Primavera Pertmaster
Fredric L. Plotnick, Ph.D., Esq., P.E.
Engineering & Property Management Consultants, Inc.
www.fplotnick.com fplotnick@fplotnick.com 215-885-3733
Evolution of CPM
Evolution of CPM
0
5
19 0s
6 s
9
1
0
7 s
9
1
0
8 s
9
1
0
9 s
9
1
0
0
0
2
Notice to
Proceed
0
Foundation
Excavation
5
Resources
North FDN
Form
6
East FDN
Form
6
South FDN
Form
6
West FDN
Form
6
North FDN
Rebar
2
East FDN
Rebar
2
South FDN
Rebar
2
West FDN
Rebar
2
North FDN
Pour
1
East FDN
Pour
1
South FDN
Pour
1
FS 2
FS 2
North FDN
Strip
1
West FDN
Pour
1
FS 2
East FDN
Strip
1
South FDN
Strip
1
FS 2
West FDN
Strip
1
Foundation
Backfill
2
Foundation
Excavation
North FDN
Form
6
North FDN
Rebar
North FDN
Pour
North FDN
Cure
North FDN
Strip
2
East FDN
Form
1
East FDN
Rebar
2
East FDN
Pour
1
East FDN
Cure
2
South FDN
Form
6
Notice to
Proceed
0
Foundation
Excavation
5
North FDN
Form
6
East FDN
Strip
1
South FDN
Rebar
South FDN
Pour
South FDN
Cure
South FDN
Strip
West FDN
Form
West FDN
Rebar
West FDN
Pour
West FDN
Cure
West FDN
Strip
Foundation
Backfill
North FDN
Strip
1
North FDN
Rebar
2
North FDN
Pour
1
East FDN
Form
6
East FDN
Rebar
2
East FDN
Pour
1
South FDN
Form
6
South FDN
Rebar
2
South FDN
Pour
1
West FDN
Form
6
West FDN
Rebar
2
FS 2
FS 2
East FDN
Strip
1
FS 2
South FDN
Strip
1
West FDN
Pour
1
FS 2
West FDN
Strip
1
Foundation
Backfill
2
Foundation
Excavation
North FDN
Form
6
North FDN
Rebar
North FDN
Pour
North FDN
Cure
North FDN
Strip
2
East FDN
Form
1
East FDN
Rebar
2
East FDN
Pour
1
East FDN
Cure
2
South FDN
Form
6
Notice to
Proceed
0
Foundation
Excavation
5
North FDN
Form
6
East FDN
Strip
1
South FDN
Rebar
South FDN
Pour
South FDN
Cure
South FDN
Strip
West FDN
Form
West FDN
Rebar
West FDN
Pour
West FDN
Cure
West FDN
Strip
Foundation
Backfill
North FDN
Strip
1
North FDN
Rebar
2
North FDN
Pour
1
East FDN
Form
6
East FDN
Rebar
2
East FDN
Pour
1
South FDN
Form
6
South FDN
Rebar
2
South FDN
Pour
1
West FDN
Form
6
West FDN
Rebar
2
FS 2
FS 2
East FDN
Strip
1
FS 2
South FDN
Strip
1
West FDN
Pour
1
FS 2
West FDN
Strip
1
Foundation
Backfill
2
Proposed Solution
RDM
Relationship Diagramming Method
Reason/Why Codes
Record the reason why the restraint exists
physical how important description
resource crew/craft/equipment/forms/materials/etc.
st
Excav 1000 P 1 / last 50 feet
feet - 10 days SS 2 & FF 2
P Required
Pave 1000
feet - 10 days R
Mo
ve M
ach
i ne
Type of restraint P=physical, R=resource and reason for restraint and duration between activities
Check for:
physical open ends
duplicative resource logic
What if:
add crews/equip/forms?
add falsework/relax code?
Open Section
of Highway
Pave Next
Location
Reason/Why Codes
Special reason why codes
physical just-in-time or subordinate support
calculate latest dates to not delay early start of successor to restraint
Survey
Pour Fdn
J = Just-in-Time
Procure
Submit
Approve
Fabricate
Deliver
Legend Top Line (Green) is Early Dates, Middle Line (Yellow) is Junior Dates, Bottom Line (Purple) is Late Dates
Legend Top Line (Green) is Early Dates, Middle Line (Yellow) is Junior Dates, Bottom Line (Purple) is Late Dates
Relationship Codes
Restraint v Relationship Codes
2440
Garage Install Roofing
2440i
10 1 C R
A12 S23
6 RF
FS 2 1
RF1
51CR
A15 S23
Physical
--
1450
Main Bldg Studs & Drywall
6 RF
1450i
FS 0 1
--
10 1 I M
S06 S07
Physical
Penetrations at 50%
1460
Main Bldg Roof HVAC
4 CP
1460i
PS 50%
41IM
S23 M14
4 SM
Notice to
Proceed
Foundation
Excavation
North FDN
Form
6
ADM
Notice to
Proceed
0
Foundation
Excavation
5
North FDN
Rebar
North FDN
Pour
North FDN
Cure
North FDN
Strip
2
East FDN
Form
1
East FDN
Rebar
2
East FDN
Pour
1
East FDN
Cure
2
South FDN
Form
1
South FDN
Rebar
North FDN
Form
6
Foundation
Excavation
3 5 10
South FDN
Strip
2
West FDN
Form
1
West FDN
Rebar
2
West FDN
Pour
1
West FDN
Cure
West FDN
Strip
Foundation
Backfill
North FDN
Strip
1
East FDN
Form
6
East FDN
Rebar
2
East FDN
Pour
1
South FDN
Form
6
South FDN
Rebar
2
South FDN
Pour
1
West FDN
Form
6
West FDN
Rebar
2
CP Crew
Physical
1
South FDN
Cure
North FDN
Pour
1
North FDN
Rebar
123
North FDN
Form
568
2
South FDN
Pour
North FDN
Rebar
2
PDM
Notice to
Proceed
000
East FDN
Strip
East FDN
Form
568
North FDN
Pour
112
Rod Crew
East FDN
Rebar
123
CP Crew
FS 2
North FDN
Cure
FS 2 2 2
FS 2
FS 2
South FDN
Strip
1
West FDN
Pour
1
North FDN
Strip
111
FS 2
West FDN
Strip
1
Foundation
Backfill
2
Physical
Labor Crew
Conc Crew
East FDN
Cure
FS 2 2 2
East FDN
Pour
112
Rod Crew
East FDN
Strip
1
East FDN
Strip
111
Physical
Labor Crew
Conc Crew
Forms #1
RDM
Physical
South FDN
Form
568
South FDN
Rebar
123
CP Crew
South FDN
Pour
112
Rod Crew
South FDN
Cure
FS 2 2 2
South FDN
Strip
111
Conc Crew
Labor Crew
Forms #2
Physical
West FDN
Form
568
West FDN
Rebar
123
West FDN
Pour
112
Physical
West FDN
Cure
FS 2 2 2
West FDN
Strip
111
Foundation
Backfill
123
Industry Adoption
Reason/Why Codes
Relationship Codes
Relationship Codes
A
10 - SiteG0 Notice to Proceed
B
1000 - SiteG0 Mobilize
C
fs
D
No
LINKTYPE
0
LINKTITLE
10[fs]
1000
G
H
I
J
K
ACT
10
SUC
1000
ACRTY
unknown craft unknown reason/why
SCRTY
ALOC1
S
SLOC1
S
ALOC2
G0
SLOC2
G0
A
B
C
D
LINKTYPE
LINKTITLE
G
H
I
J
K
ACT
SUC
ACRTY
SCRTY
ALOC1
SLOC1
ALOC2
SLOC2
EDIT
EDIT
A
B
C
D
LINKTYPE
LINKTITLE
G
H
I
J
K
ACT
SUC
ACRTY
SCRTY
ALOC1
SLOC1
ALOC2
SLOC2
EDIT
<C:>TRIAL07P
Rec: 1/1081
1115
1120
IW
CP
W
W
GS
CL
<C:>TRIAL07P
Rec: 7/1081
A
B
C
D
LINKTYPE
LINKTITLE
G
H
I
J
K
ACT
SUC
ACRTY
SCRTY
ALOC1
SLOC1
ALOC2
SLOC2
EDIT
1130
1300
CP
CP
W
W
10
09
<C:>TRIAL07P
Rec: 15/1081
1110
2110
CP
CP
W
E
GS
GS
<C:>TRIAL07P
Rec: 6/1081
59
As Early as Possible
As Late as Possible
w/o delay to Project
As Late as Possible
w/o delay to Production
Just
In
Time
LinkType
B 102
D 102
A 102
C 102
Project Duration 31
Scheduling
%
19
100
18
17
90
16
15
80
14
13
70
12
11
60
10
50
9
8
40
7
6
30
5
4
20
3
2
10
DAY
26
LATEST DATE
EXPECTED DATE
EARLIEST DATE
TARGET DATE
27
5 JUN 6
31 MAY 6
26 MAY 6
30 MAY 06
Plot Date
10FEB06
(c) Primavera Systems, Inc.
28
29
30
31
32
MC02MPRJ.MC
33
34
35
36
Sheet 1 of 1
Date
Revision
Checked
Approved
Better Specifications
Reason/Why Codes
Special reason why codes
resource leveling
Trend Durations
for ACTIVITIES
based upon any common resource
based upon any user defined activity code
Split Activities
Distinguish Passage v Progress
Activity A 10 days
3 days
Activity B 15 days
versus
Activity A 10 days
3 days
Activity B 15 days
SS2
PS2
Relationship Diagramming
Critical Path Method
CT Contiguous
Activity B
Relationship Diagramming
Critical Path Method
CC Concurrent
representing the two activities must be performed in lock-step
this is more than saying two activities joined with SS+FF or PS+FR
Relationship Diagramming
Critical Path Method
CC Concurrent
representing the two activities must be performed in lock-step
this is more than saying two activities joined with SS+FF or PS+FR
Examples include:
erecting a MSE wall and backfilling during placement
pouring a concrete slab with embedded electrical conduit
coordination of surgeon and anesthesiologist during an operation
in each instance possibly being performed by separate subcontractors
but under the daily control of only one individual
the proper logical means to depict the combination is
by only one activity, however the needs for separate
rollups by subcontractors and the general desire
for such a splitting of this ONE activity indicate a
need for this type of restraint code
Relationship Diagramming
Critical Path Method
the MSCS program of the 1960s and 1970s included a popular Z code = combination of SS+FF
indicates that the early (but not necessarily the late) start of the two activities would start together
or that the two activities (if having the same duration) would be staggered
note predecessor and successor activities should have the same duration and calendar
An error code should be generated for violations.
Similar to the DS restraint, except the successor activity will be calculated to start after the
remaining duration of the predecessor has been reduced by Lag units of time.
Similar to the DS restraint, except the successor activity will be calculated to finish after the
remaining duration of the predecessor has been reduced to Lag units of time.
Other Contributions
Q&A
fplotnick@fplotnick.com
215-885-3733
www.rdcpm.com