Date : 2/23/2015
Ref No:
RA/AK/27
Who Might be
Harmed
Initial Risk
Risk
Rating
Likelihood
Activity
SR #
Conseque
nces
Description of work :
16
16
3) Awkward movement
Involved workers
16
Involved workers
16
Page 1 of 4
Ref No:
RA/AK/27
Manual
clearing
excavated area
Who Might be
Harmed
of Unsafe
manual
excavation Involved workers
equipment, unsafe access to bottom
of excavation.
Untrained worker, Lack of workers for Involved workers
manual work. - Injuries, Fatigue due
to continuous manual drilling by single
worker.
Working
inside Confined space hazards (If the Those who work /
Balancing tank
work is to be conducted inside go
inside
attenuation
tank)
such
as attenuation tank
presence of toxic and flammable
gases OR lackof oxygen inside the
deep attenuation tank.
Initial Risk
Risk
Rating
SR #
Likelihood
Activity
Conseque
nces
Description of work :
12
12
16
Ref No:
RA/AK/27
16
Initial Risk
Risk
Rating
Likelihood
Conseque
nces
If presence
of
any toxic
/ flammable gas
methods to eliminate the gases to be
Engineers.
- Try to
exhaust fan; at the same time supply pr
of the Balancing tankThis shall be c
flammable gases are fully evacuated.
2/23/2015
Date:
:
:
Signature :
1
2
Likelihood /
Severity /
Remote /
Unlikely /
Minor /
Major /
2/23/2015
Date:
Signature:
Likelihood
Severity
4
3
2
16
12
8
12
8
6
4
4
3
2
9
6
Page 3 of 4
Ref No:
RA/AK/27
Likely /
Severe /
Frequent /
Fatality /
Working inside
Confined space hazards (If the
Balancing tank
-- work is to be conducted
CONTINUED
insideBalancing tank) such as
presence of toxic and flammable
gases OR lack of oxygen inside
the deep balancing tank.
1
Those who go / work
inside attenuation
tank
Risk
Rating
3
4
Initial Risk
Likelihood
Who Might be
Harmed
Conseque
nces
Activity
SR #
16
8
4
6
3
4
2
2
1
Page 4 of 4
Initial Risk
Risk
Rating
Who Might be
Harmed
Likelihood
Activity
SR #
Ref No:
RA/AK/27
Conseque
nces
Date : 2/23/2015
:
Those who go / work
4
Working inside
Confined space hazards (If the
Project Name : Roads and Infrastructure in Al Kheesa
North and East
inside attenuation
Balancing tank
-- work is to be conducted
CONTINUED
suchon
as site. tank
Balancing tanktank)
location
Assessment
location : insideBalancing
presence of toxic and flammable
Balancing
tank
Description of work :
gases
OR lack
of excavation
oxygen inside
the deep balancing tank.
Likelihood /
Remote /
Unlikely /
Likely /
Frequent /
:
:
:
Severity /
Minor /
Major /
Severe /
Fatality /
Page 5 of 4
Ref No:
RA/AK/27
Who Might be
Harmed
Initial Risk
Risk
Rating
Likelihood
Activity
SR #
Conseque
nces
Description of work :
Page 6 of 4
33911446
ENT FORM -
RA/AK/27
:
:
:
:
RESIDUAL
RISK
Likelihood
Risk
Rating
"
Conseque
nces
Responsible Person
ConstructionManager,
Site Engineer
Page 7 of 4
33911446
ENT FORM -
RA/AK/27
:
:
:
:
Likelihood
Risk
Rating
Responsible Person
Conseque
nces
RESIDUAL
RISK
Provide ramp with hand rails and cage laddersfor safe access of
workers to the bottom of excavation for clearing and levelling of ground.
Ensure inducted and internal trained workers are engaged for manual
levelling and clearing of ground. Rotate workers so that single worker
shall not do manual work for long time. Ensure the workers take rest one
by one. Ensure driking water at work place. Ensure the workers wear
leather hand glove, Safety googles, safety shoes, safety helmet and
cover all. provide rest area for workers .
"
Site Engineer,
Gen.Foreman
Safety Officer
Site Engineer,
Gen.Foreman
Page 8 of 4
33911446
ENT FORM -
RA/AK/27
:
:
:
4
Risk
Rating
Likelihood
If presence
of
any toxic
/ flammable gases are found, Engineering
"
methods to eliminate the gases to be applied by Construction
Engineers.
- Try to evacuate the gases with
exhaust fan; at the same time supply pressurized air into the base
of the Balancing tankThis shall be continued till the toxic /
flammable gases are fully evacuated.
RESIDUAL
RISK
Conseque
nces
Responsible Person
Site Engineer,
Gen.Foreman
:
:
1
4
3
2
Page 9 of 4
33911446
ENT FORM -
RA/AK/27
:
:
:
:
2
1
Take gas test again. Do not allow to work till toxic / flammable gases is 4
brought down to zero.
If the oxygen percentage is below 20.9 % , provide air supply at normal
pressure into the bottom of theBalancing tankand check whether the
oxygen is building upto safe level of 20.9 %. Observe for half hour and
If the oxygen content is remaining steady between 18.5 % and 20.9% ,
work shall be proceeded.
If the oxygen % is not remaining steady in a range of 18.5 % - 20.9 %,
the workers should use self contained breathing apparatus to work inside
the Balancing tankIn such case, one worker should not work
insideBalancing tankfor more than 20 minutes, if the Oxygen cylinder is
designed to use for 30 minutes.
Risk
Rating
"
Conseque
nces
Likelihood
RESIDUAL
RISK
Responsible Person
Safety Officer
Site Engineer,
Gen.Foreman. Safety
Officer
Site Engineer,
Gen.Foreman. Safety
Officer
Page 10 of 4
33911446
ENT FORM -
RA/AK/27
:
4
:
:
:
Risk
Rating
Likelihood
"
Conseque
nces
RESIDUAL
RISK
Responsible Person
Site Engineer,
Gen.Foreman. Safety
Officer
Ensure that the workers are trained to use the self contained breathing
apparatus and briefed upon the hazards involved..
:
:
:
Page 11 of 4
33911446
ENT FORM -
RA/AK/27
:
:
:
:
Risk
Rating
Page 12 of 4
Conseque
nces
Likelihood
Responsible Person
RESIDUAL
RISK
"