Contract C311333
C311333
Amal Heat Recovery Steam Generator (HRSG)-1 Project
C5A Schedule B: Schedule of Rates
Grand Summary
Ref.
No.
DESCRIPTION
Qty
Amount in RO
Item
Item
N/A
In Words:-
264403607.xls
Contract C311333
C311333
Amal Heat Recovery Steam Generator (HRSG)-1 Project
Sch B Summary
DESCRIPTION
Ref. No.
Qty
Amount in USD
1.0
Item
2.0
Item
3.0
Item
4.0
Item
5.0
Item 5: Spares
Item
6.0
Item
7.0
Item
264403607.xls
C311333
Ref. No.
DESCRIPTION
Qty
Amount in USD
Mobilization of Camp.
item
1.02
item
1.03
Demobilization of Camp.
item
1.04
item
(c) Fencing
(d) Mob/Demob of Electrical Power Supply
(e) Mob/Demob of Water Supply
(f) Mob/Demob of Sewage disposal
(g) Installation of Telephone Connection
Provision of Facilities -Maintenance cost
(h) Garbage collection and disposal
(i) Electrical Power Supply
(j) Water Supply
(k) Sewage disposal
(l) Telephone
Fabrication, Storage, Workshop
(Industrial Facilities)
item
item
item
item
item
1.05
item
1.06
item
1.07
item
1.08
1.09
264403607.xls
item
item
item
item
item
item
item
item
item
item
item
item
item
item
item
item
0
C311333
Ref. No.
DESCRIPTION
Qty
Amount in USD
0
item
item
1.13
item
1.14
item
1.15
item
1.16
item
1.17
item
1.18
item
1.19
item
264403607.xls
C311333
DESCRIPTION
Qty
Amount in
USD
Civil
Item
2.02
Mechanical systems
Item
2.03
Electrical systems
Item
2.04
SCADA system
Item
2.05
Item
2.06
Item
2.07
Item
2.08
Piping
Item
2.09
3D Model
Item
2.10
Design Review
Item
2.11
SAFOP
Item
2.12
HAZOP
Item
2.13
IPF Review
Item
2.14
Item
264403607.xls
Contract C311333
DESCRIPTION
Supply
Erection
Amount in Amount in
USD
USD
Total
Amount in
USD
Item
Item
Item
Item
Item
3.06 Gravel spread around the entire HRSG plant area Item
not covered by roads or paving
3.07 Reinforced Concrete foundation for H.P.Pumps,
Item
I.A and r Units and Auxiliaries complete.
3.08 Civil works associated with lighting around the
Item
HRSG plant area and security lighting around the
GT Complete
Item
Item
Item
Item
264403607.xls
0
0
Contract C311333
DESCRIPTION
Supply
Erection
Total
Amount in Amount in
USD
USD
Amount in
USD
Item
Item
3.15
Item
3.16 Any other Work not listed above (please specify): Item
Total for Item 3 carried forward to
Summary Page for Schedule B
264403607.xls
Contract C311333
Ref.
No.
DESCRIPTION
Supply in Erection
USD
in USD
Total in
USD
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Electrical
4.0300
4.0301
4.0302
4.0303
4.0304
0
0
0
0
0
0
0
Contract C311333
Ref. DESCRIPTION
No.
4.0311 SCADA system modifications, including
modifications/extensions required at Yibal
4.0312 Modifications and extensions to miscellaneous
items required to complete the works
4.0310 Earthing system
4.0311 Any other items not listed above (please specify):
4.0300 SUB TOTALS
Amount in USD carried fwd. to next page
264403607.xls
Supply in Erection
USD
in USD
Total in
USD
0
0
0
0
0
0
Contract C311333
Ref.
No.
DESCRIPTION
Supply in Erection
USD
in USD
4.0400
4.0401
4.0402
4.0403
4.0404
4.0405
4.0406
4.0407
4.0408
4.0409
4.0410
4.0411
264403607.xls
Total in
USD
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Contract C311333
Ref. DESCRIPTION
No.
4.0500 HRSG Station Instrumentation & Control:
Supply and Installation
4.0501 Fire & Gas and Smoke Detection Systems for
Balance of Plant
4.0502 CCTV Control System
4.0503 Software licenses
4.0504 HRSG station acess control and alarm system
4.0505 All control & instrumentation cables and cabling
for the interconnection between equipment as
required.
4.0506 Any other Item not listed above (please specify):
4.0500 SUB TOTALS
Total for Item 4 carried fwd to Summary
Page for Schedule B
264403607.xls
Supply in Erection
USD
in USD
0
0
Total in
USD
0
0
0
0
0
0
0
0
Contract C311333
DESCRIPTION
Qty
Amount in
USD
Item 5: Spares
5.01 Spare parts for pre-commissioning, commissioning (As
indicated in T-3) .
5.03 Other (Please Specify)
264403607.xls
Contract C311333
DESCRIPTION
Qty
264403607.xls
Item
Contract C311333
264403607.xls
Contract C311333
DESCRIPTION
Qty
Amount in
USD
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
7.11 Training
Item
Item
264403607.xls
C311333
Amal HRSG-1 Project
SUMMARY OF SCHEDULE C
FOR
PROVISIONAL WORK
Ref.
No.
1.0
DESCRIPTION
Item 1.0: -Provisional day works for
Commissioning Assistance
Qty
Rial Omani
(OMR)
Item
N/A
Item
N/A
N/A