Anda di halaman 1dari 61

Program explanation

This Excel Spread sheet is divided into the following item


1.Input of specification ( Spec )
2.Input of load combination ( Comb 1 )
a. Staad-Pro Load Item
b. Combination Load Item
3.Input of factor for unfactored load ( Comb 2 )
4.Input of factor for factored load ( Comb 3 )
5.Input of Staad Support reaction ( Loading )
6.Calculation of eccentric factor table ( Spr Alpha )
7.Calculation table for calculation sheet ( Check Table )
8.Calculation sheet (Cal )
a. Stability calculation
b. Design of footing
c. Design of pedestal

Detailed explanation
1.Input of specification ( Spec )
Unit weight

Concrete
Soil
Water

Strength

Concrete
Re-bar

A.Bolt

Edge of distance

Allowable

Soil pressure
Factor of Increase
Safety factor
Resistant friction factor
Concrete cover

Name

Bar type ( D or T )
Elevation ( EL or BL )

2.Input of load combination ( Comb 1 )


a. Staad-Pro Load Item
Input

No , Mark , Short name , Long name

b. Combination Load Item


Input

No , Unfactor mark , Factor mark , Condition , Condition factor

3.Input of factor for unfactored load ( Comb 2 )


Input

Factor

4.Input of factor for factored load ( Comb 3 )


Input

Factor

5.Input of Staad Support reaction ( Loading )


Input

Copy from staad data

6.Calculation of Alpha table ( Spr Alpha )


Calculation by Macro
7.Check table for calculation sheet ( Check Table )
Only reference

8.Calculation sheet (Cal )


Inspection is by try and error calculation
a. Stability calculation
Input

ID
Elevation

Dimension
Start

Item no , Type
Top of pedestal
Grade
Ground water
Total Loading & direction change
Pedestal ( min. 50mm pitch )
Footing
Macro for calculation of eccentric factor table

b. Design of footing
Input

Stress

Location of section for stress calculation

Calculation

Stress

Balance calculation of cantilever beam


Same location of section ( moment & shear force )

Re-bar

Size
Number

c. Design of pedestal
Input

Stress

Axial force , Moment , Shear force

percentage

for re-bar volume by interaction diagram

Re-bar

Size
Number

Modification of program item for future


1.Input of Staad Support reaction ( Loading )
Change to Macro
2.Calculation of Alpha table ( Spr Alpha )
Change of philosophy for program
3.Calculation of pedestal re-bar
Change to Macro
4.Inspection is by try and error calculation
Change to automatic program
5.Constitution
Change of Total constitution
6.Protection
7.Other
Use Excel command in spread sheet
VLOOKUP
HLOOKUP
OFFSET
INDEX
MATCH
MAX
MIN
SUM
ARRAY FORMULA
MID
ISERR
SEARCH
ABS
IF

Strip Footing

Square Footing

Mat Footing

Effluent Water Pump

Effluent Water Pump

Effluent Water Pump

Construction of Water Treatment Facilities - Phase 3


Contractor Job Code: G-K068-00-0000
CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

DESIGN CALCULATION
Basic Design Data
Specification
Conc =
Soil =
Water =
f 'c =
fy =
fy =

24.00
19.00
10.00
21.00
420.00
420.00

kN/m3
kN/m3
kN/m3
N/mm2
N/mm2
N/mm2

A.Bolt to Pede.
:
Base PL to Pede. :

D or

114
100

(for main bar)


(for links)

Footing Dimension

Strip Footing
Effluent Water Pump
100

1.80
1.00

Load Case

A
B,C,D,E,F,G

Safety factor :

A
B,C,F,G,H
D,E

(Footing Width = 0.5 to 3.0 m)


(Footing Depth = 0.6 to 3.0 m)

Resistant friction force :

Concrete Cover

Overturning
1.50
1.50
1.50

kN/m2
kN/m2
kN/m2

Sliding
1.50
1.50
1.50

Factor of
Increase

1.00
1.33
1.00

Uplift
1.20
1.20
1.20

0.40

Pedestal Vertical
Footing Vertical
Footing Horizontal (T)
Footing Horizontal (B)

Mark
Bar Type
Elevation Name

kN/m2

100.00
133.00
100.00

D
EL

75
75
75
75

mm
mm
mm
mm

Size (in)
1/2
5/8
3/4
7/8
1
1 1/8
1 1/4
1 3/8
1 1/2
1 3/4
2
2 1/4
2 1/2
2 3/4
3

Allowable
Footing Type
Area
Allowable Soil
Bearing Capacity

mm
mm

(Face to Face )
(Face to Face )
(Face to Face )
(Face to Face )

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)

Loading Case and Loading Combination Item


Staad-Pro Load Item
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

Mark
DS1
DS2
DS3
DS4
DS5
DS6
Df
Dee
Dep
Doe
Dop
Dte1
Dte2
Dte3
Dtp1
Dtp2
Dtp3
Lf
Lr
Wx
Wz
Iy
Ix
Iz
Afx
Afz
Ffx, TSx
Ffz, TSz
Ffx40
Ffz40
Bp
Eex
Eez
Eox
Eoz
Svx
Svz
T
Wx
Wz
WxWz-

Load Name
Dead Load of Structure (Self Weight, Fireproofing, Purlin & Metal Sheet)
Dead Load of Grating
Dead Load of Handrail
Dead Load of Ladder
Dead Load of Stair
Dead Load of Cable Tray
Erection Dead Load of Equipment
Empty Dead Load of Equipment
Empty Dead Load of Piping
Operating Dead Load of Equipment
Operating Dead Load of Piping
Test Dead Load of Equipment-1
Test Dead Load of Equipment-2
Test Dead Load of Equipment-3
Test Dead Load of Piping-1
Test Dead Load of Piping-2
Test Dead Load of Piping-3
Live Load on Floor
Live Load on Roof
Wind Load +X
Wind Load +Z
Crane Impact Load -Y
Crane Impact Load +X
Crane Impact Load +Z
Thermal Anchor Force +X
Thermal Anchor Force +Z
Thermal Friction Force +X
Thermal Friction Force +Z
Thermal Friction Force +X (One Heaviest Pipe)
Thermal Friction Force +Z (One Heaviest Pipe)
Bundle Pull Load
Earthquake (Empty) +X
Earthquake (Empty) +Z
Earthquake (Operation) +X
Earthquake (Operation) +Z
Safety Valve Impact +X
Safety Valve Impact +Z
Temperature Load
Wind Load for Shelter +X
Wind Load for Shelter +Z
Wind Load for Shelter -X
Wind Load for Shelter -Z

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Foundation Load Case Item


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66

A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F11
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13
UH14

Normal Operation (w/ Live Load & Impact)


Normal Operation (w/ Live Load & Impact)
Normal Operation (w/ Live Load & Impact)
Normal Operation (w/ Live Load & Impact)
Normal Operation (w/o Live Load & Impact)
Normal Operation (w/o Live Load & Impact)
Normal Operation (w/o Live Load & Impact)
Normal Operation (w/o Live Load & Impact)
Empty + Wind
Empty + Wind
Empty + Wind
Empty + Wind
Normal Operation + Wind (w/o Live Load)
Normal Operation + Wind (w/o Live Load)
Normal Operation + Wind (w/o Live Load)
Normal Operation + Wind (w/o Live Load)
Normal Operation + Wind (w/o Live Load)
Normal Operation + Wind (w/o Live Load)
Normal Operation + Wind (w/o Live Load)
Normal Operation + Wind (w/o Live Load)
Test (Equipment-1)
Test (Equipment-2)
Test (Equipment-3)
Test (Piping-1)
Test (Piping-2)
Test (Piping-3)
Test + Partial Wind (Equipment-1)
Test + Partial Wind (Equipment-1)
Test + Partial Wind (Equipment-1)
Test + Partial Wind (Equipment-1)
Test + Partial Wind (Equipment-2)
Test + Partial Wind (Equipment-2)
Test + Partial Wind (Equipment-2)
Test + Partial Wind (Equipment-2)
Test + Partial Wind (Equipment-3)
Test + Partial Wind (Equipment-3)
Test + Partial Wind (Equipment-3)
Test + Partial Wind (Equipment-3)
Test + Partial Wind (Piping-1)
Test + Partial Wind (Piping-1)
Test + Partial Wind (Piping-1)
Test + Partial Wind (Piping-1)
Test + Partial Wind (Piping-2)
Test + Partial Wind (Piping-2)
Test + Partial Wind (Piping-2)
Test + Partial Wind (Piping-2)
Test + Partial Wind (Piping-3)
Test + Partial Wind (Piping-3)
Test + Partial Wind (Piping-3)
Test + Partial Wind (Piping-3)
Erection + Wind
Erection + Wind
Erection + Wind
Erection + Wind
Normal Operation + Earthquake
Normal Operation + Earthquake
Normal Operation + Earthquake
Normal Operation + Earthquake
Normal Operation + Earthquake (Uplift)
Normal Operation + Earthquake (Uplift)
Normal Operation + Earthquake (Uplift)
Normal Operation + Earthquake (Uplift)
Empty + Earthquake (Uplift)
Empty + Earthquake (Uplift)
Empty + Earthquake (Uplift)
Empty + Earthquake (Uplift)

1.2 (Ds + Do) + 1.6 (Lf I) + 1.2 ( Af Ff + T)


1.2 (Ds + Do) + 1.6 (Lf I) + 1.2 ( Af Ff + T)
1.2 (Ds + Do) + 1.6 (Lf I) + 1.2 ( Af Ff + T)
1.2 (Ds + Do) + 1.6 (Lf I) + 1.2 ( Af Ff + T)
1.4 (Ds + Do Af Ff Sf + T)
1.4 (Ds + Do Af Ff Sf + T)
1.4 (Ds + Do Af Ff Sf + T)
1.4 (Ds + Do Af Ff Sf + T)
0.9 (Ds + De) 1.6 W
0.9 (Ds + De) 1.6 W
0.9 (Ds + De) 1.6 W
0.9 (Ds + De) 1.6 W
1.2 (Ds + Do) 1.6 W + 1.2 ( Af Sf)
1.2 (Ds + Do) 1.6 W + 1.2 ( Af Sf)
1.2 (Ds + Do) 1.6 W + 1.2 ( Af Sf)
1.2 (Ds + Do) 1.6 W + 1.2 ( Af Sf)
1.2 (Ds + Do) 1.6 W + 1.2 ( Af Sf)
1.2 (Ds + Do) 1.6 W + 1.2 ( Af Sf)
1.2 (Ds + Do) 1.6 W + 1.2 ( Af Sf)
1.2 (Ds + Do) 1.6 W + 1.2 ( Af Sf)
1.4 (Ds + Dte1)
1.4 (Ds + Dte2)
1.4 (Ds + Dte3)
1.4 (Ds + Dtp1)
1.4 (Ds + Dtp2)
1.4 (Ds + Dtp3)
1.2 (Ds + Dte1) 1.6 (0.75 W)
1.2 (Ds + Dte1) 1.6 (0.75 W)
1.2 (Ds + Dte1) 1.6 (0.75 W)
1.2 (Ds + Dte1) 1.6 (0.75 W)
1.2 (Ds + Dte2) 1.6 (0.75 W)
1.2 (Ds + Dte2) 1.6 (0.75 W)
1.2 (Ds + Dte2) 1.6 (0.75 W)
1.2 (Ds + Dte2) 1.6 (0.75 W)
1.2 (Ds + Dte3) 1.6 (0.75 W)
1.2 (Ds + Dte3) 1.6 (0.75 W)
1.2 (Ds + Dte3) 1.6 (0.75 W)
1.2 (Ds + Dte3) 1.6 (0.75 W)
1.2 (Ds + Dpe1) 1.6 (0.75 W)
1.2 (Ds + Dpe1) 1.6 (0.75 W)
1.2 (Ds + Dpe1) 1.6 (0.75 W)
1.2 (Ds + Dpe1) 1.6 (0.75 W)
1.2 (Ds + Dpe2) 1.6 (0.75 W)
1.2 (Ds + Dpe2) 1.6 (0.75 W)
1.2 (Ds + Dpe2) 1.6 (0.75 W)
1.2 (Ds + Dpe2) 1.6 (0.75 W)
1.2 (Ds + Dpe3) 1.6 (0.75 W)
1.2 (Ds + Dpe3) 1.6 (0.75 W)
1.2 (Ds + Dpe3) 1.6 (0.75 W)
1.2 (Ds + Dpe3) 1.6 (0.75 W)
0.9 (Ds + Df) 1.2 W
0.9 (Ds + Df) 1.2 W
0.9 (Ds + Df) 1.2 W
0.9 (Ds + Df) 1.2 W
1.2 (Ds + Do + Af) + 1.0 Eo
1.2 (Ds + Do + Af) + 1.0 Eo
1.2 (Ds + Do + Af) + 1.0 Eo
1.2 (Ds + Do + Af) + 1.0 Eo
0.9 (Ds + Do) + 1.2Af + 1.0 Eo
0.9 (Ds + Do) + 1.2Af + 1.0 Eo
0.9 (Ds + Do) + 1.2Af + 1.0 Eo
0.9 (Ds + Do) + 1.2Af + 1.0 Eo
0.9 (Ds + De) + 1.0 Eo
0.9 (Ds + De) + 1.0 Eo
0.9 (Ds + De) + 1.0 Eo
0.9 (Ds + De) + 1.0 Eo

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Combination Load for Unfactored Load

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

DS1
DS2
DS3
DS4
DS5
DS6
Df
Dee
Dep
Doe
Dop
Dte1
Dte2
Dte3
Dtp1
Dtp2
Dtp3
Lf
Lr
Wx
Wz
Iy
Ix
Iz
Afx
Afz
Ffx, TSx
Ffz, TSz
Ffx40
Ffz40
Bp
Eex
Eez
Eox
Eoz
Svx
Svz
T
Wx
Wz
WxWz-

1
A11

2
A12

3
A13

4
A14

5
A21

6
A22

7
A23

8
A24

9
B11

10
B12

11
B13

12
B14

13
C11

14
C12

15
C13

16
C14

17
C15

18
C16

19
C17

20
C18

21
D11

22
D12

23
D13

24
D14

25
D15

26
D16

27
E11

28
E12

29
E13

30
E14

31
E21

32
E22

33
E23

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0

1.0

1.0

1.0
1.0

1.0

1.0

0.56

-0.56

1.0
1.0
1.0
1.0
1.0
1.0
1.0

1.0

1.0

1.0
1.0

-1.0

1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
-1.0
1.0
-1.0
1.0
-1.0
1.0
-1.0

1.0
-1.0
1.0
-1.0
1.0
-1.0
1.0
-1.0
1.0

1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0
-1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
-1.0
1.0
-1.0
1.0
-1.0

-1.0
1.0
-1.0
1.0
-1.0
1.0

-1.0
-1.0
-1.0
-1.0
-1.0
-1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

-1.0

-1.0

-1.0

1.0

1.0
1.0

1.0
-1.0

1.0

1.0

-1.0
1.0

-1.0
-1.0

0.56
1.0

-1.0

1.0

-1.0

1.0
1.0

1.0
-1.0

-1.0
1.0

-1.0
-1.0

1.0
1.0
1.0

0.56

-0.56

0.56

1.0
1.0

-0.56

0.56

1.0

0.56

1.0

0.56

0.56
1.0

0.56

1.0

0.56
0.56

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

DS1
DS2
DS3
DS4
DS5
DS6
Df
Dee
Dep
Doe
Dop
Dte1
Dte2
Dte3
Dtp1
Dtp2
Dtp3
Lf
Lr
Wx
Wz
Iy
Ix
Iz
Afx
Afz
Ffx, TSx
Ffz, TSz
Ffx40
Ffz40
Bp
Eex
Eez
Eox
Eoz
Svx
Svz
T
Wx
Wz
WxWz-

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

34
E24

35
E31

36
E32

37
E33

38
E34

39
E41

40
E42

41
E43

42
E44

43
E51

44
E52

45
E53

46
E54

47
E61

48
E62

49
E63

50
E64

51
F11

52
F12

53
F13

54
F14

55
G11

56
G12

57
G13

58
G14

59
G21

60
G22

61
G23

62
G24

63
G31

64
G32

65
G33

66
G34

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0
1.0
1.0

0.9
0.9
0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9
0.9
0.9

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0
1.0

1.0

1.0

1.0

1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.0

1.0
1.0
0.6
0.6

1.0
1.0
0.6
0.6

1.0
1.0
0.6
0.6

1.0
1.0
0.6
0.6

0.9
0.9

0.9
0.9

0.9
0.9

0.9
0.9

1.0

1.0

1.0

1.0
1.0

1.0

1.0

1.0
1.0

1.0

1.0

1.0
1.0

1.0

1.0

1.0

0.56

-0.56

0.56

-0.56

0.56

-0.56

0.56

-0.56

1.0
1.0

1.0
-1.0

1.0
1.0

-1.0
1.0

1.0
1.0

1.0
-1.0

1.0
1.0

-1.0
1.0

0.7

-0.7
0.7

-0.7

1.0

0.56

-0.56

-0.56

0.56
0.56

-0.56

-0.56

0.56
0.56

-0.56

-0.56

0.56

-0.56

0.7

0.7

0.7
0.7

0.56

0.56

0.56

0.56
0.56
0.56

0.56

0.56
0.56
0.56

0.56

0.56

0.56

0.56
0.56

0.56

0.56
0.56

0.56
0.56

0.56

0.7

0.7
0.7

0.7

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Combination Load for Factored Load

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

DS1
DS2
DS3
DS4
DS5
DS6
Df
Dee
Dep
Doe
Dop
Dte1
Dte2
Dte3
Dtp1
Dtp2
Dtp3
Lf
Lr
Wx
Wz
Iy
Ix
Iz
Afx
Afz
Ffx, TSx
Ffz, TSz
Ffx40
Ffz40
Bp
Eex
Eez
Eox
Eoz
Svx
Svz
T
Wx
Wz
WxWz-

1
A11
UA11
1.2
1.2
1.2
1.2
1.2
1.2

2
A12
UA12
1.2
1.2
1.2
1.2
1.2
1.2

3
A13
UA13
1.2
1.2
1.2
1.2
1.2
1.2

4
A14
UA14
1.2
1.2
1.2
1.2
1.2
1.2

5
A21
UA21
1.4
1.4
1.4
1.4
1.4
1.4

6
A22
UA22
1.4
1.4
1.4
1.4
1.4
1.4

7
A23
UA23
1.4
1.4
1.4
1.4
1.4
1.4

8
A24
UA24
1.4
1.4
1.4
1.4
1.4
1.4

9
B11
UB11
0.9
0.9
0.9
0.9
0.9
0.9

10
B12
UB12
0.9
0.9
0.9
0.9
0.9
0.9

11
B13
UB13
0.9
0.9
0.9
0.9
0.9
0.9

12
B14
UB14
0.9
0.9
0.9
0.9
0.9
0.9

13
C11
UC11
1.2
1.2
1.2
1.2
1.2
1.2

14
C12
UC12
1.2
1.2
1.2
1.2
1.2
1.2

15
C13
UC13
1.2
1.2
1.2
1.2
1.2
1.2

16
C14
UC14
1.2
1.2
1.2
1.2
1.2
1.2

17
C15
UC15
1.2
1.2
1.2
1.2
1.2
1.2

18
C16
UC16
1.2
1.2
1.2
1.2
1.2
1.2

19
C17
UC17
1.2
1.2
1.2
1.2
1.2
1.2

20
C18
UC18
1.2
1.2
1.2
1.2
1.2
1.2

21
D11
UD11
1.4
1.4
1.4
1.4
1.4
1.4

22
D12
UD12
1.4
1.4
1.4
1.4
1.4
1.4

23
D13
UD13
1.4
1.4
1.4
1.4
1.4
1.4

24
D14
UD14
1.4
1.4
1.4
1.4
1.4
1.4

25
D15
UD15
1.4
1.4
1.4
1.4
1.4
1.4

26
D16
UD16
1.4
1.4
1.4
1.4
1.4
1.4

27
E11
UE11
1.2
1.2
1.2
1.2
1.2
1.2

28
E12
UE12
1.2
1.2
1.2
1.2
1.2
1.2

29
E13
UE13
1.2
1.2
1.2
1.2
1.2
1.2

30
E14
UE14
1.2
1.2
1.2
1.2
1.2
1.2

31
E21
UE21
1.2
1.2
1.2
1.2
1.2
1.2

32
E22
UE22
1.2
1.2
1.2
1.2
1.2
1.2

33
E23
UE23
1.2
1.2
1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.4
1.4
1.4
1.4

1.4
1.4
1.4
1.4

1.4
1.4
1.4
1.4

1.4
1.4
1.4
1.4

0.9
0.9

0.9
0.9

0.9
0.9

0.9
0.9

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.4
1.4

1.4
1.4

1.4
1.4

1.4
1.4

1.4
1.4

1.4
1.4

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2

1.2

1.2

1.2
1.2

1.2

1.2

0.9

-0.9

1.4
1.4
1.4
1.4
1.4
1.4
1.6

1.6

1.6

1.6
1.6

-1.6

1.6
1.6

1.6
1.6
1.6
1.2
1.2
1.2
1.2
1.2
1.2

1.6
1.6
-1.6
1.2
-1.2
1.2
-1.2
1.2
-1.2

1.6
-1.6
1.6
-1.2
1.2
-1.2
1.2
-1.2
1.2

1.6
-1.6
-1.6
-1.2
-1.2
-1.2
-1.2
-1.2
-1.2

1.4
1.4
1.4
1.4
1.4
1.4

1.4
-1.4
1.4
-1.4
1.4
-1.4

-1.4
1.4
-1.4
1.4
-1.4
1.4

-1.4
-1.4
-1.4
-1.4
-1.4
-1.4

1.2

1.2

1.2

1.2

1.4

1.4

1.4

1.4

1.6

-1.6

-1.6

-1.6

1.6

1.2
1.2

1.2
-1.2

1.6

1.6

-1.2
1.2

-1.2
-1.2

0.9
1.6

-1.6

1.6

-1.6

1.2
1.2

1.2
-1.2

-1.2
1.2

-1.2
-1.2

1.6
1.6
1.6

0.9

-0.9

0.9

1.6
1.6

-0.9

0.9

1.6

0.9

1.6

0.9

0.9
1.6

0.9

1.6

0.9
0.9

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

DS1
DS2
DS3
DS4
DS5
DS6
Df
Dee
Dep
Doe
Dop
Dte1
Dte2
Dte3
Dtp1
Dtp2
Dtp3
Lf
Lr
Wx
Wz
Iy
Ix
Iz
Afx
Afz
Ffx, TSx
Ffz, TSz
Ffx40
Ffz40
Bp
Eex
Eez
Eox
Eoz
Svx
Svz
T
Wx
Wz
WxWz-

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

34
E24
UE24
1.2
1.2
1.2
1.2
1.2
1.2

35
E31
UE31
1.2
1.2
1.2
1.2
1.2
1.2

36
E32
UE32
1.2
1.2
1.2
1.2
1.2
1.2

37
E33
UE33
1.2
1.2
1.2
1.2
1.2
1.2

38
E34
UE34
1.2
1.2
1.2
1.2
1.2
1.2

39
E41
UE41
1.2
1.2
1.2
1.2
1.2
1.2

40
E42
UE42
1.2
1.2
1.2
1.2
1.2
1.2

41
E43
UE43
1.2
1.2
1.2
1.2
1.2
1.2

42
E44
UE44
1.2
1.2
1.2
1.2
1.2
1.2

43
E51
UE51
1.2
1.2
1.2
1.2
1.2
1.2

44
E52
UE52
1.2
1.2
1.2
1.2
1.2
1.2

45
E53
UE53
1.2
1.2
1.2
1.2
1.2
1.2

46
E54
UE54
1.2
1.2
1.2
1.2
1.2
1.2

47
E61
UE61
1.2
1.2
1.2
1.2
1.2
1.2

48
E62
UE62
1.2
1.2
1.2
1.2
1.2
1.2

49
E63
UE63
1.2
1.2
1.2
1.2
1.2
1.2

50
E64
UE64
1.2
1.2
1.2
1.2
1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2
1.2

1.2

1.2

1.2

1.2
1.2

1.2

1.2

1.2
1.2

1.2

1.2

1.2
1.2

1.2

1.2

1.2

0.9

-0.9
0.9

-0.9

51
F11
UF11
0.9
0.9
0.9
0.9
0.9
0.9
0.9

52
F12
UF12
0.9
0.9
0.9
0.9
0.9
0.9
0.9

53
F13
UF13
0.9
0.9
0.9
0.9
0.9
0.9
0.9

54
F14
UF14
0.9
0.9
0.9
0.9
0.9
0.9
0.9

0.9

0.9

0.9

0.9

0.9

-0.9
0.9

-0.9

55
G11
UG11
1.2
1.2
1.2
1.2
1.2
1.2

56
G12
UG12
1.2
1.2
1.2
1.2
1.2
1.2

57
G13
UG13
1.2
1.2
1.2
1.2
1.2
1.2

58
G14
UG14
1.2
1.2
1.2
1.2
1.2
1.2

59
G21
UG21
0.9
0.9
0.9
0.9
0.9
0.9

60
G22
UG22
0.9
0.9
0.9
0.9
0.9
0.9

61
G23
UG23
0.9
0.9
0.9
0.9
0.9
0.9

62
G24
UG24
0.9
0.9
0.9
0.9
0.9
0.9

63
G31
UH11
0.9
0.9
0.9
0.9
0.9
0.9

64
G32
UH12
0.9
0.9
0.9
0.9
0.9
0.9

65
G33
UH13
0.9
0.9
0.9
0.9
0.9
0.9

66
G34
UH14
0.9
0.9
0.9
0.9
0.9
0.9

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

1.2
1.2
1.2
1.2

0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9

0.9
0.9
0.9
0.9

0.9
0.9

0.9
0.9

0.9
0.9

0.9
0.9

1.2
1.2

1.2
-1.2

1.2
1.2

-1.2
1.2

1.2
1.2

1.2
-1.2

1.2
1.2

-1.2
1.2

1.0

-1.0
1.0

-1.0

1.2

0.9

-0.9

-0.9

0.9
0.9

-0.9

-0.9

0.9
0.9

-0.9

-0.9

0.9

-0.9

1.0

1.0

1.0
1.0

0.9

0.9

0.9

0.9
0.9
0.9

0.9

0.9
0.9
0.9

0.9

0.9

0.9

0.9
0.9

0.9

0.9
0.9

0.9
0.9

0.9

1.0

1.0
1.0

1.0

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


G-K068-00-0000
Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

DESIGN OF FOUNDATION
LOADING DATA
Elevation
-

Type
Item No.

Pipe Sleeper
SL001

Top of pedestal elevation

Unit Elevation
Ground water table

EL +
10.000
GL =
GL

10.000 SAD
-0.820
m

Combined Loading Data

Dead Load of Structure (Self Weight, Fireproofing,


Dead Load of Grating
Dead Load of Handrail
Dead Load of Ladder
Dead Load of Stair
Dead Load of Cable Tray
Erection Dead Load of Equipment
Empty Dead Load of Equipment
Empty Dead Load of Piping
Operating Dead Load of Equipment
Operating Dead Load of Piping
Test Dead Load of Equipment-1
Test Dead Load of Equipment-2
Test Dead Load of Equipment-3
Test Dead Load of Piping-1
Test Dead Load of Piping-2
Test Dead Load of Piping-3
Live Load on Floor
Live Load on Roof
Wind Load +X
Wind Load +Z
Crane Impact Load -Y
Crane Impact Load +X
Crane Impact Load +Z
Thermal Anchor Force +X
Thermal Anchor Force +Z
Thermal Friction Force +X
Thermal Friction Force +Z
Thermal Friction Force +X (One Heaviest Pipe)
Thermal Friction Force +Z (One Heaviest Pipe)
Bundle Pull Load
Earthquake (Empty) +X
Earthquake (Empty) +Z
Earthquake (Operation) +X
Earthquake (Operation) +Z
Safety Valve Impact +X
Safety Valve Impact +Z
Temperature Load
Wind Load for Shelter +X
Wind Load for Shelter +Z
Wind Load for Shelter -X
Wind Load for Shelter -Z

Loading Data
SL001
(Critical Load)

: DS1
: DS2
: DS3
: DS4
: DS5
: DS6
: Df
: Dee
: Dep
: Doe
: Dop
: Dte1
: Dte2
: Dte3
: Dtp1
: Dtp2
: Dtp3
: Lf
: Lr
: Wx
: Wz
: Iy
: Ix
: Iz
: Afx
: Afz
: Ffx, TSx
: Ffz, TSz
: Ffx40
: Ffz40
: Bp
: Eex
: Eez
: Eox
: Eoz
: Svx
: Svz
:T
: Wx
: Wz
: Wx: Wz-

Vertical
N
kN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
1.50
0.00
0.00
0.00
2.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

( EL
Horizontal
X-dir.
kN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.51
0.00
0.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10.820

Z-dir.
kN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.80
0.00
0.00
0.51
0.00
0.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00

)
Moment
X-dir.
Z-dir.
kN-m
kN-m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.59
0.00
0.00
8.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.80
0.00
0.00
6.17
0.00
0.00
6.17
9.20
0.00
0.00
9.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


G-K068-00-0000
Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

4.0 Analysis and Design


SHAPE AND DIMENSION OF FOUNDATION
Material Strength
Rebar : fy ( for main bar )
Rebar : fy ( for links )
Concrete compressive strength : f 'c

420
420
21

N/mm2
N/mm2
N/mm2

wx
wx1

wx2

Mx

px
Mz

wz1

Z
pz

wz2
wz

PLAN

Action Point

EL + 10.000

h4

hf

EL + 10.000

h2
h3
df

dw

h1
EL + 9.000

ELEVATION
~~~~~~~
~~~~
Pedestal

wx1 =
wx2 =
wx =
wz1 =
wz2 =
wz =
h1 =
h2 =
h3 =
h4 =
hf =
df =
dw =
-

na
(nos)

0.900
0.900
1.800
0.900
0.900
1.800
0.300
0.700
0.700
0.000
1.000
1.000
-0.820

Weight of pedestal
Weight of footing
Weight of soil above footing
Buoyancy
Total Weight : Df

da
(in)

m
m
m
m
m
m
m
m
m
m
m
m
m

ax
(mm)

az
(mm)

plx
(mm)

px
(m)
0.650
na
da
ax
az
plx
plz
px
pz

: Total Footing size X-dir.

: Total Footing size Z-dir.


: Thickness of footing
: Pedestal Height
: Soil cover
: Projection of Pedestal
: Height of foundation
: Depth of foundation
: Depth of ground water table
7.10
23.33
37.47
0.00
67.90

plz
(mm)

kN
kN
kN
kN
kN

pz
(m)
0.650
: Number of Anchor Bolts
: Anchor Bolt Size
: Outer Bolt Distance X-dir.
: Outer Bolt Distance Z-dir.
: Base Plate Size X-dir.
: Base Plate Size Z-dir.
: Pedestal size X-dir.
: Pedestal size Z-dir.

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
Total Weight (With Buoyancy) : Df
67.90 kN

Contractor Job Code:


G-K068-00-0000
Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


G-K068-00-0000
Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

STABILITY CHECK
Combination of Loading Data (Unfactored Loading) : Top of Pedestal
L/C
A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F11
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

N (kN)
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
3.00
3.00
3.00
3.00
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
3.00
3.00
3.00
5.50
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
5.50
5.50
5.50
5.50
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
4.50
4.50
4.50
4.50
3.90
3.90
3.90
3.90
2.70
2.70
2.70
2.70

Hx (kN)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.67
-0.67
0.00
0.00
0.67
0.67
-0.67
-0.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.53
0.53
0.00
0.00
0.53
0.53
0.00
0.00
0.36
-0.36
0.00
0.00

Hz (kN)
1.80
-1.80
1.80
-1.80
1.80
-1.80
1.80
-1.80
0.00
0.00
0.05
-0.05
0.00
0.00
0.00
0.00
0.05
-0.05
0.05
-0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.53
0.53
0.00
0.00
0.53
0.53
0.00
0.00
0.36
-0.36

Mx (kN-m)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.59
-0.59
0.00
0.00
0.59
0.59
-0.59
-0.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
6.44
6.44
0.00
0.00
6.44
6.44
0.00
0.00
4.32
-4.32
0.00
0.00

Mz (kN-m)
10.80
-10.80
10.80
-10.80
10.80
-10.80
10.80
-10.80
0.00
0.00
8.05
-8.05
0.00
0.00
0.00
0.00
8.05
-8.05
8.05
-8.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.53
-4.53
0.00
0.00
4.53
-4.53
0.00
0.00
4.53
-4.53
0.00
0.00
4.53
-4.53
0.00
0.00
4.53
-4.53
0.00
0.00
4.53
-4.53
0.00
0.00
4.53
-4.53
0.00
0.00
6.44
6.44
0.00
0.00
6.44
6.44
0.00
0.00
4.32
-4.32

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


G-K068-00-0000
Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Combination Load at Bottom of Footing


L/C
A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F11
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

N (kN)
72.40
72.40
72.40
72.40
72.40
72.40
72.40
72.40
70.90
70.90
70.90
70.90
72.40
72.40
72.40
72.40
72.40
72.40
72.40
72.40
70.90
70.90
70.90
73.40
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
73.40
73.40
73.40
73.40
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
70.90
72.40
72.40
72.40
72.40
65.01
65.01
65.01
65.01
63.81
63.81
63.81
63.81

Hx (kN)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.67
-0.67
0.00
0.00
0.67
0.67
-0.67
-0.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.53
0.53
0.00
0.00
0.53
0.53
0.00
0.00
0.36
-0.36
0.00
0.00

Hz (kN)
1.80
-1.80
1.80
-1.80
1.80
-1.80
1.80
-1.80
0.00
0.00
0.05
-0.05
0.00
0.00
0.00
0.00
0.05
-0.05
0.05
-0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.53
0.53
0.00
0.00
0.53
0.53
0.00
0.00
0.36
-0.36

Hxhf(kN-m)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.67
-0.67
0.00
0.00
0.67
0.67
-0.67
-0.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.37
-0.37
0.00
0.00
0.53
0.53
0.00
0.00
0.53
0.53
0.00
0.00
0.36
-0.36
0.00
0.00

Hzhf(kN-m) Mexp (kN-m) Mezp (kN-m)


1.80
0.00
0.00
-1.80
0.00
0.00
1.80
0.00
0.00
-1.80
0.00
0.00
1.80
0.00
0.00
-1.80
0.00
0.00
1.80
0.00
0.00
-1.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.00
0.00
-0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.05
0.00
0.00
-0.05
0.00
0.00
0.05
0.00
0.00
-0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
0.00
0.00
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
0.00
0.00
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
0.00
0.00
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
0.00
0.00
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
0.00
0.00
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
0.00
0.00
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
0.00
0.00
-0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.53
0.00
0.00
0.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.53
0.00
0.00
0.53
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.36
0.00
0.00
-0.36
0.00
0.00

Mx (kN-m)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.26
-1.26
0.00
0.00
1.26
1.26
-1.26
-1.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
6.97
6.97
0.00
0.00
6.97
6.97
0.00
0.00
4.68
-4.68
0.00
0.00

Mz (kN-m)
12.60
-12.60
12.60
-12.60
12.60
-12.60
12.60
-12.60
0.00
0.00
8.10
-8.10
0.00
0.00
0.00
0.00
8.10
-8.10
8.10
-8.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
6.97
6.97
0.00
0.00
6.97
6.97
0.00
0.00
4.68
-4.68

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


G-K068-00-0000
Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Allowable Soil Pressure


Area Name :
100.00
133.00
100.00

Effluent Water Pump


kN/m2
kN/m2
kN/m2

for
for
for

A
B,C,D,E,F,G
0.00

Stability Check
e= M/N
wx =
1.80 m
k = 1+6e/w for (e/w<=1/6) , 2/3/(1/2-e/w) for (e/w>1/6)
= 1+6ex/wx+6ez/wz for (ex/wx<=1/6 and ez/wz<=1/6)
= Computer Program for (ex/wx>1/6 and ez/wz>1/6)
A=
wx.wz
=
3.24 m2
Check of Soil Pressure
Max. soil pressure
: P = k.N / A
<
Check of Overturning
Resistant moment
: Mr=N.w / 2
Safety Factor
: Fo = Mr / M
>
Check of Sliding
Resistant force
: Hr = 0.40 N
Safety Factor
: Fs = Hr / Hv
>
: Hv = ( Hx^2+Hz^2 )^0.5

wz =

1.80 m

Pallow : Allowable Soil Pressure

Foallow : Minimum Safety Factor for Overturning

Fsallow : Minimum Safety Factor for Sliding

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
(1)

Contractor Job Code:


G-K068-00-0000
Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Check of Soil Pressure


L/C
A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F11
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

ex
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.018
0.018
0.000
0.000
0.017
0.017
0.017
0.017
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.010
0.010
0.000
0.000
0.010
0.010
0.000
0.000
0.010
0.010
0.000
0.000
0.010
0.010
0.000
0.000
0.010
0.010
0.000
0.000
0.010
0.010
0.000
0.000
0.010
0.010
0.000
0.000
0.096
0.096
0.000
0.000
0.107
0.107
0.000
0.000
0.073
0.073
0.000
0.000

ez
0.174
0.174
0.174
0.174
0.174
0.174
0.174
0.174
0.000
0.000
0.114
0.114
0.000
0.000
0.000
0.000
0.112
0.112
0.112
0.112
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.064
0.064
0.000
0.000
0.064
0.064
0.000
0.000
0.064
0.064
0.000
0.000
0.062
0.062
0.000
0.000
0.064
0.064
0.000
0.000
0.064
0.064
0.000
0.000
0.064
0.064
0.000
0.000
0.096
0.096
0.000
0.000
0.107
0.107
0.000
0.000
0.073
0.073

ex/wx
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.010
0.010
0.000
0.000
0.010
0.010
0.010
0.010
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.006
0.006
0.000
0.000
0.006
0.006
0.000
0.000
0.006
0.006
0.000
0.000
0.005
0.005
0.000
0.000
0.006
0.006
0.000
0.000
0.006
0.006
0.000
0.000
0.006
0.006
0.000
0.000
0.053
0.053
0.000
0.000
0.060
0.060
0.000
0.000
0.041
0.041
0.000
0.000

ez/wz
0.097
0.097
0.097
0.097
0.097
0.097
0.097
0.097
0.000
0.000
0.063
0.063
0.000
0.000
0.000
0.000
0.062
0.062
0.062
0.062
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.036
0.036
0.000
0.000
0.036
0.036
0.000
0.000
0.036
0.036
0.000
0.000
0.034
0.034
0.000
0.000
0.036
0.036
0.000
0.000
0.036
0.036
0.000
0.000
0.036
0.036
0.000
0.000
0.053
0.053
0.000
0.000
0.060
0.060
0.000
0.000
0.041
0.041

k
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.06
1.06
1.38
1.38
1.06
1.06
1.06
1.06
1.37
1.37
1.37
1.37
1.00
1.00
1.00
1.00
1.00
1.00
1.04
1.04
1.22
1.22
1.04
1.04
1.22
1.22
1.04
1.04
1.22
1.22
1.03
1.03
1.20
1.20
1.04
1.04
1.22
1.22
1.04
1.04
1.22
1.22
1.04
1.04
1.22
1.22
1.32
1.32
1.32
1.32
1.36
1.36
1.36
1.36
1.25
1.25
1.25
1.25

P
35.35
35.35
35.35
35.35
35.35
35.35
35.35
35.35
23.20
23.20
30.15
30.15
23.69
23.69
23.69
23.69
30.66
30.66
30.66
30.66
21.88
21.88
21.88
22.65
21.88
21.88
22.67
22.67
26.61
26.61
22.67
22.67
26.61
26.61
22.67
22.67
26.61
26.61
23.33
23.33
27.28
27.28
22.67
22.67
26.61
26.61
22.67
22.67
26.61
26.61
22.67
22.67
26.61
26.61
29.45
29.45
29.45
29.45
27.29
27.29
27.29
27.29
24.54
24.54
24.54
24.54

Pallow
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00

Judge
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
(2)

Contractor Job Code:


G-K068-00-0000
Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Check of Overturning ( With Buoyancy )


L/C
A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F11
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

xMr
65.16
65.16
65.16
65.16
65.16
65.16
65.16
65.16
63.81
63.81
63.81
63.81
65.16
65.16
65.16
65.16
65.16
65.16
65.16
65.16
63.81
63.81
63.81
66.06
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
66.06
66.06
66.06
66.06
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
65.16
65.16
65.16
65.16
58.51
58.51
58.51
58.51
57.43
57.43
57.43
57.43

xM
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.26
-1.26
0.00
0.00
1.26
1.26
-1.26
-1.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
0.71
-0.71
0.00
0.00
6.97
6.97
0.00
0.00
6.97
6.97
0.00
0.00
4.68
-4.68
0.00
0.00

xFo
999.00
999.00
999.00
999.00
999.00
999.00
999.00
999.00
50.81
50.81
999.00
999.00
51.89
51.89
51.89
51.89
999.00
999.00
999.00
999.00
999.00
999.00
999.00
999.00
999.00
999.00
90.34
90.34
999.00
999.00
90.34
90.34
999.00
999.00
90.34
90.34
999.00
999.00
93.52
93.52
999.00
999.00
90.34
90.34
999.00
999.00
90.34
90.34
999.00
999.00
90.34
90.34
999.00
999.00
9.35
9.35
999.00
999.00
8.40
8.40
999.00
999.00
12.28
12.28
999.00
999.00

Foallow
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

Judge
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

zMr
65.16
65.16
65.16
65.16
65.16
65.16
65.16
65.16
63.81
63.81
63.81
63.81
65.16
65.16
65.16
65.16
65.16
65.16
65.16
65.16
63.81
63.81
63.81
66.06
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
66.06
66.06
66.06
66.06
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
63.81
65.16
65.16
65.16
65.16
58.51
58.51
58.51
58.51
57.43
57.43
57.43
57.43

zM
12.60
-12.60
12.60
-12.60
12.60
-12.60
12.60
-12.60
0.00
0.00
8.10
-8.10
0.00
0.00
0.00
0.00
8.10
-8.10
8.10
-8.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
4.56
-4.56
0.00
0.00
6.97
6.97
0.00
0.00
6.97
6.97
0.00
0.00
4.68
-4.68

zFo
5.17
5.17
5.17
5.17
5.17
5.17
5.17
5.17
999.00
999.00
7.88
7.88
999.00
999.00
999.00
999.00
8.04
8.04
8.04
8.04
999.00
999.00
999.00
999.00
999.00
999.00
999.00
999.00
14.00
14.00
999.00
999.00
14.00
14.00
999.00
999.00
14.00
14.00
999.00
999.00
14.50
14.50
999.00
999.00
14.00
14.00
999.00
999.00
14.00
14.00
999.00
999.00
14.00
14.00
999.00
999.00
9.35
9.35
999.00
999.00
8.40
8.40
999.00
999.00
12.28
12.28

Foallow
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

Judge
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
(3)

Contractor Job Code:


G-K068-00-0000
Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Check of Sliding ( With Buoyancy )


L/C
A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F11
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

Hr
28.96
28.96
28.96
28.96
28.96
28.96
28.96
28.96
28.36
28.36
28.36
28.36
28.96
28.96
28.96
28.96
28.96
28.96
28.96
28.96
28.36
28.36
28.36
29.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
29.36
29.36
29.36
29.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.36
28.96
28.96
28.96
28.96
26.00
26.00
26.00
26.00
25.52
25.52
25.52
25.52

Hv
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
0.67
0.67
0.05
0.05
0.67
0.67
0.67
0.67
0.05
0.05
0.05
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.37
0.37
0.03
0.03
0.37
0.37
0.03
0.03
0.37
0.37
0.03
0.03
0.37
0.37
0.03
0.03
0.37
0.37
0.03
0.03
0.37
0.37
0.03
0.03
0.37
0.37
0.03
0.03
0.53
0.53
0.53
0.53
0.53
0.53
0.53
0.53
0.36
0.36
0.36
0.36

Fs
16.09
16.09
16.09
16.09
16.09
16.09
16.09
16.09
42.62
42.62
581.36
581.36
43.52
43.52
43.52
43.52
593.66
593.66
593.66
593.66
999.00
999.00
999.00
999.00
999.00
999.00
75.76
75.76
999.00
999.00
75.76
75.76
999.00
999.00
75.76
75.76
999.00
999.00
78.43
78.43
999.00
999.00
75.76
75.76
999.00
999.00
75.76
75.76
999.00
999.00
75.76
75.76
999.00
999.00
54.44
54.44
54.44
54.44
48.88
48.88
48.88
48.88
71.49
71.49
71.49
71.49

Fsallow
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50

Judge
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
DESIGN OF REINFORCEMENT
Footing Design
Combination of Loading Data ( Factored Loading ) : Top of Pedestal
L/C
UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13
UH14

N (kN)
5.40
5.40
5.40
5.40
6.30
6.30
6.30
6.30
2.70
2.70
2.70
2.70
5.40
5.40
5.40
5.40
5.40
5.40
5.40
5.40
4.20
4.20
4.20
7.70
4.20
4.20
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
6.60
6.60
6.60
6.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
2.70
2.70
2.70
2.70
5.40
5.40
5.40
5.40
4.05
4.05
4.05
4.05
2.70
2.70
2.70
2.70

Hx (kN)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.06
-1.06
0.00
0.00
1.06
1.06
-1.06
-1.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.76
0.76
0.00
0.00
0.76
0.76
0.00
0.00
0.51
-0.51
0.00
0.00

Hz (kN)
2.16
-2.16
2.16
-2.16
2.52
-2.52
2.52
-2.52
0.00
0.00
0.08
-0.08
0.00
0.00
0.00
0.00
0.08
-0.08
0.08
-0.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.76
0.76
0.00
0.00
0.76
0.76
0.00
0.00
0.51
-0.51

Mx (kN-m)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.94
-0.94
0.00
0.00
0.94
0.94
-0.94
-0.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.53
-0.53
0.00
0.00
0.53
-0.53
0.00
0.00
0.53
-0.53
0.00
0.00
0.53
-0.53
0.00
0.00
0.53
-0.53
0.00
0.00
0.53
-0.53
0.00
0.00
0.53
-0.53
0.00
0.00
9.20
9.20
0.00
0.00
9.20
9.20
0.00
0.00
6.17
-6.17
0.00
0.00

Mz (kN-m)
12.96
-12.96
12.96
-12.96
15.12
-15.12
15.12
-15.12
0.00
0.00
12.88
-12.88
0.00
0.00
0.00
0.00
12.88
-12.88
12.88
-12.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.25
-7.25
0.00
0.00
7.25
-7.25
0.00
0.00
7.25
-7.25
0.00
0.00
7.25
-7.25
0.00
0.00
7.25
-7.25
0.00
0.00
7.25
-7.25
0.00
0.00
7.25
-7.25
0.00
0.00
9.20
9.20
0.00
0.00
9.20
9.20
0.00
0.00
6.17
-6.17

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Combination Load ( Factored Loading ) at Bottom of Footing


L/C
UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13
UH14

N (kN)
86.88
86.88
86.88
86.88
101.36
101.36
101.36
101.36
63.81
63.81
63.81
63.81
86.88
86.88
86.88
86.88
86.88
86.88
86.88
86.88
99.26
99.26
99.26
102.76
99.26
99.26
85.08
85.08
85.08
85.08
85.08
85.08
85.08
85.08
85.08
85.08
85.08
85.08
88.08
88.08
88.08
88.08
85.08
85.08
85.08
85.08
85.08
85.08
85.08
85.08
63.81
63.81
63.81
63.81
86.88
86.88
86.88
86.88
65.16
65.16
65.16
65.16
63.81
63.81
63.81
63.81

Hx (kN)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.06
-1.06
0.00
0.00
1.06
1.06
-1.06
-1.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.76
0.76
0.00
0.00
0.76
0.76
0.00
0.00
0.51
-0.51
0.00
0.00

Hz (kN) Hxhf(kN-m) Hzhf(kN-m) Mexp (kN-m) Mezp (kN-m)


2.16
0.00
2.16
0.00
0.00
-2.16
0.00
-2.16
0.00
0.00
2.16
0.00
2.16
0.00
0.00
-2.16
0.00
-2.16
0.00
0.00
2.52
0.00
2.52
0.00
0.00
-2.52
0.00
-2.52
0.00
0.00
2.52
0.00
2.52
0.00
0.00
-2.52
0.00
-2.52
0.00
0.00
0.00
1.06
0.00
0.00
0.00
0.00
-1.06
0.00
0.00
0.00
0.08
0.00
0.08
0.00
0.00
-0.08
0.00
-0.08
0.00
0.00
0.00
1.06
0.00
0.00
0.00
0.00
1.06
0.00
0.00
0.00
0.00
-1.06
0.00
0.00
0.00
0.00
-1.06
0.00
0.00
0.00
0.08
0.00
0.08
0.00
0.00
-0.08
0.00
-0.08
0.00
0.00
0.08
0.00
0.08
0.00
0.00
-0.08
0.00
-0.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.60
0.00
0.00
0.00
0.00
-0.60
0.00
0.00
0.00
0.04
0.00
0.04
0.00
0.00
-0.04
0.00
-0.04
0.00
0.00
0.00
0.60
0.00
0.00
0.00
0.00
-0.60
0.00
0.00
0.00
0.04
0.00
0.04
0.00
0.00
-0.04
0.00
-0.04
0.00
0.00
0.00
0.60
0.00
0.00
0.00
0.00
-0.60
0.00
0.00
0.00
0.04
0.00
0.04
0.00
0.00
-0.04
0.00
-0.04
0.00
0.00
0.00
0.60
0.00
0.00
0.00
0.00
-0.60
0.00
0.00
0.00
0.04
0.00
0.04
0.00
0.00
-0.04
0.00
-0.04
0.00
0.00
0.00
0.60
0.00
0.00
0.00
0.00
-0.60
0.00
0.00
0.00
0.04
0.00
0.04
0.00
0.00
-0.04
0.00
-0.04
0.00
0.00
0.00
0.60
0.00
0.00
0.00
0.00
-0.60
0.00
0.00
0.00
0.04
0.00
0.04
0.00
0.00
-0.04
0.00
-0.04
0.00
0.00
0.00
0.60
0.00
0.00
0.00
0.00
-0.60
0.00
0.00
0.00
0.04
0.00
0.04
0.00
0.00
-0.04
0.00
-0.04
0.00
0.00
0.00
0.76
0.00
0.00
0.00
0.00
0.76
0.00
0.00
0.00
0.76
0.00
0.76
0.00
0.00
0.76
0.00
0.76
0.00
0.00
0.00
0.76
0.00
0.00
0.00
0.00
0.76
0.00
0.00
0.00
0.76
0.00
0.76
0.00
0.00
0.76
0.00
0.76
0.00
0.00
0.00
0.51
0.00
0.00
0.00
0.00
-0.51
0.00
0.00
0.00
0.51
0.00
0.51
0.00
0.00
-0.51
0.00
-0.51
0.00
0.00

Mx (kN-m)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.01
-2.01
0.00
0.00
2.01
2.01
-2.01
-2.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.13
-1.13
0.00
0.00
1.13
-1.13
0.00
0.00
1.13
-1.13
0.00
0.00
1.13
-1.13
0.00
0.00
1.13
-1.13
0.00
0.00
1.13
-1.13
0.00
0.00
1.13
-1.13
0.00
0.00
9.96
9.96
0.00
0.00
9.96
9.96
0.00
0.00
6.68
-6.68
0.00
0.00

Mz (kN-m)
15.12
-15.12
15.12
-15.12
17.64
-17.64
17.64
-17.64
0.00
0.00
12.96
-12.96
0.00
0.00
0.00
0.00
12.96
-12.96
12.96
-12.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.29
-7.29
0.00
0.00
7.29
-7.29
0.00
0.00
7.29
-7.29
0.00
0.00
7.29
-7.29
0.00
0.00
7.29
-7.29
0.00
0.00
7.29
-7.29
0.00
0.00
7.29
-7.29
0.00
0.00
9.96
9.96
0.00
0.00
9.96
9.96
0.00
0.00
6.68
-6.68

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Maximum Soil Pressure due to Factored Load


X-Direction
L/C
UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13
UH14

ex
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.031
0.031
0.000
0.000
0.023
0.023
0.023
0.023
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.013
0.013
0.000
0.000
0.013
0.013
0.000
0.000
0.013
0.013
0.000
0.000
0.013
0.013
0.000
0.000
0.013
0.013
0.000
0.000
0.013
0.013
0.000
0.000
0.018
0.018
0.000
0.000
0.115
0.115
0.000
0.000
0.153
0.153
0.000
0.000
0.105
0.105
0.000
0.000

Z-Direction
ex/wx
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.017
0.017
0.000
0.000
0.013
0.013
0.013
0.013
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.007
0.007
0.000
0.000
0.007
0.007
0.000
0.000
0.007
0.007
0.000
0.000
0.007
0.007
0.000
0.000
0.007
0.007
0.000
0.000
0.007
0.007
0.000
0.000
0.010
0.010
0.000
0.000
0.064
0.064
0.000
0.000
0.085
0.085
0.000
0.000
0.058
0.058
0.000
0.000

kx
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.10
1.10
1.00
1.00
1.08
1.08
1.08
1.08
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.04
1.04
1.00
1.00
1.04
1.04
1.00
1.00
1.04
1.04
1.00
1.00
1.04
1.04
1.00
1.00
1.04
1.04
1.00
1.00
1.04
1.04
1.00
1.00
1.06
1.06
1.00
1.00
1.38
1.38
1.00
1.00
1.51
1.51
1.00
1.00
1.35
1.35
1.00
1.00

Px
26.81
26.81
26.81
26.81
31.28
31.28
31.28
31.28
21.76
21.76
19.69
19.69
28.88
28.88
28.88
28.88
26.81
26.81
26.81
26.81
30.64
30.64
30.64
31.72
30.64
30.64
27.42
27.42
26.26
26.26
27.42
27.42
26.26
26.26
27.42
27.42
26.26
26.26
28.35
28.35
27.18
27.18
27.42
27.42
26.26
26.26
27.42
27.42
26.26
26.26
20.86
20.86
19.69
19.69
37.06
37.06
26.81
26.81
30.35
30.35
20.11
20.11
26.57
26.57
19.69
19.69

ez
0.174
0.174
0.174
0.174
0.174
0.174
0.174
0.174
0.000
0.000
0.203
0.203
0.000
0.000
0.000
0.000
0.149
0.149
0.149
0.149
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.086
0.086
0.000
0.000
0.086
0.086
0.000
0.000
0.086
0.086
0.000
0.000
0.083
0.083
0.000
0.000
0.086
0.086
0.000
0.000
0.086
0.086
0.000
0.000
0.114
0.114
0.000
0.000
0.115
0.115
0.000
0.000
0.153
0.153
0.000
0.000
0.105
0.105

ez/wz
0.097
0.097
0.097
0.097
0.097
0.097
0.097
0.097
0.000
0.000
0.113
0.113
0.000
0.000
0.000
0.000
0.083
0.083
0.083
0.083
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.048
0.048
0.000
0.000
0.048
0.048
0.000
0.000
0.048
0.048
0.000
0.000
0.046
0.046
0.000
0.000
0.048
0.048
0.000
0.000
0.048
0.048
0.000
0.000
0.063
0.063
0.000
0.000
0.064
0.064
0.000
0.000
0.085
0.085
0.000
0.000
0.058
0.058

kz
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.58
1.00
1.00
1.68
1.68
1.00
1.00
1.00
1.00
1.50
1.50
1.50
1.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.29
1.29
1.00
1.00
1.29
1.29
1.00
1.00
1.29
1.29
1.00
1.00
1.28
1.28
1.00
1.00
1.29
1.29
1.00
1.00
1.29
1.29
1.00
1.00
1.38
1.38
1.00
1.00
1.38
1.38
1.00
1.00
1.51
1.51
1.00
1.00
1.35
1.35

Pz
42.37
42.37
42.37
42.37
49.43
49.43
49.43
49.43
19.69
19.69
33.03
33.03
26.81
26.81
26.81
26.81
40.15
40.15
40.15
40.15
30.64
30.64
30.64
31.72
30.64
30.64
26.26
26.26
33.76
33.76
26.26
26.26
33.76
33.76
26.26
26.26
33.76
33.76
27.18
27.18
34.69
34.69
26.26
26.26
33.76
33.76
26.26
26.26
33.76
33.76
19.69
19.69
27.20
27.20
26.81
26.81
37.06
37.06
20.11
20.11
30.35
30.35
19.69
19.69
26.57
26.57

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Design of Stress
wx

Lz 0
Lz

Lz C

wz
Lx

Lz 10

Lx 0

Dimension & Position

Lx C

wx
wz
px
Lpx

=
=
=
=

1.800
1.800
0.650
0.900

Lx 10

m
m
m
m

Foundation weight
Footing weight =
Soil cover weight =
UnFactored Rd =

7.20 kN/m2
11.57 kN/m2
18.77 kN/m2

h1
d
pz
Lpz

=
=
=
=

0.300
0.219
0.650
0.900

m
m
m
m

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Calculation of Soil Pressure


X-Direction
L/C
UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13
UH14

Xnx
(m)
9.47
9.47
12.58
12.58
12.58
12.58
21.23
21.23
21.23
21.23
21.23
21.23
21.94
21.94
21.23
21.23
21.23
21.23
16.14
16.14
3.26
3.26
2.67
2.67
3.48
3.48
-

Lx 0
0.000 m
26.81
26.81
26.81
26.81
31.28
31.28
31.28
31.28
17.63
21.76
19.69
19.69
24.75
24.75
28.88
28.88
26.81
26.81
26.81
26.81
30.64
30.64
30.64
31.72
30.64
30.64
25.10
27.42
26.26
26.26
25.10
27.42
26.26
26.26
25.10
27.42
26.26
26.26
26.02
28.35
27.18
27.18
25.10
27.42
26.26
26.26
25.10
27.42
26.26
26.26
18.53
20.86
19.69
19.69
16.57
16.57
26.81
26.81
9.87
9.87
20.11
20.11
12.82
26.57
19.69
19.69

Lx C
0.900 m
26.81
26.81
26.81
26.81
31.28
31.28
31.28
31.28
19.69
19.69
19.69
19.69
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
30.64
30.64
30.64
31.72
30.64
30.64
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
27.18
27.18
27.18
27.18
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
19.69
19.69
19.69
19.69
26.81
26.81
26.81
26.81
20.11
20.11
20.11
20.11
19.69
19.69
19.69
19.69

Unit : kN/m2 Intermediate Lengths


at column face
Lx10
Lxi
Lxi
1.800 m
0.575 m
1.225 m
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
31.28
31.28
31.28
31.28
31.28
31.28
31.28
31.28
31.28
31.28
31.28
31.28
21.76
18.95
20.44
17.63
20.44
18.95
19.69
19.69
19.69
19.69
19.69
19.69
28.88
26.07
27.56
28.88
26.07
27.56
24.75
27.56
26.07
24.75
27.56
26.07
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
30.64
30.64
30.64
30.64
30.64
30.64
30.64
30.64
30.64
31.72
31.72
31.72
30.64
30.64
30.64
30.64
30.64
30.64
27.42
25.84
26.68
25.10
26.68
25.84
26.26
26.26
26.26
26.26
26.26
26.26
27.42
25.84
26.68
25.10
26.68
25.84
26.26
26.26
26.26
26.26
26.26
26.26
27.42
25.84
26.68
25.10
26.68
25.84
26.26
26.26
26.26
26.26
26.26
26.26
28.35
26.76
27.60
26.02
27.60
26.76
27.18
27.18
27.18
27.18
27.18
27.18
27.42
25.84
26.68
25.10
26.68
25.84
26.26
26.26
26.26
26.26
26.26
26.26
27.42
25.84
26.68
25.10
26.68
25.84
26.26
26.26
26.26
26.26
26.26
26.26
20.86
19.27
20.11
18.53
20.11
19.27
19.69
19.69
19.69
19.69
19.69
19.69
37.06
23.12
30.51
37.06
23.12
30.51
26.81
26.81
26.81
26.81
26.81
26.81
30.35
16.41
23.81
30.35
16.41
23.81
20.11
20.11
20.11
20.11
20.11
20.11
26.57
17.21
22.18
12.82
22.18
17.21
19.69
19.69
19.69
19.69
19.69
19.69

at column face + d
Lxi
Lxi
0.356 m
1.444 m
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
31.28
31.28
31.28
31.28
31.28
31.28
31.28
31.28
18.44
20.94
20.94
18.44
19.69
19.69
19.69
19.69
25.56
28.06
25.56
28.06
28.06
25.56
28.06
25.56
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
30.64
30.64
30.64
30.64
30.64
30.64
31.72
31.72
30.64
30.64
30.64
30.64
25.56
26.96
26.96
25.56
26.26
26.26
26.26
26.26
25.56
26.96
26.96
25.56
26.26
26.26
26.26
26.26
25.56
26.96
26.96
25.56
26.26
26.26
26.26
26.26
26.48
27.89
27.89
26.48
27.18
27.18
27.18
27.18
25.56
26.96
26.96
25.56
26.26
26.26
26.26
26.26
25.56
26.96
26.96
25.56
26.26
26.26
26.26
26.26
18.99
20.40
20.40
18.99
19.69
19.69
19.69
19.69
20.62
33.01
20.62
33.01
26.81
26.81
26.81
26.81
13.92
26.30
13.92
26.30
20.11
20.11
20.11
20.11
15.54
23.85
23.85
15.54
19.69
19.69
19.69
19.69

Lxi
0.000 m
26.81
26.81
26.81
26.81
31.28
31.28
31.28
31.28
17.63
21.76
19.69
19.69
24.75
24.75
28.88
28.88
26.81
26.81
26.81
26.81
30.64
30.64
30.64
31.72
30.64
30.64
25.10
27.42
26.26
26.26
25.10
27.42
26.26
26.26
25.10
27.42
26.26
26.26
26.02
28.35
27.18
27.18
25.10
27.42
26.26
26.26
25.10
27.42
26.26
26.26
18.53
20.86
19.69
19.69
16.57
16.57
26.81
26.81
9.87
9.87
20.11
20.11
12.82
26.57
19.69
19.69

Lxi
0.000 m
26.81
26.81
26.81
26.81
31.28
31.28
31.28
31.28
17.63
21.76
19.69
19.69
24.75
24.75
28.88
28.88
26.81
26.81
26.81
26.81
30.64
30.64
30.64
31.72
30.64
30.64
25.10
27.42
26.26
26.26
25.10
27.42
26.26
26.26
25.10
27.42
26.26
26.26
26.02
28.35
27.18
27.18
25.10
27.42
26.26
26.26
25.10
27.42
26.26
26.26
18.53
20.86
19.69
19.69
16.57
16.57
26.81
26.81
9.87
9.87
20.11
20.11
12.82
26.57
19.69
19.69

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
Z-Direction
L/C
UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13
UH14

Xnz
(m)
2.45
2.45
2.45
2.45
2.45
2.45
2.45
2.45
2.23
2.23
2.71
2.71
2.71
2.71
4.05
4.05
4.05
4.05
4.05
4.05
4.16
4.16
4.05
4.05
4.05
4.05
3.26
3.26
3.26
3.26
2.67
2.67
3.48
3.48

Lz 0
0.000 m
11.26
42.37
11.26
42.37
13.14
49.43
13.14
49.43
19.69
19.69
6.36
33.03
26.81
26.81
26.81
26.81
13.48
40.15
13.48
40.15
30.64
30.64
30.64
31.72
30.64
30.64
26.26
26.26
18.76
33.76
26.26
26.26
18.76
33.76
26.26
26.26
18.76
33.76
27.18
27.18
19.68
34.69
26.26
26.26
18.76
33.76
26.26
26.26
18.76
33.76
19.69
19.69
12.19
27.20
26.81
26.81
16.57
16.57
20.11
20.11
9.87
9.87
19.69
19.69
12.82
26.57

Lz C
0.900 m
26.81
26.81
26.81
26.81
31.28
31.28
31.28
31.28
19.69
19.69
19.69
19.69
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
30.64
30.64
30.64
31.72
30.64
30.64
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
27.18
27.18
27.18
27.18
26.26
26.26
26.26
26.26
26.26
26.26
26.26
26.26
19.69
19.69
19.69
19.69
26.81
26.81
26.81
26.81
20.11
20.11
20.11
20.11
19.69
19.69
19.69
19.69

Unit : kN/m2 Intermediate Lengths


at column face
Lz 10
Lzi
Lzi
1.800 m
0.000 m
0.000 m
42.37
11.26
11.26
11.26
42.37
42.37
42.37
11.26
11.26
11.26
42.37
42.37
49.43
13.14
13.14
13.14
49.43
49.43
49.43
13.14
13.14
13.14
49.43
49.43
19.69
19.69
19.69
19.69
19.69
19.69
33.03
6.36
6.36
6.36
33.03
33.03
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
40.15
13.48
13.48
13.48
40.15
40.15
40.15
13.48
13.48
13.48
40.15
40.15
30.64
30.64
30.64
30.64
30.64
30.64
30.64
30.64
30.64
31.72
31.72
31.72
30.64
30.64
30.64
30.64
30.64
30.64
26.26
26.26
26.26
26.26
26.26
26.26
33.76
18.76
18.76
18.76
33.76
33.76
26.26
26.26
26.26
26.26
26.26
26.26
33.76
18.76
18.76
18.76
33.76
33.76
26.26
26.26
26.26
26.26
26.26
26.26
33.76
18.76
18.76
18.76
33.76
33.76
27.18
27.18
27.18
27.18
27.18
27.18
34.69
19.68
19.68
19.68
34.69
34.69
26.26
26.26
26.26
26.26
26.26
26.26
33.76
18.76
18.76
18.76
33.76
33.76
26.26
26.26
26.26
26.26
26.26
26.26
33.76
18.76
18.76
18.76
33.76
33.76
19.69
19.69
19.69
19.69
19.69
19.69
27.20
12.19
12.19
12.19
27.20
27.20
26.81
26.81
26.81
26.81
26.81
26.81
37.06
16.57
16.57
37.06
16.57
16.57
20.11
20.11
20.11
20.11
20.11
20.11
30.35
9.87
9.87
30.35
9.87
9.87
19.69
19.69
19.69
19.69
19.69
19.69
26.57
12.82
12.82
12.82
26.57
26.57

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

at column face + d
Lzi
Lzi
0.000 m
0.000 m
11.26
11.26
42.37
42.37
11.26
11.26
42.37
42.37
13.14
13.14
49.43
49.43
13.14
13.14
49.43
49.43
19.69
19.69
19.69
19.69
6.36
6.36
33.03
33.03
26.81
26.81
26.81
26.81
26.81
26.81
26.81
26.81
13.48
13.48
40.15
40.15
13.48
13.48
40.15
40.15
30.64
30.64
30.64
30.64
30.64
30.64
31.72
31.72
30.64
30.64
30.64
30.64
26.26
26.26
26.26
26.26
18.76
18.76
33.76
33.76
26.26
26.26
26.26
26.26
18.76
18.76
33.76
33.76
26.26
26.26
26.26
26.26
18.76
18.76
33.76
33.76
27.18
27.18
27.18
27.18
19.68
19.68
34.69
34.69
26.26
26.26
26.26
26.26
18.76
18.76
33.76
33.76
26.26
26.26
26.26
26.26
18.76
18.76
33.76
33.76
19.69
19.69
19.69
19.69
12.19
12.19
27.20
27.20
26.81
26.81
26.81
26.81
16.57
16.57
16.57
16.57
20.11
20.11
20.11
20.11
9.87
9.87
9.87
9.87
19.69
19.69
19.69
19.69
12.82
12.82
26.57
26.57

Lzi
0.000 m
11.26
42.37
11.26
42.37
13.14
49.43
13.14
49.43
19.69
19.69
6.36
33.03
26.81
26.81
26.81
26.81
13.48
40.15
13.48
40.15
30.64
30.64
30.64
31.72
30.64
30.64
26.26
26.26
18.76
33.76
26.26
26.26
18.76
33.76
26.26
26.26
18.76
33.76
27.18
27.18
19.68
34.69
26.26
26.26
18.76
33.76
26.26
26.26
18.76
33.76
19.69
19.69
12.19
27.20
26.81
26.81
16.57
16.57
20.11
20.11
9.87
9.87
19.69
19.69
12.82
26.57

Lzi
0.000 m
11.26
42.37
11.26
42.37
13.14
49.43
13.14
49.43
19.69
19.69
6.36
33.03
26.81
26.81
26.81
26.81
13.48
40.15
13.48
40.15
30.64
30.64
30.64
31.72
30.64
30.64
26.26
26.26
18.76
33.76
26.26
26.26
18.76
33.76
26.26
26.26
18.76
33.76
27.18
27.18
19.68
34.69
26.26
26.26
18.76
33.76
26.26
26.26
18.76
33.76
19.69
19.69
12.19
27.20
26.81
26.81
16.57
16.57
20.11
20.11
9.87
9.87
19.69
19.69
12.82
26.57

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
X-Direction ( Moment )
L/C
UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13
UH14
Max (B)
Max (T)

Rd
(kN/m2)
22.52
22.52
22.52
22.52
26.27
26.27
26.27
26.27
16.89
16.89
16.89
16.89
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
26.27
26.27
26.27
26.27
26.27
26.27
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
16.89
16.89
16.89
16.89
22.52
22.52
22.52
22.52
16.89
16.89
16.89
16.89
16.89
16.89
16.89
16.89

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Unit : kN-m
M-Dir
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
-

Lx C
0.900 m
3.13
3.13
3.13
3.13
3.65
3.65
3.65
3.65
3.05
1.04
2.04
2.04
4.14
4.14
2.13
2.13
3.13
3.13
3.13
3.13
3.18
3.18
3.18
3.97
3.18
3.18
3.29
2.16
2.73
2.73
3.29
2.16
2.73
2.73
3.29
2.16
2.73
2.73
3.97
2.84
3.40
3.40
3.29
2.16
2.73
2.73
3.29
2.16
2.73
2.73
2.61
1.48
2.04
2.04
8.11
8.11
3.13
3.13
7.33
7.33
2.35
2.35
5.39
-1.30
2.04
2.04

Lx10
1.800 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

at column face
Lxi
Lxi
0.575 m
1.225 m
1.28
1.28
1.28
1.28
1.28
1.28
1.28
1.28
1.49
1.49
1.49
1.49
1.49
1.49
1.49
1.49
0.35
1.32
1.32
0.35
0.83
0.83
0.83
0.83
0.79
1.76
0.79
1.76
1.76
0.79
1.76
0.79
1.28
1.28
1.28
1.28
1.28
1.28
1.28
1.28
1.30
1.30
1.30
1.30
1.30
1.30
1.62
1.62
1.30
1.30
1.30
1.30
0.84
1.39
1.39
0.84
1.11
1.11
1.11
1.11
0.84
1.39
1.39
0.84
1.11
1.11
1.11
1.11
0.84
1.39
1.39
0.84
1.11
1.11
1.11
1.11
1.12
1.66
1.66
1.12
1.39
1.39
1.39
1.39
0.84
1.39
1.39
0.84
1.11
1.11
1.11
1.11
0.84
1.39
1.39
0.84
1.11
1.11
1.11
1.11
0.56
1.11
1.11
0.56
0.83
0.83
0.83
0.83
-1.12
3.68
-1.12
3.68
1.28
1.28
1.28
1.28
-1.44
3.36
-1.44
3.36
0.96
0.96
0.96
0.96
-0.78
2.44
2.44
-0.78
0.83
0.83
0.83
0.83
2.44
3.68
-1.44
-0.78

at column face + d
Lxi
Lxi
0.356 m
1.444 m
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.57
0.12
0.52
0.52
0.12
0.32
0.32
0.32
0.32
0.29
0.69
0.29
0.69
0.69
0.29
0.69
0.29
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.50
0.50
0.50
0.50
0.50
0.50
0.62
0.62
0.50
0.50
0.50
0.50
0.31
0.54
0.54
0.31
0.43
0.43
0.43
0.43
0.31
0.54
0.54
0.31
0.43
0.43
0.43
0.43
0.31
0.54
0.54
0.31
0.43
0.43
0.43
0.43
0.42
0.65
0.65
0.42
0.53
0.53
0.53
0.53
0.31
0.54
0.54
0.31
0.43
0.43
0.43
0.43
0.31
0.54
0.54
0.31
0.43
0.43
0.43
0.43
0.20
0.44
0.44
0.20
0.32
0.32
0.32
0.32
-0.52
1.50
-0.52
1.50
0.49
0.49
0.49
0.49
-0.65
1.38
-0.65
1.38
0.37
0.37
0.37
0.37
-0.36
1.00
1.00
-0.36
0.32
0.32
0.32
0.32
1.00
1.50
-0.65
-0.36

Lxi
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Lxi
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
Z-Direction ( Moment )
L/C
UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13
UH14
Max (B)
Max (T)

Rd
(kN/m2)
22.52
22.52
22.52
22.52
26.27
26.27
26.27
26.27
16.89
16.89
16.89
16.89
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
26.27
26.27
26.27
26.27
26.27
26.27
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
16.89
16.89
16.89
16.89
22.52
22.52
22.52
22.52
16.89
16.89
16.89
16.89
16.89
16.89
16.89
16.89

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Unit : kN-m
M-Dir
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
-

Lz C
0.900 m
10.69
-4.43
10.69
-4.43
12.47
-5.17
12.47
-5.17
2.04
2.04
8.53
-4.44
3.13
3.13
3.13
3.13
9.61
-3.35
9.61
-3.35
3.18
3.18
3.18
3.97
3.18
3.18
2.73
2.73
6.37
-0.92
2.73
2.73
6.37
-0.92
2.73
2.73
6.37
-0.92
3.40
3.40
7.05
-0.24
2.73
2.73
6.37
-0.92
2.73
2.73
6.37
-0.92
2.04
2.04
5.69
-1.60
3.13
3.13
8.11
8.11
2.35
2.35
7.33
7.33
2.04
2.04
5.39
-1.30

Lz10
1.800 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

at column face
Lzi
Lzi
0.000 m
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

at column face + d
Lzi
Lzi
0.000 m
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Lzi
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Lzi
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
X-Direction ( Shear )
L/C
UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13
UH14
Max

Rd
(kN/m2)
22.52
22.52
22.52
22.52
26.27
26.27
26.27
26.27
16.89
16.89
16.89
16.89
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
26.27
26.27
26.27
26.27
26.27
26.27
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
16.89
16.89
16.89
16.89
22.52
22.52
22.52
22.52
16.89
16.89
16.89
16.89
16.89
16.89
16.89
16.89

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Unit : kN
M-Dir
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
-

Lx C
0.900 m
-6.96
-6.96
-6.96
-6.96
-8.12
-8.12
-8.12
-8.12
-6.22
-2.87
-4.54
-4.54
-8.63
-8.63
-5.28
-5.28
-6.96
-6.96
-6.96
-6.96
-7.07
-7.07
-7.07
-8.82
-7.07
-7.07
-7.00
-5.12
-6.06
-6.06
-7.00
-5.12
-6.06
-6.06
-7.00
-5.12
-6.06
-6.06
-8.50
-6.62
-7.56
-7.56
-7.00
-5.12
-6.06
-6.06
-7.00
-5.12
-6.06
-6.06
-5.49
-3.60
-4.54
-4.54
-15.26
-15.26
-6.96
-6.96
-13.52
-13.52
-5.22
-5.22
-10.11
1.02
-4.54
-4.54

Lx10
1.800 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

at column face
Lxi
Lxi
0.575 m
1.225 m
4.45
-4.45
4.45
-4.45
4.45
-4.45
4.45
-4.45
5.19
-5.19
5.19
-5.19
5.19
-5.19
5.19
-5.19
1.45
-4.36
4.36
-1.45
2.90
-2.90
2.90
-2.90
2.99
-5.90
2.99
-5.90
5.90
-2.99
5.90
-2.99
4.45
-4.45
4.45
-4.45
4.45
-4.45
4.45
-4.45
4.52
-4.52
4.52
-4.52
4.52
-4.52
5.63
-5.63
4.52
-4.52
4.52
-4.52
3.05
-4.69
4.69
-3.05
3.87
-3.87
3.87
-3.87
3.05
-4.69
4.69
-3.05
3.87
-3.87
3.87
-3.87
3.05
-4.69
4.69
-3.05
3.87
-3.87
3.87
-3.87
4.01
-5.65
5.65
-4.01
4.83
-4.83
4.83
-4.83
3.05
-4.69
4.69
-3.05
3.87
-3.87
3.87
-3.87
3.05
-4.69
4.69
-3.05
3.87
-3.87
3.87
-3.87
2.08
-3.72
3.72
-2.08
2.90
-2.90
2.90
-2.90
-2.77
-11.66
-2.77
-11.66
4.45
-4.45
4.45
-4.45
-3.88
-10.55
-3.88
-10.55
3.33
-3.33
3.33
-3.33
-1.94
-7.74
7.74
1.94
2.90
-2.90
2.90
-2.90
7.74
11.66

at column face + d
Lxi
Lxi
0.356 m
1.444 m
2.75
-2.75
2.75
-2.75
2.75
-2.75
2.75
-2.75
3.21
-3.21
3.21
-3.21
3.21
-3.21
3.21
-3.21
0.73
-2.86
2.86
-0.73
1.80
-1.80
1.80
-1.80
1.69
-3.82
1.69
-3.82
3.82
-1.69
3.82
-1.69
2.75
-2.75
2.75
-2.75
2.75
-2.75
2.75
-2.75
2.80
-2.80
2.80
-2.80
2.80
-2.80
3.49
-3.49
2.80
-2.80
2.80
-2.80
1.80
-2.99
2.99
-1.80
2.40
-2.40
2.40
-2.40
1.80
-2.99
2.99
-1.80
2.40
-2.40
2.40
-2.40
1.80
-2.99
2.99
-1.80
2.40
-2.40
2.40
-2.40
2.39
-3.59
3.59
-2.39
2.99
-2.99
2.99
-2.99
1.80
-2.99
2.99
-1.80
2.40
-2.40
2.40
-2.40
1.80
-2.99
2.99
-1.80
2.40
-2.40
2.40
-2.40
1.20
-2.40
2.40
-1.20
1.80
-1.80
1.80
-1.80
-2.51
-8.02
-2.51
-8.02
2.75
-2.75
2.75
-2.75
-3.20
-7.33
-3.20
-7.33
2.06
-2.06
2.06
-2.06
-1.74
-5.33
5.33
1.74
1.80
-1.80
1.80
-1.80
5.33
8.02

Lxi
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Lxi
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
Z-Direction ( Shear )
L/C
UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13
UH14
Max

Rd
(kN/m2)
22.52
22.52
22.52
22.52
26.27
26.27
26.27
26.27
16.89
16.89
16.89
16.89
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
26.27
26.27
26.27
26.27
26.27
26.27
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
22.52
16.89
16.89
16.89
16.89
22.52
22.52
22.52
22.52
16.89
16.89
16.89
16.89
16.89
16.89
16.89
16.89

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Unit : kN
M-Dir
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
-

Lz C
0.900 m
-19.56
5.64
-19.56
5.64
-22.82
6.58
-22.82
6.58
-4.54
-4.54
-15.35
6.26
-6.96
-6.96
-6.96
-6.96
-17.76
3.84
-17.76
3.84
-7.07
-7.07
-7.07
-8.82
-7.07
-7.07
-6.06
-6.06
-12.13
0.02
-6.06
-6.06
-12.13
0.02
-6.06
-6.06
-12.13
0.02
-7.56
-7.56
-13.63
-1.48
-6.06
-6.06
-12.13
0.02
-6.06
-6.06
-12.13
0.02
-4.54
-4.54
-10.62
1.53
-6.96
-6.96
-15.26
-15.26
-5.22
-5.22
-13.52
-13.52
-4.54
-4.54
-10.11
1.02

Lz10
1.800 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

at column face
Lzi
Lzi
0.000 m
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

at column face + d
Lzi
Lzi
0.000 m
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Lzi
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Lzi
0.000 m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Check of Flexure Strength


X-Direction : Bottom
Rebar size
Rebar nos
Rebar pitch
Max Mu =

12 mm
10
183 mm
3.68 kN-m

Sectional area =
Provide As =
b
=
d
=
h
=

Rn = Mu/0.9bd^2
pr = 0.85f'c/fy*(1-(1-2Rn/0.85f'c)^0.5)
Minimum p1 = 0.0018
Minimum p2-1 = 4/3 * pr
Minimum p2-2 = 0.25*f 'c^0.5 / fy
As req. = p2 * b * h
As req. =
486

mm2

=
=
=
=
=
<

113
1131
1800
207
300

0.0530 N/mm2
0.0001
0.0018
0.0002
0.0027

Provide As =

mm2
mm2
mm
mm
mm

ACI 318M-08 para 10.5.4 and para 7.12.2.1


p 2 = max (pr, p1/2) =
0.0009

1131

mm2

PASS

X-Direction : Top
Rebar size
Rebar nos
Rebar pitch
Max Mu =

12 mm
10
183 mm
1.44 kN-m

Sectional area =
Provide As =
b
=
d
=
h
=

Rn = Mu/0.9bd^2
pr = 0.85f'c/fy*(1-(1-2Rn/0.85f'c)^0.5)
Minimum p1 = 0.0018
Minimum p2-1 = 4/3 * pr
Minimum p2-2 = 0.25*f 'c^0.5 / fy
As req. = p2 * b * h
As req. =
486

mm2

=
=
=
=
=

<

113
1131
1800
207
300

0.0207 N/mm2
0.0000
0.0018
0.0001
0.0027

Provide As =

mm2
mm2
mm
mm
mm

ACI 318M-08 para 10.5.4 and para 7.12.2.1


p 2 = max (pr, p1/2) =
0.0009

1131

mm2

PASS

Z-Direction : Bottom
Rebar size
Rebar nos
Rebar pitch
Max Mu =

12 mm
10
183 mm
0.00 kN-m

Sectional area =
Provide As =
b
=
d
=
h
=

Rn = Mu/0.9bd^2
pr = 0.85f'c/fy*(1-(1-2Rn/0.85f'c)^0.5)
Minimum p1 = 0.0018
Minimum p2-1 = 4/3 * pr
Minimum p2-2 = 0.25*f 'c^0.5 / fy
As req. = p2 * b * h
As req. =
486

mm2

=
=
=
=
=

<

113
1131
1800
207
300

0.0000 N/mm2
0.0000
0.0018
0.0000
0.0027

Provide As =

mm2
mm2
mm
mm
mm

ACI 318M-08 para 10.5.4 and para 7.12.2.1


p 2 = max (pr, p1/2) =
0.0009

1131

mm2

PASS

Z-Direction : Top
Rebar size
Rebar nos
Rebar pitch
Max Mu =

12 mm
10
183 mm
0.00 kN-m

Sectional area =
Provide As =
b
=
d
=
h
=

Rn = Mu/0.9bd^2
pr = 0.85f'c/fy*(1-(1-2Rn/0.85f'c)^0.5)
Minimum p1 = 0.0018
Minimum p2-1 = 4/3 * pr
Minimum p2-2 = 0.25*f 'c^0.5 / fy
As req. = p2 * b * h
As req. =
486

mm2

=
=
=
=
=
<

113
1131
1800
207
300

0.0000 N/mm2
0.0000
0.0018
0.0000
0.0027

Provide As =

mm2
mm2
mm
mm
mm

ACI 318M-08 para 10.5.4 and para 7.12.2.1


p 2 = max (pr, p1/2) =
0.0009

1131

mm2

PASS

Rebar Arrangement for Footing Slab


X-Direction

Bottom
Top

10
10

-D
-D

12
12

@
@

183 mm
183 mm

Z-Direction

Bottom

10

-D

12

183 mm

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
Top
10
-D

12

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001
183 mm

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Check of Shear Strength for Two-way Action


Vpu = Nmax/wx'/wz'(wx'wz'-(px+d)(pz+d))
bo = 2(px+d)+2(pz+d)
bc = Max pxz / Min pxz
bo/d
@ = alpha
=
40
Vc1 = 0.75*(1/6)*[1+(2*4)/bc]*f'c^0.5*bo.d
Vc2 = 0.75*(1/12)*(d/bo+2)*f'c^0.5 . bo.d
Vc3 = 0.75*(1/3)*f'c^0.5 . bo.d

wpx =
wx =

0.900 m
1.800 m

d=

0.207 m

wpz =
wz =

0.900 m
1.800 m

ACI-318-08 para 11.11.2.1 (a)


ACI-318-08 para 11.11.2.1 (b)
ACI-318-08 para 11.11.2.1 (c)

Vpu < min ( Vc1 , Vc2 , Vc3 )

Pede

Pede

px
m
0.650
Nmax
kN
17.64

pz
m
0.650

Lpx
m
0.000

px+d
m
0.857

pz+d
m
0.857

Lpz
m
0.000
Vpu
kN
13.64

wx'
m
1.800

wz'
m
1.800

bo
mm
3428

bc
1.00

Vc1
kN
3658.25

Vc2
kN
406.96

Vc3
kN
812.94

Check of Shear Strength for One-way Action


X-Direction
Vu =
8.02 kN
Vc = 0.75*0.17 f'c^0.5bd =

217.70 kN

>

8.02 kN

PASS

ACI-318-08 para 11.2.1.1

217.70 kN

>

0.00 kN

PASS

ACI-318-08 para 11.2.1.1

Z-Direction
Vu =
0.00 kN
Vc = 0.75*0.17 f'c^0.5bd =

Judge
PASS

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Pedestal Design
Combination Load at Bottom
L/C
UA11
UA12
UA13
UA14
UA21
UA22
UA23
UA24
UB11
UB12
UB13
UB14
UC11
UC12
UC13
UC14
UC15
UC16
UC17
UC18
UD11
UD12
UD13
UD14
UD15
UD16
UE11
UE12
UE13
UE14
UE21
UE22
UE23
UE24
UE31
UE32
UE33
UE34
UE41
UE42
UE43
UE44
UE51
UE52
UE53
UE54
UE61
UE62
UE63
UE64
UF11
UF12
UF13
UF14
UG11
UG12
UG13
UG14
UG21
UG22
UG23
UG24
UH11
UH12
UH13

N (kN)
13.92
13.92
13.92
13.92
16.24
16.24
16.24
16.24
9.09
9.09
9.09
9.09
13.92
13.92
13.92
13.92
13.92
13.92
13.92
13.92
14.14
14.14
14.14
17.64
14.14
14.14
12.12
12.12
12.12
12.12
12.12
12.12
12.12
12.12
12.12
12.12
12.12
12.12
15.12
15.12
15.12
15.12
12.12
12.12
12.12
12.12
12.12
12.12
12.12
12.12
9.09
9.09
9.09
9.09
13.92
13.92
13.92
13.92
10.44
10.44
10.44
10.44
9.09
9.09
9.09

Hx (kN)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.06
-1.06
0.00
0.00
1.06
1.06
-1.06
-1.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.60
-0.60
0.00
0.00
0.76
0.76
0.00
0.00
0.76
0.76
0.00
0.00
0.51
-0.51
0.00

Hz (kN)
2.16
-2.16
2.16
-2.16
2.52
-2.52
2.52
-2.52
0.00
0.00
0.08
-0.08
0.00
0.00
0.00
0.00
0.08
-0.08
0.08
-0.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.04
-0.04
0.00
0.00
0.76
0.76
0.00
0.00
0.76
0.76
0.00
0.00
0.51

Mx (kN-m)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.69
-1.69
0.00
0.00
1.69
1.69
-1.69
-1.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.95
-0.95
0.00
0.00
0.95
-0.95
0.00
0.00
0.95
-0.95
0.00
0.00
0.95
-0.95
0.00
0.00
0.95
-0.95
0.00
0.00
0.95
-0.95
0.00
0.00
0.95
-0.95
0.00
0.00
9.73
9.73
0.00
0.00
9.73
9.73
0.00
0.00
6.53
-6.53
0.00

Mz (kN-m)
14.47
-14.47
14.47
-14.47
16.88
-16.88
16.88
-16.88
0.00
0.00
12.94
-12.94
0.00
0.00
0.00
0.00
12.94
-12.94
12.94
-12.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7.28
-7.28
0.00
0.00
7.28
-7.28
0.00
0.00
7.28
-7.28
0.00
0.00
7.28
-7.28
0.00
0.00
7.28
-7.28
0.00
0.00
7.28
-7.28
0.00
0.00
7.28
-7.28
0.00
0.00
9.73
9.73
0.00
0.00
9.73
9.73
0.00
0.00
6.53

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001
UH14
9.09
0.00
-0.51
0.00
Max
17.64
1.06
2.52
9.73
Min
9.09

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001
-6.53
16.88

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Design Load
X-Direction
Nu (+) =
Nu (-) =
Use Nu =

17.64 kN
9.09 kN
9.09 kN

Mu =

9.73 kN-m

H = Vu =

1.06 kN

17.64 kN
9.09 kN
9.09 kN

Mu =

16.88 kN-m

H = Vu =

2.52 kN

Z-Direction
Nu (+) =
Nu (-) =
Use Nu =

Construction of Water Treatment Facilities - Phase 3


Contractor Job Code:
CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump S
Company Doc. No. : *************
SL001
Contractor Doc. No. : C-000-1326-001
Pedestal Design
Dimension of pedestal

px

pz

Pedestal Size X-dir. (px) =


Pedestal Size Z-dir. (pz) =
Pedestal Height (h2) =
Rebar size
Rebar nos

650 mm
650 mm
700 mm

16 mm
16

Mu =

9.73 kN-m

Sectional area =
Provide As =
b
=
d
=
h
=

Rn = Mu/0.9bd^2
r = 0.85f'c/fy*(1-(1-2Rn/0.85f'c)^0.5)
Minimum p1 =
2 = max (r, 1)
As req. = p2 * b * d
As req. =
1810

mm2

=
=
=
=

<

201
3217
650
557
650

0.0536 N/mm2
0.0001
0.0050
0.0050

Provide As =

3217

mm2
mm2
mm
mm
mm

ACI 318M-08 para 10.8.4

mm2

PASS

x - dir
5
nos
min rebar clear spacing x-dir =

116 mm

< 250 mm OK

As per R10.6.4 in ACI 318M-08

z - dir
5
nos
min rebar clear spacing y-dir =

116 mm

< 250 mm OK

As per R10.6.4 in ACI 318M-08

Hoop Bar design


Max. Hoop spacing :
smallest sect.dimension =
16*dia.smallest vert. bar =
48*dia.stirrup bar =

650
256
480
600
256

S (max.) required =
2

nos - D

10

mm
mm
mm
mm
mm
@

ACI 318M-08 7.10.5.2


ACI 318M-08 7.10.5.2
ACI 318M-08 11.4.5.1

255 mm < 256 mm

OK

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
SL001

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Calculation Check Table


Table of Stability Check for Judge
Check of Soil Pressure
L/C
A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F11
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

P
35.35
35.35
35.35
35.35
35.35
35.35
35.35
35.35
23.20
23.20
30.15
30.15
23.69
23.69
23.69
23.69
30.66
30.66
30.66
30.66
21.88
21.88
21.88
22.65
21.88
21.88
22.67
22.67
26.61
26.61
22.67
22.67
26.61
26.61
22.67
22.67
26.61
26.61
23.33
23.33
27.28
27.28
22.67
22.67
26.61
26.61
22.67
22.67
26.61
26.61
22.67
22.67
26.61
26.61
29.45
29.45
29.45
29.45
27.29
27.29
27.29
27.29
24.54
24.54
24.54
24.54

Allow
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00
133.00

Check of Overturning ( With Buoyancy )

< 1.0
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.17
0.17
0.23
0.23
0.18
0.18
0.18
0.18
0.23
0.23
0.23
0.23
0.16
0.16
0.16
0.17
0.16
0.16
0.17
0.17
0.20
0.20
0.17
0.17
0.20
0.20
0.17
0.17
0.20
0.20
0.18
0.18
0.21
0.21
0.17
0.17
0.20
0.20
0.17
0.17
0.20
0.20
0.17
0.17
0.20
0.20
0.22
0.22
0.22
0.22
0.21
0.21
0.21
0.21
0.18
0.18
0.18
0.18
0.35
Table of Design Check for Judge

Judge
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

L/C
A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F11
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

xFo
Foallow
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
50.81
1.50
50.81
1.50
999.00
1.50
999.00
1.50
51.89
1.50
51.89
1.50
51.89
1.50
51.89
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
90.34
1.50
90.34
1.50
999.00
1.50
999.00
1.50
90.34
1.50
90.34
1.50
999.00
1.50
999.00
1.50
90.34
1.50
90.34
1.50
999.00
1.50
999.00
1.50
93.52
1.50
93.52
1.50
999.00
1.50
999.00
1.50
90.34
1.50
90.34
1.50
999.00
1.50
999.00
1.50
90.34
1.50
90.34
1.50
999.00
1.50
999.00
1.50
90.34
1.50
90.34
1.50
999.00
1.50
999.00
1.50
9.35
1.50
9.35
1.50
999.00
1.50
999.00
1.50
8.40
1.50
8.40
1.50
999.00
1.50
999.00
1.50
12.28
1.50
12.28
1.50
999.00
1.50
999.00
1.50

< 1.0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
0.03
0.00
0.00
0.03
0.03
0.03
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.16
0.16
0.00
0.00
0.18
0.18
0.00
0.00
0.12
0.12
0.00
0.00
0.18

Check of Sliding ( With Buoyancy )


Judge
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

zFo
Foallow
5.17
1.50
5.17
1.50
5.17
1.50
5.17
1.50
5.17
1.50
5.17
1.50
5.17
1.50
5.17
1.50
999.00
1.50
999.00
1.50
7.88
1.50
7.88
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
8.04
1.50
8.04
1.50
8.04
1.50
8.04
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
14.00
1.50
14.00
1.50
999.00
1.50
999.00
1.50
14.00
1.50
14.00
1.50
999.00
1.50
999.00
1.50
14.00
1.50
14.00
1.50
999.00
1.50
999.00
1.50
14.50
1.50
14.50
1.50
999.00
1.50
999.00
1.50
14.00
1.50
14.00
1.50
999.00
1.50
999.00
1.50
14.00
1.50
14.00
1.50
999.00
1.50
999.00
1.50
14.00
1.50
14.00
1.50
999.00
1.50
999.00
1.50
9.35
1.50
9.35
1.50
999.00
1.50
999.00
1.50
8.40
1.50
8.40
1.50
999.00
1.50
999.00
1.50
12.28
1.50
12.28
1.50

< 1.0
0.29
0.29
0.29
0.29
0.29
0.29
0.29
0.29
0.00
0.00
0.19
0.19
0.00
0.00
0.00
0.00
0.19
0.19
0.19
0.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.11
0.11
0.00
0.00
0.11
0.11
0.00
0.00
0.11
0.11
0.00
0.00
0.10
0.10
0.00
0.00
0.11
0.11
0.00
0.00
0.11
0.11
0.00
0.00
0.11
0.11
0.00
0.00
0.16
0.16
0.00
0.00
0.18
0.18
0.00
0.00
0.12
0.12
0.29

Design of Footing
Re-Bar

X-Dir.
Z-Dir.

Shear

No.1

Bottom
Top
Bottom
Top

Vpc =

10 - T 12 @ 183
10 - T 12 @ 183
10 - T 12 @ 183
10 - T 12 @ 183

13.64 kN

As =
As =
As =
As =

min. Vc =

406.96 kN

486 mm2
486 mm2
486 mm2
486 mm2

Provide =
Provide =
Provide =
Provide =

0.03

PASS

1131 mm2
1131 mm2
1131 mm2
1131 mm2

0.43
0.43
0.43
0.43

PASS
PASS
PASS
PASS

Judge
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

L/C
A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F11
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

Fs
Fsallow
16.09
1.50
16.09
1.50
16.09
1.50
16.09
1.50
16.09
1.50
16.09
1.50
16.09
1.50
16.09
1.50
42.62
1.50
42.62
1.50
581.36
1.50
581.36
1.50
43.52
1.50
43.52
1.50
43.52
1.50
43.52
1.50
593.66
1.50
593.66
1.50
593.66
1.50
593.66
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
999.00
1.50
75.76
1.50
75.76
1.50
999.00
1.50
999.00
1.50
75.76
1.50
75.76
1.50
999.00
1.50
999.00
1.50
75.76
1.50
75.76
1.50
999.00
1.50
999.00
1.50
78.43
1.50
78.43
1.50
999.00
1.50
999.00
1.50
75.76
1.50
75.76
1.50
999.00
1.50
999.00
1.50
75.76
1.50
75.76
1.50
999.00
1.50
999.00
1.50
75.76
1.50
75.76
1.50
999.00
1.50
999.00
1.50
54.44
1.50
54.44
1.50
54.44
1.50
54.44
1.50
48.88
1.50
48.88
1.50
48.88
1.50
48.88
1.50
71.49
1.50
71.49
1.50
71.49
1.50
71.49
1.50

< 1.0
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.04
0.04
0.00
0.00
0.03
0.03
0.03
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.02
0.02
0.02
0.02
0.09

Check of UpLift
Judge
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

L/C
A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F11
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

N
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
3.00
3.00
3.00
3.00
4.50
4.50
4.50
4.50
4.50
4.50
4.50
4.50
3.00
3.00
3.00
5.50
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
5.50
5.50
5.50
5.50
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
4.50
4.50
4.50
4.50
3.90
3.90
3.90
3.90
2.70
2.70
2.70
2.70

FDN
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90
67.90

T
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Fs
Fsallow
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
9.99E+02
1.20
999.00
1.20
999.00
1.20
999.00
1.20
9.99E+02
1.20
999.00
1.20
999.00
1.20
999.00
1.20
9.99E+02
1.20
999.00
1.20
999.00
1.20
999.00
1.20
9.99E+02
1.20
999.00
1.20
999.00
1.20
999.00
1.20
9.99E+02
1.20
999.00
1.20
999.00
1.20
999.00
1.20
9.99E+02
1.20
999.00
1.20
999.00
1.20
999.00
1.20
9.99E+02
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20
999.00
1.20

< 1.0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Judge
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS
PASS

X-Dir.
Z-Dir.

Vc =
Vc =

217.70 kN
217.70 kN

Vu =
Vu =

8.02 kN
0.00 kN

0.04
0.00

PASS
PASS

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
0

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

Check of Anchor Bolt Reaction


Combination of Loading Data (Unfactored Load)
N
Hx
L/C
(kN)
(kN)
A11
4.50
0.00
A12
4.50
0.00
A13
4.50
0.00
A14
4.50
0.00
A21
4.50
0.00
A22
4.50
0.00
A23
4.50
0.00
A24
4.50
0.00
B11
3.00
0.67
B12
3.00
-0.67
B13
3.00
0.00
B14
3.00
0.00
C11
4.50
0.67
C12
4.50
0.67
C13
4.50
-0.67
C14
4.50
-0.67
C15
4.50
0.00
C16
4.50
0.00
C17
4.50
0.00
C18
4.50
0.00
D11
3.00
0.00
D12
3.00
0.00
D13
3.00
0.00
D14
5.50
0.00
D15
3.00
0.00
D16
3.00
0.00
E11
3.00
0.37
E12
3.00
-0.37
E13
3.00
0.00
E14
3.00
0.00
E21
3.00
0.37
E22
3.00
-0.37
E23
3.00
0.00
E24
3.00
0.00
E31
3.00
0.37
E32
3.00
-0.37
E33
3.00
0.00
E34
3.00
0.00
E41
5.50
0.37
E42
5.50
-0.37
E43
5.50
0.00
E44
5.50
0.00
E51
3.00
0.37
E52
3.00
-0.37
E53
3.00
0.00
E54
3.00
0.00
E61
3.00
0.37
E62
3.00
-0.37
E63
3.00
0.00
E64
3.00
0.00
F11
3.00
0.37
F12
3.00
-0.37
F13
3.00
0.00
F14
3.00
0.00
G11
4.50
0.53
G12
4.50
0.53
G13
4.50
0.00
G14
4.50
0.00
G21
3.90
0.53
G22
3.90
0.53
G23
3.90
0.00
G24
3.90
0.00
G31
2.70
0.36
G32
2.70
-0.36

Hz
(kN)
1.80
-1.80
1.80
-1.80
1.80
-1.80
1.80
-1.80
0.00
0.00
0.05
-0.05
0.00
0.00
0.00
0.00
0.05
-0.05
0.05
-0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.03
-0.03
0.00
0.00
0.53
0.53
0.00
0.00
0.53
0.53
0.00
0.00

Mx
(kN-m)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.59
-0.59
0.00
0.00
0.59
0.59
-0.59
-0.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
0.33
-0.33
0.00
0.00
6.44
6.44
0.00
0.00
6.44
6.44
0.00
0.00
4.32
-4.32

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
0
G33
G34

2.70
2.70

0.00
0.00

X' (mm)
5099
4937
4775
4613
1576.5
1414.5
985.5
823.5
-823.5
-985.5
-1414.5
-1576.5
-4613
-4775
-4937
-5099
X2

X2 (mm2)
25999801
24373969
22800625
21279769
2485352.25
2000810.25
971210.25
678152.25
678152.25
971210.25
2000810.25
2485352.25
21279769
22800625
24373969
25999801

0.36
-0.36

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001
0.00
0.00

Calculation of anchor bolts reaction


Inertia of anchor bolts
Bolt number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

201179378

Where:
Note: X' = distance from center line of anchor bolts to center line of pedestal
Nmax = bolt reaction due to normal load = N / n - Mx * X'/X2 (governing condition is tension)
Vmax = bolt reaction due to shear load = (Hx2 + Hz2)0.5 / n
n = number of anchor bolts = 16 nos
Anchor Bolt capacity for 3/4":
(Table-1, Type-A STD DWG No. KB-055072-002)
Vserv =
16 kN
Allowable shear load
Nserv =
31 kN
Allowable tensile load
Maximum bolt reaction

L/C
A11
A12
A13
A14
A21
A22
A23
A24
B11
B12
B13
B14
C11
C12
C13
C14
C15
C16
C17
C18
D11
D12
D13
D14
D15
D16
E11
E12
E13

N/n
(kN)
0.281
0.281
0.281
0.281
0.281
0.281
0.281
0.281
0.188
0.188
0.188
0.188
0.281
0.281
0.281
0.281
0.281
0.281
0.281
0.281
0.188
0.188
0.188
0.344
0.188
0.188
0.188
0.188
0.188

Normal load (tensile load)


Mz * Z'/Z2
Nmax
(kN)
(kN)
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.187
0.000
0.188
0.000
0.188
0.000
0.188
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.281
0.000
0.188
0.000
0.188
0.000
0.188
0.000
0.344
0.000
0.188
0.000
0.188
0.000
0.187
0.000
0.188
0.000
0.188

Shear load
Condition
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression

(Hx2+Hz2)0.5

(kN)
1.80
1.80
1.80
1.80
1.80
1.80
1.80
1.80
0.67
0.67
0.05
0.05
0.67
0.67
0.67
0.67
0.05
0.05
0.05
0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.37
0.37
0.03

Vmax
(kN)
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.04
0.04
0.00
0.00
0.04
0.04
0.04
0.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02
0.02
0.00

Ratio
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
0
E14
E21
E22
E23
E24
E31
E32
E33
E34
E41
E42
E43
E44
E51
E52
E53
E54
E61
E62
E63
E64
F12
F13
F14
G11
G12
G13
G14
G21
G22
G23
G24
G31
G32
G33
G34

Nu < 0.2 Nn

Therefore,

0.188
0.188
0.188
0.188
0.188
0.188
0.188
0.188
0.188
0.344
0.344
0.344
0.344
0.188
0.188
0.188
0.188
0.188
0.188
0.188
0.188
0.188
0.188
0.188
0.281
0.281
0.281
0.281
0.244
0.244
0.244
0.244
0.169
0.169
0.169
0.169

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.169 kN
0.169 kN

0.188
0.187
0.188
0.188
0.188
0.187
0.188
0.188
0.188
0.344
0.344
0.344
0.344
0.187
0.188
0.188
0.188
0.187
0.188
0.188
0.188
0.187
0.188
0.188
0.281
0.281
0.281
0.281
0.244
0.244
0.244
0.244
0.169
0.169
0.169
0.169
0.169
<
<

Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
Compression
0.2 x 31 kN
6.20 kN

full shear strength shall be permitted: Vn > Vu

Note:
Allowable loads are loads Nserv and Vserv with a safety factor in which:
Nserv = Nn/1.4 and Vserv = Vn/1.4
Where:

= 0.75 for tension steel strength and = 0.65 for shear steel strength
= 0.70 for concrete strength

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001
0.03
0.37
0.37
0.03
0.03
0.37
0.37
0.03
0.03
0.37
0.37
0.03
0.03
0.37
0.37
0.03
0.03
0.37
0.37
0.03
0.03
0.37
0.03
0.03
0.53
0.53
0.53
0.53
0.53
0.53
0.53
0.53
0.36
0.36
0.36
0.36

0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.02
0.00
0.00
0.02
0.00
0.00
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.02
0.02
0.02
0.02
Max

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01

Construction of Water Treatment Facilities - Phase 3


Contractor Job Code:
CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake PCompany Doc. No. : *************
0
Contractor Doc. No. : C-000-1326-001
Pedestal Design
Dimension of pedestal
Part1a

Beq

Part1b

Part-2a

L1a

Part-2b

L2a

L1b

L2b

Part1a

Part1b

Part-2a

L1b

L2a

B1
L1a

L1a=
L1b=
L2a=
L2b=
L=

1100
1000
2750
1400
11100

mm
mm
mm
mm
mm

B1 =

500 mm

B2 =

550 mm

Beq =

518.92 mm

Since the loads (Mu and Nu) acting on pedestal are small, the minimum reinforcement will be used
to determine the reinforcement bars. Mu and Nu refer to sheet no: 47
The pedestal will be divided into two parts as follow:
1. Part-1 is assumed as column since the anchor bolts to be installed in this part.

min = 0.010
max = 0.080
As min = fby * Ab/fy

As per 10. 9.1 in ACI 318M-08


As per 10. 9.1 in ACI 318M-08
(minimum reinforcement based on anchor bolts)

2. Part-2 is assumed as wall since there is only beam from equipment skid to be rested in this part.
min = 0.0018
max = 0.0021

As per 7.12.2. in ACI 318M-08


As per R-10.3.5 in ACI-318M-08

Calculation of width equivalent (Beq)


Beq = Aps total/L=
518.92 mm
Aps total = 2 (Aps1a + Aps1b) + 2 x Aps2a + Aps2b
Aps1a =
Aps1b =
Aps2a =
Aps2b =
Aps total =

L1a x B2 =
L1b x B2 =
L2a x B1 =
L2b x B1 =

605000
550000
1375000
700000
5760000

mm2
mm2
mm2
mm2
mm2

B2

Construction of Water Treatment Facilities - Phase 3


Contractor Job Code:
CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake PCompany Doc. No. : *************
0
Contractor Doc. No. : C-000-1326-001
Pedestal reinforcement
Part-1
Part-1a
As min = min x Aps1a
= 0.01 x 605000
=
6050 mm2
Used dia
D16
Nos
32
As prov = 6433.9818 mm2 > As min OK
Check of minimun reinforcement based on anchor bolts
As min = fby * Ab/fy
= 250 * 1140.09 / 422 =
675.41 mm2
As prov = 6433.9818 mm2 > As min OK
Anchor bolts
size
3/4
inch
Nos
4
Ab =
1140.09 mm2

fby =
fy =

250
422

Mpa
Mpa

As prov = 32 - D16
x - dir
13
nos
min rebar clear spacing x-dir =

76 mm

> 1.5 Db = 24 mm OK
> 40 mm OK
< 150 mm OK

As per 7.6.3 in ACI 318M-08


As per 7.6.3 in ACI 318M-08
As per 7.10.5.3 in ACI 318M-08

y - dir
5
nos
min rebar clear spacing y-dir =

90 mm

> 1.5 Db = 24 mm OK
> 40 mm OK
< 150 mm OK

As per 7.6.3 in ACI 318M-08


As per 7.6.3 in ACI 318M-08
As per 7.10.5.3 in ACI 318M-08

Hoop Bar design


Max. Hoop spacing :
smallest sect.dimension =
16*dia.smallest vert. bar =
48*dia.stirrup bar =
d/2 =

550
256
480
229
600
229

S (max.) required =
11

nos - D

10

mm
mm
mm
mm
mm
mm
@

ACI 318M-08 7.10.5.2


ACI 318M-08 7.10.5.2
ACI 318M-08 11.4.5.1
ACI 318M-08 11.4.5.1

36 mm < 229 mm

OK

Construction of Water Treatment Facilities - Phase 3


Contractor Job Code:
CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake PCompany Doc. No. : *************
0
Contractor Doc. No. : C-000-1326-001
Part-1b
As min = min x Aps1b
= 0.01 x 550000
=
5500 mm2
Used dia
D16
Nos
28
As prov = 5629.734 mm2 > As min OK
Check of minimun reinforcement based on anchor bolts
As min = fby * Ab/fy
= 250 * 1140.09 / 422 =
675.41 mm2
As prov = 5629.734 mm2 > As min OK
Anchor bolts
size
3/4
inch
Nos
4
Ab =
1140.09 mm2

fby =
fy =

250
422

Mpa
Mpa

As prov = 28 - D16
x - dir
11
nos
min rebar clear spacing x-dir =

81 mm

> 1.5 Db = 24 mm OK
> 40 mm OK
< 150 mm OK

As per 7.6.3 in ACI 318M-08


As per 7.6.3 in ACI 318M-08
As per 7.10.5.3 in ACI 318M-08

y - dir
5
nos
min rebar clear spacing y-dir =

90 mm

> 1.5 Db = 24 mm OK
> 40 mm OK
< 150 mm OK

As per 7.6.3 in ACI 318M-08


As per 7.6.3 in ACI 318M-08
As per 7.10.5.3 in ACI 318M-08

Hoop Bar design


Max. Hoop spacing :
smallest sect.dimension =
16*dia.smallest vert. bar =
48*dia.stirrup bar =
d/2 =

550
256
480
229
600
229

S (max.) required =
11

nos - D

10

mm
mm
mm
mm
mm
mm
@

ACI 318M-08 7.10.5.2


ACI 318M-08 7.10.5.2
ACI 318M-08 11.4.5.1
ACI 318M-08 11.4.5.1

36 mm < 229 mm

OK

Construction of Water Treatment Facilities - Phase 3


Contractor Job Code:
CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake PCompany Doc. No. : *************
0
Contractor Doc. No. : C-000-1326-001
Part-2
Part-2a
As min = min x Aps2a
= 0.0018 x 1375000
=
2475 mm2
Used dia
Nos
As prov =

D12
24
2714

mm2 > As min OK

As prov = 24 - D12
x - dir
12
nos
min rebar clear spacing x-dir =

240 mm

< 250 mm OK

As per R10.6.4 in ACI 318M-08

Hoop Bar design


Max. Hoop spacing :
smallest sect.dimension =
16*dia.smallest vert. bar =
48*dia.stirrup bar =
d/2 =

500
192
480
204
600
192

S (max.) required =
11

nos - D

10

mm
mm
mm
mm
mm
mm

ACI 318M-08 7.10.5.2


ACI 318M-08 7.10.5.2
ACI 318M-08 11.4.5.1
ACI 318M-08 11.4.5.1

36 mm < 192 mm

OK

Part-2b
As min = min x Aps2b
= 0.0018 x 700000
=
1260 mm2
Used dia
Nos
As prov =

D12
14
1583

mm2 > As min OK

As prov = 14 - D12
x - dir
7
nos
min rebar clear spacing x-dir =

215 mm

< 250 mm OK

As per R10.6.4 in ACI 318M-08

Hoop Bar design


Max. Hoop spacing :
smallest sect.dimension =
16*dia.smallest vert. bar =
48*dia.stirrup bar =
d/2 =

500
192
480
204
600
192

S (max.) required =
11

nos - D

10

mm
mm
mm
mm
mm
mm
@

ACI 318M-08 7.10.5.2


ACI 318M-08 7.10.5.2
ACI 318M-08 11.4.5.1
ACI 318M-08 11.4.5.1
36 mm < 192 mm

OK

Construction of Water Treatment Facilities - Phase 3


CALCULATION SHEET FOR PIPE SLEEPERS (Sea Water Intake Pump Station)
0

B or px =
H or pz =
d'=
Lu =

650
650
93
700

fc'=
fy =

MAIN BAR 62 - D16


HOOP

=
=
=
=
=
=
=

(
(

2.04 kips )
7.17 fkips )

1.000
0.003
0.005
0.71
0.0015
0.080
0.0042

Asx = xBH =
USE

rx =
rz =

7.39
7.39

Klu/rx =
Klu/rz =

7.46
7.46

<
<

(
(
(
(

25.59
25.59
3.66
27.56

in )
in )
in )
in )

(
(

3045 psi )
60894 psi )

(
(

2.04 kips )
12.45 fkips )

22
22

(As=

CHECK FOR SHEAR :


Nu =
9.09 KN
Vu =
2.52 KN
=
0.75

1206 mm2)

USE

(
(

2.04 kips )
0.57 kips )

vu = Vu x 1000 / ( b x d ) = 1.01 psi (0.007 N/mm2 )


vc = 2 x fc' x = 82.77 psi (0.571 N/mm2 )
vu < 1/2 x vc

200

Z-direction :
Nu =
9.09 KN
Muz=
16.88 KNm

(As=

=
=
=
=
=
=
=

Asz = zBH =

1775 mm2

- D 16

4 D10

21 N/mm2
420 N/mm2

Nu/(B*H)
Mu/(B*H^2)

(min)
(max)
z

NG

USE

mm
mm
mm
mm

: 4 - D10 @200

X-direction :
Nu =
9.09 KN
Mux=
9.73 KNm

Nu/(H*B)
Mu/(H*B^2)

(min)
(max)
x

Contractor Job Code:


Company Doc. No. : *************
Contractor Doc. No. : C-000-1326-001

1.5708

mm2/mm)

60

- D 16

1.000
0.003
0.009
0.71
0.0015
0.080
0.0005
211 mm2
(As=

12064 mm2)

H-000-1360-007
SL
SL001

L/C
1
6
9
11
15
20
21
25
26
27
28
29
30
32
33
34
35

Fx

Fy

Fz

0.00
0.00
0.00
0.00
-0.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.51
0.00
-0.76
0.00

0.00
3.00
1.50
2.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
-0.05
0.00
0.00
0.00
0.00
0.00
-1.80
0.00
-0.51
0.00
-0.76

Mx

My

Mz
1

0.00 ### 0.00


0.00 ### 0.00
0.00 ### 0.00
0.00 ### 0.00
0.00 ### 0.59
-8.05 ### 0.00
0.00 ### 0.00
0.00 ### 0.00
0.00 ### 0.00
0.00 ### 0.00
0.00 ### 0.00
-10.80 ### 0.00
0.00 ### 6.17
-6.17 ### 0.00
0.00 ### 9.20
-9.20 ### 0.00

6 (DS6) Cable Tray


9 (DEP) Piping Empty
11 (DOP) Piping Operating
15 (DTP1)Piping Test
20 (Wx) Wind at X-dir
21 (Wz) Wind at Z-dir
25 (AFX) Anchor Force at X-dir
26 (AFZ) Anchor Force at Z-dir
27 (FF5X) Friction Force at X-dir
28 (FF5Z) Friction Force at Z-dir
29 (Ffx40 Thermal Friction Force +X (One Heaviest
30 (Ffz40)Thermal Friction Force +Z (One Heaviest
32(Eex) Earthquake (Empty) +X
33(Eez) Earthquake (Empty) +Z
34(Eox) Earthquake (Operation) +X
35(Eoz) Earthquake (Operation) +Z

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Serial #
SL001
SL002
SL003
SL004
SL005
SL006
SL007
SL008
SL009
SL010
SL011
SL012
SL013
SL014
SL015
SL016
SL017
SL018
SL019
SL020
SL021
SL022
SL023

Rev.A D
Pipe Weight
Ft
Fluid Weight during Test
Fo
Fluid Weight during Operation
FGL TOE Emb. Plate
Lateral
Longitudinal
Side InsertSpan
Plate
Largest Pipe Height
dia
El.SAD El.
L
W
D
Ft
Fo
Tx
Tz
LW S
ID
m
m
mm
kN
mm
### ### 500 500 3.00 2.50 1.50
###
200
### ### 500 500 ### ### ###
###
600
### ### 500 500 6.00 5.00 6.00
###
300
### ### 500 500 4.00 3.00 3.00
###
250
### ### 400 200 4.00 3.00 3.00
###
250
### ### 500 200 6.00 5.00 6.00
###
250
### ### 350 150 2.00 2.00 2.00
###
150
### ### 500 500 6.00 5.00 6.00
###
300
### ### 300 300 9.00 8.00 6.00
###
400
### ### 300 300 9.00 8.00 6.00
###
400
### ### 300 300 ### ### 9.00
###
500
### ### 300 300 ### ### 9.00
###
500
### ### 600 200 6.00 5.00 4.00
###
300
### ### 500 500 ### ### ###
###
1050
### ### 500 500 ### ### ###
###
1050
### ### 1400 200 ### ### ###
###
1050
### ### 500 500 9.00 5.00 7.00
###
300
### ### 500 500 6.00 5.00 4.00
###
300
### ### 500 500 9.00 8.00 6.00
###
400
### ### 500 500 3.00 4.00 3.00
###
250
### ### 500 500 9.00 8.00 6.00
###
400
### ### 500 500 3.00 4.00 3.00
###
250
### ### 500 500 ### ### 9.00
###
500

Pipe 1
of Stanchion
h1
Fdn. No.
6000
1
4000
2
4500
3
5000
4
0
5
0
6
0
7
6000
8
500
9
500
10
500
11
500
12
0
13
1500
14
3500
15
0
16
2500
17
2500
18
3000
19
3000
20
3000
21
2500
22
2500
23

SL001
SL002
SL003
SL004
SL005
SL006
SL007
SL008
SL009
SL010
SL011
SL012
SL013
SL014
SL015
SL016
SL017
SL018
SL019
SL020
SL021
SL022
SL023
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Pipe 2

Ft

Fo

3
22
6
4
4
6
2
6
9
9
13
13
6
50
50
50
3
6
9
3
9
3
14

2.5
23
5
3
3
5
2
5
8
8
13
13
5
150
150
150
4
5
8
4
8
4
14

1.5
24
6
3
3
6
2
6
6
6
9
9
4
150
150
150
3
4
6
3
6
3
9

Ft

Pipe 2
Fo

D
kN

Ft

Friction
Fo

FF5Z

Ffz40

0.225
2.300
0.600
0.350
0.350
0.600
0.200
0.600
0.750
0.750
1.100
1.100
0.500
10.000
10.000
10.000
0.800
0.500
0.750
0.300
0.750
0.300
1.150

1.800
18.400
4.800
2.800
2.800
4.800
1.600
4.800
6.000
6.000
8.800
8.800
4.000
80.000
80.000
80.000
5.200
4.000
6.000
2.400
6.000
2.400
9.200

Staad Support Reaction


Fdn No
SL001

L/C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

FX

FY

FZ

MX

MY

MZ

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.51
0.00
-0.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
1.50
0.00
0.00
0.00
2.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-1.80
0.00
0.00
-0.51
0.00
-0.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-8.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-10.80
0.00
0.00
-6.17
0.00
-9.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.17
0.00
9.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

From SAES-A-112 Jizan


Temp
Lowest one-day mean temperature
Highest one-day mean temperature

21
36

Wind
Basic wind speed, 3-sec gust km/hr
Basic wind speed, fastest mile (km/hr) 50 yr
Exposure Category
Prevailing wind

165
125
C
SW

Kzt
Kd
I
zg

1
0.85
1.15
900
274.32
9.5
0.85

G
for z <15 ft (4.6m)

Kz=2.01(15/zg) 2/

for 15 ft (4.6m) < z < zg

Kz=2.01(z/zg) 2/

Earth quake data


Short periode acceleration, Ss (in %g)
1-sec Periode Acc (S1) in %g
Peak ground acc
Site class

z(m)
20
19
18
17
16
15
14
13
12
11
10
9.5
9
8.5
8
7.5
7
6.5
6
5.5
5
4.6

Kz
1.158
1.146
1.133
1.119
1.105
1.090
1.074
1.058
1.040
1.021
1.001
0.990
0.979
0.967
0.955
0.942
0.929
0.914
0.899
0.883
0.865
0.850

qz(kN/m2)
1.458
1.442
1.426
1.409
1.391
1.372
1.352
1.331
1.309
1.285
1.260
1.246
1.232
1.218
1.202
1.186
1.169
1.151
1.131
1.111
1.089
1.070

45.83

Topo factor, SABP-M--006 Sec 3.6


Wind direcionary factor, SABP-M-006 Sec 3.6
All piperack & open frame sructure,SABP-M-006 Sec 3.6
ft
m
ASCE 7-02, Table 6.2
SABP-M-006, Sec 3.7
for Tank G = 0.95 (round type)

43.5
12.4
10
D

G
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85

m/s

Gqz(kN/m2)
1.239
1.226
1.212
1.198
1.182
1.166
1.150
1.132
1.113
1.093
1.071
1.059
1.047
1.035
1.022
1.008
0.993
0.978
0.962
0.944
0.926
0.909

Wind Load - Pipes


Item No.

SL001

Largest Pipe Dia

ID

0.20

Height from FGL to Top of Pipe

h1

12.200

Height of Largest Pipe Center line above pedestal

HCL

12.100

0.28

Sleeper Span

3.00

Projected Area - X

L
Ax= d2/4

Projected Area - Z

Az=d*L

0.84

Force Coefficient

Cf

0.70

Longitudinal Force - X

Fx1=Cf*G*qz*Az

0.67

Transverse Force - Z

Fz1=Cf*G*qz*Ax

0.05

Longitudinal Moment on Sleeper Top - XX

Mx1=Fx*HCL

8.05

Transverse Moment on Sleeper Top - ZZ

Mz1=Fz*HCL

0.59

0.06

m
m
m
m
m
m2
m2
Pipe
kN
kN
kN-m
kN-m

Increased Dia of Pipe

Seismic Load Calculation


Occupancy Category
Importance Factor
Soil site class

=
=
=

I
1.00
D

(Ref ASCE 7-10, Table 1.5.1 and 1.5.2)


(only for temporary facilities 4 years lifetime)
(Ref SAES-A-112, Table-2 note.4 or Soil report if available)

Spectral Acceln. (short period)

SS

0.435

(Ref SAES-A-112, Table-2)

Spectral Acceln. (1 second)


Structure Height

S1
hn

=
=

0.124
1.415

Fa
Fv

=
=

1.452
2.304

(Ref ASCE 7-10, Table 11.4-1)


(Ref ASCE 7-10, Table 11.4-2)

SMS

=
=

Fa * SS

(Ref ASCE 7-10, Eqn 11.4-1)

0.632
Fv * S1

(Ref ASCE 7-10, Eqn 11.4-2)

(Ref SAES-A-112, Table-2)


m

Site Coefficients

Maximum Spectral Response Accelerations:

SM1

Design Spectral Response Accelerations for Short and 1-Second Periods :


SDS
SD1 = the design spectral response acceleration
parameter at a period of 1.0 s, as determined
from Section 11.4.4 or 11.4.7

SD1

=
=

=
=
=
=

0.286

2/3 * SMS
0.421
2/3 * SM1

(Ref ASCE 7-10, Eqn 11.4-3)


(Ref ASCE 7-10, Eqn 11.4-3)

0.190

Seismic Design Category:


Category(for SDS)

(Ref ASCE 7-10 Table 11.6-1)

Category(for SD1)

=
=

C
C

(Ref ASCE 7-10 Table 11.6-2)


Most critical of either category case above controls

Use Category
Fundamental Period:
Period Coefficient

Ct

0.049

( Ref ASCE 7-10 Table 12.8-2)

Period Exponent

0.750
Ct * (hn)X
0.063

(Ref ASCE 7-10 Table 12.8-2)

Approx. Period

x
Ta

Upper Limit Coef.

Cu

Period maximum

T(max)

Tmodel
T

=
=

0.063

2.50

Cs

=
=

SDS /(R/I)

Fundamental Period
Period from model
Choose Period
Seismic Design Factors and Coefficients:
Response Modifier

Cs(max)
Cs(min)
Cs
Item No.
Total Seismic Operation Dead Load
Total Seismic Operation Dead Load
Seismic Base Shear
Empty Case
Operation Case
Largest Pipe Dia
Height of Pipe Center line
Moment - Empty Case
Moment - Operation Case

We
Wo
V = CsW
Ve
Vo
ID
HCL
Me
Mo

1.50
Cu * Ta
0.095
0.063

(Ref ASCE 7-10 Eqn. 12.8-7)


sec
(Ref ASCE 7-10 Table 12.8-1)
sec

(T = Ta <= Cu*Ta, ASCE 7-10 Section 12.8.2)

sec
sec

From STAAD

(Ref ASCE 7-10 Table 12.2.1 or 13.6.1 or 15.4.2)


for nonstructural i.e. Tank, Pump
(Ref ASCE 7-10 Eqn. 12.8-2)

0.168
= SD1/{(R/I)*T}
=
1.203
= 0.044*SDS*I 0.03
0.030
=

0.168

=
=

SL001
3.00
4.50

=
=
=
=
=
=

0.168
0.51
0.76
0.20
12.100
6.17
9.20

(Ref ASCE 7-10 Section 12.8.2)

sec

(Ref ASCE 7-10 Eqn. 12.8-3)


(Ref ASCE 7-10 Eqn. 15.4-1 (Suppl. 2))
CS(min) <= CS <= CS(max)

kN
kN
W
kN
kN
m
m
kN-m
kN-m

(Ref ASCE 7-10 Eqn. 12.8-1)

Empty
Operation

Quantity
Job Name
Job No.

Page 57 of 61

Construction of Water Treatment Facilities - Phase 3


G-K068-00-0000

rev. no
Date :

02
31-Jul-10

FOUNDATION
Dimension

Foundation Type

No

ID

SL001

CSF
EQF
MBF
MSF
PUF
SLF
SSF

Type

: Elevated Concrete Structure Foundation


: Equipment Foundation
: Miscellanies Foundation with Embedded plate
: Miscellanies Foundation
: Pump & Compressor Foundation
: Pipe Sleeper Foundation
: Steel Structure Foundation

FWBS

SSF

2300

ReBar
Unit
(ton/m3)
0.100

Embedded
Unit
(kg/m)
0.0

Type

M16
(nos)

M20
(nos)

M24
(nos)

Shape

Nos

1.000

1.000

Pedestal
px(short)
(m)
0.650

Footing
pz(long)
(m)
0.650

Projection
PJ(m)
0.000

Shape
1.000

fx
(m)
1.800

Anchor Bolt

Height :

4m
6m
up to 6 m

4
8
12

Backfill
(m3)
2.0

Disposal
(m3)
1.3

Grout
(m2)
0.4

L.Conc.
(m3)
0.2

fz
(m)
1.800

Soil
Cover
Scv(m)
0.700

Number

fh
(m)
0.300

ReBar
(ton)
0.1

Coating
(m2)
6.8

Embedded
(kg)
0.0

(nos)
1

Anchor Bolt
No
1

ID
SL001

M30
(nos)

12

SSF

nos/nos
nos/nos
nos/nos

12

Volume
No
1

ID
SL001

FWBS
2300

M16
0

A.Bolt (Equip.)
M20
M24
0
0

M30
12

Concrete
(m3)
1.3

Excavation
(m3)
3.2

263644228.xls

Formwork
(m2)
4.0

Quantity

Page 58 of 61

Summary
FWBS :

2100

Total
FWBS :

Total
Total

M30
0

Concrete
(m3)
0.0

Excavation
(m3)
0.0

Backfill
(m3)
0.0

Disposal
(m3)
0.0

Grout
(m2)
0.0

L.Conc.
(m3)
0.0

Forming
(m2)
0.0

ReBar
(ton)
0.0

Coating
(m2)
0.0

Embedded
(kg)
0.0

M24
0

M30
12

Concrete
(m3)
1.3

Excavation
(m3)
3.2

Backfill
(m3)
2.0

Disposal
(m3)
1.3

Grout
(m2)
0.4

L.Conc.
(m3)
0.2

Forming
(m2)
4.0

ReBar
(ton)
0.1

Coating
(m2)
6.8

Embedded
(kg)
0.0

M24
0

M30
0

Concrete
(m3)
0.0

Excavation
(m3)
0.0

Backfill
(m3)
0.0

Disposal
(m3)
0.0

Grout
(m2)
0.0

L.Conc.
(m3)
0.0

Forming
(m2)
0.0

ReBar
(ton)
0.0

Coating
(m2)
0.0

Embedded
(kg)
0.0

M20
0

M24
0

M30
0

Concrete
(m3)
0.0

Excavation
(m3)
0.0

Backfill
(m3)
0.0

Disposal
(m3)
0.0

Grout
(m2)
0.0

L.Conc.
(m3)
0.0

Forming
(m2)
0.0

ReBar
(ton)
0.0

Coating
(m2)
0.0

Embedded
(kg)
0.0

12

1.3

3.2

2.0

1.3

0.4

0.2

4.0

0.1

6.8

0.0

M16
0

M20
0

M16
0

M20
0

M16
0
0

A.Bolt

2600

Total
FWBS :

M24
0

M20
0

2300

Total
FWBS :

A.Bolt
M16
0

A.Bolt

2800

A.Bolt

263644228.xls

Sleeper No.

Type

SBC

Stress Ratio

A
Fx

B
Px

E
Fz

SL001

Type-II

100

0.354

1800

650

575

1800

F
Pz

L
TOE

M
BOC

N
Fh

R
Tf

650

575

10

9.000

1000

700

300

Pedestal Type

Pedestal Rebar Hoops

16-D16

Footing Rebar
Top & Bottom-X Top & Bottom-Z
2-D10
10-D12
10-D12

Emb. Pl
(DxJxTHK.)
500x500x15

Anda mungkin juga menyukai