Project Name:
Amaia Scapes Trece Martires
Project Location: Trece Martires, Cavite
Description
Unit
Mobilization/Demobilization
Community Taxes
lot
lot
mos
lots
m2
m3
m3
m3
m3
m3
lot
a.
c.
e.
2
4
g.
3
4
h.
j.
m2
m3
m2
m2
l.m.
l.m.
m2
m3
m3
k.
m.
m3
lot
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
SELLING PRICE
TOTAL
Qty
Rate
1.00
1.00
Amount
287,377.30
361,862.87
287,377.30
361,862.87
649,240.17
649,240.17
9.00
546.00
119,277.71
771.80
1,073,499.39
421,401.13
1,494,900.52
75,738.30
7,573.83
27,487.72
19.20
67.83
67.83
1,453,925.04
513,762.69
1,864,600.22
23,216.51
169.80
3,942,054.93
4,271.21
15,147.66
1.00
188.75
188.75
293,926.25
806,205.70
2,859,173.35
293,926.25
11,733,648.18
25,214.50
4,170.30
23.95
1,110.18
603,982.35
4,629,786.96
2,342.60
13,679.40
927.56
807.82
2,172,901.12
11,050,476.69
7,370.00
60.00
669.47
339.24
4,933,999.09
20,354.39
3,920.60
392.06
604.68
428.50
1,110.18
155.72
1,679,983.63
435,257.48
94,161.11
165.90
1.00
155.72
224,010.78
25,834.04
224,010.78
25,870,747.63
10.00
92.01
166.66
23.67
80.94
11.72
20.50
5.00
7.50
10.00
10.00
7.50
2.50
6,464.70
9,697.06
12,929.41
16,161.76
18,354.24
19,774.98
21,183.96
27,438.39
28,854.95
35,481.81
37,009.02
39,094.49
41,179.96
64,647.05
892,226.20
2,154,815.31
382,548.89
1,485,592.47
231,762.78
434,271.18
137,191.96
216,412.11
354,818.07
370,090.25
293,208.68
102,949.89
7,120,534.82
46,219,831.16
73,021,335.28
a.
c.
c.2
c.4
c.5
Description
DIVISION 08 - POTABLE WATER SYSTEM
uPVC Pipes Class 150 (Color Blue)
- 63 mm Pipes (2")
- 90 mm Pipes (3")
- 110 mm Pipes (4")
- 160 mm Pipes (6")
Unit
l.m.
l.m.
l.m.
l.m.
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
For 90 mm Pipes
- Elbow 90 X 90 mm
- Elbow 45 X 90 mm
- Elbow 22.5 X 90 mm
- Elbow 11.25 X 90 mm
- Tee 90 mm
- Tee Reducer 110 x 90 mm
- Tee Reducer 160 x 90 mm
- Cross Tee 90 x 90 mm
- Reducer 110 x 90 mm
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
c.6
-
pcs
pcs
Tee 160 mm
pcs
Gate Valve
160 mm
110 mm
90 mm
63 mm
pcs
pcs
pcs
pcs
pcs
Fire Hydrants
- 160 mm
- 110 mm
90 mm
pcs
pcs
pcs
d..2
d..3
d..4
e.
Lot Connections
For Single Service
Lot Non-Cross Connections (Single Connections)
20mm tapped to 160mm main
6.50M RROW
20mm tapped to 110mm main
8.00M RROW
6.50M RROW
20mm tapped to 90mm main
12.00M RROW
8.00M RROW
6.50M RROW
20mm tapped to 63mm main
6.50M RROW
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
Irrigation (150mm )
Lot Non-cross Connections
ea.
g.
ea.
lot
l.m.
a.1
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
b.A
b.4
b.6
b.8
c.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
- TIM 1050 mm
- d = 2.25 m
ea.
ea.
Area Drain
- AD 300 mm
- d = 1.25 m
ea.
Drainage Outfall
- 750 mm (4.25m)
- 900 mm (2.00m)
- 1050 mm (2.25m)
ea.
ea.
ea.
Collector Pipe
200mm PVC Pipe
100mm End Plug
l.m.
ea.
Anaerobic Trench
750mm
900mm
1050mm
ea
ea
ea
c.
c.1
c.2
c.2
ea.
ea.
ea.
d.
d.1
ea.
e.
lot
SELLING PRICE
TOTAL
Rate
Qty
1,328.00
1,839.00
509.00
227.00
680.37
858.86
1,065.42
1,776.04
11.00
6.00
7.00
41.00
11.00
11.00
2.00
1.00
1.00
1,494.48
1,321.88
1,321.88
1,321.88
1,713.39
1,909.85
2,531.49
2,221.37
2,276.10
2.00
4.00
16.00
81.00
8.00
5.00
1.00
2.00
4.00
1,808.81
1,633.40
1,633.40
1,633.40
2,221.37
2,841.62
4,119.99
2,784.08
2,142.79
1.00
2.00
24.00
2.00
4.00
2.00
2,647.97
2,386.96
2,386.96
3,010.01
4,682.70
3,115.25
4.00
9.00
3,496.94
3,496.94
Amount
903,535.53
1,579,443.13
542,296.97
403,162.07
16,439.27
7,931.27
9,253.14
54,196.98
18,847.28
21,008.31
5,062.99
2,221.37
2,276.10
3,617.62
6,533.61
26,134.45
132,305.64
17,770.98
14,208.08
4,119.99
5,568.16
8,571.16
2,647.97
4,773.91
57,286.98
6,020.02
18,730.81
6,230.51
13,987.77
31,472.48
1.00
4,702.35
4.00
6.00
20.00
13.00
14,940.59
9,904.26
8,743.76
5,993.35
1.00
26,662.08
1.00
2.00
4.00
50,054.82
48,757.85
42,128.89
2.00
3,296.27
2.00
7.00
3,133.50
3,133.50
1.00
2.00
22.00
2,896.34
2,896.34
2,896.34
26.00
2,758.82
4,702.35
59,762.34
59,425.56
174,875.16
77,913.60
26,662.08
50,054.82
97,515.70
168,515.55
6,592.55
6,266.99
21,934.47
2,896.34
5,792.69
63,719.56
71,729.40
-
1.00
4,395.03
2.00
1.00
4,640.60
4,383.81
1.00
4.00
17.00
6,261.38
4,842.60
3,915.12
10.00
3,750.93
1.00
4,640.60
6.00
8.00
4,717.78
4,717.78
4.00
11.00
54.00
4,480.63
4,480.63
4,480.63
54.00
4,101.75
3.00
6,382.06
6.00
4.00
6,687.97
6,078.95
11.00
50.00
6,891.80
5,900.74
25.00
5,744.98
10.00
4,191.26
578.00
771.80
1.00
332,959.59
4,395.03
9,281.21
4,383.81
6,261.38
19,370.42
66,556.96
37,509.33
4,640.60
28,306.71
37,742.27
17,922.53
49,286.95
241,954.13
221,494.50
19,146.18
40,127.83
24,315.81
75,809.76
295,036.92
143,624.40
41,912.64
446,098.63
332,959.59
6,992,151.30
700.00
1,562.96
1,094,071.29
-
1,269.00
280.00
54.00
36.00
14.00
1,164.43
1,296.34
1,426.84
1,557.35
1,687.85
312.00
28.00
58.00
1,590.90
1,736.84
1,884.18
207.00
127.00
1,959.68
2,123.86
155.00
39.00
27.00
2,455.86
2,728.09
3,355.35
73.00
78.00
2,898.94
3,095.40
168.00
7.00
4,682.51
6,742.50
36.00
5,623.02
8.00
6,761.50
1,477,663.07
362,974.70
77,049.47
56,064.45
23,629.90
496,360.18
48,631.46
109,282.49
405,653.06
269,730.08
380,657.97
106,395.58
90,594.51
211,622.58
241,440.96
786,661.03
47,197.52
202,428.64
54,092.02
-
59.00
9.00
1.00
1.00
26,128.83
28,472.29
37,705.79
41,045.56
18.00
3.00
2.00
1.00
28,472.29
31,812.07
34,380.05
37,705.79
11.00
7.00
28,472.29
31,812.07
7.00
4.00
31,812.07
34,380.05
4.00
4.00
31,812.07
34,380.05
1.00
6.00
34,604.57
37,228.68
2.00
40,007.15
1.00
48,398.68
115.00
11,660.84
5.00
29,130.42
1.00
1.00
1.00
27,923.35
30,258.60
32,736.25
2,160.64
265.00
1,250.31
904.47
1.00
1.00
1.00
439,592.09
623,437.95
701,194.27
1,541,601.25
256,250.62
37,705.79
41,045.56
512,501.24
95,436.20
68,760.09
37,705.79
313,195.20
222,684.47
222,684.47
137,520.18
127,248.27
137,520.18
34,604.57
223,372.07
80,014.29
48,398.68
1,340,996.66
145,652.12
27,923.35
30,258.60
32,736.25
2,701,472.07
239,684.41
439,592.09
623,437.95
701,194.27
155.00
166.00
225.00
953.44
953.44
2,475.00
546.00
771.80
1.00
912,386.32
147,782.56
158,270.35
556,874.65
421,401.13
912,386.32
19,160,112.66
26,152,263.96
Summary of Proposal
Part 1.0 Project
Details
Project Name:
Project Location:
Preliminaries
Division 1 ENABLING WORKS
SURVEY WORKS
EARTHWORKS
ROAD RIGHT OF WAY
RETAINING WALL/SLOPE PROTECTION
WET UTILITIES
Division 8 POTABLE WATER SYSTEM
Division 9 DRAINAGE SYSTEM
Overall Total
Qualifications
1
Exculsions
a
b
c
SBU:
AMAIA
PhP/m2
649,240.17
8.57
46,219,831.16
610.26
19.74
154.92
341.58
94.01
26,152,263.96
345.30
92.32
252.98
649,240.17
1,494,900.52
11,733,648.18
25,870,747.63
7,120,534.82
6,992,151.30
19,160,112.66
73,021,335.28
Deepwell
Water Tank
Tree Ball-out
964.13
GDA (m2)
Date:
75,738.30
Benchmark
PhP/m2
1/8/2014
Description
Unit
Mobilization/Demobilization
Community Taxes
lot
lot
mos
lots
NOTE!!
m2
m3
m3
m3
m3
m3
lot
a.
c.
e.
2
4
g.
3
4
h.
j.
m2
m3
m2
m2
l.m.
l.m.
m2
m3
m3
k.
m.
m3
lot
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
SELLING PRICE
TOTAL
Qty
Rate
1.00
1.00
Amount
287,377.30
361,862.87
287,377.30
361,862.87
649,240.17
649,240.17
9.00
546.00
119,277.71
771.80
1,073,499.39
421,401.13
1,494,900.52
75,738.30
7,573.83
27,487.72
19.20
67.83
67.83
1,453,925.04
513,762.69
1,864,600.22
23,216.51
169.80
3,942,054.93
4,271.21
15,147.66
1.00
188.75
188.75
293,926.25
806,205.70
2,859,173.35
293,926.25
10,279,723.14
25,214.50
4,170.30
23.95
1,110.18
603,982.35
4,629,786.96
2,342.60
13,679.40
927.56
807.82
2,172,901.12
11,050,476.69
7,370.00
60.00
669.47
339.24
4,933,999.09
20,354.39
3,920.60
392.06
604.68
428.50
1,110.18
155.72
1,679,983.63
435,257.48
94,161.11
165.90
1.00
155.72
224,010.78
25,834.04
224,010.78
25,870,747.63
10.00
92.01
166.66
23.67
80.94
11.72
20.50
5.00
7.50
10.00
10.00
7.50
2.50
6,464.70
9,697.06
12,929.41
16,161.76
18,354.24
19,774.98
21,183.96
27,438.39
28,854.95
35,481.81
37,009.02
39,094.49
41,179.96
64,647.05
892,226.20
2,154,815.31
382,548.89
1,485,592.47
231,762.78
434,271.18
137,191.96
216,412.11
354,818.07
370,090.25
293,208.68
102,949.89
7,120,534.82
44,765,906.11
71,567,410.24
a.
c.
c.2
c.4
c.5
c.6
Description
Unit
l.m.
l.m.
l.m.
l.m.
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
For 90 mm Pipes
- Elbow 90 X 90 mm
- Elbow 45 X 90 mm
- Elbow 22.5 X 90 mm
- Elbow 11.25 X 90 mm
- Tee 90 mm
- Tee Reducer 110 x 90 mm
- Tee Reducer 160 x 90 mm
- Cross Tee 90 x 90 mm
- Reducer 110 x 90 mm
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
d..2
d..3
d..4
e.
Tee 160 mm
Gate Valve
- 160 mm
- 110 mm
90 mm
63 mm
pcs
pcs
pcs
pcs
pcs
pcs
Fire Hydrants
- 160 mm
- 110 mm
90 mm
pcs
pcs
pcs
Lot Connections
For Single Service
Lot Non-Cross Connections (Single Connections)
20mm tapped to 160mm main
6.50M RROW
20mm tapped to 110mm main
8.00M RROW
6.50M RROW
20mm tapped to 90mm main
12.00M RROW
8.00M RROW
6.50M RROW
20mm tapped to 63mm main
6.50M RROW
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
Irrigation (150mm )
Lot Non-cross Connections
ea.
g.
ea.
lot
l.m.
a.1
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
b.A
b.4
b.6
b.8
c.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
- TIM 1050 mm
- d = 2.25 m
ea.
ea.
Area Drain
- AD 300 mm
- d = 1.25 m
ea.
Drainage Outfall
- 750 mm (4.25m)
- 900 mm (2.00m)
- 1050 mm (2.25m)
ea.
ea.
ea.
Collector Pipe
200mm PVC Pipe
100mm End Plug
l.m.
ea.
Anaerobic Trench
750mm
900mm
1050mm
ea
ea
ea
c.
c.1
c.2
c.2
ea.
ea.
ea.
d.
d.1
ea.
e.
lot
SELLING PRICE
TOTAL
Rate
Qty
Amount
1,328.00
1,839.00
509.00
227.00
680.37
858.86
1,065.42
1,776.04
11.00
6.00
7.00
41.00
11.00
11.00
2.00
1.00
1.00
1,494.48
1,321.88
1,321.88
1,321.88
1,713.39
1,909.85
2,531.49
2,221.37
2,276.10
2.00
4.00
16.00
81.00
8.00
5.00
1.00
2.00
4.00
1,808.81
1,633.40
1,633.40
1,633.40
2,221.37
2,841.62
4,119.99
2,784.08
2,142.79
1.00
2.00
24.00
2.00
4.00
2.00
2,647.97
2,386.96
2,386.96
3,010.01
4,682.70
3,115.25
4.00
9.00
3,496.94
3,496.94
903,535.53
1,579,443.13
542,296.97
403,162.07
16,439.27
7,931.27
9,253.14
54,196.98
18,847.28
21,008.31
5,062.99
2,221.37
2,276.10
3,617.62
6,533.61
26,134.45
132,305.64
17,770.98
14,208.08
4,119.99
5,568.16
8,571.16
2,647.97
4,773.91
57,286.98
6,020.02
18,730.81
6,230.51
13,987.77
31,472.48
1.00
4,702.35
4.00
6.00
20.00
13.00
14,940.59
9,904.26
8,743.76
5,993.35
1.00
26,662.08
1.00
2.00
4.00
50,054.82
48,757.85
42,128.89
2.00
3,296.27
2.00
7.00
3,133.50
3,133.50
1.00
2.00
22.00
2,896.34
2,896.34
2,896.34
26.00
2,758.82
4,702.35
59,762.34
59,425.56
174,875.16
77,913.60
26,662.08
50,054.82
97,515.70
168,515.55
6,592.55
6,266.99
21,934.47
2,896.34
5,792.69
63,719.56
71,729.40
-
1.00
4,395.03
2.00
1.00
4,640.60
4,383.81
1.00
4.00
17.00
6,261.38
4,842.60
3,915.12
10.00
3,750.93
1.00
4,640.60
6.00
8.00
4,717.78
4,717.78
4.00
11.00
54.00
4,480.63
4,480.63
4,480.63
54.00
4,101.75
3.00
6,382.06
6.00
4.00
6,687.97
6,078.95
11.00
50.00
6,891.80
5,900.74
25.00
5,744.98
10.00
4,191.26
578.00
771.80
1.00
332,959.59
4,395.03
9,281.21
4,383.81
6,261.38
19,370.42
66,556.96
37,509.33
4,640.60
28,306.71
37,742.27
17,922.53
49,286.95
241,954.13
221,494.50
19,146.18
40,127.83
24,315.81
75,809.76
295,036.92
143,624.40
41,912.64
446,098.63
332,959.59
6,992,151.30
700.00
1,562.96
1,094,071.29
-
1,269.00
280.00
54.00
36.00
14.00
1,164.43
1,296.34
1,426.84
1,557.35
1,687.85
312.00
28.00
58.00
1,590.90
1,736.84
1,884.18
207.00
127.00
1,959.68
2,123.86
155.00
39.00
27.00
2,455.86
2,728.09
3,355.35
73.00
78.00
2,898.94
3,095.40
168.00
7.00
4,682.51
6,742.50
36.00
5,623.02
8.00
6,761.50
1,477,663.07
362,974.70
77,049.47
56,064.45
23,629.90
496,360.18
48,631.46
109,282.49
405,653.06
269,730.08
380,657.97
106,395.58
90,594.51
211,622.58
241,440.96
786,661.03
47,197.52
202,428.64
54,092.02
-
59.00
9.00
1.00
1.00
26,128.83
28,472.29
37,705.79
41,045.56
18.00
3.00
2.00
1.00
28,472.29
31,812.07
34,380.05
37,705.79
11.00
7.00
28,472.29
31,812.07
7.00
4.00
31,812.07
34,380.05
4.00
4.00
31,812.07
34,380.05
1.00
6.00
34,604.57
37,228.68
2.00
40,007.15
1.00
48,398.68
115.00
11,660.84
5.00
29,130.42
1.00
1.00
1.00
27,923.35
30,258.60
32,736.25
2,160.64
265.00
1,250.31
904.47
1.00
1.00
1.00
439,592.09
623,437.95
701,194.27
1,541,601.25
256,250.62
37,705.79
41,045.56
512,501.24
95,436.20
68,760.09
37,705.79
313,195.20
222,684.47
222,684.47
137,520.18
127,248.27
137,520.18
34,604.57
223,372.07
80,014.29
48,398.68
1,340,996.66
145,652.12
27,923.35
30,258.60
32,736.25
2,701,472.07
239,684.41
439,592.09
623,437.95
701,194.27
155.00
166.00
225.00
953.44
953.44
2,475.00
546.00
771.80
1.00
912,386.32
147,782.56
158,270.35
556,874.65
421,401.13
912,386.32
19,160,112.66
26,152,263.96
Summary of Proposal
Part 1.0 Project
Details
Project Name:
Project Location:
Co
Preliminaries
Division 1 ENABLING WORKS
649,240.17
SURVEY WORKS
EARTHWORKS
ROAD RIGHT OF WAY
RETAINING WALL/SLOPE PROTECTION
1,494,900.52
10,279,723.14
25,870,747.63
7,120,534.82
WET UTILITIES
Division 8 POTABLE WATER SYSTEM
Division 9 DRAINAGE SYSTEM
6,992,151.30
19,160,112.66
Overall Total
Qualifications
1
Exculsions
a
b
c
Deepwell
Water Tank
Tree Ball-out
RTIRES
SBU:
GDA (m2)
AMAIA
75,738.30
Benchmark
PhP/m2
PhP/m2
649,240.17
8.57
44,765,906.11
591.06
19.74
135.73
341.58
94.01
26,152,263.96
345.30
92.32
252.98
71,567,410.24
Date:
944.93
1/8/2014
Description
Unit
Mobilization/Demobilization
Community Taxes
lot
lot
mos
lots
m3
m3
m3
m3
m3
lot
a.
c.
e.
2
4
g.
3
4
h.
j.
m2
m3
m2
m2
l.m.
l.m.
m2
m3
m3
k.
m.
m3
lot
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
lm
SELLING PRICE
TOTAL
Qty
Rate
1.00
1.00
Amount
187,761.25
236,427.25
187,761.25
236,427.25
424,188.50
424,188.50
9.00
546.00
77,931.46
504.26
701,383.11
275,327.25
976,710.37
75,738.30
7,573.83
27,487.72
44.32
44.32
335,672.74
1,218,257.90
23,216.51
110.94
2,575,586.72
4,271.21
15,147.66
1.00
123.32
123.32
192,040.08
526,743.72
1,868,073.64
192,040.08
6,716,374.79
25,214.50
3,450.56
15.65
725.35
394,618.78
2,502,858.17
2,342.60
13,679.40
606.03
527.80
1,419,689.82
7,219,955.44
7,370.00
60.00
437.41
221.65
3,223,684.78
13,298.77
3,920.60
392.06
604.68
279.97
725.35
101.74
1,097,636.53
284,380.46
61,521.24
165.90
1.00
101.74
146,360.01
16,878.97
146,360.01
16,380,882.98
11.00
112.07
161.64
73.68
36.40
18.39
22.55
5.50
8.25
11.00
11.00
8.25
2.75
4,223.79
6,335.68
8,447.58
10,559.47
11,991.96
12,920.21
13,840.78
17,927.19
18,852.71
23,182.44
24,180.27
25,542.83
26,905.40
46,461.68
710,062.18
1,365,425.02
777,989.15
436,547.94
237,656.93
312,109.65
98,599.53
155,534.86
255,006.89
265,982.97
210,728.37
73,989.84
4,946,095.00
29,020,063.13
46,759,386.72
a.
c.
c.2
c.4
c.5
Description
DIVISION 08 - POTABLE WATER SYSTEM
uPVC Pipes Class 150 (Color Blue)
- 63 mm Pipes (2")
- 90 mm Pipes (3")
- 110 mm Pipes (4")
- 160 mm Pipes (6")
Unit
l.m.
l.m.
l.m.
l.m.
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
For 90 mm Pipes
- Elbow 90 X 90 mm
- Elbow 45 X 90 mm
- Elbow 22.5 X 90 mm
- Elbow 11.25 X 90 mm
- Tee 90 mm
- Tee Reducer 110 x 90 mm
- Tee Reducer 160 x 90 mm
- Cross Tee 90 x 90 mm
- Reducer 110 x 90 mm
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
c.6
-
pcs
pcs
Tee 160 mm
pcs
Gate Valve
160 mm
110 mm
90 mm
63 mm
pcs
pcs
pcs
pcs
pcs
Fire Hydrants
- 160 mm
- 110 mm
90 mm
pcs
pcs
pcs
d..2
d..3
d..4
e.
Lot Connections
For Single Service
Lot Non-Cross Connections (Single Connections)
20mm tapped to 160mm main
6.50M RROW
20mm tapped to 110mm main
8.00M RROW
6.50M RROW
20mm tapped to 90mm main
12.00M RROW
8.00M RROW
6.50M RROW
20mm tapped to 63mm main
6.50M RROW
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
Irrigation (150mm )
Lot Non-cross Connections
ea.
g.
ea.
lot
l.m.
a.1
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
l.m.
b.A
b.4
b.6
b.8
c.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
ea.
- TIM 1050 mm
- d = 2.25 m
ea.
ea.
Area Drain
- AD 300 mm
- d = 1.25 m
ea.
Drainage Outfall
- 750 mm (4.25m)
- 900 mm (2.00m)
- 1050 mm (2.25m)
ea.
ea.
ea.
Collector Pipe
200mm PVC Pipe
100mm End Plug
l.m.
ea.
Anaerobic Trench
750mm
900mm
ea
ea
1050mm
ea
c.
c.1
c.2
c.2
ea.
ea.
ea.
d.
d.1
ea.
e.
lot
SELLING PRICE
TOTAL
Rate
Qty
1,328.00
1,839.00
509.00
298.00
11.00
6.00
7.00
41.00
11.00
11.00
2.00
1.00
1.00
2.00
4.00
16.00
81.00
8.00
5.00
1.00
2.00
4.00
1.00
2.00
24.00
2.00
4.00
2.00
4.00
9.00
444.53
561.15
696.10
1,160.40
976.44
863.66
863.66
863.66
1,119.46
1,247.82
1,653.98
1,451.36
1,487.12
1,181.81
1,067.20
1,067.20
1,067.20
1,451.36
1,856.60
2,691.84
1,819.01
1,400.02
1,730.08
1,559.55
1,559.55
1,966.62
3,059.50
2,035.39
2,284.77
2,284.77
Amount
590,335.28
1,031,947.25
354,315.93
345,798.88
10,740.79
5,181.98
6,045.65
35,410.22
12,314.09
13,726.02
3,307.96
1,451.36
1,487.12
2,363.62
4,268.81
17,075.24
86,443.41
11,610.87
9,283.01
2,691.84
3,638.02
5,600.06
1,730.08
3,119.09
37,429.10
3,933.25
12,237.99
4,070.77
9,139.07
20,562.90
1.00
4.00
6.00
20.00
13.00
1.00
1.00
2.00
4.00
2.00
2.00
7.00
1.00
2.00
22.00
26.00
3,072.33
9,761.60
6,471.06
5,712.83
3,915.83
17,419.97
32,703.89
31,856.50
27,525.39
2,153.66
2,047.31
2,047.31
1,892.36
1,892.36
1,892.36
1,802.51
3,072.33
39,046.41
38,826.37
114,256.68
50,905.74
17,419.97
32,703.89
63,713.00
110,101.56
4,307.32
4,094.61
14,331.14
1,892.36
3,784.72
41,631.90
46,865.23
1.00
3.00
1.00
1.00
4.00
17.00
10.00
1.00
6.00
8.00
4.00
11.00
54.00
54.00
3.00
6.00
4.00
12.00
51.00
26.00
10.00
579.00
1.00
700.00
2,871.54
3,031.99
2,864.21
4,090.94
3,163.97
2,557.99
2,450.72
3,031.99
3,082.42
3,082.42
2,927.47
2,927.47
2,927.47
2,679.93
4,169.79
4,369.66
3,971.75
4,502.83
3,855.32
3,753.55
2,738.41
504.26
217,542.96
1,021.18
2,871.54
9,095.98
2,864.21
4,090.94
12,655.89
43,485.75
24,507.15
3,031.99
18,494.51
24,659.35
11,709.89
32,202.19
158,083.50
144,715.97
12,509.37
26,217.98
15,887.02
54,034.00
196,621.07
97,592.19
27,384.11
291,967.91
217,542.96
4,666,438.36
714,824.00
1,269.00
280.00
54.00
36.00
14.00
312.00
28.00
58.00
207.00
127.00
155.00
39.00
27.00
73.00
78.00
168.00
7.00
36.00
8.00
760.79
846.98
932.24
1,017.51
1,102.78
1,039.43
1,134.78
1,231.05
1,280.38
1,387.65
1,604.56
1,782.43
2,192.26
1,894.06
2,022.41
3,059.37
4,405.29
3,673.86
4,417.71
965,448.08
237,153.68
50,341.15
36,630.35
15,438.86
324,302.61
31,773.92
71,400.97
265,038.07
176,231.24
248,707.24
69,514.77
59,190.96
138,266.04
157,748.21
513,973.99
30,837.04
132,259.07
35,341.64
59.00
9.00
1.00
1.00
18.00
3.00
2.00
1.00
11.00
7.00
7.00
4.00
4.00
4.00
1.00
7.00
3.00
2.00
115.00
5.00
1.00
1.00
1.00
2,160.64
265.00
1.00
1.00
17,071.57
18,602.70
24,635.51
26,817.59
18,602.70
20,784.78
22,462.60
24,635.51
18,602.70
20,784.78
20,784.78
22,462.60
20,784.78
22,462.60
22,609.29
24,323.78
26,139.13
31,621.83
7,618.74
19,032.70
18,244.04
19,769.80
21,388.60
816.91
590.95
287,212.52
407,330.32
1,007,222.83
167,424.28
24,635.51
26,817.59
334,848.55
62,354.33
44,925.19
24,635.51
204,629.67
145,493.45
145,493.45
89,850.39
83,139.11
89,850.39
22,609.29
170,266.48
78,417.38
63,243.67
876,155.52
95,163.48
18,244.04
19,769.80
21,388.60
1,765,037.70
156,600.55
287,212.52
407,330.32
1.00
166.00
177.00
236.00
579.00
1.00
458,133.30
622.94
622.94
1,617.07
504.26
596,118.04
458,133.30
103,407.75
110,260.07
381,628.18
291,967.91
596,118.04
12,648,696.73
17,315,135.09
Summary of Proposal
Part 1.0 Project
Details
Project Name:
Project Location:
Co
Preliminaries
Division 1 ENABLING WORKS
424,188.50
SURVEY WORKS
EARTHWORKS
ROAD RIGHT OF WAY
RETAINING WALL/SLOPE PROTECTION
976,710.37
6,716,374.79
16,380,882.98
4,946,095.00
WET UTILITIES
Division 8 POTABLE WATER SYSTEM
Division 9 DRAINAGE SYSTEM
4,666,438.36
12,648,696.73
Overall Total
Qualifications
1
Exculsions
a
b
c
Deepwell
Water Tank
Tree Ball-out
RTIRES
SBU:
GDA (m2)
AMAIA
75,738.30
Benchmark
PhP/m2
PhP/m2
424,188.50
5.60
29,020,063.13
383.16
12.90
88.68
216.28
65.31
17,315,135.09
228.62
61.61
167.01
46,759,386.72
Date:
617.38
1/8/2014