ICDS12

International Conference DURABLE STRUCTURES: from construction to rehabilitation


LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

DS

12

LNEC Lisbon 31 May - 1June 2012

Renovation of roofs using MTC


liquid applied membranes
Andr Rosa

IC

Product engineer Roofing Sika Portugal S.A.

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

Rehabilitation

LNE
C

Why renovating a roof is so different from


waterproofing a new one?
Different issues:
-Accessibility equipment already installed and sometimes can not
be removed

-Difficult Details New roofs and details are designed


to be compatible with the waterproofing system.
Old roofs doesnt.

-Use of building sometime the building still be


used during the works (residential/commercial)

-Fire elements/layers of a roof can be inflammable

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

Rehabilitation

12

LNEC Lisbon 31 May - 1June 2012

IC

DS

Different issues:
-Accessibility liquid membrane is easier to apply in tight places

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

Rehabilitation

LNE
C

Different issues:
-Difficult Details liquid membranes fit to any shape

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

Rehabilitation

12

LNEC Lisbon 31 May - 1June 2012

Different issues:
-Do not disturb inner uses silent and quick to apply.

IC

DS

Doesnt need to welding equipment: electricity - gas

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

Rehabilitation

LNE
C

Different issues:
-Fire

No flame on application

- Fire resistant after curing

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

Liquid applied membranes


Advantages and dangers

DS

Advantages:
-Seamless waterproofing systems
-High aesthetical effect
-Easy to apply, less errors

IC

Dangers:
-To keep the thickness in every points
-Be damaged/washed by rain before curing
-Long term bridging cracks

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

Liquid applied membranes

LNE
C

The island effect:


A higher point in a surface below a liquid will cause a minimum thickness
in the liquid layer in that point, or even the lack of product.

How to avoid it?


The thickness of the reinforcement allied to the thixotropic property
of the liquid product helps to maintain the thickness of the layer.

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

Liquid applied membranes


Moisture Triggered

Cross linking, in effect, fuses the individual polymer chains together


at the molecular level making them difficult to separate.

DS

Enhanced properties: such as UV stability, chemical


resistance and fire resistance.

No danger of gassing (no CO2 produced during the reaction)

Quicker curing

Use Aliphatic structures stable & no danger of yellowing


(UV stable)

Better weather durability

Tolerant to moisture during the curing process

Not soluble in water

IC

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

SikaRoof MTC System

LNE
C

Preparation of supports

SikaRoof MTC can be directly applied over bitumen membranes as well as ceramic tiles, asbestos or
cimentitious surfaces.
The system has very good adhesion to the great majority of the surfaces. Only plastics can be a problem.
However some supports need a primer to assure long term adhesion during all life cycle of the element/roof.
Metal Surfaces

Ceramic

Metal Primer to increase adhesion Icosit EG1primer to increase adhesion

Painted surfaces

Concrete or mortar

Bonding Primer to increase adhesion

Concrete Primer to control absorption

PVC membranes/elements
Primer 205 to increase adhesion

Wood
Concrete Primer to control absorption

Application guide has more detailed information about this subject

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

SikaRoof MTC System


First layer

The system is composed by two layers of liquid membrane, wich in the first one will be embedded a
reinforcement mat.
We use the Sikalastic 601-BC, red colour (always).
Cold applied with roller the open areas and a brush, in the less accessible spots.

DS

Sikalastic 601-BC

IC

This liquid membranes have thixotropic properties,


yet in some cases in upstands and walls, we have
to apply more than two coats, with less consumption
in each one, in order to prevent runoff and drops
in the vertical surfaces.

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

SikaRoof MTC System

First layer the mat

LNE
C

Simultaneously, is embedded a reinforcement mat into liquid membrane.


This mat is designed especially to this system, to be very easy to embed and fits to every curves and
details. Its the Sika Reemat Premium.

This mat is pressed inside the liquid coat


with the same roller used to apply
Sikalastic 601-BC.
After application, we must wait a period
of 6 hours, before the next stage.
Depending of the ambient temperature,
after 1 hour the membrane is touch-dry.
After 3-4 hours we can step on it.
We can apply the next coat until 7 days.

After that we need to re-activate this first coat.

Sika Reemat Premium

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

SikaRoof MTC System


Second layer

Is used the Sikalastic 621-TC. This product is avaliable in several colours.


This coat is also cold applied with roller.
We also use a brush, in the less accessible spots.
It is also allowed to apply this second coat through airless, because we will not embed any reinforcement.

DS

In the higher class systems, we will have a


third coating.
In that case, we must wait also a period of
6 hours, before the next coat.
Depending of the ambient temperature,
after 1 hour the membrane is touch-dry.

After 3-4 hours we can step on it.


We can apply the next coat or make any
repair until 7 days.

Sikalastic 621-TC

IC

After that, we need to re-activate


the upper coat.

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

SikaRoof MTC System

System classes

LNE
C

The waterproofing system Sikaroof MTC has 4 levels of performance.


This levels are connected to the total thickness of the cured coats.
SikaRoof MTC 12 the economy system

Primer, if needed
First coat: Sikalastic 601-BC with a consumption of 1,10kg/m2
Embedded mat of Sika Reemat Premium.
Second coat: Sikalastic 621-TC with a consumption of 1,10kg/m2

SikaRoof MTC 15 the base system

Primer, if needed
First coat: Sikalastic 601-BC with a consumption of 1,30kg/m2
Embedded mat of Sika Reemat Premium.
Second coat: Sikalastic 621-TC with a consumption of 1,20kg/m2

SikaRoof MTC 18 the high performance system

Primer, if needed
First coat: Sikalastic 601-BC with a consumption of 1,50kg/m2
Embedded mat of Sika Reemat Premium.
Second coat: Sikalastic 621-TC with a consumption of 1,50kg/m2

SikaRoof MTC 22 the premium system

Primer, if needed
First coat: Sikalastic 601-BC with a consumption of 1,40kg/m2
Embedded mat of Sika Reemat Premium.
Second coat: Sikalastic 621-TC with a consumption of 1,20kg/m2
Third coat: Sikalastic 621-TC with a consumption of 1,20kg/m2

The products are the same,


only varies the consumptions of each coat.

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

SikaRoof MTC System


Different kinds of uses of the roof

The waterproofing systems Sikaroof MTC can remain exposed or being covered.

DS

-exposed, accepts light to average traffic

-root resistant can be used in green roofs

IC

-also support pavers or concrete slabs


(to heavy traffic or even car traffic)

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

Security

LNE
C

What gives us security in the choice


of a solution ?
Proven systems, already applied
-history-

Certification - guarantees

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

Security

12

LNEC Lisbon 31 May - 1June 2012

Manufacturing plant:
Liquid Plastics Limited
Iotech House
P O Box 7
Miller Street
Preston
Lancashire PR1 1EA
United Kingdom

Certification

09

European Technical
approval No.

ETA 03/0052
ETA 07/0004

DS

Last two digits of the year in


which the marking was
affixed

Sikalastic 601 BC/621TC waterproofing systems


have ETA approval

IC

Production plant in Preston, near


Manchester, UK homologation

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

Security

LNE
C

Certification

Guarantees: up to 15 years
History: Roofs up to 25 years old in good condition

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

IC

DS

Before and After

12

LNEC Lisbon 31 May - 1June 2012

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

LNE
C

Before and After

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

IC

DS

Before and After

12

LNEC Lisbon 31 May - 1June 2012

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

LNE
C

Portugal - examples

Refurbishment of sandwich panels- DELPHI Seixal

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

Portugal - examples

IC

DS

Renovation of several villas at Quinta do Anjo - Palmela

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

Portugal - examples

LNE
C

Connection between and metalic frame and existent bituminous waterproofing -

Marina Parque das Naes

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

Portugal - examples

IC

DS

Repairing bituminous waterproofing on the basis of pillars


Sporting Clube de Portugal stadium

DURABLE STRUCTURES

LNEC Lisbon 31 May - 1June 2012

Portugal - examples
Waterproofing of details in fail on old bituminous roof

LNE
C

Tabaqueira - Albarraque

ICDS12
International Conference DURABLE STRUCTURES: from construction to rehabilitation
LNEC Lisbon Portugal 31 May - 1 June 2012

DURABLE STRUCTURES

12

LNEC Lisbon 31 May - 1June 2012

LNE
C

IC

DS

Thank you for your attention!