TPF 5: TEAM COMPOSITION AND TASK PROJECTS

1. TECHNICAL /MANAGERIAL STAFF


NAME
1. JOSE A. PALAC

2. VINCI NICHOLAS R. VILLASEOR

In Joint Venture
with
Certificate PH 14/1061

POSITION
TEAM LEADER

CIVIL / STRUCTURAL
ENGINEER BUILDING

and

TASK
Responsible for the overall technical and administrative
management of the project.

Manage and supervise all aspects of the project.

Recommend the approval of Detailed Design, Proposed Change


in Detail Design and MPSS.

Monitor the Concessionaires plans and programs for the


development, construction and maintenance of the Project prior
to their implementation to ensure conformity with the approved
final drawings and/or architectural and engineering plans,
specifications and procedures.

Responsible in determining the Time Extension to be granted to


the Concessionaire in case of Dispute between the
Concessionaire and the Grantors.

Review the Report on Works submitted by the Concessionaire.

Certify the Operational readiness and the successful completion


of testing and transfer activities of the Concessionaire in order
for the Concessionaire to initiate the Operations and
Maintenance of any Augmented Capacity.

Review and recommend the approval of the Detailed Structural


Design (Building) submitted by the Concessionaire.

Review any proposed change in the Detailed Design and


MPPS.

Prepare Punchlist and review the Punchlist Rectification


Program prepared by the Concessionaire.

TPF 5 Page 1 of 6

TPF 5: TEAM COMPOSITION AND TASK PROJECTS


3. GREGORIO B. FULLIDO, JR.

Review and recommend the approval of the Detailed Structural


Design (Pavement) submitted by the Concessionaire.

Review any proposed change in the Detailed Design and


MPPS.

Prepare Punchlist and review the Punchlist Rectification


Program prepared by the Concessionaire.

Review and recommend the approval of the Detailed


Architectural Design submitted by the Concessionaire.

Review any proposed change in the Detailed Design and


MPSS.

Prepare Punchlist and review the Punchlist Rectification


Program prepared by the Concessionaire.

AIRPORT OPERATIONS
EXPERT

Review the O& M Manual submitted by the Concessionaire.

Monitor the performance of the Concessionaire during the


Operations and Maintenance of the Concessionaire O & M
Facilities including compliance with the MPSS for Operation
and Maintenance of the Concessionaire O & M Facilities.

SAFETY EXPERT

Review the Safety Manual / Procedure submitted by the


Concessionaire.

Monitor the compliance of the Concessionaire on Health and


Safety Requirements during Construction Stage.

Review the Project Cost.

Review and evaluate the variation proposal submitted by the


Concessionaire.

Estimate the Handback Rectification Amount.

CIVIL / STRUCTURAL
ENGINEER PAVEMENT

4. DAVID G. MASON

5. REYNALDO S.J. JIMENEZ

ARCHITECT

6. SIK YOUNG AHN

7. ROGELIO A. PESCASIO

In Joint Venture
with
Certificate PH 14/1061

QUANTITY SURVEYOR /
COST ENGINEER

and

TPF 5 Page 2 of 6

TPF 5: TEAM COMPOSITION AND TASK PROJECTS


8. NOEL I. FANDIALAN

9. HERMINIO M. DAVID

Review and recommend the approval of the Detailed Electrical


Design submitted by the Concessionaire.

Review any proposed change in the Detailed Design and


MPPS.

Prepare Punchlist and review the Punchlist Rectification


Program prepared by the Concessionaire.

Witness the Commissioning and Acceptance Test and


recommend the issuance of Acceptance Certificate, Provisional
Acceptance Certificate for Renovation, Apron Construction,
Construction Completion and Capacity Augmentation
Completion based on the results of the Commissioning and
Acceptance Test.

Review and recommend the approval of the Detailed


Mechanical Design submitted by the Concessionaire.

Review any proposed change in the Detailed Design and MPPS

Prepare Punchlist and review the Punchlist Rectification


Program prepared by the Concessionaire.

Witness the Commissioning and Acceptance Test and


recommend the issuance of Acceptance Certificate, Provisional
Acceptance Certificate for Renovation, Apron Construction,
Construction Completion and Capacity Augmentation
Completion based on the results of the Commissioning and
Acceptance Test.

IT / MIS EXPERT

Review the Design / Development / Implementation /


Maintenance of IT systems or MIS of an airport

TRANSPORT PLANNER

Review the Design of the Concessionaire on the facility


requirements based on the projected passenger demand and
setting out operational requirements and minimum performance

ELECTRICAL ENGINEER

MECHANICAL ENGINEER

10. ROLANDO MOSES F. AQUINO


11. BYOUNG KUK KI

In Joint Venture
with
Certificate PH 14/1061

and

TPF 5 Page 3 of 6

TPF 5: TEAM COMPOSITION AND TASK PROJECTS

standard and specifications.


12. HEUNG MOON KIM

13. ALEXIS B. DE LA CRUZ

CONTRACT/ DOCUMENT
SPECIALIST

Responsible in determining the Time Extension to be granted to


the Concessionaire in case of Dispute between the
Concessionaire and the Grantors

QUALITY CONTROL
ENGINEER

Witness the Commissioning and Acceptance Test and


recommend the issuance of Acceptance Certificate, Provisional
Acceptance Certificate for Renovation, Apron Construction,
Construction Completion and Capacity Augmentation
Completion based on the results of the Commissioning and
Acceptance Test.

Inspect, check or test at any time after the O & M Start Date
and/or Construction Start Date and during the Concession
Period.

Monitor the performance of the Concessionaire during the


Operations and Maintenance of the Concessionaire O & M
Facilities including compliance with the MPSS for Operation
and Maintenance of the Concessionaire O & M Facilities.

Design a questionnaire and survey process as a basis for


measuring the Subjective Performance Parameters in the event
that the Concessionaire is not a member of the Airport Council
International

Undertake a Comprehensive survey to determine whether the


Project complies with the Handback Requirements and whether
the Project Asset Register accurately reflects the Project Assets
(Handback Survey).

Responsible for the review of Plumbing Design

Monitor the Progress of Works

Prepare Punchlist and review the Punchlist Rectification

14. JOSIELYN B. MALICDEM

15. ARNEL A. PASCUA

In Joint Venture
with
Certificate PH 14/1061

SURVEYS

SANITARY ENGINEER

and

TPF 5 Page 4 of 6

TPF 5: TEAM COMPOSITION AND TASK PROJECTS

Program prepared by the Concessionaire

Witness the Commissioning and Acceptance Test and


recommend the issuance of Acceptance Certificate, Provisional
Acceptance Certificate for Renovation, Apron Construction,
Construction Completion and Capacity Augmentation
Completion based on the results of the Commissioning and
Acceptance Test.

2. TECHNICAL SUPPORT STAFF


NAME

POSITION

TASK

1. ROMULO T. TAMBIS

RESIDENT ENGINEER

2. GARRY G. ALVIENTO

STRUCTURAL ENGINEER

3. CHRARLES L. NG

ARCHITECT

4. MANUEL V. PANIS

ELECTRICAL ENGINEER

5. ROGELIO M. ALO

MECHANICAL ENGINEER

In Joint Venture
with
Certificate PH 14/1061

and

Assist in the Team Leader during Construction Stage.


Monitor the Progress of All Works of the Project.
Prepare Punchlist and review the Punchlist Rectification
Program prepared by the Concessionaire.
Assist the Sr. Structural Engineer during Construction Stage.
Monitor the Progress of Structural and Civil Works of the
Project.
Prepare Punchlist and review the Punchlist Rectification
Program prepared by the Concessionaire.
Assist the Sr. Architect during Construction Stage.
Monitor the Progress of Architectural Works at Landside Devt.
Prepare Punchlist and review the Punchlist Rectification
Program prepared by the Concessionaire.
Assist the Sr. Electrical Engineer during Construction Stage.
Monitor the Progress of Electrical Works at Landside Devt .
Prepare Punchlist and review the Punchlist Rectification
Program prepared by the Concessionaire.
Assist the Sr. Mechanical Engineer during Construction Stage

TPF 5 Page 5 of 6

TPF 5: TEAM COMPOSITION AND TASK PROJECTS

6. CIPRIANO C. GAGAN

SANITARY ENGINEER

SAFETY ENGINEER

CONTRACT SPECIALIST

Assist the Sr. Contract Specialist


Responsible in determining the Time Extension to be granted to
the Concessionaire in case of Dispute between the
Concessionaire and the Grantors.

QUANTITY/COST
ENGINEER

Assist the Sr. Quantity / Cost Engineer.


Review and evaluate the variation proposal submitted by the
Concessionaire.

7. RODOLFO G. ABAD

8. MADELYN D. TOLEDO

Monitor the Progress of Mechanical Works at Landside Devt


Prepare Punchlist and review the Punchlist Rectification
Program prepared by the Concessionaire
Assist the Sr. Sanitary Engineer during Construction Stage
Monitor the Progress of Sanitary Works at Landside Devt
Prepare Punchlist and review the Punchlist Rectification
Program prepared by the Concessionaire.
Assist the Sr. Safety Engineer
Monitor the compliance of the Concessionaire on Health and
Safety Requirements during Construction Stage.

9. ARNEL L. CUSTODIO

3. ADMIN SUPPORT STAFF


NAME

POSITION
ADMIN OFFICER /
ACCOUNTANT

1. TBN
2. TBN

COMPUTER ENCODER /
SECRETARY

3. TBN
MESSENGER / UTLITITY

In Joint Venture
with
Certificate PH 14/1061

and

TASK

Manage the work schedules, appointments and meeting of the


Team Leader.
Manage incoming and out-going office communications.

Performs encoding works necessary in the preparation of reports.


Photocopy documents for submittal.
Binds Reports.

TPF 5 Page 6 of 6