Anda di halaman 1dari 9

SIR SYED UNIVERSITY OF ENGINEERING & TECHNOLOGY,

KARACHI
Final Year Project (FYP) Proposal Form
Project Title:

RF CONTROLLED FIRE FIGHTING ROBOT

Nominated Project Details:

Project
Supervisor Name

Contact
Details

Supervisor
Designation

Supervisor
Qualificati
on

Email:
Cell No
Off No:

Supervisors Signature:

Students
Name(s)

1.Muhammad hunain
2.Zaheer Hussain Sharifi
3.Ali Shair Khan
4.Taimoor khalid

Students Mobile
No

1.
2.
3.
4.

03423706996
03111237366
03453241369
03132889979

Roll
Numbers

Students
Email

1.2012-TE-055
2. 2012-TE-117
3.2012-TE-083
4.2012-TE-086
1)m.hunain12@g
mail.com
2)zaheer_hussain
91@hotmail.com
3)ali.ali@yahoo.c
om
4)t_khalid@hotm
ail.com

SIR SYED UNIVERSITY OF ENGINEERING & TECHNOLOGY,


KARACHI

SIR SYED UNIVERSITY OF ENGINEERING & TECHNOLOGY,


KARACHI

Final Year Project Details:

A. Project Title:

Mobile phone based SCADA


for industrial automation

B. Project Start Date:


C. Project Completion Date:
D. Project Summary (less than
200 words)

March-2015
November-2015

E. Project Objectives:

SCADA control system that enables a site operator to monitor


and control processes that are distributed among various
remote sites.
SCADA is used to observe and supervise the industrial
automation applications.
SCADA now provides monitoring of the entire automation
process, including the treatment facilities.

SIR SYED UNIVERSITY OF ENGINEERING & TECHNOLOGY,


KARACHI
F. Project Implementation
Method

External data communication


and integration from various
information sources such as
control centers, power plants,
and substations have be come a
necessity. As more and more
real-time in formation is being
desired by many customers and
vendors, existing information
management sys tems cannot
satisfy the new challenges.
Distrib uted SCADA has already
become the trend of the future
industrial automation system
development. In operation of
the mobile phone based applica
tion, SCADA software in the
server is operated rst.
Afterwards, the SCADA
controlling program SCP, which
realizes the process of sending
data to the server side
program SSP, is operated.
Then, it transfers the data
reading from the SCADA
database to the Web page
designated, where the ASP
active server pageis responsible
for setting up the connection
between the mobile phone and
the SCADA system. The simple
quan tities of data received by
the ASP, sending from SCP
found in the Web server, is
stored in the ASP This
information reaches the ASP by
means of GPRS or WAP after JAP
in the mobile phone and this
information is saved in the JAP
database. Ana lyzing the data in

SIR SYED UNIVERSITY OF ENGINEERING & TECHNOLOGY,


KARACHI
this database, the JAP turns it
into a value diagram, bar graph,
text message, and various
graph animations, which can
easily be understood by the operator. As
long as the program
in the mobile phone operates,
data between the
mobile phone and SCADA
system are automatically exchanged. The proposed
mobile phone
based SCADA automation
system includes six
levels as shown Fig. 10.
1. There are three servers in
the rst level:
Web server, the master server,
and the reserve server.
2. Firewall software or
specially designed
cards are used to ensure data
security in the
second level.
3. The operator station or
control room, that contains PCs
or thin clients, are installed at
the central location in the plant.
In the proposed system, a Javaenabled mobile phone is
included as a client into the
SCADA system

SIR SYED UNIVERSITY OF ENGINEERING & TECHNOLOGY,


KARACHI

G. Proposed Block Diagram

H. Key Milestones of the Project


with dates

S.No
1.
2.
3.
4.
5.

Elapsed time since start of


the project

Milestone

Deliverable

SIR SYED UNIVERSITY OF ENGINEERING & TECHNOLOGY,


KARACHI
Please add rows if required
I. Final Deliverable of the
Project:
Hardware System
Software Simulation results

(Please tick one of the following)

Software System
Comparative Study

HW/SW integrated system


Theoretical
Design/Architecture

Simulator Design

Other Please
specify
J. Please Specify Technical
Details of Final Deliverable

K. Equipment required for


making prototype/working
model:

Master Unit
This is heart of the system and is
centrally
located
under
the
operator's control.
Remote Unit - This unit is installed
from where the process is actually
monitored. It gathers required data
about
the process and sends it to the
master unit.

SIR SYED UNIVERSITY OF ENGINEERING & TECHNOLOGY,


KARACHI
Communication Mode
This unit transmits signals/data
between the master unit and the
remote unit.
Communication mode can be a
cable, wireless media, satellite etc.
Software
The software
is an
interface
between the
operator and the
units.
It allows the operator to
visualize
and control the functions of the
process.

L. Benets of the Project

(A properly designed SCADA


system saves time and
money by eliminating the
need for service personnel to
visit each site for inspection,
data collection/logging or make
adjustments.

It is certified that the FYP titled ___________________________________________


has been approved and is being undertaken by the above mentioned
students as their Final Year Project.

Name and signatures of FYP committee members:

SIR SYED UNIVERSITY OF ENGINEERING & TECHNOLOGY,


KARACHI
Committee Member 1:

Signature:

Committee Member 2:

Signature:

Committee Member 3:

Signature:

Committee Member 4:

Signature:

Committee Member 5:

Signature:

Comments by FYP committee members (if any)

Date:

Anda mungkin juga menyukai