Installation Manual
Click here to place subtitle
LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATIN you agree to the following
terms. If you do not agree to the following terms, please notice that you are not allowed
to use this document.
Copyright 2009 ZTE CORPORATION. Any rights not expressly granted herein are
reserved. This document contains proprietary information of ZTE CORPORATION. Any
reproduction, transfer, distribution, use or disclosure of this document or any portion of
this document, in any form by any means, without the prior written consent of ZTE
CORPORATION is prohibited.
and
are registered trademarks of ZTE CORPORATION. ZTEs company
name, logo and product names referenced herein are either trademarks or registered
trademarks of ZTE CORPORATION. Other product and company names mentioned
herein may be trademarks or trade names of their respective owners. Without the prior
written consent of ZTE CORPORATION or the third party owner thereof, anyones access
to this document should not be construed as granting, by implication, estopped or
otherwise, any license or right to use any marks appearing in the document.
The design of this product complies with requirements of environmental protection and
personal security. This product shall be stored, used or discarded in accordance with
product manual, relevant contract or laws and regulations in relevant country
(countries).
This document is provided as is and as available. Information contained in this
document is subject to continuous update without further notice due to improvement
and update of ZTE CORPORATIONs products and technologies.
ZTE CORPORATION
Addres
s:
Websit
e:
Email:
NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057
http://dms.zte.com.cn Technical Support
TSM.Aftersales@zte.com.cn
Revision History
Product Version
Document Version
Serial Number
R1.0
Author
Date
2010-12-7
Document Version
Prepared
by
Reviewed by
Zhou
Ronghua
Zhang
Xianghong,Zhang
Jun,Xia
Mingbo,Tao
Feng,Liang
Chun,Wang Qing
R1.0
Approved by
Wang Tiancheng
II
Reference material
1
2
3
Follow-up document: After read this document, you may need the following information
SEQ
Reference material
Information
III
Description
1 Safety Instruction
IV
TABLE OF CONTENTS
1
1.1
1.2
1.3
Safety Instruction.............................................................................................1
Safety Instruction...............................................................................................1
Shelter Transport Safety Statements.................................................................1
Sign Statements.................................................................................................1
2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.2
2.3
2.4
2.4.1
2.4.2
3
3.1
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
3.2.8
3.2.9
3.2.10
3.3
3.3.1
3.3.2
FIGURES
Figure 2-1 Unpacking Chart....................................................................................................4
Figure 3-1 Supervisor Unit Installation....................................................................................6
Figure 3-2 Door Sensor Installation........................................................................................6
Figure 3-3 Smog Sensor Installation.......................................................................................7
Figure 3-4 Heat Exchanger Installation...................................................................................8
Figure 3-5 TEC Air-condition Installation.................................................................................9
Figure 3-6 Shelter Body Grounding......................................................................................10
TABLES
Table 1-1 Safety Symbol and Meaning...................................................................................1
VI
1 Safety Instruction
1.1 Safety Instruction
There are high temperature and high pressure in the equipment. The expert who has
trained well has ability in installation, operation and maintenance.
Must abide by local safe criterion and related operate criterion in equipment installation
operation and maintenance, or may cause body injured and equipment damage. The
safety attention item mentioned in this manual is the supplement of local safe criterion.
ZTE do not take on any duties that are caused by going against safe operation, design,
manufacture and the safe standard of equipment use.
Note:
If the shelter will be installed on rooftop, when carry the shelter, forbidden non installation
engineers to access to 10 meters around the site. Set safety sign on the site at the same time.
Meaning
Note safety statement
The safety attention is divided into four ranks: dangerous, warning, beware and note.
The letter prompt of the safety attention locates in the right side of the safety symbol, the
detailed content of the safety content is under the symbol.
Check whether the packaging wooden box is damaged, and make the relevant
record.
2.
3.
Check whether the quantity of the goods is correct in the wooden box according to
the packaging list in the box.
4.
Check whether the goods in the box are damaged. The damaged material can be
replaced with the material in the spare goods at first, and then propose the
changing request in time.
5.
6.
ZTE personnel and user personnel should countersign the "unpacking acceptance
report" together, and return this record to the marketing department and affiliated
office in time.
2.
When the shelter is located on the foundation, mark the fixing hole position on the
foundation by label pen or other tools according the hole on the base steel frame;
3.
Move away the shelter, drill the holes which are 16 mm and 75mm depth on the
foundation according the marks;
4.
Clean the holes, move the foundation to the position, make sure the holes on the
base steel frame are according to the holes on concrete foundation;
5.
Note:
1. When install the expansion bolts, use the wooden board to knock the bolts;
2. If there are some steel plates in the goods, when the shelter is located, no need to move
away the shelter, use steel plates to fix the base steel frame.
6.
Install the washer spring washer and nut on the bolt, and tighten the nut.
Note:
1. Supervisor unit is a equipment which collects the alarm signals from each monitor
equipments and transmit the signal to center or other control equipment;
2. Check the Connection Disposal Diagram of Environment Supervisor System to confirm
the connection about the supervisor unit and sensors.
Note:
1. The temperature control switch must be put in battery cabinet.
2. The film heating panel can not be pasted on the wall.
Note:
The wire must be disposed along the door and fix to clip, make sure the wire is in good
situation when open the door.
Connect shelter body with indoor grounding copper bar by 16mm 2 grounding
wire,as shown in Figure 3 -7.
2.
Connect bracket bottom grounding point with indoor grounding copper bar by
16mm2 grounding wire.
3.
Connect indoor grounding bar to earth mat by 16mm 2 grounding wire through the
hole on the floor.
4.
Connect steel base frame to earth mat by 35 mm 2 grounding wire, fix the connector
of wire with steel base frame by M8 nut.
10