Anda di halaman 1dari 42

eNodeB Growth

Agenda: Day 3
Background Introduction of VLAN
Understanding ODD
eNodeB Growth
Software Loading from LSM
Parameter Configuration
Cell Management
Neighbor Management
SON Management

eNodeB Activation
System Check

VLAN
LSM

OM IP

VLAN
103

Signaling IP

VLAN
102

Bearer IP

VLAN
101

P
H
Y

MPLS
Backhaul
BH2

5x

eNodeB

SAE

MME

VLAN (Continued)
L2 Switch

L2 Switch

VLAN ID 1

UNASSIGNED PORT (VLAN ID 0)

VLAN ID 2

HYBRID PORT

VLAN ID 3

TRUNK PORT

eNB Growth Process

eNB Growth

eNB Growth & Commissioning

Non Plug & Play (Non PnP)

SOLPAR needs to commission the


eNB
OM IP and VLAN ID 103 and NE
ID Need to be commissioned
Boot Mode is set to STATIC

Plug & Play (PnP)

Factory commissioned. SOLPAR


needs to commission
Just need to Plug to Backhaul and
power up
Boot Mode is set to be DHCP

Samsung eNodeB Self-Establishment


2) Acquire configuration
from LSM

1) Acquire eNB & LSM


IP from DHCP server

DHCP

LSM

Backhaul
Network

MME

eNodeB

3) Configure VLANs for


a) S1-C b)S1-U & X2

SAE
GW

eNodeB

Samsung eNodeB Self-Establishment (Continued)

DHCP

LSM

4) Establish S1-MME

Backhaul
Network

MME

eNodeB

6) Establish X2

SAE
GW

eNodeB

eNB Growth - High-level Process


Understanding ODD

Software loading
from LSM

Parameter
Configuration

eNB activation
(Changing eNB
status to In-Service)

Steps in System Growth Process


Step 1

System Basic information

Step 2

External Links (Backhauls & UDEs)

Step 3

MME IP information

Step 4

Scheduler information

Step 5

MCE Info

Step 6

eNB Serial No.

Step 7

Cell Management

Steps in System Growth Process


Step 8

SON (Self Optimizing Networks) option

Step 9

Frequency Information

Step 10

Location Information

Step 11

Detailed Cell Information

Step 12

Finalizing Configurations

Step 1: System Basic Information


System basic information contains following data types (Refer ODD)

Group: Select particular group in Tree viewer


NE Type: Select "MACRO OUT0OOR 01ST"
NE Version: Select "2.0.0"
NE ID: NE 10 of eNB
Name: Site name of eNB
Serial No.: Serial number of UAMA
Smart Cell: Select "TYPE_E"
MCC: MCC value of eNB
MNC: MNC value of eNB
Cell ID: Cell ID MSB 4-bits value of 0 to F according to site type.
Latitude: GPS information
Longitude: GPS information type

Entering System Basic Information


To start growing the system, click Grow eNB on the AceMan LSM menu.

Then enter the information as per ODD

Click Next

Fields for System Basic Information


Following Data types need to be configured

IF Name:
ge_O_O_Port#
or
ge_O_O_Port#.
vLAN ID

IP version:
Select IPv6

IP Address:
IP address
according to
interface

IP Pfx Len:
Prefix value
of IP address

OAM: Select
ON if you
want to use
this interface
for OAM.

LTE_SIGNAL_S1:
Select ON if you
want to use this
interface for S1
signal.

LTE_BEARER:
Select ON if you
want to use this
interface for
Bearer traffic.

LTE_SIGNAL_X2: Select
ON if you want to use
this interface for X2
signal.

Click Next

LTE_BEARER_M1:
Select ON if you
want to use this
interface for
eMBMS M1.

Step 2: Configuring External Links


Select the external Port No. for Backhaul and UDE in the check box and click
N/W Data button

Click Next

Step 2: Configuring External Links (Continued)


ADD LSM route with CSS as gateway in route table shown below.

Click Next

Click the Apply button

Step 3: MME IP Information


In the MME IP information select as below.
IP Type: IPV6
IP Address: S1AP IP Address of MME (from ODD)

Click Next

Step 4: Scheduler Info


Enter the information of Smart Scheduler as below
- Scheduler Type: Select SCHEDULER
- Smart Type: Select CLUSTER
- NRT Scheduler ID: Smart Scheduler NE ID
- IP version: Select IPv6
- IP Address: Service (XE Interface) IP address of Smart Scheduler

Click Next

Step 5: MCE Info


Enter the M2 IP address information of MCE as below,
- IP version: Select IPv6
- IP Address: M2 IP address of MCE

Click Next

Step 6: eNB Serial Number


Enter correct value from field or check other eNB with same serial no's in
Serial No. of System Basic Information like below.

Enter eNB Serial No.

Step 7: Cell Management


Step 7a): Click box of Cell #0 and then click box of SubCell (dsp#0 /0) as below.

Remark: If you click the cell, this box color will be changed from white to pink.
And you can see "0" in Subcell box.
Step 7b): Click box of Cell #1 and then click box of SubCell (dsp#1 /2) as below.

Remark: If you click the cell, this box color will be changed from white to
pink. And you can see "1" in Subcell box.

Step 7: Cell Management (Continued)


Step 7: Click box of Cell #0 and then click box of SubCell (dsp#0/2/4)

Note: If you click the cell, this box color will be changed from white to pink.
And you can see "2" in SubCell box.

Step 8: SON Options


In SON options, We can configure 4 parameters as follows

Initial auto PCI Allocation


Initial Auto RACH Optimization
Initial NRT configuration
Initial SRS pool configuration

Step 8: SON Options - Initial Auto PCI Allocation


Select Initial auto PCI Allocation as shown below using SON Option menu

Selected Column in Detail Cell Information turns Gray (Disabled) from Yellow

Step 8: SON Options - Initial Auto RACH Optimization


Using RSI SON Option (Assign value of RSI automatically)

Selected Column in Detail Cell Information turns Gray (Disabled) from Yellow

Step 8: SON Options - Initial SRS Pool Configuration


Using SRS POOL Index SON Option (Assign index value of SRS pool
automatically)

Selected Column in Detail Cell Information turns Gray (Disabled) from Yellow

Step 9: Frequency Information

Check the value of FrqBandInd whether


value is 40 (correct value) or not.

Steps 10 & 11: Location & Detailed Cell Information

Input the GPS value (Latitude / Longitude / Height)


of each cell.
Input the detail value of each cell as below

Diversity: Select "4Tx4Rx"


Path: Select "A/B/C/D"
TAC: Tracking Area Code value
EAID: 0 (Emergency Area ID)
HSF: Select "OFF" (High Speed Flag)
ZCZC: 12 (Zero Correlation Zone Configuration)

Step 12: Finish Growth Operation

Finish Grow Options

eNB Growth - High-level Process


Understanding ODD

Software loading
from LSM

Parameter
configuration

eNB activation
(Changing eNB
status to In-Service)

Software Loading from LSM


After grow eNB on LSM client, eNB starts PKG loading from LSM server.
Once eNB finish PKG loading, eNB executes each processor.

Messages to
be noted

eNB Growth - High-level Process


Understanding ODD

Software loading
from LSM

Parameter
configuration

eNB activation
(Changing eNB
status to In-Service)

Set PCID of SON Function


1) Set the value of
"PCID_ENABLE" from
"sonFuncOff" to
"sonAutoApply"
2) "CHG-SONFN- ENB" on
[CLI] windows in LSM client
3) Execute the command

Check the value of


"PCID_ENABLE" which is
"sonAutoApply"

Set SRS of SON Function


2) Select 0&&2

1)Select CHG-SONFN-CELL

4) Execute
3) Select SonAutoApply

MCE Parameters: Set MBMS Info


Step 1

Step 2
Step 3

Step 4

MCE Parameters: Set ENBMCCH


Step 1

Step 2

Step 3

Check Environment Information


Check whether new 3 environment information are added with "RTRV-ENV-INF" on CLI
command in LSM client.
IPv6_ENABLE: 1
RS_IP: IP address of LSM
NE_ID: NE_ID of eNB

Check Environment Information (Continued)


Change Boot Mode (Not Required for non-PnP)
Change BOOTMODE parameter to static once site is up.

Execute after selecting static

eNB Growth - High-level Process


Understanding ODD

Software loading
from LSM

Parameter
configuration

eNB activation
(Changing eNB
status to In-Service)

Change eNB Status to In-Service


Step 1: System Activate
Step 1:
To unlock eNB, execute
"Unlocked" in
"Administrate State"
menu after click right
button of mouse on
eNB what you want to
change

Step 2: Cell Activate

Step2:
To activate cell, select [Cell
Management] menu on [Configuration]
and then select whole
Cells on the "Cell Management"
window, and then execute "Unlocked"
after click right

Change eNB Status to In-Service (Continued)


Step 3.1: Subcell Activate
Step 3.1:
To activate subcell,
select whole Subcells
on the "Cell
Management" window,
and then execute
"Unlocked" after click
right button of mouse.

Step 3.2: Subcell Activate


Step 3.2:
Check the "SERvICE OFF"
alarm is clear

Summary
eNB growth involves understanding ODD, loading the software from LSM-R,
configuring parameters and activation of eNB
Appropriate bearers need to be switched on for the OAM, S1, and bearer
Enter MME IP information for the MMEs defined
Enter Scheduler and MCE information
SON definitions include initial PCI, RACH and SRS automation

Anda mungkin juga menyukai