Anda di halaman 1dari 36

STUDENT: DUYEN TRINH DUC/55XE/624455

DANG PHAM

TUTOR: Dr. KHOA

PROJECT OF CONSTRUCTION ENGINEERING II


DESIGN OF ASSEMBLY METHOD FOR A PRE-ENGINEERD BUILDING

STUDENTS NAME: DUYEN TRINH DUC


CLASS

: 55XE

CODE

: 624455

CHAPTER I: INTRODUTION OF BUILDING


I>
FEATURE OF CONSTRUCTION.
- This is a pre-engineering building which has one story, three spans, and 11
bays. It is built by erection method from several elements that consist of
bridge girder, column, beam, runway beam, truss, steel opening window,
concrete wall panel, concrete roof panel.
+ These elements are fabricated in factory and are transported to the site by
special transportation to erect.
+ This is a huge building with three spans, 11 bays x 6m=72m, it must use
chink of settlement.
- Condition: this construction is assembly on plan site, no limit of plan,
another condition is well, both transportation and equipments are full to
make for the erection. The number of labors always enough.
1> DAT
- Assumption: The plan of construction at level: 0.00m, the head of column is
fixed into foundation at 0.5m.
- Inside column (C2):
H= 11m, h = 9.2 m, w= 5.3
(T)
- Outside column (C1):
H= 8m, h =5.8m, w= 3.6
(T)
- Concrete crane runway beam:
L= 6m, h=0.6 m, w=3.0 (T)

PROJECT OF CONSTRUCTION ENGINEERING II

Page 1

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

- Steel Truss:
w=2.4(T)
- Concrete roof frame:
(T)
- Concrete roof panel:
w=1.4 (T)
- Concrete wall panel:
w=0.7 (T)
- Steel opening window:
-

TUTOR: Dr. KHOA

L2= 18m, h=3.0m,


L1= 12m, h= 1.7m, w=4.2
dimension: 1.5 x 6m,
dimension: 0.6 x 6m,

8000

3000

2600

l2= 6m, b=2.6m, w= 0.5 (T

12000

18000

12000

CHAPTER II: DESIGN AND POINT OUT THE SEVERAL METHODS.


I>

Calculation of lifting equipment.

Qct

1, Design the lifting cable on column.

According to the diagram of lifting cable on head column, we calculate the


diameter of lifting cable.
a, inside column:
we have : ptt= n x p= 1.1 x 5.3=5.83 (T) ( n =1.1 safety factor).

PROJECT OF CONSTRUCTION ENGINEERING II

Page 2

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

The tensile force is determined by :


s

k .Ptt
6 x5.83

17.49(T )
m.n.cos 1x 2 x cos 0

With: + K- safety factor concerns with inertia load ( K=6)


+ m =1 the factor is mentioned when the lifting cable is not stable
+ n=2 the number of lifting cables
+

the angle of lifting cable compare with the vertical. ( =0)

According to the appendix 1, we Choose the cable with dimension: 6x19x1,


diameter D=20mm, tensile strength

140( KG / cm2 )

, the weight of cable

1.43( Kg / m)

.
The weight of cable and equipment:
qtb .lcab q frictionbell 1.43 x13.4 30 49.162( KG ) 0.0492(T )
with : lcab (11 5.8 1.5)2 13.4m

B, outside column (C1):


we have : ptt= n x p= 1.1 x 3.6=3.96 (T) ( n =1.1 safety factor).
The tensile force is determined by :
s

k .Ptt
6 x3.96

11.88(T )
m.n.cos 1x 2 x cos 0

Because the tensile force in the lifting cable on outside column more than that
on inside column
=> we choose similarly inside column.
2, Design the lifting cable on crane runway beam.
- We use the equipment which have semi-auto lock to hang the beam:
PROJECT OF CONSTRUCTION ENGINEERING II

Page 3

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

Ptt nxp 1.1x3 3.3(T )


s

- Tensile force:

K .Ptt
6 x3.3

14(T )
m.n.cos 1.2.cos45

According to the appendix 1, we Choose the cable with dimension: 6x19x1,


diameter D=18.5mm, tensile strength
1.22( Kg / m)

140( KG / cm 2 )

, the weight of cable

qtb 0.01(T )

PROJECT OF CONSTRUCTION ENGINEERING II

Page 4

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

3, Design the lifting cable on steel truss and steel opening window.
- Combine the steel truss and opening window after that lifting and erecting it.
- Use lever arm and automatic-balance cable:
We have:

Ptt nxp 1.1x(2.4 0.5) 3.19(T )


s

- Tensile force:

K .Ptt
6 x3.19

9.57(T )
m.n.cos 1.2.cos0

According to the appendix 1, we Choose the cable with dimension: 6x19x1,


diameter D=14mm, tensile strength
0.69( Kg / m)

170( KG / cm 2 )

, the weight of cable

3000

2600

3500

CODE: 195946R-11

18000

- The weight of lifting equipment: Qeq= Qd+ Lcab. = 0.455+ 3.5x2x0.69.103


=0.46(T)

4, Design the lifting equipment hanging concrete roof frame.


PROJECT OF CONSTRUCTION ENGINEERING II

Page 5

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

- We use the equipment which have semi-auto lock to hang the beam:
Ptt nxp 1.1x 4.2 4.62(T )
s

- Tensile force:

K .Ptt
6 x 4.62

19.6(T )
m.n.cos 1.2.cos45

According to the appendix 1, we Choose the cable with dimension: 6x19x1,


diameter D=22mm, tensile strength

140( KG / cm 2 )

, the weight of cable

4800
1700

6500

1.66( Kg / m)

1200

9600

1200

12000
- The weight of lifting equipment: Qeq=6.8x2x1.66 =22,6 ( Kg)=0.023
(T)
5, Design the lifting cable hanging roof panel.
- The lifting equipment is bunch of lifting cable which
consists of four branches and automatic-balance ring.
- We have :

Ptt nxp 1.1x1.4 1.54(T )


s

- Tensile force:

K .Ptt
6 x1.54

4.16(T )
m.n.cos 0.785.4.cos45

PROJECT OF CONSTRUCTION ENGINEERING II

Page 6

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

According to the appendix 1, we Choose the cable with dimension: 6x19x1,


diameter D=11mm, tensile strength

140( KG / cm 2 )

, the weight of cable

0.42( Kg / m)

- The weight of lifting equipment: 0.01 (T)

6, Design the lifting equipment hanging the wall panel.

- Use the two hooks .


- We have :

Ptt nxp 1.1x0.7 0.77(T )


s

- Tensile force:

K .Ptt
6 x 0.77

3.27(T )
m.n.cos 1.2.cos45

According to the appendix 1, we Choose the cable with dimension: 6x19x1,


diameter D=11mm, tensile strength

140( KG / cm 2 )

, the weight of cable

0.42( Kg / m)

- The weight of lifting equipment: 0.01 (T)


II> Choose the type of crane.
The choice of diagram of transport during the erection is important step which
affects to the process of calculation but in fact, the location of crane is suitable as
design so Ryc ( required radius) must select following the real position on the site.
In this requirement of project, it is not limit bank of the site.
After the calculation of parameter had done, we are going to choose the
appropriate diagram of move to reduce the time of move.
We have to choose the crane via four parameters which include:
Hyc: the height from the elevation of crane to Pulley.
PROJECT OF CONSTRUCTION ENGINEERING II

Page 7

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

Lyc: the length of jib.


Ryc: the radius.
1, Installation of column.
The assembly method has not obstacles so we can choose the Jib which slide
max 75

(sin 75=0.966, cos75=0.259, tan75=3.732) as geometrical method, we


can choose the parameters as below.
a, outside column.
- The required height of jib: Hyc= Hmc +hcab= HL+a +hel+heq +hcab= 0+
0.5+8+1.5+1.5=11.5(m)
H yc hc
sin 75 0

11.5 1,5
10.35
0,966

- The length of required jib: Lyc =


=
- S=Rmin=Lmin. Cos75=10.35.0.259=2.68(m).
Ryc= S+ Rc=2.68+1.5=4.18 (m)
Qyc= Qel+Qeq =3.96+0.0492=4.01 (T)

m.

b, inside column.
- The required height of jib: Hyc= Hmc +hcab= HL+a +hel+heq +hcab= 0+
0.5+11+1.5+1.5=14.5(m)
H yc hc
sin 75

14.5 1.5
13.46
0,966

- The length of required jib: Lyc =


=
- S=Rmin=Lmin. Cos75=13.46x0.259=3.49(m).
Ryc= S+ Rc=3.49+1.5=4.99 (m)
Qyc= Qel+Qeq =5.83+0.0492=5.88 (T)

PROJECT OF CONSTRUCTION ENGINEERING II

m.

Page 8

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

l =(m)

MKG_16

PROJECT OF CONSTRUCTION ENGINEERING II

Page 9

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

2, Installation of concrete runway beam.


The assembly method has not obstacles so we can choose the Jib which slide
max 75

(sin 75=0.966, cos75=0.259, tan75=3.732) as geometrical method, we


can choose the parameters as below.
a, inside runway beam.
- The required height of jib: Hyc= Hmc +hcab= HL+a +hel+heq +hcab
In which:
HL= the height of erection (8.6m)
a= 0.5m the gap from the ground to bottom of member.
Hel : the height of element. (0.6m)
Heq: the height of lifting equipment. (2.4m)
Hcab : the height of cable.(1.5m)
Hyc=8.6+0.5+0.6+2.4+1.5=13.1m
H yc hc
sin 75 0

13.1 1,5
12.0m
0,966

- The length of required jib: Lyc =


=
- S=Rmin=Lmin. Cos75=12x0.259=3.11(m).
Ryc= S+ Rc=3.11+1.5=4.61 (m)
Qyc= Qel+Qeq =3.3+0.01=3.31 (T)
b, outside runway beam:
PROJECT OF CONSTRUCTION ENGINEERING II

Page 10

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

Hyc=4.9+0.5+0.6+2.4+1.5=9.9m
H yc hc
sin 75

9.9 1, 5
8.70m
0, 966

- The length of required jib: Lyc =


=
- S=Rmin=Lmin. Cos75=8.7x0.259=2.25(m).
Ryc= S+ Rc=2.25+1.5=3.75 (m)
Qyc= Qel+Qeq =3.3+0.01=3.31 (T)

PROJECT OF CONSTRUCTION ENGINEERING II

Page 11

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

PROJECT OF CONSTRUCTION ENGINEERING II

TUTOR: Dr. KHOA

Page 12

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

3, Installation of wall panel:


- The required height of jib: Hyc= Hmc +hcab= HL+a +hel+heq +hcab=
0.5+10.1+2.4+1.5+0.6=15.1(m)
H yc hc
sin 75

15.1 1.5
13.6
0, 966

- The length of required jib: Lyc =


=
- S=Rmin=Lmin. Cos75=13.6x0.259=3.49(m).
Ryc= S+ Rc=3.49+1.5=4.99 (m)
Qyc= Qel+Qeq =0.77+0.01=0.78(T)

PROJECT OF CONSTRUCTION ENGINEERING II

m.

Page 13

TUTOR: Dr. KHOA

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

PROJECT OF CONSTRUCTION ENGINEERING II

Page 14

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

4, Installation of steel truss and opening window.


Parameters are identified via Geometrical method:
Span of combined steel truss: 18m, Q=3.19 (T) so we use a crane to assembly.
- The required height of jib: Hyc= Hmc +hcab= HL+a +hel+heq +hcab=
0.5+10.1+5.6+3.5+1.5=21.2(m)
H yc hc
sin 75 0

21.2 1.5
20.4
0, 966

el

- The length of required jib: Lyc =


=
- S=Rmin=Lmin. Cos75=20.4x0.259=5.28(m).
Ryc= S+ Rc=5.28+1.5=6.78 (m)
Qyc= Qel+Qeq =3.19+0.46=3.65(T)

m.

5, Installation of roof panel.


- Roof panel is light weight, but it also has a obstacle in front of which is a
roof truss. Therefore , we should choose the distance between the cable and
the panel in safety , choose e = 1 (m)
- Choose parameters at the place where the panel is the highest with 2
situations : jibs and without jibs.
- Due to geometric method we have the diagram to choose the parameters for
crane :
a) Erect the panel for the center span :
The situation without jib : H = 15.7 (m)
H yc H L a hel heq hcab 15.7 0.5 0.4 2.4 1.5 20.5m

H ch H L a hel 15.7 0.5 0.4 16.6m

tw arctg 3

Lmin

H ch hc
eb

arctg 3

16.6 1.5
57.34
1 3

H ch hc
eb
16.6 1.5
4

25.35m
sin 57.34 cos57.34 sin 57.34 cos57.34

PROJECT OF CONSTRUCTION ENGINEERING II

Page 15

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

S Lmin .cos57.34 13.68m

Ryc S Rc 13.68 1.5 15.2m

Qyc 1.54 0.01 1.55T

The situation with jib :

max 75

PROJECT OF CONSTRUCTION ENGINEERING II

Page 16

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

tw arctg 3

=>

H ch hc

ebl'

l = 3.7

=750

16.6 1.5
tg 750
4l'

= 3.732

(m)

Lyc =

H ch hc
sin 75 0

=> Lmin =

S=

=>

TUTOR: Dr. KHOA

16.6 1.5
0,966

e b l'
cos 75 0

16.6 1,5
sin 75

1 3 3, 7
0, 259

=16.8

m.

*Cos750 = 4.05 m.

=> Ryc = 4.05 + 1.5 + 1+3 =9.55 m.


Q = Pck + qtb = 1.55T

PROJECT OF CONSTRUCTION ENGINEERING II

Page 17

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

PROJECT OF CONSTRUCTION ENGINEERING II

Page 18

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

b) Erect the panel for the outside span


The situation without jib : H = 9.2 m

H yc H L a hck htb hcab 9.2 0.5 0.4 2.4 1.5 14m


H ch H L a hck 9.2 0.5 0.4 10.1m

tw arctg 3

Lmin

eb

10.1 1.5
52.23
1 3

arctg 3

H ch hc
eb
14 1.5
4

22.34m
sin 52.23 cos52.23 sin 52.23 cos52.23

H ch hc

S Lmin .cos57.34 12.1m

Ryc S Rc 12.1 1.5 13.6m

Qyc 1.54 0.01 1.55T

max 75

The situation with jib :

tw arctg 3

=>

H ch hc
ebl'

l = 3.8

=750

=>

10.1 1.5
tg 750
4l '

= 3.732

(m)

Lyc =

H ch hc
sin 75 0

=> Lmin =

e b l'
cos 75 0

10.1 1,5
sin 75

1 3 3,8
0, 259

PROJECT OF CONSTRUCTION ENGINEERING II

=9.7

m.

Page 19

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

S=

10.1 1.5
0,966

TUTOR: Dr. KHOA

*Cos750 = 2.3 m.

=> Ryc = 2.3 + 1.5 + 1+3 =7.8 m.


Q = Pck + qtb = 1.55T

Members

Parameters

Type of crane

column C1

Qyc
4.0

Ryc
4.1

Hyc
11.5

Lmin
10.3

Name
KX-5363

columnC2

14.5

(L=20 m)

5.8

4.9

13.4

8
3.3

9
4.6

6
12

Runway
beam(inside)

13.1

17,8

8,7

17,2

(L=35 m)

16

32.5

KX-

1.7

15

20.5

4361(L=25m)

MKG-16

XKG- 30
4.6

3
w.panel

(L=18,5 m)

Roof beam

QCT Rmax Hmc

0.7

4.9

18,4

17,5

15.1

13.6

PROJECT OF CONSTRUCTION ENGINEERING II

Page 20

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

window+stee
l truss
Inside
r.panel with
jip

21.2

20.4

XKG- 30

3.6

6.7

(L=35 m)

5
1.5
5

8
9.5
5

l=5 m
XKG- 30

15.7

1.5
5

15.
2

15.7

outside
r.panel with
jip

1.5
5

7.8

9.2

outside
r.panel
without jip

1.5
5

13.
6

16.8

(L=35 m)

Inside
r.panel
without jip

9.2

25.3
5

16

32.5

16

32,5

16

32,5

16

32,5

16

32,5

l=5 m
XKG- 30
(L=35 m)

16.8
0
22.3
4

TUTOR: Dr. KHOA

XKG- 30
(L=35 m)
l=5 m
XKG- 30
(L=35 m)

CHAPTER III: TECHNICAL METHODS.


Base on the parameters of crane that is chose above and the present condition
construction of plan to determine the position of crane for erection.
1.Column installation.
Use the crane that name is KX-5363(L=20m) to assembly the both inside column
and outside column with parameters which is mentioned above.
1.1. The position and transportation of diagram of crane.
+ From the zone of action of crane corresponds each member (the area allows the
crane that stands and acts). We identify the zone of erection for all elements.
+ The crane goes straight between the both rows of column. And each the place, it
can assembly two side as shown in figure.
PROJECT OF CONSTRUCTION ENGINEERING II

Page 21

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

+ The minimum boom outreach of crane is Rmin = 7m; the weight of column Q =
5.88 (ton)

6708

The maximum boom outreach of crane is Rmax = 9m


Therefore, It is shown in figure :

5292

1000

5500

6000

6000

6000

6000

DIAGRAM OF TRANSPORTATION
1.2 Construction methods.
Preparation.
+) Transport columns from the factory to the site by truck or lorry.
Using crane to lift and arrange these columns on the site as shown in
figure
+) On the surface of foundation where marked exactly the position of
columns and there were wood pad, timber and guy wire.
+) Marking all the central lines of columns and marking the level at
the determined point in the column.
+) Checking the dimension of columns : the width, the height, the
section. Checking bolts which link the columns to the run-way beams
PROJECT OF CONSTRUCTION ENGINEERING II

Page 22

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

such as : the position of joint; the quality of bolt and the screw of all
column. All of them need to satisfy the quality and the quantity.
+) Checking lifting equipments such as : the wires ( no break) ,
friction belt, temporary fixed equipments ( wedge, turn buckle, jack
lift and brace )
+) Preparing the aggregate of hearting concrete to link to the
foundation as design.
ERECTION.
+) Set up the friction belt into the body of system , pour a concrete
layer into the socket foundation.
+) Connecting the lifting system to the hook of crane, the crane lift the
column to the position where is 0,5m from the surface of foundation.
We use wagons and some special equipments to drag the column and
we can reduce the friction.
+) The labour use rope system to set up the column into the centroid
of foundation and then lower the crane gradually to install the column
into foundation.
+) Using 5 wood wedges and 4 turn buckles to fix temporarily, and
then using theodolite to adjust the position of column and using
gradienter to adjust the level of column, contortion the turn buckle and
install the wedge in appropriate way. If the level still does not satisfy ,
we will change the thickness of concrete layer in the foundation.
+) In conclusion, cleaning the base of column and using cement
mortar with high strength to link the column , mortar grade > 20% the
concrete grade of foundation and columns.
Fixing the masonry hollow joint into 2 processes :
- The first process : pour concrete to the bottom of the wedge

PROJECT OF CONSTRUCTION ENGINEERING II

Page 23

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

- The second process : when the mortar grade reaches to 80% we can get the
wedge out and pour concrete fully to the foundation.

1. Erecting the crane runway beam.


Using crane MKG-16 ( L = 18,5 m )
1.1. The diagram of moving crane
The minimum boom outreach of crane is Rmin = 6m ; the weight of
crane runway beam Q = 3.31 (ton)
The maximum boom outreach of crane is Rmax = 8.7m
Therefore, we can erect them by the way that the crane may run along the
edge of range column. As shown in figure:

PROJECT OF CONSTRUCTION ENGINEERING II

Page 24

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

5500

6000

6000

6000

TUTOR: Dr. KHOA

6000

1000

DIAGRAM OF TRANSPORTATION
1.2.

The standing position of crane.


The standing position of crane must ensure that the crane can
assemble 2 crane runway beam ( in one bay column ) in the central
span.
The number of standing position of crane is 2 in outside span , 3 in
inside span.

PROJECT OF CONSTRUCTION ENGINEERING II

Page 25

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

1.3. Construction method.


Preparation
+) Using truck to transport crane runway beams to gather at site and
put along the range of column.
+) Checking the dimension of crane runway beam ( length, width, ..) ,
bolts and the steel pad for connecting of crane runway beam ( quantity
and position )
+) Checking hanging and tie equipments, fasten or replace if
necessary.
+) Checking the level of console by level theodolite , mark the
centroid of beam, checking the distance of column
+) Preparing steel pads, connected equipments such as : bolts, spike
driver , welding rod and band saw brazing machine
+) Hanging and tie equipments must be putted in the right position.
Lifting
+) Installing the hook of crane in hanging and tie equipments of crane
runway beam, lifting crane runway beam up, labours use wire to
control the position of beam.
+) 2 labours will stand in 2 working platform where are on the top of
column to control the beam in right connection and position. If there
are any backlash we will use steel pads.
+) In conclusion , we weld and drive bolts permanently.
3. STEEL TRUSS AND OPENING WINDOW INSTALLATION.
Use the crane that name is XKG-30/35m to erect the steel truss and opening
window.
3.1. position of crane and diagram of transportation.
- Diagram of transportation: crane goes between the inside span.

PROJECT OF CONSTRUCTION ENGINEERING II

Page 26

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

- determine the place of crane: the location of crane is determined following the
minimum radius and maximum radius of crane that must be corresponded with the
weight of truss, position of truss.
+ install the truss.
-Maximum radius: Rmax=16m
- The crane must lift the truss that has weight equal P=3.65 (ton)
All the things are illustrated in the figure bottom.
+ install the concrete beam
-maximum radius: Rmax=16m
The crane must lift the truss that has weight equal P=4.63(ton)
3.2 Technical installation.
+ Preparation: after labor had fixed permanent the column into the foundation, we
determine the center line to erect another member.
+ Adjustment and strengthening for truss before erecting it on the column.
+ When truss is erected, truss is fixed temporary at three points and we use the
brace bar and tuner buckle. Each truss is fixed temporary at 2 head points and a
center point.
+ Check and adjust the vertical plan of truss compared with vertical plan.
+ fix permanent the truss after the all technical requirement is ensured as design.
4. Roof panel installation.
4.1 Diagram of transportation.
Use the crane XKG-30/35m that go inside span.
4.2 Position of crane.

PROJECT OF CONSTRUCTION ENGINEERING II

Page 27

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

- determine the place of crane: the location of crane is determined following the
minimum radius and maximum radius of crane that must be corresponded with the
weight of panel, position of panel.
+ install the roof panel.
-maximum radius: Rmax=16m
- The crane must lift the truss that has weight equal P=1.55 And critical height
H=15.7m
4.3 Technical installation.
+ Preparation: the truss is pined on the column. After that, we lift the panel at four
points and also use the automatic-balance pulley.
+ The panel is erected from border to opening window. It is also noticeable that
we have to determine the location of panel on the roof to avoid the accumulation
on the roof. On the opening window, the panel is erected from one head to other
head.
+ check and adjust the location of panel as design.
+ The panel is fixed permanent after the all technical requirement is ensured as
design.

PROJECT OF CONSTRUCTION ENGINEERING II

Page 28

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

R16000
12000

R16000

R16000
18000

R16000

12000

R16000
R16000

6000

6000

6000

6000

6000

6000

6000

6000

6000

5. Wall panel installation.


5.1 Diagram of transportation.
Use the crane KX-3461/25m that go straight outside wall.
5.2 Position of crane.
- determine the place of crane: the location of crane is determined following the
minimum radius and maximum radius of crane that must be corresponded with the
weight of panel, position of panel.
PROJECT OF CONSTRUCTION ENGINEERING II

Page 29

10

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

+ install the panel.


- Minimum radius: Rmin=7.5m
-Maximum radius: Rmax=15m
- The crane must lift the wall panel that has weight equal P=0.78(ton) And critical
height H=15.1m
5.3. Technical installation.
+ Preparation: after pouring the concrete into the bracing foundation, we use truck
to prepare the wall panel. The panel is hung by lifting cable and automatic-balance
pulley with two points.
+ Assembly and temporary fixation: erect the wall from bottom to top
+ Check and adjust location of panel as design.
+ Fixation permanent: The panel is fixed permanent after the all technical
requirement is ensured as design

12000

18000

12000

DIAGRAM OF TRANSPORTATION

5500

6000

6000

6000

5500

5500

6000

6000

6000

6000

1000

IV. Safety technique in assembling.

PROJECT OF CONSTRUCTION ENGINEERING II

Page 30

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

- Assembling often proceed at high level so labours need to have a good


healthy ( no vertigo, no headache) . When giving new jobs to labours at the
high level , engineer must inform some technical requirements and safety
methods in a detail way.
- Giving to labours who work at high level some special clothes such as : tidy,
not sliny shoes, protection gloves and safety belt. These belts must stand
static forces which reach to 300 kg. Forbid strictly connecting these safety
belt to unreliable structure.
- When lifting structural element up to 0.5m we must stop and wait for 1-2
minutes to check the safety of hooks.
- No standing under elements which are lifting and installing.
- Labours must stand outside the rotated radius.
- There must be barriers and warning light at night (or guards ) to prohibit
traffic at the site.
- Electric wire must not run over lifting and assembling areas , if not they
must run underground.
- Prohibit labours to stand on the lifting elements.
- Hooks must have safety equipments to avoid slipping. No pull these
components in horizontal because the crane can be turned over.
- Not hanging any weight into the jib in break time.
- Only remove hooks when the components is stable.
- Platform working must be stable , there should be balcony with 1m in
height. The chink between the inside edge of deck and elements must be less
than 10cm.
- Checking regularly, fixing decks and platform working.
- Prohibit traffic on the upper side of jack rafter, beam and braces. Only walk
on the downside of frame when cables lift elements up 1m.
- There should be temporary lightning resistant for high rise building . The
popular method is that using temporary conductor, lighting rod made by
metal and it connects to the ground.

PROJECT OF CONSTRUCTION ENGINEERING II

Page 31

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

V. CALCULATION OF INDEX
- Use the crane: KX-5363/20m to install column.
+ Construction: 6 shift
+ Moving to site and coming back the fabrication: 2 shift
+ It is not time to wait.
- Use the crane: MKG-16/18.5m to install runway beam.
+ Construction: 14 shift
+ Moving to site and coming back the fabrication: 2 shift
- Use the crane: XKG-30/35m to install concrete beam, steel truss+opening
window, roof panel.
+ Construction: 12 shift
+ Moving to site and coming back the fabrication: 2 shift
- Use the crane: KX-4361/25m to install wall panel.
+ Construction: 8 shift
+ Moving to site and coming back the fabrication: 2 shift

PROJECT OF CONSTRUCTION ENGINEERING II

Page 32

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

number Number
sign
TCXDVN
1776
1
2
1
AG.411
2
AG.411

Members
name

3
4

AG.413
LA.32

AG.415

weight Number
of
element
(T)
(chic )
3
4
5
In.column 5.83
26
Out.colum 3.96
26
n
Run.beam 3.3
66
Truss.win 3.19
13
dow
r.panel1
1.54
176

6
7

AG.412
AG.415

c.beam
r.panel 2

4.62
1.54

26
132

AG.415

w.panel1

0.77

368

AG.415

w.panel2

0.77

259

TUTOR: Dr. KHOA

Total

PROJECT OF CONSTRUCTION ENGINEERING II

Norm
shift

total

tim mach
e
ine

labor

6
0.09
0.07

labor shift labor


people
7
8
9
10
1.58 2.34 41.08 4
1.17 1.82 30.42 2

11
1
1

12
11
16

0.2
0.3

1.36
2.73

13.2 89.76
3.9 35.49

14
4

1
1

7
9

0.01
9
0.13
0.01
9
0.01
8
0.01
8

0.1

1.76 17.6

1.04
0.1

3.38
2.50
8
6.62
4
4.66
2
40.1
94

27.04
13.2

4
4

1
1

8
4

33.12

23.31

0.09
0.09

311.02

Page 33

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

TUTOR: Dr. KHOA

1. COLUMN INSTALLATION
2. RUNWAY BEAM INSTALLATION
3. BEAM . TRUSS+ OPENING WINDOW AND R.PANEL INSTALLATION
4. W.PANEL INSTALLATION

STEEL TRUSS, OPENING WINDOW AND


ROOF PANEL INSTALLATION
RUNWAY BEAM INSTALLATION

COLUMN
INSTALLATION

STEEL TRUSS, OPENING WINDOW AND


ROOF PANEL INSTALLATION

RUNWAY BEAM INSTALLATION


BEAM AND ROOF PANEL
INSTALLATION

3
4
T.A SPAN AB T.B SPAN BC T.C SPAN CD T.D
13 1 13 1
13 1 13 1
1 13 1
13 1 13

1
2

COLUMN
INSTALLATION

33
16

12

40
4

20

9
29
13

6
16

1 6
2

21

10

15

8
13
3

20

25

5 33

30

43

35

40

45

50

55

60

65

70

75

80

85

NGU ? I
23
PROJECT OF CONSTRUCTION
ENGINEERING II
16

15

13

9
21

13
29 33

Page 34

5
43

NGY

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

PROJECT OF CONSTRUCTION ENGINEERING II

TUTOR: Dr. KHOA

Page 35

STUDENT: DUYEN TRINH DUC/55XE/624455


DANG PHAM

PROJECT OF CONSTRUCTION ENGINEERING II

TUTOR: Dr. KHOA

Page 36