I t ll ti Techniques
Installation
T h i
S-Lay
L Configurations
C fi
ti
Installation Procedures
General approach
Start
Start--up operation
Start
Start--up positioning
Drop dead man anchor
Pretensioning check
Rigging with pullpull-up head
Pipelay operation
Laydown operation
Target box positioning
Flange
Flange--up laydown head and connect with A&R
winch
Release tensioner
Start--up Operation
Start
Pipelay
p y Operation
p
St ti 0: Ready
Station
R d Rack
R k
St ti 1a: Fit
Station
Fit--up
St ti 1b:
Station
b Root
R t & hot
h t pass
St ti 3: Fill pass
Station
Heat Shrink
Sleeve
Infill
Foam
Mastic resin
Station 8: To Seabed
L d
Laydown
H d
Head
Pipelay
p y Operation
p
Analysis
A l i off SS-Lay
L Stress
St
I t ll ti Analysis
Installation
A l i off Pipelay
Pi l
Standard software
Offpipe
OrcaFlex
ABAQUS
Design Scenario
Static Analysis
Dynamic analysis
Start--up analysis
Start
D i Parameters
Design
P
t
Design
g Criteria
Static Analysis
Pipelay configuration
Determine pipe submerged unit weight
Determine the radius of curvature
Determine the required
q
tension
(Centenary's equation)
FEA analysis
Static analysis
D
Dynamic
i analysis
l i
Start up analysis
Radius of curvature
Govern by the overbend stress
As
as possible
A minimum
i i
ibl to
t minimize
i i i the
th requiring
i i
tension
Estimated from the following equation
Radial stress
ED
=
2R
ED
R =
2 SYMS
Flexible Riser
PLEM Components
Suction
Suct
o Ca
Caisson
sso
Mooring
M i Joint
J i t
Heavyy Chain
Flexible Riser
Ri
Riser
Buoy
B
Buoy Attachment
Riser Lift
Hose Assemblyy
Abandon Arrangement
g
Fl
Flange
P
Protector
t t
Sho e App
Shore
Approach
oach
Pulling
g Layout
y
Pulling
P lli Head
H d
Pulling Facilities
Pi li Fittings
Pipeline
Fitti
Flanges
Gasket
Ball valves
Flange
Fl
and
d Gasket
G k t
W ld Neck
Weld
N k Flange
Fl
S i l Flange
Swivel
Fl
K
Kamos
G k t
Gasket
Anode
Replacement Anode
Assignment
A i
t