.80
67,781.93 $
67,781.93 $
67,781.93 $
67,781.93
1,483,502.96 $
6,755,404.63 $
8,257,528.31 $
9,249,529.72
35,828,010.75 $
44,085,539.06 $
53,335,068.77
14,451,203.94
$
29,072,606.12 $
A UNIFAMILIAR "ASOVITA"
SEMANA 4
4
982,179.46
585,766.85
442,018.46
982,179.46 $
982,179.46
442,018.46 $
442,018.46
442,018.46
20,531,498.64
4,732,473.44
296,526.80
296,526.80 $
296,526.80
296,526.80
369,354.60 $
82,078.80
82,078.80
67,781.93
67,781.93 $
67,781.93
67,781.93
2,374,273.50 $
2,157,861.25 $
1,870,585.45
26,152,378.08
30,665,182.86
$
55,709,342.28 $
57,867,203.53 $
59,737,788.98
$
$
85,890,167.06
442,018.46
442,018.46
11,406,388.14
11,406,388.14
5,066,248.93
417,571.19
585,766.85
442,018.46
442,018.46
690,852.13
690,852.13
690,852.13
417,571.19
417,571.19
417,571.19
82,078.80
17,414,305.51
12,956,829.91
1,550,441.78
2,136,208.63
62,346
$
103,304,472.57
116,261,302.49
117,811,744.26
119,947,952.89
E GIGANTE HUILA
TIEMPO (7 SEMA
SEMANA 6
6
982,179.46
585,766.85 $
585,766.85
442,018.46 $
$
$
982,179.46
442,018.46
442,018.46
690,852.13 $
690,852.13
690,852.13
417,571.19 $
417,571.19
417,571.19
2,136,208.63
62,346,372.54
$
122,084,161.52
3,118,388.09 $
2,532,621.24
125,202,549.61 $
127,735,170.84
$
$
A
TIEMPO (7 SEMANAS)
SEMANA 6
3
982,179.46
442,018.46 $
442,018.46 $
442,018.46
13,687,665.76 $
11,406,388.14
417,571.19 $
417,571.19 $
417,571.19
1,841,769.11 $
14,547,255.41 $
12,265,977.79
35,165,601.28
$
129,576,939.95 $
144,124,195.37 $
156,390,173.15
SEMANA 7
6
442,018.46
417,571.19
982,179.46
585,766.85 $
585,766.85
585,766.85
442,018.46 $
442,018.46
442,018.46
690,852.13 $
690,852.13
690,852.13
417,571.19 $
417,571.19
417,571.19
859,589.65
35,165,601.28
$
157,249,762.80
2,136,208.63 $
2,136,208.63 $
3,118,388.09
159,385,971.43 $
161,522,180.06 $
164,640,568.15
$
$
SEMANA 7
4
982,179.46
442,018.46
442,018.46
690,852.13
690,852.13
417,571.19
417,571.19 $
417,571.19
2,532,621.24
1,550,441.78 $
417,571.19
11,891,439.54
$
167,173,189.38
168,723,631.16
$ 169,141,202.35
Cant.
Director de Obra
Residente de obra
Auxiliar de ingenieria
Topografo
Cadeneros
Patinador
Secretaria
Contador
1
1
1
1
1
1
1
1
Duracion
(meses)
1.75
1.75
1.75
1.20
1.75
1.75
1.75
1.75
Dedicacin (%)
0.50
0.80
1.00
0.10
0.10
1.00
0.10
0.05
Cant.
Duracion (meses)
Gastos de Oficina
Arriendo
Agua
Electricidad
Telefono
Materiales e insumos de oficina
de Limpieza
Equipo de Materiales
Oficina (computador,
calculadora,
fax, copiadora, ,A.A.)
1
1
1
1
1
1
1
2
2
2
2
2
2
2
DESCRIPCION
Polizas de Seguros
Rete fuente 1%
VALOR
$
$
635,000
1,691,412
300,000
SUB TOTAL
2,626,4
DESCRIPCION
Ensayos de laboratorio
Diseos de mezclas
Ensayos de suelo
SUB TOTAL
VALOR
$
$
$
$
400,0
300,0
500,0
1,200,0
1,055,483 $
169,141,2
2. IMPREVISTOS
IMPREVISTOS (%)
Por alza de jornales
Por alza de materiales
Por alza de combustibles
Por actividades no remuneradas
% TOTAL
NOTA:
3. PORCENTAJE DE UTILIDAD
10%
TOTAL (%)
ADMINISTRACIN
IMPREVISTOS
11.6%
5%
UTILIDADES
10%
TOTAL
26.6%
Salario Basico
$
$
$
$
$
$
$
$
2,900,000
1,650,000
800,000
750,000
535,600
535,600
535,600
900,000
SUBTOTAL
1.75
1.75
1.75
1.75
1.75
1.75
1.75
1.75
Total obra
$
$
$
$
$
$
$
$
$
4,448,491
4,042,500
2,454,340
157,779
164,318
1,643,181
164,318
138,057
13,212,984
2 SOSTENIMIENTO DE LA OFICINA
Dedicacin (%)
Costo mensual
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Valor total
$
$
$
$
$
$
55,000 $
320,000 $
30,000 $
50,000 $
40,000 $
50,000 $
20,000 $
110,000
640,000
60,000
100,000
80,000
100,000
40,000
100,000
200,000
1,330,000
SUBTOTAL
V/ UNITARIO
VALOR TOTAL
15.0
10.0
5.0
2.0
8.0
3.0
50.0
20.0
$
$
$
$
$
$
$
$
30,000
10,000
100,000
25,000
15,000
30,000
1,200
7,000
$
$
$
$
$
$
$
$
450,000
100,000
500,000
50,000
120,000
90,000
60,000
140,000
5.0
20,000
100,000
1,610,000
SUBTOTAL
VALOR
$
$
635,000.00
1,691,412.02
300,000.00
2,626,412
VALOR
$
$
$
$
400,000
300,000
500,000
1,200,000
13,212,984
1,330,000
1,610,000
2,626,412
1,200,000
1,300,000
19,669,396
TOTAL DE ADMINISTRACION
Costo Total de la construccion
$
169,141,202
Valor Total
11.6%
2. IMPREVISTOS
IMPREVISTOS (%)
1.25%
1.25%
1.25%
1.25%
5%
ostos directos asumiendo que en la zona durante ya varios meses se esta propagando una
dificil ola invernal.
CENTAJE DE UTILIDAD
NOTA: Lo que estima el contratista es un 10% de utilidad del contrato.