Anda di halaman 1dari 27

Office Support for Vale OMAN

Vale Oman Pelletizing Company LLC

TECHNICAL SPECIFICATION FOR Office support (Sewage removal,


Water supply and Diesel supply)

Sohar
16 February 2015

[Proposal No. 11]

[14/12/2014]

Office Support for Vale OMAN

[Proposal No.]

[Publish Date]

Office Support for Vale OMAN

1. OBJECTIVE:
To provide service support in Vale Oman Located at Liwa Site and details to support
their inferences. We demand with third party Office Support to hiring specialized
company, improve the quality of the work, quick responded, & to meet the
requirement of the department to achieve the goal

[Proposal No.]

[Publish Date]

Office Support for Vale OMAN

2. SPECIFICATION OF THE SERVICE:

The Service Provider will be responsible to provide the Complete with


Office Support (Sewage removal, Water Supply and Diesel Supply) to all
Company facilities within the designated work areas as specified herein,
including provision but not be limited to Office Support to suit the
intended purpose.

[Proposal No.]

[Publish Date]

Office Support for Vale OMAN

3. SERVICE PROVIDER OBLIGATION

The service Provider shall be provide Supervisor to control all area in Vale
Oman (VOPC & VODC)Vale Oman Pelletizing Company & Vale Oman
Distribution Company

The Service Provider Will be asked by client for additional Service


required any time
3.1.

Sewage Removal:

The Service provider will be responsible to remove the sewage water ( 5000G

) by tanker inclusive of accommodation, food, travel and another


obligations as per Oman labor law
The Service provider shall be Provision for additional tanker ( on call )
when required ( daily, weekly and monthly )
The Service provider shall be Provision Sewage maintenance and
cleaning when required
The Service Provider shall be follow up the requirement on the below
table

Sewage Removal I

Class

Unit

Main Cabin

Daily

Old Restaurant

Daily

Yard Operation Area (Gate No-3)

Daily

C.C.R Building

Daily

Line-B Toilet

Daily

Thickener Area Toilet

Daily

Line- A Travelling Grate Area

Daily

8
9

Balling Building
Jetty Movable Toilet (2 Nos)

Daily
Daily

Class II

[Proposal No.]

Unit

Sewage Removal II

Tank
Capacity
2000
Gallons
2000
Gallons
2000
Gallons
2000
Gallons
1000
Gallons
1000
Gallons
1000
Gallons
1000
Gallons
500 Gallons

Tank

[Publish Date]

Office Support for Vale OMAN

Capacity
1
2

Induration Building
Weigh bridge Building

Waste management Area

Yard Lab

Mechanical Building

Gate Number 1&3

Grinding Substation Area Toilet

Balling Building

Yard Toilet

10

Grinding Operator Room

11
12

Jetty Building
New Contractor building Area

13

Lab Chemical water

3.2.

Water Supply:

Weekly 2
Times
Weekly 2
Times
Weekly 2
Times
Weekly 2
Times
Weekly 2
Times
Weekly 2
Times
Weekly 2
Times
Weekly 2
Times
Weekly 2
Times
weekly 3
Times
weekly 3
Times
Monthly 1 time
Monthly 3
times

Unknown
Unknown
Unknown
Unknown
Unknown
4000
Gallons
1000
Gallons
2000
Gallons
1000
Gallons
Unknown
5000Gallons
Unknown
2000
Gallons

The Service provider shall Supply fresh drinking water (1200G ) by


tanker
The Service Provider shall Supply of irrigation water (10000G ) by tanker
The Service Provider should be inclusive of accommodation, food, travel
and all other obligations as per Oman labor law
The service provider shall be Provision for additional tanker (on call)
when required ( daily, weekly and monthly )
The Service provider shall be Provision water tank cleaning when
required.

Supply Water

Class
1
2
3
4

Main cabin & old Restaurant


Security Gate1&3
Jetty Mobile Toilet (2 Nos)
Waste Management (Office)

Weigh Bridge Building

[Proposal No.]

Unit
Daily 3 times
Daily
Daily
weekly once
weekly 2
times

Tank Capacity
2000 Gallons
500 Gallons
1000 Gallons
500 Gallons
500 Gallons

[Publish Date]

Office Support for Vale OMAN

weekly 2
times

Yard Toilet

500 Gallons

3.3 Diesel Supply:

[Proposal No.]

[Publish Date]

Office Support for Vale OMAN

The Service Provider shall Supply of diesel fuel tank with diesel reader
inclusive of accommodation, food, travel and other obligations as per Oman
labour law.

[Proposal No.]

[Publish Date]

Office Support for Vale OMAN

The Service Provider shall provision for additional tanker (on call) when
required (daily, weekly and monthly)

Class
1
2
3
4
5
6

Diesel Consumption
Fire Truck
Workshop Oil Drum
Welding DG 12 Nos
Induration
Workshop
Line A&B and Jetty

[Proposal No.]

As
As
As
As
As
As

Per
Per
Per
Per
Per
Per

Unit
requirement
requirement
requirement
requirement
requirement
requirement

[Publish Date]

Office Support for Vale OMAN

[Proposal No.]

[Publish Date]

Office Support for Vale OMAN

4. Assignment and Subcontracting:

[Proposal No.]

10

[Publish Date]

Office Support for Vale OMAN

4.1. Assignment:
The Contractor shall not assign the scope of this contract or its
obligations under the contract. A charge in favour of the Contractor's
bankers of any monies due under the contract shall not be
considered an assignment.

4.2.

Subcontracting:

4.2.1. The Contractor shall not subcontract any part or all scope of this
contract without the prior written approval from Vale.

4.2.2. The Contractor shall however, not require such approval for
purchases of materials or to place contracts for minor details or for
any part of the works of which the manufacturer or supplier is
named in the contract.
4.2.3. The contractor shall be responsible for the acts, defaults and
neglects of any
subcontractor, its agents or employees as fully as
if they were the acts, defaults or neglects of the contractor, its
agents or employees

5. Clearance of Site:
2.1
The Contractor shall at all times keep the Site neat, clean and free
from accumulation of waste materials and rubbish which arise out of
the performance of the Works regardless of the source and without
limitation, the contractor shall keep the Site, the Works and the work of
other contractors free from dropping, dripping and spattering of
materials used in the Works.
2.2
On completion of the Works/service the contractor shall remove
from the site all of its waste materials and rubbish, temporary buildings
and facilities, tools, temporary works, contractor's Equipment and

[Proposal No.]

11

[Publish Date]

Office Support for Vale OMAN

surplus materials and shall leave the Site clean and reinstated to the
condition prior to the Contractor' initial access unless approved
otherwise by the Vale.
2.3
IF the Contractor fails to perform any of its obligations under
this Sub Clause, the Vale may arrange to have whatever may be
necessary to correct such default performed by others, and the Vale will
be entitled to deduct the cost thereof as determined by the Vale, from
the amount due to the Contractor.
6. Authority for Access:

6.1.
No persons other than the employees of the contractor and its
subcontractors shall be allowed on the Site except with the consent of
Vale.
6.2.
Facilities to inspect the works shall at all times be afforded by the
contractor to Vale and its representatives, authorities and officials.
6.3.
The contractor shall comply with Vale's requirements as stated in
the contract with regard to:
6.4.
the screening of employees and visitors and the issue of permits
and the wearing of identity cards,
6.5.
The exclusion of unauthorized persons from the Site.

7. Working Hours and leave schedules:

7.1.
The working house shall be agreed in advance between the
contractor and vale ,however in general contractor shall perform the
services/works in two daily timings:
Working from 8:00am to 5:00am

8. Salary Payment / Benefits:


8.1.
Contractor shall ensure that each person engaged in this
contract is paid as per the minimum wage in a timely manner but not
later than the second working day of each month. Proof of payment
shall be submitted to Vale every month. Late payment shall not be
tolerated under any circumstances
[Proposal No.]

12

[Publish Date]

Office Support for Vale OMAN

8.2.
The Contractor shall ensure that all staff receives one (1) month
paid leave for every 1 year of employment with return air ticket to the
country of origin or in accordance with Oman Labor Law.
8.3.
Vale reserves the right to check that salaries to personnel
working on this Contract are paid in full and on time. Failure to provide
information and or failure to adhere to timely payment may result in
termination of this Contract.
9. Leave / Absenteeism / Termination / Replacement:
9.1.
The contractor shall be responsible for the effective management
of vacation leave; absences, sick- leave, special leave etc, and must
ensure that sufficient systems and structures are in place to maintain
the level of Service performance requirements under this contract.
9.2.
All leave to be taken by contractor personnel must first be
submitted to Vale for approval and only upon approval may a
Contractors personnel be allowed to proceed on leave. A replacement
must be available to take the place of the personnel on leave and
maintain the required duties and schedule of those proceeding on
leave immediately.
9.3.
The Contractor from time to time shall provide vacation leave
schedule of all his personnel in a given year for Vales reference.
9.4.
Contractor shall not transfer, remove, or replace any of his
personnel who are providing the Services without the prior written
approval of Vale
9.5.
Should Vale identify any contractors personnel deemed
unacceptable due to misconduct, lack of cooperation, unacceptable
hygiene standards, and incompetence or otherwise, then the
Contractor shall replace these personnel at no cost to vale
9.6.
Contractor shall ensure without fail that Vale is provided with the
agreed number of workers each working day. Any absenteeism shall
reported
immediately
by
Contractors
Supervisor
to
Vale
Representative.
9.7.
Planned leave should be advised giving at least one months
notice. Contractor shall provide suitable Vale approved replacement
personnel for any absentee due to planned leave or sick leave.

[Proposal No.]

13

[Publish Date]

Office Support for Vale OMAN

9.8.
The Contractor shall ensure sufficient personnel are available to
provide coverage for bi-annual leave, sick leave, special leave, etc. in
order to maintain the level of Service performance.
10.

Security Passes:
10.1.
All Contractor staff shall have valid residence permits and carry
their original ID Cards with them at all times.
10.2.
At the start of this Contract, the Contractor shall obtain
permanent gate passes for all staff required to enter Vale office and
plant from vale Security Dept. This requires Contractor to submit
copies of valid Passports, ID cards along with a No objections
certificate, etc. from Vale. Passes must be carried at all times by
Contractor personnel along with original ID card. Each person shall be
responsible for the safe keeping of his/her pass. Passes shall remain
the property of Vale Security Dept. Any lost or stolen cards must be
reported to Vale immediately, and all costs related to replacement of
such cards shall be borne by the Contractor.
10.3.
All contractor staffs should be under contractor's legal permit
name and they have to hold the ID provided by the authority.

11.

Uniform

11.1.
Contractor shall provide and maintain a high standard of
cleanliness to all uniforms (including footwear), plus provide name tag
to be worn by Contractor personnel in performance of their respective
duties under this Contract
11.2.
Vale reserves the right to approve the design style, fabrics and
colors for uniforms and quality of shoes to be provided by Contractor
to his personnel providing services under this Contract.

[Proposal No.]

14

[Publish Date]

Office Support for Vale OMAN

11.3.
At least six (6) sets of uniform and two (2) pairs of safety shoes
to be provided to each employee annually. Contactor shall provide
more sets and pairs incase the perform tasks need so.
11.4.
Uniforms to be replaced at a minimum on an annual basis and
earlier if deemed necessary by the Vale representatives.
11.5.
All uniforms shall be subject to regular inspection by Vale
representatives. Contractors personnel shall ensure that the uniform
is clean and his appearance is neat and tidy at all time while providing
the services.
11.6.
All Contractors personnel shall ware a name tag that will be
styled and colored as approved by Vale. The name tag shall reflect
workers true identity.
11.7.
All cost related to uniforms and safety shoes shall be borne by
Contractor.

12.

Stores, Materials & Equipment:

12.1.
Contractors personnel shall maintain adequate stores of
necessary equipment and materials. Contractor shall organize the
storing of all consumables, materials and chemicals as directed by
Vale Representative.
12.2.
Any Vale property found to be damaged or rendered useless due
to misuse or negligence by Contractor staff will be repaired or
replaced by Vale and the cost shall be deducted from Contractor next
invoice.
12.3.
Contractor shall be responsible for supply, delivery of all
necessary materials and equipment contractor shall ensure that
enough quantities of necessary materials and equipment are available
at all times. In addition to the Vale proposed materials/equipment.

13.

Quality:

[Proposal No.]

15

[Publish Date]

Office Support for Vale OMAN

13.1.

QA/QC System:

13.1.1. Contractor shall submit and execute a Services Quality Plan


highlighting quality control measures and quality assurance
processes and procedures. The Contractor must then consider and
document how its quality system will be applied to the specific
details of each individual task of the Services.
13.1.2. Contractor shall adhere to and comply with the approved quality
assurance requirements in performing the Services to achieve and
sustain the quality of the required Services.
13.1.3. The effectiveness of its quality management system and
Contractor's compliance to it shall be subject to monitoring by Vale
following an agreed period of notice.
13.1.4. Contractor shall grant Vales inspectors access for inspection
purposes during all stages of the Services execution and during
the 3 monthly performance evaluation.

13.2.

Quality Records:

13.2.1. Contractor shall maintain quality control and quality assurance


records to demonstrate achievement of the required quality and
specified requirements.
13.2.2. Contractor shall ensure that system is maintained for
identification, collection, indexing, filing storage, maintenance and
disposition of the quality records.
13.2.3. Vale reserves the right of access to Subcontractor(s) works for
review of all quality records including random inspection and any
other test reports and records.

13.3.

Quality Audits:

13.3.1. Vale reserves the right to review and audit all activities
performed by Contractor in carrying out the Services, using either
Vales own or other personnel. The audit may include, but not
[Proposal No.]

16

[Publish Date]

Office Support for Vale OMAN

limited to, Services spot check, inventory level of materials,


conditions used equipment, Conditions of Contractors personnel
living quarters and facilities, completion of daily and weekly
Services reports, compliance to legal rules and regulations, and
any other Contractors internal control documentation as required.
13.3.2. Vale and or its representatives reserve the right to conduct
quality audits (documentation, process or personnel) at
Contractor/Subcontractors locations to assess compliance to the
quality management system and quality plan requirements,
degree of implementation, effectiveness and adequacy of their
quality system being able to provide the required level of quality in
the Services.

14.

CONTRACTOR TO PROVIDE:

14.1.
Notwithstanding the responsibility of Contractor to fulfill all the
Contract obligations, the Contractor without being limited to the
following, shall provide:
14.2.
Provision of valid work visas, residence permits, driving license
(including lessons if required), and other mandatory authorizations of
Governments or local bodies that may from time to time be required to
provide the services.
14.3.
Air tickets, accommodation and the general safety and welfare of
his own personnel in accordance with Oman Labor Law.
14.4.
Provision of accommodation, all meals, water, and messing &
ablution facility, washrooms. Vale may provide some meals such as
Launch for the permanent crew only after the preapproval form vale.
14.5.
Provision of both normal and emergency medical treatment for
Contractor staff providing services under this Contract.
14.6.
All necessary materials, supervision, labor, equipment necessary
for the performance of the Services.
14.7.
Provision of temporary Services signs and barriers as necessary
during performance of the Services in compliance with prevailing Vale
Safety procedure.
14.8.
All support services including logistical planning from the office
of the Contractor.

[Proposal No.]

17

[Publish Date]

Office Support for Vale OMAN

14.9.
All daily, weekly and monthly reports as requested by Vale.
14.10. Provision of a minimum six (6) sets of uniforms and two (2) pairs
of safety shoes per year for the Contractor personnel providing
services under this Contract to the Vale.
14.11. Provision of trained personnel, skilled and fully experienced in
their respective trades and / or professions, capable of understanding
spoken English, and certified as medically fit to perform the Work
14.12. Vale approved identification cards bearing the personnel
photograph.
14.13. Provision of transportation to his employees to and from the
Work site. Contractor shall also provide transportation within the
Services work area, as and when required. All vehicles entering the
plant site shall meet Vales minimum requirement. Vehicles not
meeting the Plant requirement shall not be allowed to enter the plant
site.
14.14. Provision of mobile phone with SIM cards and vehicles to the
Supervisors at Contractors own cost.
14.15.
All necessary equipment to perform task should be certified by a
Third Party Inspection authority. The Contractor shall at his own cost
carry out all inspection maintenance and repair of his own or hired
equipment to ensure that it is safe, fully certified and operational at all
times. Vale retains the right to carry out equipment audits on a regular
basis to ensure all Certification if required is current.
14.16. The details job description of site supervisor and any other senior
staff.
14.17. Supplies (consumables, fuel, gas, etc.), Job site surveillance,
general Tools and Special Tools.
14.18. Stationary, Computers, printers, fax. Furniture, files, copy
machines, water coolers, Software Licenses, Internet etc.
14.19. Material for use Examples, not limited to: rags, sandpaper,
insulating tape, masking tape, Teflon tape, Anti-seize Lubricant, drill bit
in general, saws in general
14.20. Internal Obligatory Trainings/ Third Party Training
14.21. Any additional requirements as required by Oman law for the
successful completion of the Services as per the Contract.
14.22. Perform all services with care, cleanliness, efficiency, punctuality
and promote awareness campaigns and improvements in line with Vale
Technical Standards and procedures.
14.23. Keep all equipment, devices and materials allocated for the
execution of the services in a perfect state of preservation,

[Proposal No.]

18

[Publish Date]

Office Support for Vale OMAN

maintenance, cleanliness and hygiene, ready to be used at any time,


with its productivity compatible with the technical specifications.
14.24. In case of damage in equipment and facilities caused by the
contractor, the necessary maintenance or repair will be Contractor's
responsibility at no cost to Vale and shall be performed immediately.
14.25. Be responsible for any damages incurred in Vale and / or Third
Party equipment, caused by Contractor's employees, whenever
characterized as malpractice, recklessness or negligence in the
performance of activities delegated to its staff.
14.26. Be fully responsible for the care of all equipment and materials
under its responsibility (belonging to Contractor or Vale), exonerating
Vale from the liability of theft, damage or loss.
14.27. Remove, at its own expense, any and all materials owned by
Contractor from Vales facilities within ten days before the end of the
contract term.
14.28. Actively participate with Vale on programs related to quality,
safety and environment.
14.29. Provide and take into consideration all legal licenses and
requirements for the perfect functioning of the contract.
14.30. Carry out and provide, when requested, the necessary elements
to the service registry, statistical data, cost statements, invoices,
controls, and any information that serve to instruct studies, analysis,
monitoring and research promoted by Vale.
14.31. Accept Vale exclusive criteria for acceptance or rejection of the
services under the aspect of quality.
14.32. Accept and facilitate, at its disposal and by all means, Vale
actions.
14.33. Prepare, submit, follow up and target the measurement of
services.
14.34. Contractor shall provide, pay and keep valid, all licenses,
registrations and authorizations necessary to perform the services,
object of this contract, during the term of the service rendering, from
any authority body.

15.

VALE TO PROVIDE

[Proposal No.]

19

[Publish Date]

Office Support for Vale OMAN

15.1.
Without limiting the responsibility of the Contractor in any way to
complete the provision of the Services, the Vale will provide/assist the
following:
15.2.

Interviews and selection of candidates.

15.3.

Assist to obtain security passes.

15.4.
Random inspection of Contractors Services when deemed
necessary.
15.5.
The necessary documents, drawings, manuals, details and
support to assist contractor performing work in his scope.
15.6.
Communicate and monitor preventive maintenance program (if
any)
15.7.

Review/Approval of Contractors Services Quality Plan.

15.8.

Review/Approval of Contractors working Method Statements

15.9.

Review/Approval of Contractors provide equipment

15.10.

Permit to Work and Site Induction Training courses

15.11.

Periodic inspection and auditing of Contractor Services

15.12. Ad-hoc inspection of Contractor equipment and personnel


transport.

16.

General Administration Requirement:


16.1.

Recruitment

16.1.1.
Vale shall select Contractor personnel through interviews,
and reserve the right to perform these either in Oman or at the
proposed Contractor location. If Personnel are not available in
Oman, Contractor to provide the details about the country of origin
and mobilization plan.
16.1.2.
Vale reserves the right to select the personnel to be
recruited for the Contract.

[Proposal No.]

20

[Publish Date]

Office Support for Vale OMAN

16.1.3.
Selected Contractor personnel shall be provided with tow
(2) years-valid Residence Permit under Contractors sponsorship &
cost and another one (1) year if the Contract is extended.
16.1.4.
Contractor shall ensure that he or his recruitment partner
or agents do not charge for any recruitment fees including airfares from the potential candidates being recruited or selected by
Vale Representative. All such cost for recruitment including
mobilization and demobilization shall be borne by the Contractor.
16.1.5.
It should be very clear for the contractor that incase of
termination of the contract of any reason Vale will not be liable for
the recruited personnel under this contract.

17.

Health Certificate / Medical Facility:


17.1. Contractor shall ensure that all his personnel providing services
under this Contract are medical fit. If required by Law Contractor shall
at his own expense obtain all Medical/Health Certificates for each
personnel before mobilizing from hospital as required by Oman Law).
17.2. Contractor shall at his own expense, provide Medical Corporation
Health Card for each employee providing services to Vale under this
contract and a copy of the same should be submitted to the Vale
within one month of the mobilization. Health cards must be renewed
by Contractor at his own expense on annual basis and a copy provided
to the Vale after renewal.
17.3. Contractor shall ensure that he has in place health insurance
coverage for all critical illness for their employees during the duration
of the Contract and any extensions thereof.
17.4. Contractor shall make adequate arrangements for medical
assistance to staff close to their assigned work location, as well as any
emergency transportation on a need basis.
17.5. The Contractor shall forward a copy of the medical report for any
of his personnel away from the duty due to ill health. Contractor shall
in addition also provide medical/fitness certificate that the personnel
is medically fit to provide the services.

[Proposal No.]

21

[Publish Date]

Office Support for Vale OMAN

18.

Transportation
18.1. Contractor should provide air-conditioned transportation for its
personnel engaged in this Contract from living quarters to duty
location and back
18.2. Contractor shall ensure the vehicles are in roadworthy condition
and that the number of passengers in the vehicles does not exceed
the number of seats available in the vehicle. Drivers will be
responsible for obeying all Oman traffic road regulations.
18.3. Contractor shall also provide transportation for Call-Off workers
as requested by Vale on a Call-Off basis.
18.4. Contractor should provide a vehicle & mobile phone for the
Supervisor at Contractors cost. The vehicle should be sufficient to
transport personnel to and from various locations. The mobile phone
should allow both incoming and outgoing calls.
18.5. Contractor shall be fully responsible for all transport to be
provided to Janitors to and from different work locations.

19.

Site Visit:
19.1. The contractor must visit and examine the site and its
surroundings to obtain for themselves, at their own expense, all
information that may be necessary for preparing their proposal, such
as site conditions, facilities, sources of supply and sufficient means of
obtaining and delivering all materials, and other resources required for
the services.
19.2. Persons or companies granted permission by Vale to enter the
site shall bear the full responsibilities against any personal injury, loss
of or damage to property and any other loss, damage, costs and
expenses whatsoever.
19.3. Any one nominated to be part of the site visit shall wear full PPE
and should understand Vale HSE standards.

20.

Price and Measurement Criteria:

[Proposal No.]

22

[Publish Date]

Office Support for Vale OMAN

20.1.
The contactor shall issue the bulletin of measurement (BMS) of
the contracted services every month according to VALEs approved
Spreadsheet of Quantities. The BMS shall be issued on or before the
25th day of every month and shall be agreed upon between the two
parties before the end of the month. The BMS shall cover the period
between the 21st day of the previous month and the 20 th day of the
current month, with the exception of the first measurement that will
consider the activities performed since the date of the Contract
signing until the 20th day of the same month.
20.2.
After the analysis and approval of the Measurement Bulletin by
Vale, the contactor will submit the billing documents.

20.3.
All invoices shall be issued in Omani Rial (OMR) or the agreed
currency and only one measurement shall be issued every month.

21.

Documents to be supplied by the contractor with the offer:

21.1.
The following information/documents shall be submitted by the
contractor along with the offer and shall form part of the bid
evaluation criteria:
21.2.

Price schedule

21.3.

Deviations from tender documents, if any as per Annexure II.

21.4.

List of sub-Contractors & Suppliers.

21.5.

List of equipment

21.6.

Organization Chart

21.7.

CVs of Key Personnel and permanent crew.

21.8.

HSE Manual

21.9.

Proposed method statement for major/ frequent activities

21.10.

Sample Inspection Check List/ Report (if any)

21.11.

Sample monthly maintenance plan (if any)

[Proposal No.]

23

[Publish Date]

Office Support for Vale OMAN

22.

21.12.

Omanization plan

21.13.

ICV plan

Mobilization:

The contractor shall be starting mobilize all his manpower and equipment
within one (30) Week from the date of signing the contract.

23.

Demobilization:

The contractor should start demobilizing all his manpower and equipment
immediately after the end of the contract period and if both parties didnt
agree to extend the contract period The Contractor no later than 30 days
prior to the end of the term specifying the additional Service and a further
Period time.
23. Commencement and completion

[Proposal No.]

24

[Publish Date]

Office Support for Vale OMAN

23.1.
This Agreement commences on the signing date of the contract
and shall be valid for three years from the commencement date.

24.

Services Level Agreement (SLA)

(Annex I)

25.

Price Structure

SL
NO

SERVICES OFFERED

UNIT

DIESEL SUPPLY

LITRE

TANKER WATER SUPPLY 10000 G

TRIP

TANKER WATER SUPPLY 5000G

TRIP

WATER TANK CLEANING

UNIT

SEWAGE WATER REMOVAL 5000 G

TRIP

TANKER WATER SUPPLY 1200 G &


1500 Gallon

TRIP

SEWAGE CLEANING & MAINTINANCE

UNIT

[Proposal No.]

25

UNIT RATE
(OMR)

[Publish Date]

Office Support for Vale OMAN

[Proposal No.]

26

[Publish Date]