PUNCHING SHEAR to BS8110:1997


Originated from RCC13.xls v2.6 on CD

MATERIALS

DIMENSIONS

LOADING

SLAB

fcu N/mm2 40
fyv N/mm2 460
link mm 10
A
B
G

Vt
ult UDL
h

mm
mm
mm

kN
kN/m2
mm

STATUS
VALID DESIGN

E
F
H

mm

1381
20.00

280

dx
dy
ave d

RESULTS
Veff = 1588.2 kN
At col. face, v max = 2.688 N/mm2

PROVIDE LINKS 0
0
0
0
0
0
0
0
0
0

mm
mm

mm
mm
mm

Job No

R68

0
0
0

3397.1

250
240
245

Asx mm2/m 7110


Asy mm2/m 7110
ave As
2.903
%

vc =
At 1.5d perimeter, v =
At 0d perimeter, v =

0
0
0
0
0
0
0
0
0

Revision

31

Legend

Links not required


0
0
0
0
0
0
0
0
0

Page

26-Mar-2015

chg

1999-2003 BCA for RCC

800
400
0

Date

Plan

1.1920
1.1833
0.9125

N/mm2
N/mm2
N/mm2

(Table 3.8)

Project

Spreadsheets to BS 8110

Client
Location

Advisory Group
Column B2

REINFORCED CONCRETE COUNCIL


Made by

EDGE
rmw
COLUMN Checked

PUNCHING SHEAR to BS8110:1997


Originated from RCC13.xls v2.6 on CD

MATERIALS

fcu N/mm2 40
fyv N/mm2 460
link
8
mm

DIMENSIONS

LOADING

SLAB

A
B
D

Vt
ult UDL
h

mm
mm
mm

kN
kN/m2
mm

STATUS
VALID DESIGN

223
14.40
250

Perimeter 1
Perimeter 2
0
0
0
0
0
0
0

6 T8 @ 220
7 T8 @ 265
0
0
0
0
0
0
0

mm

-62.5
-275
150
125

1399

dx
dy
ave d

RESULTS
Veff = 312.2 kN
At col. face, v max = 1.976 N/mm2

PROVIDE LINKS (single leg)

mm
mm

mm
mm
mm

Revision

32
Job No

R68

Legend

E
F
G
H

mm

Page

26-Mar-2015

chg

1999-2003 BCA for RCC

200
200
50

Date

207
187
197

Asx mm2/m 2010


Asy mm2/m 1005
ave As
0.754
%

vc =
At 1.5d perimeter, v =
At 2.25d perimeter, v =
.
98 from col face
246 from col face
0
0
0
0
0
0
0

Plan

0.8032
1.0364
0.7813

N/mm2
N/mm2
N/mm2

(Table 3.8)

Project

Spreadsheets to BS 8110

Client

Advisory Group

Location

Columns A1, D1, A5 & D5

REINFORCED CONCRETE COUNCIL


Made by

CORNER

COLUMN Checked

PUNCHING SHEAR to BS8110:1997


Originated from RCC13.xls v2.6 on CD

MATERIALS

fcu N/mm2 40
fyv N/mm2 460
link mm 8

DIMENSIONS

LOADING

A
B
C
D
Vt
ult UDL

SLAB

mm
mm
mm
mm
kN
kN/m2
mm

STATUS
VALID DESIGN

E
F
G
H

mm

mm

-50
-250
100
100

272.0
16.10

350

mm
mm

215
195
205

dx
dy
ave d

RESULTS
Veff = 340.0 kN
At hole face, vmax = 2.745 N/mm2

PROVIDE LINKS (single leg)


Perimeter
Perimeter
Perimeter
Perimeter
Perimeter

1
2
3
4
5
0
0
0
0

6
8
5
6
7

T8
T8
T8
T8
T8

@
@
@
@
@
0
0
0
0

140
125
275
265
265

mm

mm

Page

26-Mar-2015
Revision

33
Job No

R68

Legend

400
250
0
0

mm

Date

chg

1999-2003 BCA for RCC

250

rmw

Asx mm2/m 2010


Asy mm2/m 2010
ave As
0.983
%

vc =
At 1.5d perimeter, v =
At 4.5d perimeter, v =
.
102 from col face
256 from col face
410 from col face
564 from col face
717.5 from col face
0
0
0
0

Plan

0.8686
1.6585
0.7741

N/mm2
N/mm2
N/mm2

(Table 3.8)

Project

Spreadsheets to BS 8110

Client

Advisory Group

Location

An example

REINFORCED CONCRETE COUNCIL


Made by

RE-ENTRANT
rmw
CORNER Checked

PUNCHING SHEAR to BS8110:1997


Originated from RCC13.xls v2.6 on CD

MATERIALS

fcu N/mm2 40
fyv N/mm2 460
link mm 10

DIMENSIONS

LOADING

SLAB

A
B
C
D
Vt
ult UDL
h

mm
mm
mm
mm
kN
kN/m2
mm

STATUS
VALID DESIGN

E
F
G
H

mm

447.0
14.40

250

dx
dy
ave d

RESULTS
Veff = 558.8 kN
At col. face, v max = 2.534 N/mm2

PROVIDE LINKS (single leg)


Perimeter 1
Perimeter 2
0
0
0
0
0
0
0

6 T10 @ 220
8 T10 @ 255
0
0
0
0
0
0
0

mm
mm
mm

mm
mm
mm

Page

26-Mar-2015
Revision

chg

1999-2003 BCA for RCC

350
350
0
0

Date

34
Job No

R68

Legend

-125
-425
250
250
591.6

202
180
191

Asx mm2/m 2580


Asy mm2/m 2580
ave As
1.355
%

vc =
At 1.5d perimeter, v =
At 2.25d perimeter, v =
.
95 from col face
239 from col face
0
0
0
0
0
0
0

Plan

0.9841
1.1738
0.9209

N/mm2
N/mm2
N/mm2

(Table 3.8)

Project

Spreadsheets to BS 8110

Location

ECBP Typical Floor Column B3

INTERNAL COLUMN

PUNCHING SHEAR to BS8110:1997


Originated from RCC13.xls v2.6 on CD

Made by rmw
1999-2003 BCA for Date

Job No R68
26-Mar-15

DETAILED CALCULATIONS
Veff/Vt

1.1500

CRITICAL PERIMETERS
Per No
a
1
367.5
2
551.25
3
735
4
918.75
5
1102.5
6
1286.25
7
1470
8
1653.75
Hole face
0
Col face
0
LINK REQUIREMENTS
Per No
v
1
1.1833
2
0.9125
3
0.7348
4
0.6080
5
0.5122
6
0.4367
7
0.3750
8
0.3233
Hole face
2.6884
Col face
2.6884
LINK PERIMETERS
Per No
a
1
122.5
2
306.25
3
490
4
673.75
5
857.5
6
1041.25
7
1225
8
1408.75
9
1592.5

(enhancement factor)

link leg area 78.5


Hole deduction ? NO
ENCLOSED AREAS
Final
Per No
Internal
5340
1
1.742
6810
2
2.859
8280
3
4.245
9750
4
5.901
11220
5
7.828
12690
6
10.025
14160
7
12.492
15630
8
15.229
2400
Hole face
0.320
2400
Col face
0.320

Internal
5340
6810
8280
9750
11220
12690
14160
15630
2400
2400

deduct
0
0
0
0
0
0
0
0
0
0

Asv
1195
1523
1852
2181
2510
2839
3168
3496

Total No
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Location
0.00 d
0.00 d
0.00 d
0.00 d
0.00 d
0.00 d
0.00 d
0.00 d

within
Band?
0
0
0
0
0
0
0
0

Internal
3380
4850
6320
7790
9260
10730
12200
13670
15140

deduct
0
0
0
0
0
0
0
0
0

Final
3380
4850
6320
7790
9260
10730
12200
13670
15140

No
12
16
20
24
28
32
36
40
44

Spacing
335
345
350
350
355
355
355
355
360

Project

Spreadsheets to BS 8110

Location

Column B2

EDGE COLUMN

PUNCHING SHEAR to BS8110:1997


Originated from RCC13.xls v2.6 on CD

Made by rmw
1999-2003 BCA for RCC

Date

Job No R68
26-Mar-15

DETAILED CALCULATIONS
Veff/Vt

1.4000

CRITICAL PERIMETERS
Per No
a
1
295.5
2
443.25
3
591
4
738.75
5
886.5
6
1034.25
7
1182
8
1329.75
Hole face
25
Col face
0
LINK REQUIREMENTS
Per No
v
1
1.0364
2
0.7813
3
0.6177
4
0.5025
5
0.4158
6
0.3475
7
0.2916
8
0.2446
Hole face
1.8039
Col face
1.9758
LINK PERIMETERS
Per No
a
1
98.5
2
246.25
3
394
4
541.75
5
689.5
6
837.25
7
985
8
1132.75
9
1280.5

(enhancement factor)

link leg area 50.3


Hole deduction ? YES

Internal
3164
4346
5528
6710
7892
9074
10256
11438
1000

Choose
1882
2473
3064
3655
4246
4837
5428
6019
1000
800

deduct
396
543
691
839
987
1134
1282
1430
125
0

Final
1487
1930
2373
2816
3260
3703
4146
4589
875
800

Asv
267
347
427
507
586
666
746
825

Total No
5.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Location
1.50 d
2.25 d
0.00 d
0.00 d
0.00 d
0.00 d
0.00 d
0.00 d

within
Band?
1
0
0
0
0
0
0
0

Internal
1588
2770
3952
5134
6316
7498
8680
9862
11044

Choose
1094
1685
2276
2867
3458
4049
4640
5231
5822

deduct
199
346
494
642
790
937
1085
1233
1381

Final
896
1339
1782
2225
2669
3112
3555
3998
4442

ENCLOSED
Per No
1
2
3
4
5
6
7
8
Hole face
Col face

No
6
7
9
10
12
13
15
16
18

Spacing
220
265
250
275
265
280
270
285
275

AREAS
Edge D
0.431
0.753
1.162
1.659
2.242
2.913
3.672
4.517
0.063
0.040

Project

Spreadsheets to BS 8110

Location

Columns A1, D1, A5 & D5

CORNER COLUMN
Made by rmw

PUNCHING SHEAR to BS8110:1997


Originated from RCC13.xls v2.6 on CD

Job No R68

Date

1999-2003 BCA for RCC

26-Mar-15

DETAILED CALCULATIONS
Veff/Vt 1.2500 (enhancement factor) link leg area 50.3
Hole deduction ? YES
CRITICAL PERIMETERS
Per No
a
Internal Edge C Edge D Corner Choose deduct
1
307.5
3760
2280
2130
1265
1265
288
2
461.25
4990
2895
2745
1572.5 1572.5
391
3
615
6220
3510
3360
1880
1880
447
4
768.75
7450
4125
3975
2187.5 2187.5
498
5
922.5
8680
4740
4590
2495
2495
549
6
1076.25 9910
5355
5205
2802.5 2802.5
600
7
1230
11140 5970
5820
3110
3110
652
8
1383.75 12370 6585
6435
3417.5 3417.5
703
Hole face
25
1500
1150
1000
700
700
100
Col face
0
650
650
0
ENCLOSED AREAS
Per No
Corner
1
0.394
2
0.613
3
0.878
4
1.191
5
1.551
6
1.958
7
2.412
8
2.914
Hole face 0.117
Col face 0.100

LINK REQUIREMENTS
Per No
v
Asv
1
1.659
668
2
1.353
268
3
1.097
268
4
0.912
316
5
0.774
364
6
0.666
412
7
0.578
460
8
0.506
508
Hole face 2.745
Col face 2.536

LINK PERIMETERS
Per No
a
Internal Edge C Edge D
1
102.5
2120
1460
1310
2
256.25
3350
2075
1925
3
410
4580
2690
2540
4
563.75
5810
3305
3155
5
717.5
7040
3920
3770
6
871.25
8270
4535
4385
7
1025
9500
5150
5000
8
1178.75 10730 5765
5615
9
1332.5 11960 6380
6230

Final
977
1182
1433
1690
1946
2202
2458
2715
600
650

within
Total No LocationBand?
13.3
1.50 d
1
5.3
2.25 d
1
5.3
3.00 d
1
6.3
3.75 d
1
0.0
4.50 d
0
0.0
0.00 d
0
0.0
0.00 d
0
0.0
0.00 d
0

Corner Choose deduct


855
855
152
1162.5 1162.5
254
1470
1470
357
1777.5 1777.5
430
2085
2085
481
2392.5 2392.5
532
2700
2700
583
3007.5 3007.5
635
3315
3315
686

Final
703
908
1113
1348
1604
1860
2117
2373
2629

No
6
8
5
6
7
8
8
9
10

Spacing
140
125
275
265
265
265
300
295
290

Project

Spreadsheets to BS 8110

Location

An example

RE-ENTRANT CORNER COLUMN

PUNCHING SHEAR to BS8110:1997


Originated from RCC13.xls v2.6 on CD

Made by rmw
1999-2003 BCA for RCC

Date

Job No R68
26-Mar-15

DETAILED CALCULATIONS
Veff/Vt

1.2500

(enhancement factor)

CRITICAL PERIMETERS
Per No
a
Internal
1
286.5
3692
2
429.75
4838
3
573
5984
4
716.25
7130
5
859.5
8276
6
1002.75
9422
7
1146
10568
8
1289.25
11714
Hole face
0
1400
Col face
0
LINK REQUIREMENTS
Per No
v
1
1.1738
2
0.9209
3
0.7548
4
0.6370
5
0.5488
6
0.4801
7
0.4249
8
0.3794
Hole face 2.5338
Col face
2.5338
LINK PERIMETERS
Per No
a
1
95.5
2
238.75
3
382
4
525.25
5
668.5
6
811.75
7
955
8
1098.25
9
1241.5

Corner
3119
3978.5
4838
5697.5
6557
7416.5
8276
9135.5
1400
1400

link leg area 78.5


Hole deduction ? YES
ENCLOSED AREAS
Final
deduct
Per No
Internal
659
2460
1
0.852
864
3115
2
1.463
1069
3769
3
2.238
1273
4424
4
3.177
1478
5079
5
4.281
1683
5734
6
5.548
1887
6389
7
6.980
2092
7044
8
8.576
250
1150
Hole face
0.123
250
1150
Col face

Asv
429
543
657
772
886
1000
1114
1228

Total No
5.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Location
1.50 d
2.25 d
0.00 d
0.00 d
0.00 d
0.00 d
0.00 d
0.00 d

within
Band?
0
0
0
0
0
0
0
0

Internal
2164
3310
4456
5602
6748
7894
9040
10186
11332

Corner
1273
2132.5
2992
3851.5
4711
5570.5
6430
7289.5
8149

deduct
386
591
796
1000
1205
1410
1614
1819
2024

Final
887
1541
2196
2851
3506
4161
4816
5471
6125

No
6
8
10
12
15
17
19
22
24

Spacing
220
255
270
285
265
275
280
270
275

Corner
0.405
0.608
0.852
1.137
1.463
1.830
2.238
2.687
0.123
0.123

Disclaimer

All advice or information from the British Cement Association and/or Reinforced Concrete
Council is intended for those who will evaluate the significance and limitations of its
contents and take responsibility for its use and application. No liability (including that for
negligence) for any loss resulting from such advice or information is accepted by the BCA,
RCC or their subcontractors, suppliers or advisors. Users should note that all BCA software
and publications are subject to revision from time to time and should therefore ensure that
they are in possession of the latest version.

This spreadsheet should be used in compliance with the accompanying publication


'Spreadsheets for concrete design to BS 8110 and EC2' available from British Cement
Association, Telford Avenue, Crowthorne, Berkshire RG45 6YS.

Status of spreadsheet This spreadsheet is shareware. It may be distributed freely, but may
Public release version.

not be used for commercial purposes until the user has registered
with the RCC.

Revision history RCC13 Punching Shear

Date

Version

28-Apr-04 RCC13 v2.6


8-Aug-03
14-Mar-03
18-Feb-03
21-Jan-03
3-Dec-02
11-Oct-02
27-Feb-02
15-Feb-02
17-Aug-00
3-Aug-99

Action

Correction to perimeter deduction for large holes.


Updated to May 2002 amendment to BS 8110 formulae
RCC13 v2.5
for vc.
RCC13 v2.4 Correction to hole deductions on REENTRANT sheet.
RCC13 v2.3
Correction to hole deductions on EDGE sheet.
RCC13 v2.2
DETR logo replaced by DTI.
RCC13 v2.1
Fix for error when no holes.
RCC13 v2.0
Version 2 enhancements
RCC13 V1.3 Column face perimeter changed on "detail" sheets.
Improved routine for perimeter reduction due to
RCC13 V1.2
adjacent holes.
RCC13 v1.1
Red warning if INTERNAL:M14 negative.
First public release.
RCC13 v1.0
Includes b version comments

r Reinforced Concrete
and limitations of its
ity (including that for
accepted by the BCA,
that all BCA software
therefore ensure that

mpanying publication
from British Cement

ibuted freely, but may


e user has registered

Size (kB)
412
409
406
417
402
421
421
404
407
310
309

Anda mungkin juga menyukai