Anda di halaman 1dari 6

Jakarta, February 25th 2015

Attention To:
Human Resources Development
PT Timas Suplindo

Dear Sir/Miss,
Job information from reading website www.petromindo.com and company profile of
www.temas.com on February 24th 2015. On this good opportunity, I would like apply as
employee in your company. My name is Aliyanto, 23 years old I am a former PT Grand
Kartech Tbk as Junior Project Leader and Engineer. I want to have a career to expand my
experience in Designing and Engineering. To cover the shortfall in the field of engineering,
im joined the training Piping and Design Engineering in the Oil Institute.
My personality as a hardworking, have a high motivation, Creative, Innovative
responsible, able to work together in teams and independent, ready to work under pressure.
For your consideration, I attach a curriculum vitae and other equipment that can support and
provide a picture of myself.
I am willing to participate in the selection process as defined, then I am willing to be
contacted by phone / e-mail as set forth in this letter.

Sincerely,

Aliyanto
+6281336024093
mr.aliyanto@gmail.com

Aliyanto
Telp. +6281336024093
e-mail: mr.aliyanto@gmail.com
PERSONAL DETAILS :
Full Name
Gender
Place, Date of Birth
Home Address

Place Address
NPWP.
Insurance AIA
BPJS
Religion
Marital Status
Nationality
Phone No.
E-mail Address

: Aliyanto
: Male
: Banyuwangi, July 19th 1991
: Village Rejoagung, RT/RW: 03/01Village
Sumberagung Sub-district Pesanggaran
Regency Banyuwangi-East Java
: Jl. Jatinegara-Lio No. 72 subdistricts
Cakung-East Jakarta
: 66.789.570.0-627.000
: 8000194100490774
: 3510011906910004
: Moslem
: Single
: Indonesia
: +6281336024093
: mr.aliyanto@gmail.com

A. CAREER OBJECTIVE :
To obtain a position as Drafter Structure
B. EDUCATION BACKGROUND :
2009-2013 : Mechanical Engineering, Majoring: Energy Conversion (GPA : 3.48)
University of Muhammadiyah Malang (UMM) in Malang East Java
Qualifications:

Piping Drafting Tools


Piping Design Tool
Piping Engineering Tool
3D Modeling Analysis
BOM
Ms. Excell

Ms. Project

: Autocad, PDMS and Autodek Inventor


: Autocad, PDMS and Autodek Inventor
: CAESAR II for Pipe Strees Analysis
: Autodesk Inventor for Static and Dinamic Analysis Stress
: Autodesk Inventor Ilogic, Ipart, BoQ, Input New Materials
: Ms Excell for Compare + Rekapitulasi (BoQ, Drawing
and Actual) and Calculation of Material
: Ms. Project for Scedule Fabrication and Instalation,
Transportation, Survey and Master Scedule

C. SKILLS :

Knowledge of Piping Code & Piping Standard


Knowledge of Piping Systems & Piping Materials
Knowledge of Piping Design
Knowledge of Piping Engineering
Knowledge of Input Progress Fabrication, Installation for Client and Management
Knowladge of Calculation Materials

D. COURSES AND TRAININGS :


1. November 01 th, 2014- January 08 th, 2015, Piping Design & Engineering Course by Oil
Institut Jakarta, Indonesia.
Covering the relevant module of :
Piping System
Piping Material
Piping Code & standards
Piping Drafting
Piping Design use PDMS
Pipe Stress Analysis use Caesar II
2. September 22 th - September 23 th, 2012, Rigging Plan Workshop Course by LSO
Otomotif and Hagun Institut Malang, Indonesia.
Covering the relevant module of :
Rigging ontology
Safety Rigging Analysis
Job Safety Assesment
Rigging Plan by Autocad
3. May 18th - May 20 th, 2012, The Basic Fundamentals of Health and Safety Course by
KSR PMI UMM Malang, Indonesia.
4. September 25 th - December 27 th, 2010, Assistant Laboratorium Draw Engineering
Course by Muhammadyah Applied Technology Center Malang, Indonesia.
5. September 27 th - Maret 23 th, 2008, Microsoft Office Course by Multi Education Center
(MEC) Banyuwangi, Indonesia.
E. Profesional Working Experience
1

Period
Company
Position
Project
Description
Job Description

November 2014 - 17 January 2015


PT. Grand Kartech Tbk
Jr. Project Leader Engineer
Project : Facility CED Coating Line for PT Benecom Tricom
Location : Cibitung West Java-Indonesia
Review document and drawing to identify & quantify scope of work.
Prepare PR, BoQ, and Master Scadule.
Request material Purchase for BoQ and Drawing
Review Material Specification and Technical Query to Client to Pipe,
fitting pipe, support, stand, painting, equipment pump, filter and tank.
Prepare Piping Material Spesification database for MTO calculation.
Prepare Fabrication, Transportation and Instalation Scadule
Update Progress Fabrication and Instalation for Client and Managemant
Supervision on site and workshop
Request and Prepare Tools and Facility for Instalation
Survey Location Instalation
Coordinator Subcontracting
Monitoring and Update Client Property
Mapping Man power for Instalation and Fabrication
Scadule Kick of Meeting dan meeting client
Document Index and transmittal

Period
Company
Position
Project
Description
Job Description

Maret 2014 10 January 2015


PT. Grand Kartech Tbk
Jr. Project Leader Engineer
Project : Mezanine Booth Painting Suzuki Indo Mobil
Location : Cikarang West Java-Indonesia
Review document and drawing to identify & quantify scope of work.
Review PR, BoQ, and Master Scadule.
Request material Purchase for BoQ and Drawing
Review Material Specification and Technical Query to Client
Prepare Material Spesification database for MTO calculation.
Review Fabrication, Transportation and Instalation Scadule
Update Progress Fabrication and Instalation for Client and Managemant
Request and Prepare Tools and Facility for Instalation
Coordinator Subcontracting
Mapping Man power for Instalation and Fabrication
Memo drawing fabrication

Period
Company
Position
Project
Description
Job Description

Juli - September 2014


PT. Grand Kartech Tbk
Jr. Project Leader Engineer
Project : Supply Thinner and Recovery Systerm Line 3 and Line 4
Location : Cikampek West Java-Indonesia
Review document and drawing to identify & quantify scope of work.
Prepare PR, BoQ, and Master Scadule.
Request material Purchase for BoQ and Drawing
Review Material Specification and Technical Query to Client to Pipe,
fitting pipe, support, stand, painting, equipment pump, filter and tank.
Prepare Piping Material Spesification database for MTO calculation.
Prepare Fabrication, Transportation and Instalation Scadule
Update Progress Fabrication and Instalation for Client and Managemant
Supervision on site and workshop
Request and Prepare Tools and Facility for Instalation
Survey Location Instalation
Coordinator Subcontracting
Monitoring and Update Client Property
Mapping Man power for Instalation and Fabrication
Scadule Kick of Meeting dan meeting client

Period
Company
Position
Project
Description
Job Description

Period
Company
Position
Project
Description
Job Description

Juni- Juli 2014


PT. Grand Kartech Tbk
Jr. Project Leader Engineer
Project
: Redesign and drafting Production Separator( EJ-V-003) 66
Inch OD x 210.25 InchLegth (S/S)
Project title : Pertamina PHE ONWJ
Drafting and redesign Production Separator( EJ-V-003) 66 Inch OD x
210.25 InchLegth (S/S)
3D describe in full by the standards of ASME section VIII
BOM automatically obtain and update automatically between 3D and 2D
images that do not need redrawing so help design engineer
Calculate the volume of welding on the layer of the layer, the actual
cutting plan that help estimator
Efficiently and effectively to client requests for live updates OD all the
spec in the BOM will also change according to ASME section VIII
Stress Analysis by Equipment Support

April - Mei 2014


PT. Grand Kartech Tbk
Jr. Project Leader Engineer
Project : Supply Thinner and Recovery Systerm Line 1 and Line 2
Location : Cikampek West Java-Indonesia
Review document and drawing to identify & quantify scope of work.
Prepare PR, BoQ, and Master Scadule.
Request material Purchase for BoQ and Drawing
Review Material Specification and Technical Query to Client to Pipe,
fitting pipe, support, stand, painting, equipment pump, filter and tank.
Prepare Piping Material Spesification database for MTO calculation.
Prepare Fabrication Scadule, Transportation Scadule and Instalation
Scadule
Update Progress Fabrication and Instalation for Client and Managemant
Supervision on site and workshop
Request and Prepare Tools and Facility for Instalation
Survey Location Instalation
Coordinator Subcontracting
Monitoring and Update Client Property
Mapping Man power for Instalation and Fabrication

Period
Company
Position
Project
Description
Job Description

September 2010-January 2013


Muhammadiyah Applied Tecnology Center MATC Patners Autodek
Training
Assistant Laboratorium Drawing Engineering Manuals and Computer
Aided Design
Project : Training Manual Drawing and Computer Aided Design to
AUTOCAD and INVENTOR
Location : Malang East Java-Indonesia
Training schedule
Collection trainees
Presentation lessons
Prepare the exam and tutorial classes
Explain procedures and training time
Give participants

F. Organitation Experience
Organitation
Association of Muhammadiyah Students
(IMM) "Aufklarung Techniques"
Students set of Department of Mechanical
Engineering
LSO-Otomotif

Location
Malang

Office
Member

Periode
2009-2010

Malang

Secretary of Interests Talent

2010-2011

Malang

Head of research and development

2011-2012

Scientific Discussion Forum (FDI)

Malang

Member

2012-2013

G. Awards
Instansi
HMJ-Mechanical
Engineering
FT Univ. Indonesia
Dikti

Location
Malang
Jakarta
Mataram

Kategori
Champion 2nd Drawing Contest Applications
Using AUTOCAD
Competitors drawing using the app inventor
Continguen Pimnas 26th Mataram in Mataram
with Student Creativity Program (PKMEntrepreneurship)
Sincerely,

Aliyanto

Periode
2011
2012
2013

Anda mungkin juga menyukai