AACE Internationals Professional Practice Guide to

Contracts and Claims, Fourth Edition


TABLE OF CONTENTS - Page 1
Introduction to the Fourth Edition
Introduction to the Third Edition
Introduction to the Second Edition
Introduction to the First Edition
Chapter 01: Contract Administration
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

Cost Interpretation of Contractual Terms, M. Viswanathan, AACE Transactions, 1974


Scheduling and Controlling Construction Sub-Contracts, James A. Bent, AACE Transactions, 1977
New Construction Management Emphasis Costs Cost and Schedule, Wesley R. Querns, CCE, AACE Transactions, 1982
Contract Provisions That Ensure Complete Cost Disclosures, Curtis D. Sutliff, CCE; James G. Zack, Jr., Cost Engineering Journal,
1987
Innovative Contract Documents and Progressive Project Management Yields Success, Donald J. Fredlund, Jr.; Stephen J. Fortney;
Stan A. Christopher, PE, AACE Transactions, 1989
An Analysis Of Construction Contracts: Types, Characteristics, and Applications, Robert S. Ironmonger, CCE, Cost Engineering
Journal, 1989
Are You Contracting for Success?, Serge Pressoir, PE, AACE Transactions, 1992
Achieving Cost And Schedule Goals: Contracting Approaches That Really Worked, AACE International Planning and Scheduling
Committee, Cost Engineering Journal, 1994
"Risk Sharing" - Good Concept, Bad Name, James G. Zack, Jr., AACE Transactions, 1995
A Contract Clause for Allocating Risks, Dr. George F. Jergeas, P.Eng.; Dr. Francis T. Hartman, P.Eng., AACE Transactions, 1996
Best Value Contracting: Breaking the Low-Bid Paradigm, Dr. Douglas D. Gransberg, PE; Michael A. Ellicott, PE, AACE
Transactions, 1996
The Top Ten Lessons Learned in Construction Contracting, Dr. William W. Badger; Steven W. Gay, Cost Engineering Journal,
1996
Change-Order Management, Bob M. McCally, AACE Transactions, 1997
Best-Value Contracting Criteria, Dr. Douglas D. Gransberg, PE; Michael A. Ellicott, PE, Cost Engineering Journal, 1997
Cost/Schedule Management of Government Construction Subcontracts, Harry W. Jarnagan, PE CCE, Cost Engineering Journal,
1997
Construction Contracts: Shifting Risk or Generating a Claim?, Donald F. McDonald, Jr., PE CCE; John O. Evans III, AACE
Transactions, 1998
RFIs - Use, Abuse, Control, James G. Zack Jr., AACE Transactions, 1998
Appropriate Risk Allocation in Lump-Sum Contracts - Who Should Take the Risk?, Dr. Francis T. Hartman, PE; Patrick Snelgrove,
P.Eng.; Dr. Rafi Ashrafi, Cost Engineering Journal, 1998
Value Engineering Incentive Clauses, George F. Jergeas; Vernon G. Cooke; Francis T. Hartman, Cost Engineering Journal, 1999
Claims Avoidance Techniques: Best Practices for Contract Administration, Kathleen M.J. Harmon; Bruce M. Stephan, AACE
Transactions, 2001
Start Your Project the Right Way, Edward E. Douglas III, AACE Transactions, 2002
Reducing Contract Cost: The Trust Issue, Ramy Zaghloul; Francis T. Hartman, AACE Transactions, 2002

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 2
23. Weather Derivatives Allow Construction to Hedge Weather Risk, Robert B. Connors, CCE, Cost Engineering Journal, 2003
24. Contractor Default Insurance: A Key Issue for Estimators Budgeting Capital Projects, Robert Seals, Cost Engineering Journal,
2003
25. Owner-Furnished Equipment: Savings or Potential Claims?, Talal Abi-Karam, PE CCE, AACE Transactions, 2003
26. Make Liquidated Damages Work, Clark R. McCormick, PE, AACE Transactions, 2003
27. Understanding Risk to Mitigate Changes and Avoid Disputes, L. Adam Winegard; Stephen P. Warhoe, PE CCE, AACE
Transactions, 2003
28. Project Management Oversight: An Effective Risk Management Tool for EPC/Design-Build Contracts, George E. Baram, P.Eng.
CCE, AACE Transactions, 2003
29. Self-Perform Versus Subcontract Decision in Construction Contracts, Khaled Nassar, AACE Transactions, 2003
30. False Claims on Public Projects: Don't Bet Your Business on It, Kayhan Fatemi; Matthew J. Lankenau, CCE, AACE Transactions,
2004
31. Rules of Engagement for Construction Claims, Philip D. Barnard, PE, AACE Transactions, 2004
32. Guidelines for Specification Development, George Belev, AACE Transactions, 1989
33. Subcontract Administration and Control, James A. Bent, CCE, AACE Transactions, 1982
34. Uniform Proposal Form for the Subcontractor, Michael J. Cook, AACE Transactions, 1998
35. Financial Administration of Construction Contracts by Owners, W. Doug Creech, CCC, AACE Transactions, 2006
36. Subcontractor Management for the General Contractor, Robert W. Fessler, AACE Transactions, 1990
37. Lump Sum Contracting: An Owner's Perspective, Dwight R. Johnson, Jr., Cost Engineering Journal, 1987
38. Subcontractor Status Reporting, Tom Mendel, AACE Transactions, 1985
39. Progress and Performance Control of a Cost Reimbursable Construction Contract, Moses Y. Nkuah, CCC, Cost Engineering
Journal, 2006
40. Construction Contract Administration in Kenya, Moses A. Nyakiongora, AACE Transactions, 2000
41. Team Approach for Evaluating Contract Administration Procedures, Serge Pressoir, PE, AACE Transactions, 1989
42. The Effectiveness of the Construction Contract, Nathan Paul Slauson, AACE Transactions, 2005
43. LS-EPC From A Legal Viewpoint, Chris Thompson, Cost Engineering Journal, 1987
44. Construction Specifications - Their Impact on Construction Cost, William T. Trotter, AACE Transactions, 1975
45. Managing International Contract Administration, Niall Reynolds, AACE Transactions, 2008
Chapter 02: Management of Construction Schedules
1.
2.
3.
4.
5.
6.
7.
8.

Problems In The Implementation of Scheduling Systems, Gui Ponce-Campos, AACE Transactions, 1975
Owner Approach to Planning and Scheduling, James A. Bent; John W. Hackney, AACE Transactions, 1976
Scheduling Specifications for the 80's, Dr. Gui Ponce de Leon, AACE Transactions, 1983
CPM - Established and Then Some, Gary O. Glenn, AACE Transactions, 1985
Practical Specifications For Project Scheduling, John R. Clark, PE, Cost Engineering Journal, 1990
Schedule Games People Play and Some Suggested Remedies, James G. Zack, Jr., AACE Transactions, 1991
New Directions in Schedule Management, Gui Ponce de Leon, PE, AACE Transactions, 1991
Contrasting Cost-Loaded CPM Scheduling Specifications, Dr. Gui Ponce de Leon, PE; Michael J. Mix; Philip Spittler, AACE
Transactions, 1994
9. Developing an As-Built Schedule From Project Records, John R. Knoke, PE; Gary H. Jentzen, PE, AACE Transactions, 1996
10. A Scheduling Tool for Tunnel Construction, K.A. Pohrte; W.W. Edgerton, PE, AACE Transactions, 1996
11. Activity Duration Quantification Under Uncertainty: Fuzzy Set Theory Application, Jong H. Ock, Cost Engineering Journal, 1996
12. A Multiobjective Linear Program for Scheduling Repetitive Projects, Dr. Kamal Al-Subhi Al Harbi; Dr. Shokri Z. Selim; Mazen AlSinan, Cost Engineering Journal, 1996

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 3
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.

Practical Applications of Probabilistic Scheduling, Dr. Gui Ponce de Leon, PE; John R. Knoke, PE, AACE Transactions, 1997
Optimized Scheduling for Highway Construction, Khaled El-Rayes; Osama Moselhi, PE, AACE Transactions, 1997
Project Scheduling Under Limited Resources, Mohammed Moizuddin; Shokri Z. Selim, AACE Transactions, 1997
Practical Risk Analysis in Scheduling, Abhi Basu, PE, AACE Transactions, 1998
The Case for Critical Path, Michael A. Hatfield; James Noel, Cost Engineering Journal, 1998
Soft Logic - An Overview, Dennis Read Hanks, PE CCE, Cost Engineering Journal, 1999
Industry Crisis: Construction Scheduling Software, Jon M. Wickwire; Stuart Ockman, AACE Transactions, 2000
The Pitfalls of CPM Scheduling on Construction Projects, Ian A. Street, Cost Engineering Journal, 2000
Schedule Review Basics, Craig L. Olsen, AACE Transactions, 2000
Baseline Schedule Approval, Zartab Q. Zafar; Dean Rasmussen, Cost Engineering Journal, 2001
Selecting Planning and Scheduling Specifications, Leaf A. Ballast; Calin M. Popescu, AACE Transactions, 2001
Project Scheduling Enhancements for Avoiding Litigation, Anamaria Popescu; James T. O'Connor; John D. Borcherding, AACE
Transactions, 2002
Tripping Hazards in Schedules, Donald F. McDonald Jr., AACE Transactions, 2002
Computing Near-Longest Path, Ron Winter, Cost Engineering Journal, 2003
Computing Near-Longest Path - Part 2: Now That I have Longest Path Value, Whats It Good For?, Ron Winter, Cost Engineering
Journal, 2003
Effect of Multiple Calendars on total Float and Critical Path, Nestor J. Scavino, CCC, Cost Engineering Journal, 2003
How to Befuddle a College Professor (Without Really Trying), Ronald M. Winter, Cost Engineering Journal, 2003
Computing the Near-Longest Path, Ronald M. Winter, AACE Transactions, 2003
Contract Requirements for Construction Schedule, Win G. Li, PE CCE, AACE Transactions, 2003
Impact Of Uncertain Resources On Project Schedule And Cost, HN Ahuja; V Arunachalam, Cost Engineering Journal, 1985
Critical Path Scheduling: Fundamentals And Concepts, William P. Allman, AACE Transactions, 1962
Implementing CPM With Cost Monitoring For Multitype Projects, Larry N. Allen, AACE Transactions, 1965
Cost-Time-Risk Diagram: Project Planning and Management, Peerapong Aramvereekul, PSP EVP; Daniel J. Seider, PE, Cost
Engineering Journal, 2006
CPM Scheduling in Construction: A Case Study, Abhi Basu, AACE Transactions, 2003
Is Your Schedule Late at the Starting Gate?, Abhi Basu, PE, AACE Transactions, 2005
CPM Schedules - Why and How, Satinder Singh Baweja, CCE, AACE Transactions, 2006
Scheduling Specifications: A Lump Sum Contractor's Perspective, Martin J. Bradley, CCC, AACE Transactions, 2005
PDM Scheduling at EPCOT Center, James Brownell, AACE Transactions, 1986
Scheduling Comparison of Engineering/Manufacturing to Engineering/Construction, Terry F. Carlson, AACE Transactions, 1989
Line Of Balance Technology, Vincent C. Carnazza, AACE Transactions, 1965
Project Schedule Delay vs. Strategic Project Planning, Massimoluigi Casinelli, PE, CCE, AACE Transactions, 2005
Have the Networks Fit the Project, Donald J. Cass, CCE, AACE Transactions, 1984
Reducing Time and Cost With Pre-facilitating Techniques, Allan D. Chasey PE; Neesha Regmi, AACE Transactions, 2005
The Project Schedule: The Key to Project Communication, James M. Colvin; Larkin B. Breed, AACE Transactions, 1976
Benefits of a Fixed Scheduling System, Cecil J. Bendy; Thomas E. Danz, AACE Transactions, 1979
Henry L. Gantt and Frederick Taylor: The Pioneers of Scientific Management, Peter B. Darmody, PSP, AACE Transactions, 2007
Project Time Risk Analysis Through Simulation, Prasanta K. Dey; Stephen O. Ogunlana, Cost Engineering Journal, 2001
Project Planning--Then Scheduling, Edward E. Douglas III, CCC, AACE Transactions, 2004
Planning and Scheduling Cost-Limited Projects, Edward E. Douglas III, CCC, AACE Transactions, 1994
The Great Negative Lag Debate, Edward E. Douglas, III CCC PSP; Timothy T. Calvey, PE PSP; Donald F. McDonald, Jr. PE CCE
PSP; Ronald M. Winter, PSP, AACE Transactions, 2006
Project Management - Planning and Scheduling System, Gerald W. Duray, AACE Transactions, 1976
The Adequacy of Initial Scheduling Estimates, John M. Dye; Dr. Irtishad U. Ahmad, PE, AACE Transactions, 1998

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 4
55. Planning and Scheduling With Multiple Decision Points, Fritz Ehrenreich-Hansen, P.Eng. CCE; S.W. (Bill) Wilson, P.Eng., Cost
Engineering Journal, 1997
56. Project Management with Scheduling, Daniel P. Elliott, AACE Transactions, 1976
57. Recognizing and Avoiding Problems Inherent in Today's Scheduling Environment, David L. Freidl, CCE, AACE Transactions, 1987
58. CPM Scheduling -- How Industry Views Its Use, Patricia D. Galloway, PE, Cost Engineering Journal, 2006
59. Resource Allocation And Critical Path Techniques, W. C. Geoghan, AACE Transactions, 1965
60. Scheduling for Estimators, Robert R. George, CCC, AACE Document, 1998
61. Lets Scrap the Precedence Diagramming Method, Earl T. Glenwright Jr., AACE Transactions, 2004
62. Modular CPM's or Detail CPM Schedules at a Barchart Price, Stephen Goodman, AACE Transactions, 1992
63. Scheduling Practices and Project Success, Andrew F. Griffith, PE, AACE Transactions, 2005
64. Planning & Scheduling an International Project, Mark Grinberg, AACE Transactions, 1981
65. Scheduling for on Time Project, David H. Hamburger, PE, AACE Transactions, 1989
66. Soft Logic - Engineering, or "Seeing the Forest", Dennis Read Hanks, Cost Engineering Journal, 1999
67. Soft Logic -- Construction, Dennis Read Hanks, Cost Engineering Journal, 2000
68. Conceptual Planning of Highway Construction Projects, Ahmed Hassanein, P.Eng., AACE Transactions, 2006
69. BAL: An Algorithm for Scheduling and Control of Linear Projects, Tarek Hegazy; Osama Moselhi; Dr. Paul Fazio, AACE
Transactions, 1993
70. Certification Of Contract Progress Payments Using Critical Path Schedules, J. G. Hazan; B. J. Swain, AACE Transactions, 1971
71. "Enhanced" PDM -- Concepts and Benefits, Scott C. Herold, PE, AACE Transactions, 2004
72. Repetitive Production Method (RPM) and CPM, Lawrence L. Humphries, CCE, AACE Transactions, 1993
73. Up-front Project Scheduling in an Owner/Contractor Alliance, Murray W. Janzen, Cost Engineering Journal, 1992
74. Approaches to Planning and Scheduling a Project, Ed Juracek, AACE Transactions, 1974
75. Critical Path Planning, W. G. Kast, AACE Transactions, 1963
76. Critical Path Scheduling Experience In Defense Contracts, William R. Kelley, AACE Transactions, 1962
77. How to Reduce Risk in Project Schedules and Portfolios, Sarim Khan, Cost Engineering Journal, 2007
78. The Perfect Plan, BE Kibler,, Cost Engineering Journal, 1985
79. Artificial Resource Loading for Schedule Review, Albert Joseph Kuhn, PSP, AACE Transactions, 2007
80. CPM Not Working Well On Small Projects, Albert Joseph Kuhn, PSP, AACE Transactions, 2006
81. Factors Affecting Construction Planning, Dr. Alexander Laufer; Dora Cohenca, AACE Transactions, 1986
82. Construction Scheduling Based on Resource Constraints, Yong-Il Lee; Thomas M. Gatton, AACE Transactions, 1994
83. The Use of CPM Through Knowledge-Based Information Systems, Maris G. Lenss, AACE Transactions, 1988
84. A Continuously Changing As-Planned Baseline?, John. C. Livengood; Mark I. Anderson, AACE Transactions, 2005
85. Integrated Scheduling System - An Approach, Joseph R. Lorenzo; Dikshit Sharad, AACE Transactions, 1975
86. A Comparison Between the Non-Mixed and Mixed Convention in CPM Scheduling, Gunnar Lucko, Cost Engineering Journal, 2007
87. Planning and Scheduling for Success, Ignacio Manzanera, CCE, AACE Transactions, 1990
88. Automatic Resource-Bases Cost-Time Forecasts, VK Marston; RM Skitmore, AACE Transactions, 1990
89. The CPM Technique in Construction - A Critique, Derek Mason, AACE Transactions, 1984
90. Program Scheduling: Not Exactly = Project Scheduling, Courtney James McCracken, PE; Patricia J. Auger; John H. Baratta, PE,
AACE Transactions, 1995
91. A Project Plan for Maximum Control, Thomas W. McKeown; Raymond A. Haarstick, AACE Transactions, 1976
92. Scheduling Concerns in the Hazardous Waste Industry, Timothy C. McManus; Minosca V. Alcantara, Cost Engineering Journal,
1996
93. Construction Scheduling - Don't Depend on a Textbook, Brett M. McPherson; Daniel J. Whitecotton, AACE Transactions, 1991
94. Considerations in Planning and Scheduling, John K. Nabors, AACE Transactions, 1994
95. Integrated Network Planning and Scheduling with 3-D Construction Sequence Models, Daniel P. Nevins; Ronald J. Zabilski; Bridget
E. O'Reilly, AACE Transactions, 1993

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 5
96.
97.
98.
99.
100.
101.
102.
103.
104.
105.
106.
107.
108.
109.
110.
111.
112.
113.
114.
115.
116.
117.
118.
119.
120.
121.

Contemporary Controversies - Circa 2005, James J. O'Brien; Earl Glenwright, PE PSP, AACE Transactions, 2005
Matrix Scheduling for Repetitive Residential Construction, Neil D. Opfer, CCE, AACE Transactions, 1996
Schedule Risk Analysis Using Computer Simulation, Joseph J. Orczyk, PE; Dr. Donn Hancher, PE, AACE Transactions, 1987
Parametric Project Scheduling of Milestones, Joseph Orczyk, PE; Luh-Maan Chang, AACE Transactions, 1990
Construction CPM Scheduling - Precision Without Accuracy, Victor M. Ostrowski, PSP, AACE Transactions, 2006
Studies in Planning and Scheduling, Gordon G. Peterman, CCE, AACE Transactions, 1978
Repetitive Activity Scheduling Process, F. Fred Rahbar; Dr. James E. Rowings, CCE, AACE Transactions, 1992
Back To The Basics Of Planning And Scheduling, Gary W. Rastelli, Cost Engineering Journal, 1993
Breakthrough Planning Methodology, Joe Rizzo, AACE Transactions, 1992
The Role of Probability in Scheduling, Aaron Rose, CCE, AACE Transactions, 1981
Enhanced Project Management with Reference Schedules, Dr. James E. Rowings, Jr.CCE, AACE Transactions, 1986
Project Planning and Scheduling and its Impact to Project Outcome: A Study of EPC Projects in Canada, Janaka Y. Ruwanpura;
Tanveer Nabi Ahmed; Karim Kaba; Gerald Patrick Mulvany, AACE Transactions, 2006
Transparent CPM, Mark C. Sanders, PE CCE, AACE Transactions, 2005
A Systems Approach to Project Management Measurements of Productivity and Cost Control, Howard M. Sanderson, AACE
Transactions, 1976
CPM- Scheduling At An Existing Operating Airport, CJ Saper, AACE Transactions, 1986
CPM Techniques Really Can Be Applied to Major Mechanical and Technical Construction, Peter J. Schappa, CCE; Dwight A. Zink,
CCE, AACE Transactions, 1983
CPM - Pert Time Scaled Summary Network, Harold B. Shugar, AACE Transactions, 1985
Schedule Planning for Construction Projects, William A. Shunk, AACE Transactions, 1982
The Planning Engineer - A Human Element of Planning and Scheduling, Remo J. Silvestrini, AACE Transactions, 1983
Multiproject Scheduling, Andrew Sipos, PE, Cost Engineering Journal, 1990
Benefits of Linear Scheduling, Gary Rock Spencer, PE; Rose Mary Lewis, AACE Transactions, 2005
Fundamentals Of Critical Path Planning And Scheduling, Anthony R. Stumpo, Jr., Cost Engineering Journal, 1986
Critical Path Scheduling - Philosophy And Experience, Robert B. Vogeler, AACE Transactions, 1962
Utility Rate Case - Schedule Analysis, Anthony J. Werderitsch,PE CCE; Clive D. Francis, CCE, AACE Transactions, 1987
Managing A Turnaround Using Computerized CPM, KW Woodcock, Cost Engineering Journal, 1989
Linear Scheduling Fundamentals for Cost Engineers, Carla Lopez del Puerto CCC; Douglas D. Gransberg PE CCE, AACE
Transactions, 2008

Chapter 03: Schedule Control


1.
2.

Time Extension In Construction Contracts, Steven G. Revay, CCE, Cost Engineering Journal, 1979
Preliminary Time And Overhead Estimates By The One-Third Rule, Marvin Gates, PE CCE; Amerigo Scarpa, PE, Cost Engineering
Journal, 1980
3. Controlling Job Costs Through CPM Scheduling, Philip S. Inglis, AACE Transactions, 1987
4. Modified CPM - A Scheduler's Best Friend, James D. Stevens, PE, Cost Engineering Journal, 1988
5. CPM Schedules In Construction Claims, Robert B. McCullough, Cost Engineering Journal, 1989
6. ODOT's Construction And Control Process, Amir Tavakoli, PE CCE, Cost Engineering Journal, 1991
7. Owner's Reviews of Schedules - How Far Should They Go?, Donald J. Fredlund, Jr.; Fred King, AACE Transactions, 1992
8. Duration Analysis, Andrew Sipos, PE, Cost Engineering Journal, 1992
9. Third-Party CPM Scheduling - Making It Work, Terry W. Towle, Cost Engineering Journal, 1993
10. Out-Of-Logic Progress, Saad A. Suhail, PE CCE, Cost Engineering Journal, 1993
11. Using Schedule Variance As The Only Measure Of Schedule Performance, Jim W. Short, CCC, Cost Engineering Journal, 1993

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 6
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.

Field Project Control - Back To Basics, Edward E. (Ted) Douglas III, CCC, Cost Engineering Journal, 1993
The Effect of Resource Constraints on Project Schedules, Michael R. Just, CCE; James P. Murphy, AACE Transactions, 1994
Project Time-Cost Optimization With the Purchase Time Method, Andrew Sipos, PE, Cost Engineering Journal, 1998
Improving Productivity With Short-Interval Scheduling, Walter J. Strutt, AACE Transactions, 2001
Time-for Versus Time-of Performance, Ferdinand Fourie, AACE Transactions, 2003
Pre-planning Project Control, Alfred L. Dellon, AACE Transactions, 1969
Engineer-Constructor and Client Tools for Cost and Schedule Control, Trent O. Meacham; Richard L. Patterson, AACE
Transactions, 1974
Short Cycle Methods for Improved Construction Control, Gui Ponce-Campos; Edward E. Pauley, AACE Transactions, 1977
Reverse Technique for Project Planning/Scheduling Controls, Duane A. Fuller, AACE Transactions, 1978
Construction Control Schedule, Derek Mason, AACE Transactions, 1982
Cost-Schedule Integration: Alternatives, Raad H. Hermes, AACE Transactions, 1982
ADM or PDM?, Raymond G. Piper, Cost Engineering Journal, 1982
Meaningful Scheduling Summaries for Management, Robert R. Cook, CCE, AACE Transactions, 1983
Modern Innovations in Scheduling Techniques, Dr. James E. Rowings, Jr.; John S. Bloess, AACE Transactions, 1984
A Scheduling Tool for Smaller Jobs, Fred Rahbar, AACE Transactions, 1984
Back To Basics: Practical Scheduling Guidelines Using CPM Computer Programs, Shiela Toth, Cost Engineering Journal, 1985
Using Milestone and CPM Scheduling Techniques to Decrease Network Size, James R. Walsh, PE, Cost Engineering Journal,
1988
Scheduling Technique to Control Several Minor Modification Projects, Mark A. Andrews; Kenneth L. Mortensen, PE; Edward J.
Kaufmann, PE, AACE Transactions, 1988
Is Resource Constrained Project Management Software Reliable, BM Woodworth, Cost Engineering Journal, 1989
Automation of the Scheduling Analysis Process, Dr. Gary Rock Spencer; F. Fred Rahbar, AACE Transactions, 1989
A Mechanical Model for CPM Scheduling Calculations, Abhi Basu, AACE Transactions, 1990
Owners Specify Contractor's Estimating/Scheduling Systems, Thomas L. Goff, AACE Transactions, 1991
Management of Networks of Projects, Roland Gareis, AACE Transactions, 1992
Automating the Schedule Review Process, John R. Knoke, PE; Jhan Schmitz, AACE Transactions, 1992
A Statistical Evaluation Of The Impact Of Limited Resources On Project Scheduling, BM Woodworth, Cost Engineering Journal,
1993
Improve Schedule Forecasting Via Earned Value, Donald J. Cass, CCE, AACE Transactions, 1994
The Cost of Chasing Unrealistic Project Schedules, Christopher F. Michalak, AACE Transactions, 1997
Managing Schedule Changes at Rocky Flats, Todd Bilstein, AACE Transactions, 1999
Managing Hospital Design Using CPM, Agustin Dominguez-Larrea; Calin M. Popescu, PE, AACE Transactions, 2002
Notes From Your Technical Board: What is Construction Schedule Control?, Satinder S. Baweja, CCE, Cost Engineering Journal,
2003
Schedule Integration -- Communication Tool Par Excellence, Rohit Singh, CCE, AACE Transactions, 2003
Project Schedules: Simple Checks for Accuracy, David L. Freidl, PE CCE, AACE Transactions, 2003
Contract Requirements for Construction Schedule, Win G. Li, PE CCE, AACE Transactions, 2003
Scheduling Results: Automation of Remaining Durations, Suhaib M. Anani, AACE Transactions, 2003
Notes from your Technical Board: Managing the Project Schedule, Clive D. Francis, CCC, Cost Engineering Journal, 2003
Contractor's Schedule Submittal: Catch-22, Earl T. Glenwright Jr., AACE Transactions, 2004
Construction Baseline Schedule Review and Submittal Timeframe, Win G. Li, PE CCE PSP; David J. Carter, Cost Engineering
Journal, 2005
Documenting the Schedule Basis, Edward E. Douglas III, CCC, PSP, AACE Transactions, 2005
Managing Multiple Milestones, Ron Winter, PSP, AACE Transactions, 2005
Predicting Building Construction Duration, Theresa Keoughan Burrows; Ian Pegg; Joe Martin, AACE Transactions, 2005

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 7
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.

Effective Use of Gantt Chart for Managing Large Scale Projects, Pankaja Pradeep Kumar, CCE, Cost Engineering Journal, 2005
Evaluating CPM Reliability: A Linguistic Approach, Lee J. Hobb, Cost Engineering Journal, 2006
Proposed Specification Language Regarding Pacing, Kenji P. Hoshino, PSP, AACE Transactions, 2006
Don't Create Variances During Planning, Leah V. Zimmerman, CCC PSP, AACE Transactions, 2006
Schedule Analysis Indices, Gary Rock Spencer, PE; Rose Mary Lewis, PE, AACE Transactions, 2006
Claims Analysis Nested in Schedule Updates, Christopher Willis Carson, AACE Transactions, 2006
RDM - Relationship Diagramming Method, Fredric L. Plotnick, PE, AACE Transactions, 2006
Scheduling: The Good, the Bad and the Ugly, H. Lance Stephenson, CCC, AACE Transactions, 2006
Making CPM More Transparent, Ronald M. Winter, PSP, AACE Transactions, 2006
Innovative Approaches to CPM Scheduling Management, Russell P. Vakharia, CCE PSP, AACE Transactions, 2006
Predicting Construction Duration of Building Projects, Theresa Keoughan Burrows; Ian Pegg; Joseph L. N. Martin, AACE
Transactions, 2006
Scheduling Specifications for the 21st Century, Paul Levin, PSP, AACE Transactions, 2006
Managing Resource Leveling, Michael R. Nosbisch, CCC PSP; Ronald M. Winter, PSP, Cost Engineering Journal, 2006
Scheduling Practices for Project Success, Andrew F. Griffith, PE, Cost Engineering Journal, 2006
How the Critical Chain Scheduling Method is Working for Construction, Jyh-Bin Yang, Cost Engineering Journal, 2007
Applying Earned Schedule Analysis to EVM data for Estimating Completion Date, Ray W. Stratton, EVP, AACE Transactions, 2007
Implications of Schedule Response, John C. Hildreth; Michael C. Vorster, AACE Transactions, 2007
Innovative Schedule Performance Measurements, Donna J. Nardella, PE PSP, AACE Transactions, 2007
Scheduling Management: Classifications vs. Levels, H. Lance Stephenson, CCC, AACE Transactions, 2007
Converting Linear Schedules to Critical Path Method Precedence, Douglas D. Gransberg, PE CCE, AACE Transactions, 2007
4D Modeling: Adding a New Dimension to CPM Scheduling, Vidya C. Dixit, CCE PSP, AACE Transactions, 2007
4D Scheduling A Case Study, Abhimanyu Basu, PE PSP, AACE Transactions, 2007
Pangs of Progress: Transition From P3 to P5, Jeffery L. Ottesen, PE PSP; J. Scott Palmer, AACE Transactions, 2007
Scheduling Management: Schedule Basis Memorandum, H. Lance Stephenson, CCC, AACE Transactions, 2007
Business Rules in CPM Scheduling Software, Abhimanyu Basu PE PSP, AACE Transactions, 2008
Schedule Acceleration - What, Why and How, Sunu Mohan PSP EVP, AACE Transactions, 2008
Risk Review of Recovery Schedules, John J. Ciccarelli PE CCE PSP; Matthew Murch, AACE Transactions, 2008
Schedule Constructability Review, Edward E Douglas III CCC PSP, AACE Transactions, 2008
Using the Contemporaneous Period Analysis During Projects, Mark F Nagata PSP; Brian Furniss, AACE Transactions, 2008
Construction Scheduling: Keeping Relevance, Amit Sarkar, AACE Transactions, 2008
RP 53R-06, Schedule Update Review, Ronald M. Winter PSP, AACE Transactions, 2008

Chapter 04: Schedule Float Ownership


1.
2.
3.
4.
5.
6.
7.

Who Owns Float?, Gordon G. Peterman, CCE, Cost Engineering Journal, 1979
Float Ownership: Specs Treatment, Dr. Gui Ponce de Leon, PE, Cost Engineering Journal, 1986
Qualitative Criteria Combination for Total Float Distribution, Suthi Pasiphol; Calin M. Popescu, PE, AACE Transactions, 1994
Total Float Management in CPM Project Scheduling, Dr. Suthi Pasiphol; Dr. Calin M. Popescu, PE, AACE Transactions, 1995
Schedule Density as a Tool for Pricing Compensable Float Consumption, Michael Ross Finke, Cost Engineering Journal, 2000
Once Upon a Time: A Scheduler's Tale, Lee Hobb, Cost Engineering Journal, 2003
Total Float Management: Renovating a Misused and Abused Approach, Anamaria I Popescu PE; John Jerz, AACE Transactions,
2008

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 8
Chapter 05: Cost Control
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.

A Contractor's Costing System, J.J. Kelsall, Cost Engineering Journal, 1980


Cost Containment and Cost Reduction, Stephen C. Wexler, PE CCE, AACE Transactions, 1985
Controlling Project Costs Through Trending, Daniel Becker, CCE, AACE Transactions, 1988
Range Estimating: Measuring Uncertainty and Reasoning with Risk, Michael W. Curran, Cost Engineering Journal, 1989
Project Cost Controls: Estimate Preparation Through Claim Defense, Del L. Younker, CCE, Cost Engineering Journal, 1990
Tools of the Trade: Advances in Cost Control and Schedule Management for Commercial Construction, Robert B. McCullough, PE
CCE, AACE Transactions, 1997
Competitively-Bid Construction Contracts, Randy R. Rapp, PE, Cost Engineering Journal, 1997
Cost Control and Cash-Flow Management: A Simple Approach, Irving M. Fogel, PE, Cost Engineering Journal, 1997
The Dual-Entry Cost Control Method: Why Cost Engineers Should Switch, Wieslaw J. Jurkiewicz, PE, Cost Engineering Journal,
1997
Earned Value Programs for DOE Projects, Donald J. Cass, CCE, AACE Transactions, 1998
Optimization for Bidder Profitability and Contractor Selection, Dr. Amarjit Singh, P.Eng.; Max M. Shoura, PE, Cost Engineering
Journal, 1998
The Myth About General Conditions, Iftikhar K. Madni, Cost Engineering Journal, 1998
Improving the Cost and Schedule Control System, Mohammed S. El-Mashaleh; Allan D. Chasey, PE, Cost Engineering Journal,
1999
Bid Markup Methodologies, Dr. Kwaku A. Tenah; Dr. Carleton Coulter III, PE, Cost Engineering Journal, 1999
Analysis of Change Order Markup Allowances on Stipulated Price Building Contracts, Aminah Robinson Fayek; Moses Y. Nkuah,
Cost Engineering Journal, 2002
Up-Front Cost Estimating of Change Orders, Osama Moselhi; Ihab Assem; Khaled El-Rayes, AACE Transactions, 2002
Estimating the Cost of Change Orders, Osama Moselhi, PE, Cost Engineering Journal, 2003
How Much is Too Much?, Michael C. Ray, PE, CCE, AACE Transactions, 2003
Cost Control Systems: Benefits Provided to Claims Analysis, John J. Ciccarelli, AACE Transactions, 2003
Cost Control Or Complacency, Frederick H. Barnes, AACE Transactions, 1962
Capital Project Costs Can Be Controlled, John F. Lovett, AACE Transactions, 1963
Can The Application Of The Critical Path Method Assist Cost Control, Alex S. Traub; John R. Bridgeman; Martin J. Gibson, Jr.;
Thomas J. Monahan; Lars O. Soderberg; Robert E. Templeton, AACE Transactions, 1963
Better Project Control Through Coordinated Estimating, Cost Control And Scheduling, J. Alcabes, AACE Transactions, 1969
Cost And Schedule Control Of Engineering Work Using One Data Base & The Network Technique: A Concept, G. Suhanic, Jr.,
AACE Transactions, 1969
Why Not Cost Control?, A. Patrascu; C. P. Rapier; A. Smolin; H. K. A. Solu, AACE Transactions, 1970
Cost Control As A Management Tool, F. Graham, AACE Transactions, 1971
Computerized Project Cost Control System Using CPM As A Basis, E. E. Faulkner; S. S. Sriram, AACE Transactions, 1972
Cost Control and the Project Manager, A. E. Garred, AACE Transactions, 1973
Capital Cost Control Requires Cost Engineering - Plus!, Edward F. Hensley, AACE Transactions, 1973
A Practical Cost Control System for Force Account Construction Projects, D. A. Zink, AACE Transactions, 1973
Interrelating Project Estimates to CPM Schedules, Albert A. Badger, AACE Transactions, 1974
Managerial Attention to Cost and Schedule, John W. Strach, AACE Transactions, 1974
Can We Really Control Multi-Million Projects?, Joseph R. Lorenzo; D. Sharad, AACE Transactions, 1974
Cost Control... Where It's At!, William G. Fischer; J. W. Hackney, AACE Transactions, 1975
Cost Control in Building Design - Determining the Right Strategy, Peter Brandon, AACE Transactions, 1976
Cost Management Techniques for Construction Projects, Kenneth M. Guthrie, AACE Transactions, 1976
Construction Project Planning and Cost Control, Arnold J. Quakkelaar, AACE Transactions, 1977

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 9
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.

Cost Control Through Engineering Interface, Jack F. Browder; Collin J. Douthit, AACE Transactions, 1977
Early Warning System Trending Techniques, Charles F. Johnson, CCE, AACE Transactions, 1978
Cost Control for the Common Man, Robert F. Smith, CCE; Joseph E. Strasser, AACE Transactions, 1978
Cost Control on Multi-Contract Projects, Dick Sharad, CCE; W. W. Roney, AACE Transactions, 1979
Key Cost Control for Capital Projects, John W. Hackney, CCE, AACE Transactions, 1979
Cost/Performance Measurement, Melvin F. Rogers, AACE Transactions, 1979
Project Cost Control - Behavioral Considerations, Dr. Carl Wolf, CCE; Dr. Phillip F. Ostwald, AACE Transactions, 1980
Cost Control of a Negotiated Contract, Norman H. Matthews, AACE Transactions, 1981
The System of Project Control, George Suhanic, AACE Transactions, 1981
Project Controls - A Force-Account Approach to CM, Thomas P. Roche, AACE Transactions, 1981
Project Control: An Integrated Approach to Construction Planning and Cost Control, Philip W. Dixon, AACE Transactions, 1981
Integration of Cost and Scheduling Systems, Paul B. Shiring, Jr., CCE, AACE Transactions, 1981
Cost Controls Used Constructing A Nuclear Station, Yogesh V. Shah; Barnwell R. Linley, CCE, Cost Engineering Journal, 1981
Applications of Cost and Schedule Integration, William R. Crean; Walter F. Adamczyk, AACE Transactions, 1982
A Critique of Integrated Cost/Schedule Systems, William M. Sancho, CCE, AACE Transactions, 1982
Cost/Schedule Integration - Panacea or Poison?, Robert R. Cook, CCE, AACE Transactions, 1982
An Early Warning System, Paul B. Shiring, Jr., CCE, AACE Transactions, 1983
Early Warning Project Cost Control, William C. Hickey, AACE Transactions, 1983
Engineering Cost and Schedule Control, James A. Bent, CCE, AACE Transactions, 1983
How to Interface Cost and Planning in Offshore Projects, Pierre Boutineau; James-Jacques Eldin, AACE Transactions, 1983
Integration of Cost and Planning: Myth or Reality?, Serge Pressoir, AACE Transactions, 1983
Construction Cost Control at the Corporate Level, Rupinder S. Rangar; Bevis A. Ostermann, AACE Transactions, 1983
Cost and Schedule Integration in Process Plants Construction, Chandra S. Murthy, AACE Transactions, 1983
Integration of Cost and Scheduling with Materials Management Function, John C. Cato; Chandra S. Murthy, AACE Transactions,
1983
Cost Control And The Small Construction Company, Keith O. Thomas, Cost Engineering Journal, 1983
Practical Cost Control: Techniques & Timing, J. Peter Bullis, AACE Transactions, 1984
Cost Controls for International Development Projects, Raymond H. Lennark, PE CCE, AACE Transactions, 1984
Authority Over Cost Control of Construction, G. E. Ninos; S. H. Wearne, AACE Transactions, 1984
Project Cost Control by the Government of Canada, Jean-Guy Hache, AACE Transactions, 1984
Cost Control's Missing Link - Progress Measurement, James G. Buck, AACE Transactions, 1985
The Cost Control Tree, George Suhanic, PEng, Cost Engineering Journal, 1986
The Cost Control Banana, George Suhanic, P Eng., AACE Transactions, 1986
Cost Control in a Nutshell, H. K. A. Solu, PE, AACE Transactions, 1986
Determining Overrun Probabilities, John W. Hackney, CCE, AACE Transactions, 1986
Construction Cost Control Techniques in the United Kingdom, R.B. Watson, Cost Engineering Journal, 1988
Cost Control: The Industrial Owner's View, Leland S. Riggs, Cost Engineering Journal, 1988
Capital Cost Control: The Owner's Perspective, Marc T. Richardson, PE CCE, AACE Transactions, 1988
Cost Control and Project Accounting are Getting Married, Serge Pressoir, PE, AACE Transactions, 1988
A System for Monitoring Cost and Schedule Performance of Professional Design Services, Luis F. Suarez, CCE; Howard A. Green,
AACE Transactions, 1988
Cost Control - The Tricks and Traps, Leslie E. McMullan, AACE Transactions, 1991
Implementing an Owner's Cost Control System, Ron F. Cagle, AACE Transactions, 1991
Project Control -- Back To Basics, Robert A. McKim, Cost Engineering Journal, 1990
Cost Control In Design/Build, JG Fish, Cost Engineering Journal, 1991
Aspects Of Cost Control, Bruce A. Martin, CCE, Cost Engineering Journal, 1992

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 10
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.
97.
98.
99.
100.

Integrated Cost And Schedule Control, BE Kibler, Cost Engineering Journal, 1992
Joint Ventures - The Wave of the Future, F. Sam Griggs, Jr., CCE, AACE Transactions, 1992
Cost Control of Engineering Services in Buildings, R. Bruce Watson, AACE Transactions, 1992
Applied Cost Control, Don E. Stiner, CCE, AACE Transactions, 1992
Proactive Field Level Cost Control, Neil D. Opfer, CCE, AACE Transactions, 1992
Construction Cost Control Systems in Saudi Arabia, Dr. Ali A. Shash; Samer Ahmad Zamel, AACE Transactions, 1993
The Project Trend Program, Harry W. Jarnagan, PE CCE, AACE Transactions, 1993
Biopharmaceutical Construction, Costs, and Cost Controls, Christopher Law, Cost Engineering Journal, 1997
Improving the Cost and Schedule Control System, Mohammed S. El-Mashaleh; Allan D. Chasey, PE, Cost Engineering Journal,
1999
Project Controls - Where It Fits In, Michael C. Ray, PE CCE, AACE Transactions, 1998
Integration of Schedule and Cost Risk Models, Robert V. Wendling; Randal B. Lorance, PE, AACE Transactions, 1999
Project Controls in an International Arena, Desmond G. Pellicena, AACE Transactions, 2000
Project Controls: Getting Back to Basics, Michael R. Nosbisch, AACE Transactions, 2002
The Project Management Tools: Scheduling and Cost Control Systems, Chris Brous, AACE Transactions, 1978
Cost Control - A Perspective Of Its Future, Marc S. Caspe, PE, AACE Transactions, 1978
Practical Cost/Schedule Modeling for CIP Management, John R. Knoke, PE; Jaime de la Garza, AACE Transactions, 2003
Improving Cost Control for Skeptical Managers, Morris E. Fleishman, PE CCE, AACE Transactions, 2004
Cost Management, Allen C. Hamilton, CCE, AACE Transactions, 2004
Cost and Schedule Control for Engineering Contracts, Kenneth R. Davey, CCE, Cost Engineering Journal, 2004

Chapter 06: Management of Change


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

Change Orders Impact on Construction Cost and Schedule, George Suhanic, AACE Transactions, 1980
Estimating and Negotiating Change Orders, Leonard A. McMahon, CCE, AACE Transactions, 1984
Cost Guidelines for Change Orders, Ronald F. Cilensek, CCE, AACE Transactions, 1986
Construction Projects: Change Order Management, Dr. Calin M. Popescu, AACE Transactions, 1986
The Role of the Cost Engineer and the Change Order Process, Alfred L. Dellon, CCE, AACE Transactions, 1986
Change Orders: Causes, Prevention, Control, and Resolution, John H. DeFeis, Jr., Cost Engineering Journal, 1986
Documentation And Verification In The Change Order Process, Alfred L. Dellon, CCE; Dr. Irene J. Dellon, AACE Transactions,
1988
Direct Range Estimating for Change Orders, John R. Knoke, PE; John R. Spittler, PE, AACE Transactions, 1991
Budgeting for Changes in Construction, Stephen F. Rusteika, Jr.; John L. Boomer, AACE Transactions, 1992
Change Order Management For Construction Projects, Fritz Ehrenreich-Hansen, PE CCE, Cost Engineering Journal, 1994
Forward Pricing Impact on Construction Projects, Brian E. Kasen; Victor C. Oblas, PE, AACE Transactions, 1996
Estimating the Cost of Change Orders, Dr. Osama Moselhi, PE, AACE Transactions, 1998
Constructability in the Design Firm, James A. Young III, CCC, Cost Engineering Journal, 1998
Tracking Changes in Capital Improvement Budgets, John R. Knoke, PE, AACE Transactions, 1999
Managing Changes in Large Programs, Ashish Kumar, AACE Transactions, 2000
Project Trends and Change Control, Edward E. (Ted) Douglas III, AACE Transactions, 2000
Lookout For change Orders, Iftikhar K. Madni; Joseph M. Reed, Cost Engineering Journal, 2001
Change Order Evaluation and Resolution Approach, Joseph W. Wallwork, Cost Engineering Journal, 2001
Analyzing the Cumulative Impact of Changes, David D. Reichard; Cheryl L. Norwood, AACE Transactions, 2001
Projects Costing Too Much? Taking Too Long?, Dean Dahlen, AACE Transactions, 2001
Notes From Your Technical Board: Managing Change Orders, Sarwar A. Samad, CCE, Cost Engineering Journal, 2002

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 11
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.

Constructive Changes, Anthony J. Werderitsch; James E. Krebs, AACE Transactions, 2002


Deferred Work Impact: A Solution, Michael A. Hauser, CCC, AACE Transactions, 2003
Proactive Change Order Management, Frank Kettlewell, AACE Transactions, 2003
Coping with Changes, Stephen O. Revay, CCC, AACE Transactions, 2003
Effective Management of Project Change Orders, Edward E. Douglas III, CCC, AACE Transactions, 2003
A Project Control to Meet Project Change, Mark W. Beyer, PE, AACE Transactions, 1988
Management Change in the Project Environment, Dr. M. Dean Martin; Dr. Stephen D. Owens, AACE Transactions, 1988
Managing Change: Making the Most of Contingency, Daniel W. Jordan, CCE, AACE Transactions, 1989
Designs: They Are A-Changin', Stanley L. Cohen, PE, AACE Transactions, 1992
Change Control and Tracking, Mark T. Chen, PE CCE, AACE Transactions, 1992
The Keys to Forecasting - #3 Change Control, James E. Baar; Stephen M. Jacobson, CCC, Cost Engineering Journal, 2004
Controlling Design-Phase Scope Creep, John A. Kuprenas, PE; Elhami B. Nasr, AACE Transactions, 2003
Accelerating Change in Construction Project Delivery, George F. Jergeas, P.Eng., AACE Transactions, 2004
Systematic Contract Change Review, Mark C. Sanders, PE CCE, AACE Transactions, 2004
The Effect of Early Freezing of Scope on Project Schedule, Neil N. Eldin, PE, Cost Engineering Journal, 2005
Project Scope Management, Asadullah Khan, Cost Engineering Journal, 2006
Change Management for Today's Projects - A Process Approach, Stephen E. Goodman, AACE Transactions, 2006
"Root Causes": The Six Reasons for CHANGE, Robert L. Tichacek, PE, AACE Transactions, 2006
Six Steps for Successful Change Order Management, Katherine K. Molly, CCC, Cost Engineering Journal, 2007
Performing Value Analysis on Construction Project Variation Orders, Jamal Al Duaij; Tareq Awida; A.E. Kollarayam, Cost
Engineering Journal, 2007
42. Skills and Knowledge of Cost Engineering: Change Management for EPC Contracting, Donald F. McDonald, Jr. PE CCE PSP, AACE
Transactions, 2007
Chapter 07: Cost Impacts

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

Pricing Construction Claims, Irv Richter, AACE Transactions, 1978


Minimizing The Cost Of Delay Related Construction Claims, Dwight A. Zink, AACE Transactions, 1979
The Integration Of Labor Cost Distribution (LCD) & Network Scheduling, Stephen C. Wexler, AACE Transactions, 1979
Escalation: Measuring Its Effect On Project Costs, Frederick L. Blanchard, Cost Engineering Journal, 1980
Material Escalation Claim on an International Project - A Case Study, P. E. Ullmann, AACE Transactions, 1981
Complex Claims: Cost Principles, Models and Behavior, Michael O'Connor, PE, AACE Transactions, 1984
The Measured Mile: Proving Construction Inefficiency Costs, Dwight A. Zink, Cost Engineering Journal, 1986
Proof of Damages in Construction Claims, Richard J. Long, AACE Transactions, 1988
Computing Construction Equipment Costs For Government Contracts, William W. Powell, PE, Cost Engineering Journal, 1988
Recovering Added Costs When Superior Knowledge Is Undisclosed, LuRicka L. Kougl, Cost Engineering Journal, 1990
Substantiation Of Costs In Construction Claims, Robert A. Dieterle, CCE; Stanley J. Maziarz, Cost Engineering Journal, 1991
Understanding Contractor Overhead, Ron Cilensek, CCE, Cost Engineering Journal, 1991
The Cost of General Conditions, Daniel F. Becker, AACE Transactions, 1993
Liquidated Damages for Multi-Prime Projects, Gui Ponce de Leon, PE; Gerald P. Klanac; William H. Edwards, AACE Transactions,
1993
Estimating Construction Claims - A Different Problem, Arthur Monsey, PE, AACE Transactions, 1993
General Conditions Analysis - A Contracting Approach, Lorry T. Bannes, AACE Transactions, 1993
Fee Analysis - A Contractor's Approach, Lorry T. Bannes, PE, AACE Transactions, 1994
Windfall Profits, Dwight A. Zink, AACE Transactions, 1995

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 12
19. Indirect Rate Development for Government Contracts, David A. Norfleet, CCC, Cost Engineering Journal, 1995
20. Consequential Cost Effects, Paul R. Heather, CCE; Michael D. Summers, CCE, AACE Transactions, 1996
21. Equipment Compensation in US Government Construction Equitable Price Adjustments, Beni Warshawsky, Cost Engineering
Journal, 1996
22. A Spreadsheet Checklist to Analyze and Estimate Prime Contractor Overhead, Walter B. Jones, CCC, Cost Engineering Journal,
1996
23. Analyzing the Impact of Change Orders on a Schedule, Jeffrey A. Veenendaal, Cost Engineering Journal, 1998
24. Practical Analyses in Proving Damages, Jack W. Harris; Andrew Ainsworth, AACE Transactions, 2003
25. Cost Validation Methodology: New Systems Implementation, Jack W. Harris, AACE Transactions, 2004
26. Impacts of Modifications to the Change Order Process, G. Steve Gardner, PE; Roy W. Block, AACE Transactions, 2004
27. Contingency! Who Owns and Manages It?, Peter W. Ripley, CCC, AACE Transactions, 2004
28. The Impact Of Modifications On Major Projects, Ronald A. Gillis, AACE Transactions, 1967
29. Impact: The Real Effect Of Change Orders, Carroll J. Collins, AACE Transactions, 1970
30. Cost Control land Lump Sum Contracting (Coping with all the Changes), John R. Healy, CCE, AACE Transactions, 1981
31. Calculations of Lost Profits from Lost Business Opportunities, Kris R. Nielsen; Joseph J. Galeno, AACE Transactions, 1984
32. "Mathews Curve" - A Model for Evaluating Impact, Paul R. Heather, CCE, AACE Transactions, 1989
33. Labor Cost Calculations in International Construction, Dr. Enno Koehn, PE; D. C. Regmi, AACE Transactions, 1991
34. Predictive Model of Cost Overruns, Dr. Mark O. Federle; Steven Pigneri, AACE Transactions, 1993
35. Model Building Strategy for Construction Cost Overruns, Dr. Mohamed K. El-Choum, AACE Transactions, 1995
36. Estimating the Cost of Change Orders, Dr. Osama Moselhi, PE, AACE Transactions, 1998
37. Analysis of Change Order Markup Allowances on Stipulated Price Building Contracts, Aminah Robinson Fayek; Moses Y. Nkuah,
Cost Engineering Journal, 2002
38. Estimating Change Orders, -- Cost or Opportunity?, Michael B. Carringer, AACE Document, 1998
39. Estimating Cost Growth From Schedule Changes: A Regression, John V. Bielecki; Edward D. White, Cost Engineering Journal,
2005
40. Impacts of Project Change Management on Project Cost and Schedule Performances, Yi Zou; Sang-Hoon Lee, AACE
Transactions, 2006
41. The Cost of Change, Michael T. McKeeman; Kurt Rossetti, CCE, Cost Engineering Journal, 2007
42. The Cumulative Effect of Change, Bob M. McCally, AACE Transactions, 2006
43. Design Phase Influences on Construction Change Order Costs, John A. Kuprenas, PE, AACE Transactions, 2007
44. Pricing Cumulative Impacts of Differing Site Conditions and Design Changes in Construction, Danielle Bonhomme-Delprato, CCE,
Cost Engineering Journal, 2008
45. Reviewing Change Orders 101, Brian S Clare CCC, AACE Transactions, 2008
46. Recommended Ways to Reduce the Number of Change Orders on School and Hospital Building Projects, Jacqueline Therese Doyle;
J Michael Molnar; Robert B Brown PE, AACE Transactions, 2008
47. Change Management During FEED - Owner's Case Study, Vijay S. Jambhekar; Stephen D. Weeks, AACE Transactions, 2008
Chapter 08: Productivity Impacts
1.
2.
3.
4.
5.
6.

Learning Curves: Theory And Practice, B. R. Elder, AACE Transactions, 1963


Learning Curves, Sal M. Kadri, AACE Transactions, 1963
Estimating Capital Equipment Construction Costs With The Learning Curve, W. B. Hirschmann, AACE Transactions, 1965
Measurement of Engineering Productivity: An Approach, Sharad Dikshit, AACE Transactions, 1973
Effect Of Scheduled Overtime On Construction-Projects, RM Blough, Cost Engineering Journal, 1973
Overtime In Construction, Weldon McGlaun, Cost Engineering Journal, 1973

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 13
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.

The Use of the Learning Curve, Jack H. Chellew, AACE Transactions, 1974
Productivity in Construction - With Relation to Union and Nonunion Operation, John P. Trimmer, AACE Transactions, 1974
Extended Overtime and Construction Productivity, John Smith, AACE Transactions, 1975
Factors Affecting Productivity, Leon Morrison, AACE Transactions, 1975
Productivity Analysis - A Case Study, Charles J. Peles, AACE Transactions, 1977
Construction Productivity and Progress Control, Robert E. Sheffield, CCE, AACE Transactions, 1978
Factors Which Influence Productivity on Large Projects, Dr. John D. Borcherding, AACE Transactions, 1978
Developments in Firm-Level Productivity Measurement, Jerry L. Hamlin, CCE, AACE Transactions, 1978
Productivity--An Updated Concept of Management, H. Murray Hohns, AACE Transactions, 1979
Major Factors Influencing Craft Productivity in Nuclear Power Plant Construction, John D. Borcherding; Scott J. Sebastian, AACE
Transactions, 1980
Analysis of Working Space Congestion from Scheduling Data, Dr. Paviz F. Rad, CCE, AACE Transactions, 1980
Motivation and Productivity of Craftsmen and Foremen on Large Projects, John D. Borcherding; Douglas F. Garner, AACE
Transactions, 1980
A More Effective Program to Monitor Productivity, Fred S. Griggs, Jr., AACE Transactions, 1980
Construction Labor Productivity During Nuclear Power Plant Construction, William B. Murray, AACE Transactions, 1980
Productivity Control on Large Power Projects, Jude P. Laspa, AACE Transactions, 1980
Worker Productivity: Characteristics and Measurement, Ira B. Gregerman, AACE Transactions, 1981
Productivity Defined, Jean-Claude Huot, AACE Transactions, 1981
Using Pay to Motivate Construction Job Performance, Alexander Laufer; John D. Borcherding, AACE Transactions, 1981
The Productivity Measurement of Construction Labor Using Work Sampling, Ira B. Gregerman, AACE Transactions, 1981
A Program to Improve Productivity of Field Directed Construction Operations, Michael H. Casten, AACE Transactions, 1981
The Correction Curve, Marvin Gates, CCE; Amerigo Scarpa, AACE Transactions, 1982
Understanding the Word "Productivity": What It Means And What Is Behind It, Marjatta Strandell, AACE Transactions, 1982
Improving Construction Productivity: The Case for Motivation, G. Douglas Jenkins, Jr.; Alexander Laufer, AACE Transactions, 1982
Work Sampling And Unit Man-hours, Enno Koehn, Cost Engineering Journal, 1983
Significant Elements of Construction Productivity, Dr. Carleton Coulter III; Victor F. Spruill, AACE Transactions, 1983
Construction Productivity Management, R Cardell, Cost Engineering Journal, 1986
Learning Curves and Work Interruptions in Construction, Vassilios Frantzolas, AACE Transactions, 1984
Craftsman Questionnaire Sampling for Construction Productivity, Luh-Maan Chang; Dr. John Borcherding, AACE Transactions,
1984
Predicting Productivity, James M. Neil, CCE; Lee E. Knack, AACE Transactions, 1984
Management Development Leads to Increased Productivity, Karl W. Haavind, AACE Transactions, 1984
Construction Industry Factors Impairing Productivity, P. Fazio; Don Chutter; G. Bourassa; Dr. Alan D. Russell, AACE Transactions,
1984
The Megaproject And Productivity, MA Muspratt, Cost Engineering Journal, 1984
Dollars And Sense Of Productivity, M. R. Goodes, Cost Engineering Journal, 1984
Labor Productivity and Manpower Forecasting, Forrest D. Clark, CCE, AACE Transactions, 1985
Criteria And Techniques For Meaningful Work Sampling Productivity Studies, James B. Scarfuto, Cost Engineering Journal, 1985
The Measured Mile: Proving Construction Inefficiency Costs, Dwight A. Zink, Cost Engineering Journal, 1986
Labor Productivity in Third World Environments, Dr. James E. Rowings, Jr.CCE; Hashiem, AACE Transactions, 1986
Estimating Labor Productivity, Joseph A. Brown, CCE, AACE Transactions, 1986
Methods for Construction Productivity Measurement, Jeffrey S. Russell; Dr. Luh-Maan Chang, AACE Transactions, 1987
Construction Site Operations Perceptions of Tradesmen, Dr. Enno Koehn; Cpt. Michael W. Pratt; Ryan Cook, AACE Transactions,
1987
Increasing Onsite Production, Andrew G. Smith, CCE, AACE Transactions, 1987

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 14
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.

Activity Survey Impact on Construction Productivity, Stephen G. Goranson, AACE Transactions, 1988
Analytical Techniques to Improve Construction Productivity, Dr. Luh-Maan Chang, AACE Transactions, 1988
Impact of Overtime on Construction, Irwin Bromberg, PE, AACE Transactions, 1988
Development and Application of Learning Curves, John F. Synan; Frederick K. Larson, AACE Transactions, 1989
Labor Productivity Factors for Hazardous Waste Sites, Donald J. Cass, CCE, AACE Transactions, 1989
Productivity Improvement Through Communications: C O G, A. Larry Aaron, AACE Transactions, 1989
Productivity Committee Meeting and Productivity - Guess It or Measure It, Ralph P. O'Neal, Jr. CCE, AACE Transactions, 1989
Can the Mystery of Productivity be Solved?, Ralph P. O'Neal, Jr., CCE, AACE Transactions, 1990
An Estimate-Independent Productivity Measurement System, A. Larry Aaron; Dr. H. Randolph Thomas, AACE Transactions, 1990
Multiple Improvement Curve Effects Upon Productivity, Dr. Robert C. Creese; B. P. Madhu Sudhan, AACE Transactions, 1991
Impacts And Construction Inefficiency, Dwight A. Zink, Cost Engineering Journal, 1990
Determining Labor Productivity: A Case Study, TG Mendel, Cost Engineering Journal, 1991
Measuring Construction Productivity, LM Chang, Cost Engineering Journal, 1991
The Creation and Use of Labor Productivity Standards among Specialist Subcontractors in the Construction Industry, John D.
Gilleard, Cost Engineering Journal, 1992
A Method to Calculate the Productivity Factor, Juan Fornino Gaeta; Robert R. Ruiz Gomez, AACE Transactions, 1993
Productivity: Measurement and Management, Vic Alby, PE, CCE, AACE Transactions, 1994
Construction Production Factors in International Areas, Dr. Enno Koehn; Chih-Shing Pan; Jen-Yuan Liu; Rana P. Pingili; Sirichai
Tanratanawong, AACE Transactions, 1995
Crew Synchronization in Construction, Anamaria I. Popescu; George E. Gibson, Jr., PE; John D. Borcherding, PE, AACE
Transactions, 1995
Labor Productivity Modeling With Neural Networks, Dr. James E. Rowings Jr., PE CCE; Rifat Sonmez, AACE Transactions, 1996
Productivity of Construction in Developing Areas: India, Enno Koehn, PE; V. R. Ganapathiraju, AACE Transactions, 1996
Construction Productivity: Continuous Improvement Is Normal, Dr. Richard E. Larew, PE CCE, AACE Transactions, 1996
TVA's Continuous Outage Productivity Measurement/Improvement, Dr. Hans E. Picard; C. Robert Seay Jr., AACE Transactions,
1996
Shiftworker Fatigue: The $77 Billion Problem, Ed Coburn, Cost Engineering Journal, 1997
Production Rates for International Projects in Asia, Dr. Enno Koehn, PE; Moin U. Ahmed, AACE Transactions, 1998
Construction Productivity as a Competitive Edge, Dr. Hans E. Picard, AACE Transactions, 1998
Variation in Construction Productivity: Developing Countries, Enno "Ed" Koehn; Sheikh Arif Ahmed; Satyanarayana Jayanti, AACE
Transactions, 2000
Productivity Improvement through Work Sampling, James L. Jenkins; Daryl L. Orth, AACE Transactions, 2003
Improving Construction Process Capability, Hans E. Picard, AACE Transactions, 2003
Mechanical and General Construction Productivity Results, Daryl L. Orth; James L. Jenkins, AACE Transactions, 2003
Project Productivity Analysis: What Is 1.0?, Charles P. Woodward, PE CCE, AACE Transactions, 2003
Impact of Overtime on Construction Labor Planning, Awad S. Hanna, PE; Kenneth T. Sullivan, Cost Engineering Journal, 2004
Performance Measurement in the UK Construction Industry, Joe Martin, AACE Transactions, 2004
Analyzing Construction Productivity, Joseph J. Orczyk, PE, AACE Document, 1999
A Case Study: Schedule Forecast Verification With Productivity Assessment, Win G. Li, PE CCE PSP, AACE Transactions, 2005
Construction Productivity in Developing Global Regions, Enno Koehn, PE; Sanjay A. Jagushte, AACE Transactions, 2005
Modeling Labor Productivity in Steel Fabrication, Lingguang Song; Simaan M. AbouRizk, P.Eng., AACE Transactions, 2006
Construction Productivity, James D. Whiteside, II PE, AACE Transactions, 2006
Scheduled Overtime and Loss of Productivity: Fact or Fiction? A Business Roundtable Report, Robert Seals, PSP; Josette
Rodriguez, Cost Engineering Journal, 2006
Productivity Claims: Beyond Smoke and Mirrors, John Gerard Boyle, AACE Transactions, 2007
The Measured Mile - A Better Way Of Utilizing An Old Tool, Glen R. Palmer, PSP, AACE Transactions, 2008

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 15
88. Monitoring the Adequacy of the Amount and Productivity of Engineering and Construction Manpower, Dwight A. Zink, CCE, AACE
Transactions, 1980
89. An Improved Technique of Productivity Measurements, Steven G. Revay, CCC, AACE Transactions, 1984
90. Construction Industry Factors Impairing Productivity, P. Fazio; Don Chutter; G. Bourassa; Dr. Alan D. Russell, AACE Transactions,
1984
91. Construction Productivity: Major Causes of Impact, Charles A. Leonard; Dr. Paul Fazio; Dr. Osama Moselhi, AACE Transactions,
1988
92. Variance Analysis Labor Cost Report, Joseph Orczyk, PE, AACE Transactions, 1989
93. Impacts And Construction Inefficiency, Dwight A. Zink, Cost Engineering Journal, 1990
94. A Methodology for Measuring Construction Productivity, Foster M. Burton, AACE Transactions, 1991
95. Use of Productivity Factors in Construction Claims, Robert Dieterle, CCE; Alfred DeStephanis, AACE Transactions, 1992
96. Labor Productivity Impact of Varying Crew Levels, Donald J. Cass, CCE, AACE Transactions, 1992
97. A Model for Analyzing Jobsite Productivity, David D. Chitester, PE, AACE Transactions, 1992
98. Are Any Construction Overtime "Studies" Reliable?, Dr. Richard Lerew, PE, AACE Transactions, 1995
99. Labor Productivity, Disruptions, and the Ripple Effect, Dr. H. Randolph Thomas, PE; Dr. Amr A. Oloufa, PE, Cost Engineering
Journal, 1995
100. Use of Statistical Control Charts in Construction, Satinder S. Baweja, CCE, AACE Transactions, 1997
101. Demonstrated Labor Efficiency: An Effective Labor Cost Control and Analytical Tool, Bob M. McCally, AACE Transactions, 1998
102. Measuring Construction Labor Productivity by Daily Visits, Dr. Iqbal Noor, PE CCE, AACE Transactions, 1998
103. Quantifying the Effect of Change Orders on Electrical Construction Labor Efficiency, Dr. Awad S. Hanna, PE; Dr. Jeffrey S. Russell,
PE; David Thomack, Cost Engineering Journal, 1998
104. The Effect of Hot Weather on Construction Labor Productivity and Costs, Donn E. Hancher; Hesham A. Abd-Elkhalek, Cost
Engineering Journal, 1998
105. Are Any Construction Overtime "Studies" Reliable?, Richard E. Larew, Cost Engineering Journal, 1998
106. Statistical Evaluations of Measured Mile Productivity Claims, Michael Ross Finke, Cost Engineering Journal, 1998
107. Simplified Spreadsheet Solutions: Models for Critical Path Method and Time-Cost-Tradeoff Analysis, Tarek Hegazy; Amr Ayed, Cost
Engineering Journal, 1999
108. Construction Productivity: A Survey of Industry Practices, George F. Jergeas; Mohammad S. Chishty; Marko J. Leitner, AACE
Transactions, 2000
109. Labor Productivity Impacts: A Case Study, Robert D. Kelly, AACE Transactions, 2000
110. Measured Mile Analysis and International Mega-Projects, Dan Crowley; John C. Livengood, AACE Transactions, 2002
111. Construction Productivity: An Auditing and Measuring Tool, George F. Jergeas; Robert McTague, AACE Transactions, 2002
112. Productivity Issues, Melanie L. Longmore; Doug Major; Jose L. Maldonado, AACE Transactions, 2002
113. "Measured Mile" Process Project Controls to Support Equitable Recovery of Production Inefficiency Claims, Thomas W. Presnell,
CCC, Cost Engineering Journal, 2003
114. Assessing Methodologies for Quantifying Lost Productivity, Mark C. Sanders, PE; Mark F. Nagata, AACE Transactions, 2003
115. Inefficiency, Zartab Z. Quraishi, PE CCE, AACE Transactions, 2003
116. The Productivity Baseline, Ronald Gulezian; Frederick Z. Samelian, AACE Transactions, 2003
117. Measured Mile Labor Analysis, Timothy T. Calvey, PE; William R. Zollinger III, PE, AACE Transactions, 2003
118. Loss of Learning in Disruption Claims, David A. Norfleet, CCC, AACE Transactions, 2004
119. Going the Extra Mile, Walter Bauer, P.Eng., AACE Transactions, 2004
120. Quantifying Disruption through Simulation and Heuristics, Kenneth G. Cooper; Kimberly Sklar Reichelt; Jonathan Moore, AACE
Transactions, 2004
121. Estimating Lost Labor Productivity in Construction, AACE International, AACE International Recommended Practice, 2004

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 16
Chapter 09: Management and Analysis of Delay
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.

Construction Delay Claims - Assessment Defense, A. J. Werderitsch, CCE; Shah Firoozi, AACE Transactions, 1983
How to Save a Delayed Project, Wesley R. Querns, CCE, AACE Transactions, 1986
Delay Analysis: A Systematic Approach, Joseph S. Reams, Cost Engineering Journal, 1989
Weather-Related Delays on Government Contracts, Michael R. Finke, AACE Transactions, 1990
Delay Evaluation Using "Record Schedules", Donald J. Fredlund, Jr.; Gui Ponce de Leon, PE, AACE Transactions, 1990
Substantiation And Use Of The Planned Schedule In A Delay Analysis, Joseph S. Reams, CCE, Cost Engineering Journal, 1990
Selecting As-Planned Base in Project Disputes, Calin Popescu, PE, AACE Transactions, 1991
A Cost-Effective Delay Analysis Technique, Mireille Battikha; Sabah Alkass, PE, AACE Transactions, 1994
Delay Analysis - Issues Not for Granted, George E. Baram, CCE, AACE Transactions, 1994
Responsibility for Delays After the Expiration of the Contract Time, Gary H. Jentzen, PE; Philip Spittler; Dr. Gui Ponce de Leon, PE,
AACE Transactions, 1994
Proving and Pricing Constructive Acceleration Claims, Craig C. Halvorson, CCC, AACE Transactions, 1995
Remedies for Delays in Architectural Construction, Timothy C. McManus; Daniel R. Tishman; Lisa R. Turnbaugh, AACE
Transactions, 1995
Construction Delay Analysis Systems, Dr. Janet K. Yates; Hisham Aoude, AACE Transactions, 1995
Quantifying and Apportioning Delay on Construction Projects, Lee Schumacher, PE, Cost Engineering Journal, 1995
Construction Project Delay Analysis, Zartab Q. Zafar, PE CCE, Cost Engineering Journal, 1996
The Reliability of Critical Path Method (CPM) Techniques in the Analysis and Evaluation of Delay Claims, Gasan G. Kallo, Cost
Engineering Journal, 1996
Construction Documentation Used as Indicators of Delays, Hala Elnagar; Janet K. Yates, Cost Engineering Journal, 1997
Contemporaneous Analyses of Excusable Delays, Michael Ross Finke, PE, Cost Engineering Journal, 1997
Delay Damages - Some Owner Defenses, James G. Zack Jr., AACE Transactions, 1998
The Five Commandments of Construction Project Delay Analysis, Hamed A. Al-Saggaf, Cost Engineering Journal, 1998
Pacing Delays - The Practical Effect, James G. Zack Jr., AACE Transactions, 1999
CPM Schedules in Construction Claims From the Contractors Perspective, Robert B. McCullough, PE CCE, AACE Transactions,
1999
But-For Schedules - Analysis and Defense, James G. Zack Jr., AACE Transactions, 1999
Interruptible or Continuous Activity Durations?, Dr. Joseph J. Orczyk, PE, AACE Transactions, 1999
Delay Claims Management in Construction - A Step-By-Step Approach, M.A. Baki, Cost Engineering Journal, 1999
Delay Analysis - Eliminating the Smoke and Mirrors, Eric Z. Fruchtman, AACE Transactions, 2000
The Window Methods of Analyzing Delay Claims, George E. Baram, AACE Transactions, 2000
Weather Delays and Impacts, Donald F. McDonald Jr., Cost Engineering Journal, 2000
Schedule Delay Analysis, George R. Stumpf, PE, Cost Engineering Journal, 2000
But-For Schedules -- Analysis and Defense, James G. Zack Jr., Cost Engineering Journal, 2001
Software Review: Schedule Analyzer Pro - An Aid in the Analysis of Delay Time Impact Analysis, E. Douglas Lucas, Cost
Engineering Journal, 2002
Analyzing Weather-Related Construction Claims, Osama Moselhi, P.Eng.; Khaled El-Rayes, Cost Engineering Journal, 2002
Schedule Delay Analysis: Modified Windows Approach, Kirk D. Gothand, CCC, Cost Engineering Journal, 2003
Daily Delay Measure: A New Technique to Precisely Identify Delay, John C. Livengood; Brian G. Laush, AACE Transactions, 2003
Business Interruption Claims -- Delay Analysis Considerations, Donald J. Fredlund Jr.; Robert B. Brown, PE; Frank DeLessio, AACE
Transactions, 2003
Construction Delay Analysis Method, Jae-Seob Lee, AACE Transactions, 2003
Claims Schedule Development and Analysis: Collapsed As-Built Scheduling for Beginners, Vera A. Lovejoy, CCC, Cost
Engineering Journal, 2004

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 17
38. Continuous Delay Measurement and the Role of Daily Delay Values, Robert Seals, AACE Transactions, 2004
39. Calculating Imaginary Numbers: Time Quantification in Acceleration, John C. Livengood; Christopher R. Bryant, AACE
Transactions, 2004
40. Is Noncritical Progress Critical?, William R. Zollinger III, PE; Timothy T. Calvey, PE, AACE Transactions, 2004
41. Determining the Actual Critical Path, Ronald M. Winter, AACE Transactions, 2004
42. Notes From Your Technical Board: Draft Framework for Recommended Practice for Forensic Schedule Analysis at the 48th Annual
Meeting, Kenji Hoshino, Cost Engineering Journal, 2004
43. Forensic Schedule Analysis, AACE International, AACE International Recommended Practice, 2007
44. Utilities' forced Delays - Controllable or Uncontrollable?, Patricia D. Galloway; Kris R. Nielsen, AACE Transactions, 1986
45. Project Commencement Delays on Architectural Projects, Stephen F. Rusteika, Jr., AACE Transactions, 1991
46. Interdependent Analysis of Construction Project Cost and Time, Tadeusz Kasprowicz, AACE Transactions, 2001
47. Is Noncritical Progress Critical?, William R. Zollinger III, PE; Timothy T. Calvey, PE, AACE Transactions, 2004
48. The Case of US Projects in Europe - Guidelines to Mitigate Schedule Delay, from the Owner's Viewpoint, Massimoluigi Casinelli, PE
CCE, Cost Engineering Journal, 2005
49. System Dynamic Modeling of Delay and Disruption Claims, William Ibbs; Min Liu, Cost Engineering Journal, 2005
50. Window Analysis: The Method and the Myth, John J. Ciccarelli, PE, CCE; Mark W. Cohen, PE, AACE Transactions, 2005
51. Retrospective As-Built Schedule Development, Anamaria I. Popescu, PE; Andrew Avalon, PE, AACE Transactions, 2005
52. The Link Between Planning and Programming Practice and the Analysis of Delay and Disruption Claims, Nuhu Braimah; Issaka
Ndekugri, AACE Transactions, 2006
53. Current Delay Analysis Techniques and Improvements, Satish B. Mohan; Khalid S. Al-Gahtani, AACE Transactions, 2005
54. Concurrent Delay Analysis in Litigation, Victor M. Ostrowski, PSP; Michael T. Midgette, PSP, Cost Engineering Journal, 2006
55. Concentrated Window Analysis Results, Jeffery L. Ottesen, PE PSP, AACE Transactions, 2006
56. Measuring Delay Using the Contemporaneous Period Analysis, Mark F. Nagata, PSP, AACE Transactions, 2006
57. Delay Analysis Considering Productivity, Jae-Seob Lee, AACE Transactions, 2006
58. Identifying As Built Completion Drivers, Robert B. McCullough, PE CCE; Satinder Singh Baweja, CCE, AACE Transactions, 2006
59. Total Float Management for Delay Analysis, Khalid S. Al-Gahtani; Satish B. Mohan, Cost Engineering Journal, 2007
60. Performing Forensic Delay Analyses From Deep Within the Black Tent, Thomas F. Peters, PE CFCC, AACE Transactions, 2007
61. The Great DebateTIA vs WINDOWS A Better Path for Retrospective Delay Analysis?, Bruce Evans Hallock, PSP CFCC; Pradip M.
Mehta, AACE Transactions, 2007
62. Additional Practical Applications of the Window Analysis, John J. Ciccarelli, PE CCE PSP, AACE Transactions, 2007
63. Retrospective TIAs: Time to Lay Them to Rest, John C. Livengood, PSP, AACE Transactions, 2007
64. How Claims Happen When Schedules Become Political An Actual Court Case Study, Michael W. Leary, PE; Craig D. Hutchison,
AACE Transactions, 2007
65. Delay Analysis Using Linear Schedule in Construction, Jae-Seob Lee, AACE Transactions, 2007
66. Delay Analysis Under Multiple Baseline Updates, Tarek M. Hegazy, P.Eng.; Wail Menesi, AACE Transactions, 2007
67. Daily Specific As-Built in As-Planned vs. As-Built Schedule Analysis, Svetlana Lyasko, Cost Engineering Journal, 2008
68. Use of Relational Databases in Forensic Delay Analysis, Faik Burak Evrenosoglu CCE PSP, AACE Transactions, 2008
69. Delay Analysis Considering Dynamic Resource Allocation and Multiple Baselines, Tarek M Hegazy P.Eng.; Wail Menesi, AACE
Transactions, 2008
70. A Synthesis of Forensic Schedule Analysis Techniques, J Scott Lowe; Mark F Nagata PSP, AACE Transactions, 2008
71. Forensic Schedule Analysis: Example Implementation, Mark C Sanders PE CCE PSP, AACE Transactions, 2008
72. Primavera Project Management Software and the Claims Consultant, Anne Marie Tombros; Sunu Mohan PSP EVP, AACE
Transactions, 2008
73. When is the "Critical Path" Not the Most Critical Path?, Murray Woolf, AACE Transactions, 2008

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 18
Chapter 10: Concurrent Delay Issues
1.
2.
3.
4.
5.
6.
7.
8.
9.

Theories of Concurrent Delays, Gui Ponce de Leon, PE, AACE Transactions, 1987
Concurrent Delays in Construction Litigation, Dr. David Arditi; Mark A. Robinson, PE, Cost Engineering Journal, 1995
Concurrent Delays - What Are They and How to Deal With Them?, George E. Baram, AACE Transactions, 2000
Dissecting the Doctrine of Concurrent Delay, Thomas F. Peters, PE, AACE Transactions, 2003
Analyzing Concurrent Delay when Using the Lean Approach to Scheduling, John R. Spittler, PE, AACE Transactions, 2003
Management of Concurrent Delay in Construction, Abdulaziz A. Bubshait; Michael J. Cunningham, Cost Engineering Journal, 2004
Concurrent Schedule Delay Between Main Contractor and Subcontractor, Massimoluigi Casinelli, PE CCE; Aldo De Angelis, AACE
Transactions, 2007
Concurrent Delay Analysis for Litigation, Victor M. Ostrowski, PSP; Michael T. Midgette, PSP, AACE Transactions, 2005
Pacing: An Excuse for Concurrent Delay?, Ronald J. Rider; Thomas E. Finnegan, AACE Transactions, 2005

Chapter 11: Pricing of Delay


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

The Cost Of Delay In Construction, Daniel M. Uman, AACE Transactions, 1975


Construction Delay Claims: Treatment of Extended Overhead, Ronald F. Parisi; Robert J. Schlunt, AACE Transactions, 1983
Minimizing Costs of Delay Construction Claims, Dwight A. Zink, AACE Transactions, 1987
Home Office Overhead - Recovery in Construction Delay Claims, Michael R. Just, CCE; Michael J. Grdgon, Jr., CCE, AACE
Transactions, 1992
An Alternative to Eichleay, Gui Ponce de Leon, PE, AACE Transactions, 1992
Extended Overhead Costs: When Should They Be Paid?, Gary H. Jentzen, PE; Robert S. J. Berry; Philip Spittler, AACE
Transactions, 1995
Estimating Delay Damages, Gary H. Jentzen, PE; Robin A. Collins, PE; Dr. Gui Ponce de Leon, PE, AACE Transactions, 1996
Unabsorbed Overhead: Meaning and Method, Beni Warshawsky, Cost Engineering Journal, 1997
Determining Shop Burden, Dr. Mark O. Federle, PE CCE; Dr. James E. Rowings Jr., PE CCE, Cost Engineering Journal, 1997
Calculation and Recovery of Home Office Overhead, James G. Zack Jr., AACE Transactions, 2001
Alternative Estimation of Home Office Overhead, Jefferey L. Ottesen, PE; Jack L. Dignum, AACE Transactions, 2003
Owner Caused Delay - Field Overhead Charges, Matthew J. Lankenau, CCE, Cost Engineering Journal, 2003
The Real Cost of Mitigating Delays, John J. Ciccarelli, PE CCE, AACE Transactions, 2004
Eichleay Update, Paul E. Makris, PE, AACE Transactions, 2004
New Ideas in Overhead Recovery, Michael R. Just, CCE; James P. Murphy, AACE Transactions, 1995
The Time Value of Project Change, David Chick, Cost Engineering Journal, 1999
Forensic Estimating and Impact Cost Determination, Robert H. Pratt, AACE Document, 1998
Eichleay and Qualifying Costs, Robert D. Kelly, PSP, AACE Transactions, 2005
Liquidated Damages Court Pulls Plug on Utility Contractor's Case, Kurt Rossetti, CCE; Michael T. McKeeman, Cost Engineering
Journal, 2007
The Theory of Indirect Costs, David A. Norfleet, CCC, AACE Transactions, 2007
Analysis of Delay Damages for Site Overhead, William Ibbs; Long D. Nguyen, Cost Engineering Journal, 2008
The Eichleay Formula - Is Standby the Standard?, Robert A Dieterle CCE, AACE Transactions, 2008

Chapter 12: Mitigation of Claims


1.

The Cost Engineer's Role in Construction Claims and Claims Prevention, R. P. Vanden Bosche, CCE, AACE Transactions, 1981

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 19
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.

Claims Control/Cost Control - Working Together, Thomas P. Roche, AACE Transactions, 1983
Improving Project Management for Claims Reduction, John J. Yanoviak, CCE, AACE Transactions, 1987
The Cost Engineer and Claims Prevention, H. D. Casner, Jr., PE, AACE Transactions, 1988
Claims Avoidance and Resolution, William G. Clark, CCE, AACE Transactions, 1990
The Ultimate ADR, Roy L. Wilson, PE CCE, AACE Transactions, 1992
Practical Dispute Management, James G. Zack, Jr., AACE Transactions, 1994
The Benefits Of Constructability Reviews During The Design Of Environmental Capital Projects, Henry C. Pepper III, PE CCE, Cost
Engineering Journal, 1994
Claims Prevention: Offense Versus Defense, James G. Zack Jr., AACE Transactions, 1996
Constructability in the Design Firm, James A. Young III, CCC, AACE Transactions, 1996
An Integrated and Proactive Approach for Avoiding Delay Claims on Major Capital Projects, Lee Schumacher, PE, Cost
Engineering Journal, 1996
Measuring Partnered Project Performance, Dr. Douglas D. Gransberg, PE CCE; Howard L. Reynolds; Jack W. Boyd, AACE
Transactions, 1998
Partnering in Public Works Construction, Talal S. Abi-Karam, PE, AACE Transactions, 1999
The Project Achilles Heel: Misalignment, Gregory J. Skulmoski; Francis T. Hartman, Cost Engineering Journal, 2000
Stakeholder Management on Construction Projects, George F. Jergeas; Erin Williamson; Gregory J. Skulmoski; Janice L. Thomas,
AACE Transactions, 2000
Key Partnering Success Factors, Jennifer L. Krahn; George F. Jergeas; Sami Fahmy, AACE Transactions, 2001
Partnering Construction Contracts: A Conflict Avoidance Process, Richard B. Fisher, AACE Transactions, 2004
Construction Process Risk Allocation, Carl A. Erikson; Leroy T. Boyer; Michael J. O'Connor, AACE Transactions, 1978
Pipeline Projects Can Result In Construction Claims - Be Prepared, Roy L. Wilson, PE, Cost Engineering Journal, 1982
Claims And Their Prevention, Howard A. Feldman, Cost Engineering Journal, 1993
Effective Risk Management for Remediation Projects, Timothy C. McManus; Robert Goltz, PE; Lisa R. Turnbaugh, AACE
Transactions, 1996
...Project Risks and Risk Allocation, John A. Rutgers; H. Dean Haley, Cost Engineering Journal, 1996
How to Reduce Your Project Cost, Ramy Zaghloul Mohamed; Francis T. Hartman, AACE Transactions, 2000
Managing Risk in Design-Build, Talal Abi-Karam, AACE Transactions, 2001
Overcoming Gotchas Clauses in Construction Contracts, Donald F. McDonald Jr., PE CCE, AACE Document, 1999
Identifying Risk Transfer Traps, Sidney J. Hymes, AACE Transactions, 2005
Front-end Specifications: Tool or Trouble?, Sidney J. Hymes, AACE Transactions, 2006
How Design Documents Create Claims and What to Do About It, Bryan Payne, PE CCE, AACE Transactions, 2007
A Structured Approach To Least Cost Recovery Scheduling, Christopher W. Carson, PSP, AACE Transactions, 2007
The New Scheduling CPM: Claims Protection Methods, Edward E. Douglas, III CCC PSP, AACE Transactions, 2007
Exculpatory Clauses in Construction Contracts: The Effect of the Use of Exculpatory Clauses On Contractors Bid Price, Bashar
Haddad, AACE Transactions, 2007

Chapter 13: Documentation and Claims Management


1.
2.
3.
4.
5.

Document Management for Construction Claims Prevention, John J. Yanoviak, CCE, AACE Transactions, 1989
Construction Claims - Documenting the Facts, George E. Baram, CCE, AACE Transactions, 1992
Integrity And Credibility In Construction Dispute Resolution - Documenting And Presenting The Facts, George E. Baram, CCE, Cost
Engineering Journal, 1994
Applying Multimedia Technology to Mitigate Claims, Dr. Liang Y. Liu; John R. Knoke, PE, AACE Transactions, 1995
Effective Claims Presentations: Making Your Point, Michael R. Just, CCE; Bill Ogden, AACE Transactions, 1998

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 20
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

Construction Claims: Making It Simple, Michael Marenghi; Anthony J. Werderitsch, PE CCE, AACE Transactions, 1999
Electronic Project Documentation: Legal and Practical Problems, James G. Zack Jr., AACE Transactions, 2002
What Construction Management Seeks in Pictorial Documentation, R. Dennis Foster, AACE Transactions, 1982
Construction Project Document Management Aided by Microcomputers, Donald F. McDonald, Jr. CCC, AACE Transactions, 1987
The Daily Report As A Job Management Tool, DA Pogorilich, Cost Engineering Journal, 1992
Notes from your Technical Board: Construction Document Control, Edward E. Douglas III, Cost Engineering Journal, 2003
Project Documents and How They Influence Damages, Patrick Steven Ray, CCC, AACE Transactions, 2006
Electronic Databases for Claims Analysis, Joseph W. Wallwork, PE CCE PSP; Thomas S. Sinacore, CCE PSP; Eric Schatz, AACE
Transactions, 2006
Is the Theory of Cumulative Impact a Provable Reality?, Stephen P. Warhoe, PE CCE CFCC, Cost Engineering Journal, 2007
Lost Profits Analysis Lost Business Opportunities, Jack W. Harris; Louise B. DiCiesare, AACE Transactions, 2007
Causation - How is it Proved?, James E Krebs PE CCE; Michael J Reynolds, AACE Transactions, 2008
Managing Evidence Preservation at a Construction Accident Site, John R. Spittler PE; Robert B Brown PE; John F Lattyak PE,
AACE Transactions, 2008

Chapter 14: Claim Recognition and Analysis


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

Identifying Construction Claims, Richard Vanden Bosche, AACE Transactions, 1978


Recognition And Documentation Of Construction Claims, Harvey L. Kornbluh, Cost Engineering Journal, 1982
Improve Your Profits by Understanding Claim Analysis, Ignacio Manzanera, CCE; Khaled Bubshait, AACE Transactions, 1991
Analysis Of Construction Disputes And Strategies For Cost Minimization, Thomas R. Henderson, CCE, Cost Engineering Journal,
1991
Claimsmanship - A Current Discussion, James G. Zack, Jr., AACE Transactions, 1992
Is Your Project Heading For Trouble? - How To Recognize The Signs, Donald R. Boyken, CCC, Cost Engineering Journal, 1993
Contractors' Protection Against Construction Claims, Dr. George F. Jergeas, PE; Francis T. Hartman, PE, AACE Transactions,
1994
Construction Defects Claims Analysis and Mitigation, Neil D. Opfer, CCE, AACE Transactions, 1997
One More Time... Why Design Professionals Are Not Liable to Contractors, Talal S. Abi-Karam, PE, AACE Transactions, 1999
Appraisal of Contractual Claims, Gianluca di Castri, AACE Transactions, 2000
Claim Evaluation for Combined Effect of Multiple Claim Factors, Amarjit Singh, Cost Engineering Journal, 2001
Early Warning Signs of Troubled Projects, Donald B. Giegerich, AACE Transactions, 2002
Confronting Mold Damage Claims, Neil D. Opfer, CCE, AACE Transactions, 2003
Proving Causation, Paul E. Makris, PE, AACE Transactions, 2004
Understanding Building Contractor's Claims for Extras, Jerome Reiss, AACE Transactions, 1975
Is Your Project Heading For Trouble? - How To Recognize The Signs, Donald R. Boyken, CCC, Cost Engineering Journal, 1993
Claims in the Design/Build Arena, James G. Zack, Jr., AACE Document, 2000
Allocating Damages in Construction Defect Cases, David A. Norfleet, CCC, AACE Transactions, 2006
False Claims: Road Embankment Construction Proves to Be a Slippery Slope for Contractors, Kurt Rossetti, CCE; Michael T.
McKeeman, Cost Engineering Journal, 2007
How to Prove/Disprove Cumulative Impact Claims, Anamaria Popescu, PE; Jeffrey L. Ottesen, PE PSP; Glen R. Palmer, PSP,
AACE Transactions, 2007
Risk Assessment For Scheduling Acceleration, Khalid S. Al-Gahtani, AACE Transactions, 2007
Contractors Tort Claims Leave Design Professionals Wondering if Liability is Spiraling Out of Control, Michael T. McKeeman; Kurt
Rossetti, CCE, Cost Engineering Journal, 2007

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 21
Chapter 15: Claims Management
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.

The Construction Claim, Roy L. Wilson, Cost Engineering Journal, 1979


Anatomy of a Construction Claim, R. P. Vanden Bosche, CCE, AACE Transactions, 1981
Construction Claims: Justification and Negotiation, William G. Clark, CCE, AACE Transactions, 1984
Planning And Scheduling Concepts In The Containment Of Contract Claims, Dr. Gui Ponce de Leon, PE, Cost Engineering
Journal, 1985
Issues Related To Construction Claims, Thomas J. Watts, Cost Engineering Journal, 1987
Construction Claims And The Problems Of Cost Management, Irvin E. Richter, Cost Engineering Journal, 1987
Public Agency Construction Claims Costing - An Analysis, Michael C. Ray, CCC, Cost Engineering Journal, 1989
Claims Management, Gasan Kallo, Cost Engineering Journal, 1990
Claims Management in the Contract Startup Phase, Gui Ponce de Leon, PE, AACE Transactions, 1991
Proactive Defense Against Total Cost Claims, John A. Smith, AACE Transactions, 1992
Claims - What and When to Claim, Rosa C. Sotelo, CCE; Ramon Vazques Del Mercado, AACE Transactions, 1993
Dispute Resolution Using Innovative Project Controls, Robert A. Dieterle, CCE; Michael V. Griffin, PE, AACE Transactions, 1995
Managing Changes and Claims on Design Contracts, Stephen F. Rusteika, Jr.; Gary H. Jentzen, PE, AACE Transactions, 1995
Developing Construction Claims for Arbitration: An Arbitrators Viewpoint, Dr. Douglas D. Gransberg, PE CCE; Charles A. Joplin,
AACE Transactions, 1999
What to Do on Receipt of a Notice of Termination of US Government Contracts, Richard E. McCracken, Cost Engineering Journal,
1999
Claims Avoidance -- A Project Management Primer, Anthony J. Werderitsch; James E. Krebs, AACE Transactions, 2000
Be Prepared for Construction Claims -- Globally, Rohit Singh, AACE Transactions, 2000
Claims and Disputes in the Construction Industry, George F. Jergeas, AACE Transactions, 2001
Managing Design Errors and Omissions in Construction Projects, George W. Davie; Carl Wolf, AACE Transactions, 2001
Total Cost Construction Claims Tactics, Charles R. McDuff; Michael C. Ray, AACE Transactions, 2002
CPM as a Tool in Claims Management, Rohit Singh, AACE Transactions, 2002
Communicating the Dispute, Joseph W. Wallwork, PE CCE, AACE Transactions, 2003
Charting a Successful Dispute Resolution, Osmond F. Belcher, AACE Transactions, 2003
Disputes and Construction Industry Cultures, Raufdeen Rameezdeen; Nishanthi Gunarathna, AACE Transactions, 2003
Constructive Acceleration: Waking the Sleeping Giant, Thomas F. Peters, PE, AACE Transactions, 2004
Spearin Doctrines Effect on the A/E Construction Process, Jean-Paul Prentice, CCE, AACE Transactions, 2004
Charting a Successful Global Dispute Resolution, Osmond F. Belcher, AACE Transactions, 2004
Staking Your Claim: Effective Claim Resolution, Philip D. Barnard, PE, AACE Transactions, 2005
Daily Observation Reports Prevent Unwanted Costs, William J. Bender, PE, AACE Transactions, 2006
Construction Claims Practice: USA versus Brazil, Joao Otavio Goulart Brizola, AACE Transactions, 1994
Youre Fired!, Timothy T. Calvey, PE, AACE Transactions, 2005
Using Artificial Neural Networks for Predicting the Outcome of Canadian Construction Litigated Claims, Amir Camille Chehayeb;
Mohamed Al-Hussein, P.Eng., AACE Transactions, 2006
Construction Claims in Egypt: Contrasts and Similarities With Published Literature, Amr A.G. Hassanein; Waleed M. El Nemr, AACE
Transactions, 2007
Cost Engineering Applications for Performance Bond Surety Defaults, Lin B. Heath, CCE, Cost Engineering Journal, 2004
The Claims Consultant as a Peacemaker, George F. Jergeas, P.Eng; Stephen O. Revay, CCC, AACE Transactions, 2006
A Critical Analysis of a Roof Dispute With an Emphasis on Project Management, Paul S. Kupakawana, Cost Engineering Journal,
2006
Getting Paid on Private Work Projects, Michael T. McKeeman; Rossetti, Cost Engineering Journal, 2007
Appraisals Resulting from Negligence of Others, James P. Miller, AACE Transactions, 2005

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 22
39. Structuring Win-Win Proposal Strategies: Trials and Tribulations, Iqbal Noor, PE CCE; Shankar Narayan, PE; Matthew Grumo; Tod
Hubbard, AACE Transactions, 2007
40. Displaying Complex Technical Data Graphically, John C. Potter, PSP, AACE Transactions, 2006
41. Phased Root Cause Analysis -- A Distinctive View on Construction Claims, L.S. Sandlin; James R. Sapple; R.M. Gautreaux, Cost
Engineering Journal, 2004
42. Subcontract Management Through a Bankruptcy, Retta M. Sandoval; Paul Edwards, PE; Michael Peek, AACE Transactions, 2005
43. Dispute Resolution - Is There a Right Way?, L. Lee Schumacher, PE, Cost Engineering Journal, 2004
44. Calpines Effective Use of Project Control Minimizes and Eliminates Disputes, Christopher B. Stimpson, Cost Engineering Journal,
2004
45. Determining the Cost to Complete, Joseph W. Wallwork, PE CCE PSP, AACE Transactions, 2007
46. Does Sharing Project Data Create Claims?, William R. Zollinger III, PE; Michael W. Leary, PE, AACE Transactions, 2005
47. Impact Costs Litigation in Montreals Mega-hospitals, Jean-Claude Huot PE, AACE Transactions, 2008
48. Put Some Punch in Your Pen, Jeffery L. Ottesen PE PSP CFCC, AACE Transactions, 2008
49. The Use of Forensic Animations in Resolving Complex Disruption Claims - A Case Study, Keith Pickavance, AACE Transactions,
2008
Chapter 16: Negotiation Process
1.
2.
3.
4.
5.
6.
7.
8.

How to Successfully Negotiate and Administer Contracts, James A. Bent, CCE, AACE Transactions, 1985
Negotiation - Important in Project Management, Tom E. Krieg, CCE, AACE Transactions, 1986
Construction Disputes: A Negotiated Resolution, Anthony J. Werderitsch, PE CCE, AACE Transactions, 1986
Dispute Resolution: Managing Construction Conflict with Step Negotiations, John R.Spittler, PE; Gary H. Jentzen, PE, AACE
Transactions, 1992
Organizing the Negotiation Process: Techniques and Factors to Consider When Negotiating Lump Sum Changes on Behalf of the
Owner, Darrel D. Field, PE; Michael Harvey, PE; John Spittler, PE, AACE Transactions, 1993
Negotiation of Settlements - A Team Sport, James G. Zack, Jr., AACE Transactions, 1993
How to Lose Money Negotiating a Construction Claim, Michael R. Just, CCE; Brian Torone, AACE Transactions, 1997
Behind-the-Scenes Hurdles to Settlement, Stephen O. Revay, AACE Transactions, 2000

Chapter 17: Alternative Dispute Remedy Process


1.

Alternate Methods to Resolve Contract Disputes: Approaches to Effective Prevention, Management, and Settlement of Construction
Contract Claims, S. Leonard Didonato, AACE Transactions, 1993
2. How To Use Dispute Review Boards For Claims Settlement During Contracts, John A. Smith, Cost Engineering Journal, 1993
3. Mediation - The Process, Stephen O. Revay, CCC, Cost Engineering Journal, 1993
4. A New Twist on Construction Arbitration Rules, Gordon Beveridge, Cost Engineering Journal, 1996
5. Construction Claims Preparation Under ADR, Douglas A. Findley, AACE Transactions, 1997
6. Resolution of Disputes: The Next Generation, James G. Zack Jr., AACE Transactions, 1997
7. How To Select A Mediator, Zela G. Claiborne, Cost Engineering Journal, 1998
8. Mediative Conciliation, Ifeanyi Tim Anago, AACE Transactions, 2000
9. Are You Prepared for Mediation?, James G. Zack Jr., AACE Transactions, 2000
10. Alternate Dispute Resolution: The Mini-Trial Approach, Michael C. Ray, AACE Transactions, 2000
11. Dispute Review Boards - One View, Juan E. Duran; Janet K. Yates, Cost Engineering Journal, 2000

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 23
12. Developing Construction Claims for Arbitration: Two Arbitrators' Viewpoint, Douglas D. Gransberg, PE CCE; Charles A. Joplin, Cost
Engineering Journal, 2000
13. Mock Arbitration: Catfish Contractors Versus NYET County Airport Board, Case No. AACE 2000 SIG001, Robert B. McCullough;
Donald F. McDonald Jr., AACE Transactions, 2000
14. Awarding Damages in Construction Claims Arbitration, Douglas D. Gransberg, AACE Transactions, 2001
15. Arbitration of Disputes in International Construction, Talal Abi-Karam, AACE Transactions, 2001
16. Using the Project Neutral Process to Resolve Contentious Disputes, Robert A. Dieterle; Alann M. Ramirez, AACE Transactions,
2001
17. Mapping Dispute Resolution Mechanism with Construction Contract Types, Sai-on Cheung, Cost Engineering Journal, 2002
18. Dispute Review Boards Help Settle Disputes During Construction, Adele McKillop, P.Eng., AACE Transactions, 2003
19. Adding A Neutral Third Part To ADR Process Can Reduce Exposure To Construction Litigation, Donald R. Cruver, Cost
Engineering Journal, 1994
20. Partnering and CE: A Construction Attorney's Perspective, Marc T. Richardson, PE, AACE Transactions, 1995
21. Partnering Construction Projects - Worth the Time?, Ken A. Rice, AACE Transactions, 1995
22. Partnering: An Innovative and Effective Project Organization Concept, Abdulaziz A. Bubshait, Cost Engineering Journal, 2001
23. Dispute Review Board Effects on Bid Prices, Kathleen M. J. Harmon, Cost Engineering Journal, 2004
24. Dispute Resolution Strategy and Decision Analysis, Jon Hoogenboom, PE; W. Stephen Dale, AACE Transactions, 2005
Chapter 18: Litigation and the Cost Engineer
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

The Cost Engineer As An Expert Witness, Ram L. Bashambu, Cost Engineering Journal, 1981
Cost Engineers as Construction Claims Expert Witnesses, Sidney Numerof, AACE Transactions, 1986
Cost Estimates in Litigation Disputes, Donald F. McDonald, Jr., PE CCE, AACE Transactions, 1992
Preparing Litigation Estimates For Public Improvements Correction In Land Development, John D. Bledsoe, PE CCE, Cost
Engineering Journal, 1992
Expert Witnessing - In Court and Out, David Rosoff, CCE, AACE Transactions, 1994
Discovery - Where Does It Fit Into The Adjudication Process?, Michael C. Ray, AACE Transactions, 2002
Depositions - From the Deponent's Perspective, Michael C. Ray, AACE Transactions, 2001
Surviving a Daubert Challenge: A CPM Experts Perspective, Kenji P. Hoshino, AACE Transactions, 2003
The Liability Labyrinth: How Will Cost Engineering Respond to the Increasing Liability Problem?, John W. McManus, AACE
Transactions, 1978
Liability: A New Cost Trap For Architectural/Engineering And Construction Firms, Glenn E. Hayes; William G. Hundt, Cost
Engineering Journal, 1980
Testimony Of Expert Witness Upheld, AACE, Cost Engineering Journal, 1982
Damage Issues In Construction Claims, Robert A. Dieterle, Cost Engineering Journal, 1985
The Cost Engineer's Role in Legal Proceedings, Otto Mendel, CCE, AACE Transactions, 1985
Adversarial Cost Engineering, Gideon Samid, Cost Engineering Journal, 2000
Forensic Estimating of Project Owner Damages, Robert H. Pratt, AACE Document, 1999

Chapter 19: Project Audits


1.
2.
3.

"Here Come the Auditors", Deborah Flannagan, AACE Transactions, 1988


Preaward Contract Audits - A Claims Avoidance Procedure, Sherry M. Rice, AACE Transactions, 1991
Government Requirements for Estimating System Audits, Frank D. Postula, PE CCE, AACE Transactions, 1993

AACE Internationals Professional Practice Guide to


Contracts and Claims, Fourth Edition
TABLE OF CONTENTS - Page 24
4.
5.

EVMS Internal and DCAA Audit Recommendations, Sean T. Regan, CCE, AACE Transactions, 2006
Construction Audit - An Essential Project Controls Function, Alexia Nalewaik, CCE, Cost Engineering Journal, 2007

Appendix A: CFCC Certification Information


1.

Certified Forensic Claims Consultant (CFCC), AACE International, Certification Information, 2007

Author Index
Chronological Index
About the Editor

AACE Internationals Professional Practice Guide to


Risk, Second Edition
TABLE OF CONTENTS - Page 1
Introduction to the Second Edition
Introduction to the First Edition
Chapter I: Dictionary
1. AACE International's Risk Management Dictionary, AACE International's Decision and Risk Management Committee, Cost
Engineering Journal, 2000
Chapter II: Capital Investments
1. Risk Analysis for Capital Projects Using Risk Elements, Sam L. Shafer, AACE Transactions, 1974
2. Quantifying Risks in Capital Estimates, Patricia A. Owen; John K. Nabors, AACE Transactions, 1983
3. Simplified Risk Analysis in Project Economics, Julian A. Piekarski, CCE, AACE Transactions, 1984
4. Managing Project Execution Risks, G. Frederick Ort, AACE Transactions, 1985
5. Risk Analysis In Capital Cost Estimating, KS Mathur, Cost Engineering Journal, 1989
6. Expert Systems for Minimum Scope Estimating in the Process Industries, Dr. Robert L. Steinberger, AACE Transactions, 1994
7. Managing Risk on Capital Projects, Joseph A. Lukas, PE, CCE, AACE Transactions, 1995
8. Managing Risk on Global Projects, Charles P. Woodward, PE CCE; Kartar Singh, PE, AACE Transactions, 1996
9. Methodology and Techniques of Estimating Heavy Industrial Process-Related Projects, Kiran Jani, PE, AACE Transactions,
1996
10. Risk and Capital Budgeting, Reza Amirkhalili, AACE Transactions, 1997
11. From Business Opportunity to Cost Target, Herman C. Poortinga, CCE, AACE Transactions, 1999
12. Constructability: The Key to Reducing Investment Risk, Allan D. Chasey; Ann M. Schexnayder, AACE Transactions, 2000
13. Cost Engineering Taking on Capital Management, Bernard A. Pietlock, AACE Transactions, 2000
14. The Future Net Present Value of Investment Alternatives, Maarten S.A. Vrijland, AACE Transactions, 2000
15. Probabilistic Selection of Project Alternatives, Leroy J. Isidore; Adetokunbo A. Oyetunji, AACE Transactions, 2000
16. Integrate Analysis: A New Company Evaluation Method, Nicolae Postavaru, AACE Transactions, 2000
17. Projects, Operations, and Capabilities in Evaluation of a Strategic Plan, Corrado Gatti; Gianluca Vagnani, AACE Transactions,
2002
18. Power Plant Financial Pro Forma Analysis, Gordon V.Z. Beard, PE CCE, AACE Transactions, 2003
19. Exploration Risk Management and Business Development in the Petroleum Industry, Varoujan K. Minassian; George F.
Jergeas, P.Eng., AACE Transactions, 2003
20. Quantifying the Benefits of Sustainable Buildings, Benson Kwong, PE CCE, AACE Transactions, 2004
21. Budgeting School Construction Projects, Iftikhar K. Madni, CCE, AACE Transactions, 2004
22. Portfolio Approach to Program Management, Robert B. Connors, PE CCE, AACE Transactions, 2004
23. Risk Mitigation Plan for Optimizing Protection of Constructed Facilities, Harold E. Marshall; Robert E. Chapman; Chi J. Leng,
Cost Engineering Journal, 2004
24. Implementation of Successful Risk-Based Portfolio Management, Iqbal Noor, PE CCE; Robert Martin; Douglas Bowman, AACE
Transactions, 2005
25. Feasibility Studies: A Case For Using A Stochastic Approach, Sabah Alkass, P.Eng.; Saad Al-Jibouri; Vipha Techakosol, AACE
Transactions, 2006
Chapter III: Cash Flow
1. Life-Cycle Costing, Louis C. Amadio, AACE Transactions, 1979
2. Selection of Discount Rates for Project Evaluation: Principles and Pitfalls, A. Lawrence Kolbe, AACE Transactions, 1983
3. Range Estimating - Coping with Uncertainty, Michael W. Curran, AACE Transactions, 1976
4. Construction Process Risk Allocation, Carl A. Erikson; Leroy T. Boyer; Michael J. O'Connor, AACE Transactions, 1978

AACE Internationals Professional Practice Guide to


Risk, Second Edition
TABLE OF CONTENTS - Page 2
5.
6.

Enhancing Profitability for Unit Price Contracts, Robert H. Mayer, Jr.; James E. Diekmann, AACE Transactions, 1982
Range Estimating: Reasoning with Risk, Michael W. Curran, AACE Transactions, 1988

Chapter IV: Competitive Bidding


1. Range Estimating - Coping with Uncertainty, Michael W. Curran, AACE Transactions, 1976
2. Construction Process Risk Allocation, Carl A. Erikson; Leroy T. Boyer; Michael J. O'Connor, AACE Transactions, 1978
3. Enhancing Profitability for Unit Price Contracts, Robert H. Mayer, Jr.; James E. Diekmann, AACE Transactions, 1982
4. Range Estimating: Reasoning with Risk, Michael W. Curran, AACE Transactions, 1988
5. Statistical Bidding Models, Robert A. McKim, PE, Cost Engineering Journal, 1999
6. Risk Analysis and Optimization of the (Un)Balanced Bid, Jon Hoogenboom, PE; W. Stephen Dale; Craig Martell, AACE
Transactions, 2006
Chapter V: Contingency Analysis
1. A Mathematical Model for Contingency, James E. Spooner, AACE Transactions, 1973
2. Estimate Contingency, Risk, and Accuracy - What Do They Mean?, Raleigh S. Williamson; Jack F. Browder, CCC; William R.
Donnell IV, AACE Transactions, 1980
3. Contingency It Demands Equal Time, JR Duenas, Cost Engineering Journal, 1981
4. Contingency Funds Evaluation, John R. Healy, CCE, AACE Transactions, 1982
5. An Overview Of Contingency Considerations, MW Graf, Cost Engineering Journal, 1984
6. Contingency Evaluation in Capital Cost, Lawrence C. Bacher, CCE, AACE Transactions, 1984
7. Determining Meaningful Estimate Contingency, JJ Stevenson, Cost Engineering Journal, 1984
8. Applied Contingency Analysis, John W. Hackney, CCE, AACE Transactions, 1985
9. Range Estimating Operating and Manufacturing Costs, Michael W. Curran, AACE Transactions, 1986
10. Economic Risk of Offshore Field Development, Rolf Skjong; Jon Lereim, AACE Transactions, 1988
11. How Accurate are Capital Cost Estimates?, G. Stevens; T. Davis, AACE Transactions, 1988
12. Management of Project Risk, Dr. James M. Neil, CCE, AACE Transactions, 1989
13. Managing Change: Making the Most of Contingency, Daniel W. Jordan, CCE, AACE Transactions, 1989
14. Range Estimating: Contingencies with Confidence, Michael W. Curran, AACE Transactions, 1989
15. Range Estimating: Measuring Uncertainty and Reasoning with Risk, Michael W. Curran, Cost Engineering Journal, 1989
16. The Project Manager - Risk Taker and Contingency Planner, David H. Hamburger, PE, AACE Transactions, 1989
17. What is Contingency, Anyway?, Wesley R. Querns, CCE, AACE Transactions, 1989
18. How to Deal With Accuracy and Contingency, C. Peter Rapier, AACE Transactions, 1990
19. How to Uncover Program Cost Risks, Robert M. Smith, PE, AACE Transactions, 1991
20. Contingency Allocation: A Computer-Aided Approach, Irtishad Ahmad, AACE Transactions, 1992
21. Contingency Draw-Down Using Risk Analysis, Randal B. Lorance, PE, AACE Transactions, 1992
22. Integrated Estimating Technique, Arun Chakravartty, PE, AACE Transactions, 1992
23. Contingency Management for the Hong Kong Airport Care Program (ACP), Jhan Schmitz; Norman H. Shotwell, AACE
Transactions, 1993
24. Contingency Revisited, Gideon Samid, PE, Cost Engineering Journal, 1994
25. Contingency Estimating for Environmental Remediation Projects, Donald Wendel, CCC, Cost Engineering Journal, 1995
26. Factored Estimating Guidelines - Refinery/Petrochemical Projects, Robert S. Smith, PE, AACE Transactions, 1996
27. Risk Assessment and Contingency Estimating, Dr. Osama Moselhi, PE, AACE Transactions, 1997
28. GRIMS: A Systemic Approach to Geological Risk Management for Underground Work, Dr. Giuseppe Pignanelli, CCE; Dr.
Monica Papini; Dr. Antonella Granito, AACE Transactions, 1999
29. A Neural Network Approach to Risk Assessment and Contingency Allocation, Dong Chen; Francis T. Hartman, AACE
Transactions, 2000

AACE Internationals Professional Practice Guide to


Risk, Second Edition
TABLE OF CONTENTS - Page 3
30.
31.
32.
33.
34.
35.
36.
37.
38.

Contingency Management on DOE Projects, Edward E. Douglas, III, CCC, AACE Transactions, 2001
Risk Response and Contingency Strategies Among Contractors in Sydney, Australia, Deepak Bajaj, AACE Transactions, 2001
Risk Modeling with Influence Factors, Robert J. Coppo, AACE Transactions, 2003
Contingency, Quantifying the Uncertainty, Riaan Burger, CCE, Cost Engineering Journal, 2003
Contingency Misuse and Other Risk Management Pitfalls, Iqbal Noor, PE CCE; Robert L. Tichacek, PE, AACE Transactions,
2004
Cost Contingency as the Standard Deviation of the Cost Estimate, Geoffrey Rothwell, Cost Engineering Journal, 2005
Significance of WBS in Contingency Modeling, John Gengxin Zhao, AACE Transactions, 2006
Why Traditional Risk Management Fails in the Oil and Gas Sector: Empirical Front-Line Evidence and Effective Solutions, Brett
Schroeder; Jan A. Jackson, AACE Transactions, 2007
The Monte-Carlo Challenge: A Better Approach, John K. Hollmann, PE CCE, AACE Transactions, 2007

Chapter VI: Contracts


1. A Conceptual Aspect of Project Management: Point of No Return, Dr. Yash P. Gupta, AACE Transactions, 1981
2. Effective Contract Management, James A. Bent, CCC, AACE Transactions, 1989
3. A Productivity Challenge in a Utility's Reliability Construction Program, H. Leon Ellis; Dr. Saied Gouda, PE; Scott Trowbridge,
PE, AACE Transactions, 1993
4. Government Requirements for Estimating System Audits, Frank D. Postula, PE CCE, AACE Transactions, 1993
5. The Cost of General Conditions, Daniel F. Becker, AACE Transactions, 1993
6. Transaction Exposure Management in International Construction, Hans Fritsche, AACE Transactions, 1994
7. General Conditions and Fee Risk Analysis, Lorry T. Bannes, PE, AACE Transactions, 1995
8. Linking Contractor Payments to Contractor Performance, Quentin W. Fleming; Joel M. Koppelman, AACE Transactions, 1995
9. "Risk Sharing" - Good Concept, Bad Name, James G. Zack, Jr., AACE Transactions, 1995
10. A Contract Clause for Allocating Risks, Dr. George F. Jergeas, P.Eng.; Dr. Francis T. Hartman, P.Eng., AACE Transactions,
1996
11. Pricing the Risk of Liability Associated With Environmental Clean-Up Projects, Dr. Joon H. Paek, AACE Transactions, 1996
12. Project Capital Cost Risks and Contracting Strategies, Dr. Keith Pedwell, P.Eng.; Dr. Francis T. Hartman, P.Eng.; Dr. George F.
Jergeas, P.Eng., AACE Transactions, 1996
13. Subcontracting Out Scope: According to Plan, Quentin W. Fleming; Joel M. Koppelman, AACE Transactions, 1996
14. ...Project Risks and Risk Allocation, John A. Rutgers; H. Dean Haley, Cost Engineering Journal, 1996
15. A Realistic Approach To Risk, Ian B. Parr, AACE Transactions, 1997
16. Construction Defects Claims Analysis and Mitigation, Neil D. Opfer, CCE, AACE Transactions, 1997
17. Evaluating Best Value Contract Proposals, Dr. Douglas D. Gransberg, PE, AACE Transactions, 1997
18. Appropriate Risk Allocation in Lump-Sum Contracts - Who Should Take the Risk?, Dr. Francis T. Hartman, PE; Patrick
Snelgrove, P.Eng.; Dr. Rafi Ashrafi, Cost Engineering Journal, 1998
19. Construction Contracts: Shifting Risk or Generating a Claim?, Donald F. McDonald, Jr., PE CCE; John O. Evans III, AACE
Transactions, 1998
20. Managing Risk in Design-Build, Talal Abi-Karam, AACE Transactions, 2001
21. Understanding Risk to Mitigate Changes and Avoid Disputes, L. Adam Winegard; Stephen P. Warhoe, PE CCE, AACE
Transactions, 2003
22. Risk Mitigation in Fast Tracking Projects, Albert van der Werf, CCE, AACE Transactions, 2003
23. Self-Perform Versus Subcontract Decision in Construction Contracts, Khaled Nassar, AACE Transactions, 2003
24. Identifying Risk Transfer Traps, Sidney J. Hymes, AACE Transactions, 2005
25. Client and Contractor Attitudes to Prequalification, Anthony Mills, AACE Transactions, 2005
26. Exculpatory Clauses in Construction Contracts: The Effect of the Use of Exculpatory Clauses On Contractors Bid Price, Bashar
Haddad, AACE Transactions, 2007

AACE Internationals Professional Practice Guide to


Risk, Second Edition
TABLE OF CONTENTS - Page 4
Chapter VII: Cost Engineering
1. Challenges and Pitfalls of Conceptual Estimating, Maureen C. Cronin, AACE Transactions, 1975
2. An Owner's Experience with Computerized Estimating and Scheduling, Randolph J. Brozek, AACE Transactions, 1978
3. Benefits of Probabilistic Cost Estimating for Nuclear Power Plant Projects, William C Finch; Franklin D. Postula, AACE
Transactions, 1979
4. Management Science Applications in Cost Engineering, Dr. Aaron Rose, CCE, AACE Transactions, 1979
5. Probabilistic Cost Estimate Tree Analysis - Computer Program, Kazumi Kageyama, AACE Transactions, 1979
6. Estimating Commercial Electric Energy Conversion Costs at Liquid-dominated Geothermal Reservoirs, George; WO Jacobsen;
DG Van Newell; LG Wagenen; JW Caroll, AACE Transactions, 1980
7. Statistical Techniques in Cost Engineering, Carlos Uriegas-Torres, AACE Transactions, 1981
8. The Application of Probabilistic Cost Estimating to an Advanced Energy System, William C. Finch; Kathryn A. Young, AACE
Transactions, 1981
9. What's the Hang-Up with Computers in Construction Cost Estimating?, H.P. Connor, AACE Transactions, 1981
10. Forecasting Final Project Cost with Econometric Techniques, John K. Nabors, AACE Transactions, 1982
11. Cumulative Law of Common Events, Marvin Gates, CCE; Amerigo Scarpa, AACE Transactions, 1983
12. Is Your Rate of Return Too Low?, Henry C. Thorne, CCE, AACE Transactions, 1983
13. Risk Evaluation of Alternative Energy Sources, W. C. Finch; F. D. Postula, AACE Transactions, 1983
14. The Value of Precision in Cost Estimates, David A. Frost, AACE Transactions, 1984
15. Assessing and Managing Project Risks, Richard S. Madenburg, PE; M. C. Humphrey, PE, AACE Transactions, 1986
16. Cost Estimating -- Dealing with Uncertainty, P. A. Wright; T. V. Hill, AACE Transactions, 1986
17. Determining Overrun Probabilities, John W. Hackney, CCE, AACE Transactions, 1986
18. Cost Estimation as a Complexity Modeling Problem, Celestine A. Ntuen; Arup K. Mallik, PE, AACE Transactions, 1987
19. Approaches in Construction Project Cost Risk, Karlos A. Artto, AACE Transactions, 1988
20. Accuracy of Hazardous Waste Project Estimates, John W. Hackney, CCE, AACE Transactions, 1989
21. Advanced Cost Estimating, Donald F. McDonald, Jr.,CCC, AACE Transactions, 1989
22. Balanced Reduction Of Uncertainty, G Samid, Cost Engineering Journal, 1989
23. Parametric Cost Estimating: A Design Function, Edwin B. Dean, AACE Transactions, 1989
24. Direct Range Cost Estimating, Dr. Paul F. Mlakar; Larry M. Bryant, AACE Transactions, 1990
25. Range Estimating Reduces Iatrogenic Risk, Michael W. Curran, AACE Transactions, 1990
26. Direct Range Estimating for Change Orders, John R. Knoke, PE; John R. Spittler, PE, AACE Transactions, 1991
27. Estimate and Project Risk Analysis Approaches, Sam L. Shafer, PE, AACE Transactions, 1991
28. Historical Data-Driven Range Estimating, Thomas W. Townley, CCC, AACE Transactions, 1991
29. A Project Definition Methodology for Environmental Restoration Projects, J. L. Poldy; W. R. Shangraw; R. F. Shangraw, Jr.,
AACE Transactions, 1992
30. A Technique for Assessing Cost Uncertainty, Carl R. Hudson, AACE Transactions, 1992
31. Modular Factored Estimating: The New Wave, Walter J. Strutt, PE CCE, AACE Transactions, 1992
32. Reducing Construction Risks through Project Controls, Danny J. Whitecotton; Brett M. McPherson, AACE Transactions, 1992
33. Risk Management-Back To Basics, RA Mckim,, Cost Engineering Journal, 1992
34. Using @Risk to Predict Project Costs, Raymond E. Cochrane,PE CCE, AACE Transactions, 1992
35. Nuclear Industry Restart - The Daunting Uncertainty, Richard S. Capone; Ronald T. Pullie, AACE Transactions, 1993
36. Power Plant Outage Project Productivity Improvement, Hans E. Picard; Harley R. Macklin, PE, AACE Transactions, 1993
37. A Parametric Building Cost Estimating System, John K. Hollmann, PE, AACE Transactions, 1994
38. Contractor Risks in Conceptual Estimating, Joon Hong Paek, Cost Engineering Journal, 1994
39. Risk Analysis-Some Practical Suggestions, DH Buchan, Cost Engineering Journal, 1994
40. Cost Engineering in Financial Product Development, Dr. Itzhak Wirth, AACE Transactions, 1995

AACE Internationals Professional Practice Guide to


Risk, Second Edition
TABLE OF CONTENTS - Page 5
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.

Developing a Project Scope/Conceptual Estimate Questionnaire, Frank B. Mitchell, Jr., AACE Transactions, 1995
Estimating? - Yesterday, Today, and Tomorrow, Kul B. Uppal, PE, AACE Transactions, 1995
Model Building Strategy for Construction Cost Overruns, Dr. Mohamed K. El-Choum, AACE Transactions, 1995
Project History - Closing the Loop, John K. Hollmann, PE, CCE, AACE Transactions, 1995
Risk Reduction Performance Measuring System (RRPMS), Sarwar A. Samad, AACE Transactions, 1995
A Probabilistic Cost Estimating Model, Dr. Thomas E. Uher, Cost Engineering Journal, 1996
Concurrent Management of Total Cost and Total Quality, Bryan R. McConachy, P.Eng., AACE Transactions, 1996
Effective Risk Management for Remediation Projects, Timothy C. McManus; Robert Goltz, PE; Lisa R. Turnbaugh, AACE
Transactions, 1996
Going for the Goal, Forecasting, Joseph M. Brown, CCC, AACE Transactions, 1996
Risk Management Through Sensitivity Analysis, Dr. Ted G. Eschenbach, PE, AACE Transactions, 1996
Statistical Cost Estimating for Public Works, Dr. John D. Bledsoe, PE CCE, AACE Transactions, 1998
Basic Techniques for Analyzing and Presenting Cost Risk Analysis, Randal B. Lorance, PE; Robert V. Wendling, AACE
Transactions, 1999
Techniques for Developing Cost Risk Analysis Models, Randal B. Lorance, PE; Robert V. Wendling, AACE Transactions, 1999
Integrated Range Estimating and Stochastic Scheduling, Leroy J. Isidore; Dr. W. Edward Back, AACE Transactions, 1999
Fuzzy Sets Theory and Range Estimating, Ahmed Abdel-Baset Hassanein; Vasu Cherlopalle, AACE Transactions, 1999
Monte Carlo Analysis: Ten Years of Experience, Dale E. Clark, AACE Transactions, 1999
Integration of Schedule and Cost Risk Models, Robert V. Wendling; Randal B. Lorance, PE, AACE Transactions, 1999
Guidelines for Successful Risk Facilitating and Analysis, Dr. Iqbal Noor, PE CCE; Thomas J. Rye, AACE Transactions, 1999
A Cost Analysis Information System for Developing and Underdeveloped Countries, Abdul Samad Kazi; Dr. Chotchai
Charoenngam, Cost Engineering Journal, 1999
Guidelines for Successful Risk Facilitating and Analysis, Iqbal Noor, PE CCE; Thomas J. Rye, Cost Engineering Journal,
2000
Integration of Schedule and Cost Risk Models, Robert V. Wendling; Randal B. Lorance, PE, Cost Engineering Journal, 2000
The Estimate Review and Validation Process, Larry Dysert; Bruce G. Elliott, AACE Transactions, 2000
Integrated Range Estimating and Stochastic Scheduling, Leroy Isidore; Edward Back, Cost Engineering Journal, 2001
Basic Techniques for Analyzing and Presentation of Cost Risk Analysis, Randal B. Lorance; Robert V. Wendling, Cost
Engineering Journal, 2001
Monte Carlo Analysis: Ten Years of Experience, Dale E. Clark, Cost Engineering Journal, 2001
Risk-Based Cost Control for Construction, William J. Bender; Bilal M. Ayyub, AACE Transactions, 2001
Technical Risk Analysis of Multidisciplinary Projects, Giancarlo Guenzi, PE CCE; Giovanni Cannistra, PE CCE, AACE
Transactions, 2003
Cost Risk Management in West Rail Project of Hong Kong, Chen Hua; S.W. Poon; F.F. Ng, AACE Transactions, 2004
Simplified Risk Assessment for Construction Clients, William J. Bender, PE, AACE Transactions, 2004
Integrating Risk Analysis With Cost Estimating Relationships, Peter Yu, AACE Document, 1999
Project Execution Risks in EPC/Turnkeys Contracts and the Project Managers Roles and Responsibilities, George E. Baram,
P.Eng. CCE, AACE Transactions, 2005
Marrying Risk Register With Project Trending, John G. Zhao, AACE Transactions, 2005
Risk Analysis In Transit Project, Jeffrey Allen; Ali Touran, PE, AACE Transactions, 2005
Transferring Risk for Contaminated Facility Demolition, Kristyn Clayton; Jay Augustenborg, AACE Transactions, 2005
Multi-Attribute Utility Model for Quantifying Schedule and Cost Overruns in Pipe-line Projects, Ahmed Eldieb; Mohamed
Marzouk; Moheeb Elsaid, AACE Transactions, 2005
The Application of Risk Management in Infrastructure Projects, Rashed Ali, CCE, Cost Engineering Journal, 2005
Simplified Approach to Probabilistic Cost Benefit Analysis: Architectural Lighting Example, Khaled Nassar; Abdullah AlMohaisen, Cost Engineering Journal, 2006

AACE Internationals Professional Practice Guide to


Risk, Second Edition
TABLE OF CONTENTS - Page 6
78. Value-Based Risk Management (VBRM), Kevin M. Curran, Cost Engineering Journal, 2006
79. Managing Project Cost Risk, Dan Patterson, AACE Transactions, 2006
80. Cost-Time-Risk Diagram: Project Planning and Management, Peerapong Aramvereekul, PSP EVP; Daniel J. Seider, PE, Cost
Engineering Journal, 2006
81. The Use of Historical Costs from the Rocky Flats Environmental Technology Site for Estimating Uncertainty for the Life-Cycle
Cost of the US Department of Energy Environmental Management Program, Dan Melamed; Bryan Skokan, PE; Mathew
Zenkowich; Dan Kocher, AACE Transactions, 2007
82. Schedule and Cost Risk Evaluation, Rashmi Prasad, AACE Transactions, 2007
Chapter VIII: Decision Analysis
1. Application Of Risk Analysis To Evaluation Of Research Projects, Warner J. G. Cudmore; J. B. Corns, AACE Transactions,
1972
2. A Methodology for the Economic Analysis of Component Redundancy, Gregory C. Opdycke, AACE Transactions, 1976
3. Decision Analysis, Dr. James M. Neil, PE CCE, AACE Transactions, 1991
4. Credible Projection Now Require Decision Analysis, JR Schuyler, Cost Engineering Journal, 1992
5. The Role of Risk Series: Understanding Risk, Michael W. Curran, Cost Engineering Journal, 1999
6. PRAM It or Walk Away, Neal S. Gray, AACE Transactions, 1998
7. Decision Support System for Pipeline Route Selection, Prasanta Kumar Dey; Soumitra S. Gupta, Cost Engineering Journal,
1999
8. Risk Management in Construction: An Approach for Contractors in South Korea, Soon Kim; Deepak Bajaj, Cost Engineering
Journal, 2000
9. Decision Process for Value Management Proposals, Bryan R.A. McConachy, AACE Transactions, 2000
10. Cost Estimates: A Decision-Making Tool, Douglas W. Leo; Scott W. Knotowicz, AACE Transactions, 2001
11. Project Risk Management: A Combined Analytic Hierarchy Process and Decision Tree Approach, Prasanta Kumar Dey, Cost
Engineering Journal, 2002
12. Notes From Your Technical Board: Easy (?) Decision-Making, Randy R. Rapp, PE CCE, Cost Engineering Journal, 2002
13. Knowledge Gaps Impacts on Risk Management, Iqbal Noor, PE CCE; Robert J. Martin Jr.; Joseph A. Treige, P.Eng., AACE
Transactions, 2003
14. Risk Management in Building Projects, Dariusz Skorupka, AACE Transactions, 2003
15. Project Risk Identification and Management, Mark W. Cohen, PE; Glen R. Palmer, AACE Transactions, 2004
16. Risk Assessments: Value of the Process, Christopher P. Caddell, PE; Sherri R. Crepinsek; Gerald P. Klanac, AACE
Transactions, 2004
17. Do We Truly Understand Project Risk?, Stephen L. Cabano, AACE Transactions, 2004
18. Neural Networks in the Risk Management of a Project, Dariusz Skorupka, AACE Transactions, 2004
19. Understanding Risk, Michael W. Curran, AACE Document, 1998
20. Managing Risk for Global Energy Projects, Nick J. Lavingia, PE, AACE Transactions, 2005
21. Implementing Risk Management on Transit Mega-Projects, Shawn L. Kildare; George P. Blank, AACE Transactions, 2006
22. Case Studies of the Decision-Making Process of Construction Clients, Anthony J. Mills, AACE Transactions, 2006
23. Schedule and Cost Risk: An Integrated Part of Risk Management Process in the Ormen Lange Project, Svein Olav Aslaksen;
Gudmund Vigerust, AACE Transactions, 2007
24. Practical Risk Analysis, Waymon D. Lofton; Robert J. Coppo, AACE Transactions, 2007
Chapter IX: Economic Analysis
1. Monte Carlo Simulation - A Tool For Combating Uncertainty In Economic Analysis, G. L. Smith, AACE Transactions, 1966
2. Calculating The Calculated Risk, David Stuhlbarg, AACE Transactions, 1967
3. A Venture Analysis Of An Existing Business, Arthur L. Squyres, AACE Transactions, 1969

AACE Internationals Professional Practice Guide to


Risk, Second Edition
TABLE OF CONTENTS - Page 7
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

Risk Analysis: Now You Have One, What Do You Do With It?, Robert C. Doyle, Cost Engineering Journal, 1979
Impact of Business Environment on Project, Henry C. Thorne, CCE, AACE Transactions, 1981
Risk Management in Cost Engineering - Application of Utility Theory, Dr. Carl Wolf, CCE; Gordon S. Kalley, AACE
Transactions, 1983
Coal Supply Risk Evaluation for Site Selection, Endre Mozes, CCE, AACE Transactions, 1988
"Bottom Line" Project Management, David H. Hamburger, AACE Transactions, 1988
Quick Sensitivity Analysis for Small Projects and Feasibility Studies, Dr. Ted G. Eschenbach, PE, AACE Transactions, 1992
The Economic Impact of Marketing Uncertainties, Henry C. Thorne, CCE, AACE Transactions, 1992
Feasibility Analyses, An Explanation! Feasibility Study, Model Feasibility Analysis, Risk Analysis, S West, Cost Engineering
Journal, 1993
Economic Evaluation of Trenchless Technology, Robert H. Harbuck, AACE Transactions, 2000
Validity Calculus: A Novel Methodology To Manage High-Uncertainty Projects, Gideon Samid, PE, AACE Transactions, 2002
Using Independent Assessments to Improve Company Performance, Andrew S. Dowd Jr., AACE Transactions, 2003
Visual Display of Sensitivity and Risk, Maarten S.A. Vrijland, AACE Transactions, 2003
Quantifying Pavement Life Cycle Cost Inflation Uncertainty, Douglas D. Gransberg, PE CCE; James Diekmann, AACE
Transactions, 2004

Chapter X: Escalation
1. Sharing the Risks of the Cost of Inflation, George Stukhart, AACE Transactions, 1982
2. Cost Engineering In A Setting Of High Inflation And Political Uncertainty: A Case Study Of A Major School Building Program In
Brazil, JOG Brizola; PC Dinsmore; PLU Guerra, Cost Engineering Journal, 1993
Chapter XI: Human Factors
1. Graphic Presentations and How to Use Them Effectively in Cost Engineering, Walter H. Gage, CCE, AACE Transactions,
1980
2. Selling Your Estimate to Management, Alfred P. Sill, CCE, AACE Transactions, 1980
3. Learning to Live with Probable Outcomes, Lanny Golden, AACE Transactions, 1991
4. Neural Networks and the Identification and Estimation of Risk, Dr. R. A. McKim, PE, AACE Transactions, 1993
5. Risk Behavior and Construction Performance, Dr. R.A. McKim, PE, AACE Transactions, 1993
6. Cost Engineering: Making it Work, Arthur J. Hadnett, AACE Transactions, 1994
7. Corporate Risk Assessment in the Construction Industry: An Australian Perspective, Deepak Bajaj, AACE Transactions, 2001
8. Challenges of Implementing Risk Management Processes, Iqbal (Bob) Noor, PE CCE; Terry Joyner; Robert J. Martin Jr., AACE
Transactions, 2002
9. The Risk Management of Construction Project's Consent Availability, Ottorino Maggiore Van Beest, AACE Transactions, 2003
10. Risk Management in IT Implementation: A Human Factor, Wayne S. Magro; William T. Kellow, AACE Transactions, 2004
11. Managing Design-Build Project Security Issues Risk, Gayla M. Badillo-Kwiatkowski; Douglas D. Gransberg, PE CCE, AACE
Transactions, 2004
Chapter XII: Manufacturing
1. Vague Boundaries of Product and Customer Costs, Marko Seppanen; Jouni Lyly-Yrjanainen, AACE Transactions, 2002
Chapter XIII: Research & Development
2. Monte Carlo Simulation Applications In Research Project Evaluation, A. N. Defriece; G. E. Hamilton; C. E. Larson, AACE
Transactions, 1967
3. Risk Management on Research and Development Projects, Steven W. Wageman, CCC, AACE Transactions, 2004
4. Fuel Cell Town: A Feasibility Study, Iftikhar Kamil Madni, CCE, AACE Transactions, 2006

AACE Internationals Professional Practice Guide to


Risk, Second Edition
TABLE OF CONTENTS - Page 8
Chapter XIV: Safety & Health
1. A Cost-Effective Maintenance Program Through Risk Analysis, Tusar Bandyopadhyay; Prasanta K. Dey; Saumitro S. Gupta,
AACE Transactions, 1997
2. Construction Industry Safety Measures, Nancy Terrero; Janet K. Yates, Cost Engineering Journal, 1997
3. A Risk-Based Maintenance Model for Cross-Country Pipelines, Prasanta K. Dey; Stephen O. Ogunlana; Saumitra S. Gupta;
Mario T. Tabucanon, Cost Engineering Journal, 1998
Chapter XV: Schedule
1. Meaningful Risk Assessment, George T. Kraemer, AACE Transactions, 1976
2. A Retrospective Evaluation of a Probabilistic Schedule Analysis, Henry R. Block, CCD; Richard A. Mazzini, CCE, AACE
Transactions, 1980
3. Planning & Scheduling an International Project, Mark Grinberg, AACE Transactions, 1981
4. The Role of Probability in Scheduling, Aaron Rose, CCE, AACE Transactions, 1981
5. Planning Risk Analysis in Offshore Projects: A Realistic Approach, Jean-Jacques Eldin; Jean-Claude Boudry, AACE
Transactions, 1982
6. Impact Of Uncertain Resources On Project Schedule And Cost, HN Ahuja; V Arunachalam, Cost Engineering Journal, 1985
7. Schedule Risk Analysis Using Computer Simulation, Joseph J. Orczyk, PE; Dr. Donn Hancher, PE, AACE Transactions, 1987
8. A "PERT" Approach to Contractor Prequalification Analysis, Dr. Jeffrey S. Russell; Irtishad Ahmad, AACE Transactions, 1990
9. Assessing Project Cost and Schedule Risk, Edward W. Merrow; Mary Ellen Yarossi, AACE Transactions, 1990
10. A PERT Approach to Cost Risk Analysis, Pedro V. Aquino, AACE Transactions, 1992
11. Combining Risk Management And Resource Optimization In Project Management Software, OB Thomasen; L Butterfield, Cost
Engineering Journal, 1993
12. Using Schedule Variance As The Only Measure Of Schedule Performance, Jim W. Short, CCC, Cost Engineering Journal,
1993
13. Project Scheduling Risk Assessment Using Monte Carlo Methods, Eric D. Finley, PE; Dr. Deborah J. Fisher, PE, Cost
Engineering Journal, 1994
14. The Essence and Evolution of Earned Value, Quentin W. Fleming; Joel M. Koppelman, AACE Transactions, 1994
15. A Cost-Schedule Decision-Support System for Airport Renovation, Manar Shami, AACE Transactions, 1996
16. Activity Duration Quantification Under Uncertainty: Fuzzy Set Theory Application, Jong H. Ock, Cost Engineering Journal,
1996
17. Planning and Scheduling With Multiple Decision Points, Fritz Ehrenreich-Hansen, P.Eng. CCE; S.W. (Bill) Wilson, P.Eng., Cost
Engineering Journal, 1997
18. Practical Applications of Probabilistic Scheduling, Dr. Gui Ponce de Leon, PE; John R. Knoke, PE, AACE Transactions, 1997
19. Risk Analysis for Environmental Remediation Projects: A Comprehensive Approach, James E. Diekmann, Cost Engineering
Journal, 1997
20. Practical Risk Analysis in Scheduling, Abhi Basu, PE, AACE Transactions, 1998
21. Basic Techniques for Analyzing and Presenting Schedule Risk Analysis, Robert V. Wendling; Randal B. Lorance, PE, AACE
Transactions, 1999
22. Seal Coat Constructability Program, Dr. Douglas D. Gransberg, PE CCE; Dr. Sanjaya P. Senadheera; Ilker Karaca, AACE
Transactions, 1999
23. Project Time Risk Analysis Through Simulation, Prasanta K. Dey; Stephen O. Ogunlana, Cost Engineering Journal, 2001
24. Risk Management for Pharmaceutical Project Schedules, Alexia Nalewaik, CCE, AACE Transactions, 2005
25. The Benefits of Monte-Carlo Schedule Analysis, Jason Verschoor, P.Eng., AACE Transactions, 2005
26. Assessing Project Schedule Risk with Contingent Tasks by Spreadhsheet-Based Simulation, Li-Chung Chao; Sung-Lin Hsueh,
Cost Engineering Journal, 2006

AACE Internationals Professional Practice Guide to


Risk, Second Edition
TABLE OF CONTENTS - Page 9
27. Project Risk Management Using Monte Carlo Simulation, Mohamed K. Khedr, PSP, AACE Transactions, 2006
28. The Value Added by Linking the Project Risk Register to Quantitative Schedule Risk Analysis, Emmanuel Mulambya, AACE
Transactions, 2007
29. Risk Assessment For Scheduling Acceleration, Khalid S. Al-Gahtani, AACE Transactions, 2007
Chapter XVI: Technological Risk
1. Cost-Performance Analysis for Building Envelopes, Dr. Ramy El-Diasty, AACE Transactions, 1988
2. Cost Assessment of Emerging Construction Technologies, Thomas R. Napier; Dr. Luh-Maan Chang, AACE Transactions,
1988
3. Minimizing Risk in High Technology Programs, G. C. Belev, AACE Transactions, 1990
4. Enterprise IT Risk Management: A Case Study, Iqbal Noor; Richard B. Dillon; Ray Williams, AACE Transactions, 2001
Chapter XVII: Value Engineering
1. System Evaluation Combining Value Engineering and Cost Engineering Methods, W. C. Finch; F. D. Postula, AACE
Transactions, 1980
2. Range Estimating in Value Engineering, William P. Rowland; Kevin M. Curran, AACE Transactions, 1991
3. Project Management Oversight: An Effective Risk Management Tool for EPC/Design-Build Contracts, George E. Baram, P.Eng.
CCE, AACE Transactions, 2003
4. Risk Management Implementation and Analysis, Sean T. Regan, CCE, AACE Transactions, 2003
5. Improve Profitability Through Effective Project Management and Total Cost Management, Nick J. Lavingia PE, Cost
Engineering Journal, 2003
6. Project Uncertainty Management, Maruboyina Ramgopal, CCE, Cost Engineering Journal, 2003
7. Identifying Risks and Opportunities Using EAC, H. Lance Stephenson, CCC, AACE Transactions, 2004
8. Value Engineering for Hazardous Waste Projects, Richard A. Selg, CCE, AACE Transactions, 2006
Author Index
Chronological Index
About the Editor

TABLE OF CONTENTS Page 1 of 1


Introduction
Chapter I: Aerospace
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.

The Challenge of Change, Sarwar A. Samad, Cost Engineering, 1996


An Investment Analysis Model for Space Mining Ventures, Knut I. Oxnevad, AACE Transactions, 1991
Twelve New, Exciting Estimating Tools, Joseph A. Brown, CCE, AACE International Transactions, 1996
Dual Sourcing To Reduce Aerospace Hardware Costs, Frank D. Postula; Dwight T. Little, Cost Engineering, 1992
Designing for Cost, Edwin B. Dean; Dr. Resit Unal, AACE Transactions, 1991
240 Aerospace Cost Indexes and Escalation, Joseph A. Brown, CCE, AACE International Transactions, 1995
Government Requirements for Estimating System Audits, Frank D. Postula, PE CCE, AACE Transactions, 1993
Estimating and Bidding for the Space Station Processing Facility, Joseph A. Brown, CCE, AACE Transactions, 1993
S.P.C. Approach to Cost Reduction, (Robin) W. S. Tham, AACE Transactions, 1988
Construction Bidding Cost of KSC's Space Shuttle Facilities, Joseph Andrew Brown, CCE, AACE Transactions, 1979
Parametric Cost Estimating -- A Guide, John W. Hackney, CCE; Kay Hudson; Lesley Gasperow, AACE Transactions, 1987
Parametric Software Cost Estimation with an Adaptable Model, Robert E. Park, AACE Transactions, 1988
Project Controls: Cost / Schedule / Progress Management on the NASA Wind Tunnel Restoration Project, Kelvin Yu, PE, CCE, Cost
Engineering, 1996
MIS For Space Shuttle Facilities, James Brownell; John P. Wallace, AACE Transactions, 1986
Cases Impairing C/SCSC Application in Program Management, Nghi M. Nguyen, PE, AACE Transactions, 1989
WBS Criteria for Effective Project Control, Frank D. Postula, PE CCE, AACE Transactions, 1991
Computer-Aided Engineering Integrates Product Development, Gene S. Rosenbaum; Frank D. Postula, PE CCE, AACE
Transactions, 1991
Challenges Developing CAD/ACE, J. A. Brown, AACE Transactions, 1990
Cost Engineering's Role in Total Quality Management, Frank D. Postula, AACE Transactions, 1990
Effective Subcontractor Management in High-Tech Projects, Nghi M. Nguyen, PE, AACE Transactions, 1991

Chapter II: Aviation

Free Flight: Keeping Up with Changing Times, Sarwar A. Samad, CCE, Cost Engineering, 1998
The US Federal Aviation Administrations Airspace System in a Changing World, Sarwar A. Samad, CCE, Cost Engineering, 1997
Cost Scale-Up Factors for Airport Construction, Dr. Donald S. Remer, PE; Christopher Wong, Cost Engineering, 1996
A Cost-Schedule Decision-Support System for Airport Renovation, Manar Shami, AACE International Transactions, 1996
Scheduling For Upgrade of an Airline's Ramp Level Facilities, Sargon Tomik, Cost Engineering, 1993
CPM- Scheduling At An Existing Operating Airport, Charlotte Jan Saper, AACE Transactions, 1986
An Airport Managers Primer On Passenger Loading Bridge Planning And Installation, Michael E. Bitner; David Black, Cost
Engineering, 1990
8. Army Aviation: Economic/Cost/Operations Research Analysis, Edward P. Laughlin, AACE Transactions, 1991
9. Roles and Trends: Cost Estimating of New Technologies, Edward P. Laughlin, AACE Transactions, 1989
10. Contingency Management for the Hong Kong Airport Core Program (ACP), Jhan Schmitz; Norman H. Shotwell. AACE
Transactions, 1993
11. Airport Maintenance Costs, Leopoldo Varela, CCE, AACE Transactions, 1992
12. Total Project Management At The Miami International Airport, Michael E. Bitner, Cost Engineering, 1985

1.
2.
3.
4.
5.
6.
7.

Author Index
Chronological Index

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 1
Introduction
Chapter 01: Planning
1. Organization Planning - Concepts & Implications, S.L.G. Jain, AACE Transactions, 1981
2. How Modular Plant Construction Offers Improved Cost and Schedule Control, Leo B. Glaser; Anthony Starkey, AACE Transactions, 1982
3. Planning Risk Analysis in Offshore Projects: A Realistic Approach, Jean-Jacques Eldin; Jean-Claude Boudry, AACE Transactions, 1982
4. Organizational Credibility in Cost and Scheduling: The Critical Ingredient, Richard A. Mazzini, CCE, AACE Transactions, 1982
5. Role and Duties of the Planning Engineer in Material Management for Construction Projects, Calin Popescu, AACE Transactions, 1982
6. How to Interface Cost and Planning in Offshore Projects, Pierre Boutineau; James-Jacques Eldin, AACE Transactions, 1983
7. Integration of Cost and Planning: Myth or Reality?, Serge Pressoir, AACE Transactions, 1983
8. Scheduling Specifications for the 80's, Dr. Gui Ponce de Leon, AACE Transactions, 1983
9. The Planning Engineer - A Human Element of Planning and Scheduling, Remo J. Silvestrini, AACE Transactions, 1983
10. Capital Cost Estimates: Sensitivity to Schedule, David J. Peeples, CCE, AACE Transactions, 1984
11. Engineering Document Planning and Progress Control, C. Henrik Lund; Jon Ostensvig, AACE Transactions, 1984
12. Integrated Computer Systems, Frederick Wm. Mueller, CCE; Phillip F. Mueller, AACE Transactions, 1984
13. Integrated Project Control Data Base, George E. Conniff; Walter A. Schindler, AACE Transactions, 1984
14. The Perfect Plan, BE Kibler,, Cost Engineering Journal, 1985
15. Integrating Planning, Scheduling and Construction with the Cost Estimate, George Epstein, AACE Transactions, 1985
16. Schedule Planning for Construction Projects, William A. Shunk, AACE Transactions, 1985
17. Back To Basics: Practical Scheduling Guidelines Using CPM Computer Programs, Shiela Toth, Cost Engineering Journal, 1985
18. Factors Affecting Construction Planning, Dr. Alexander Laufer; Dora Cohenca, AACE Transactions, 1986
19. The Professional Planner/Scheduler and the Personal Computer, Philip T. Perzanowski, AACE Transactions, 1986
20. Microcomputer Time-Scale Representation of Precedence Method, Edmond Miresco, AACE Transactions, 1986
21. Scheduling Basics, Dr. Brisbane H. Brown, Jr., AACE Transactions, 1987
22. Project Planning, Remo J. Silvestrini, PE, AACE Transactions, 1987
23. Cost/Schedule Control System Criteria - A Lighthearted Introduction for the Non-Believer, Lee R. Lambert, AACE Transactions, 1988
24. Micro to Mainframe Multiproject Scheduling, Charles P. Woodward, PE CCE; Linda M. Ramme, AACE Transactions, 1988
25. Expert Systems - A Real Tool for Planning, J. L. Basham; C. K. Skweres; J. S. Hamilton, AACE Transactions, 1988
26. A Project Control to Meet Project Change, Mark W. Beyer, PE, AACE Transactions, 1988
27. A Look at Planning & Scheduling in the Middle East, Dr. Khaled A. Bu-Bushait; Ignacio Manzanera, CCE, AACE Transactions, 1989
28. From CAD to CPM Software, Philip T. Perzanowski, CCE, AACE Transactions, 1989
29. Profit Maximization in Hotel Planning, Krishan Mathur; Dr. W. D. McGeorge, AACE Transactions, 1989
30. Practical Specifications For Project Scheduling, John R. Clark, PE, Cost Engineering Journal, 1990
31. Variations in Project Planning Intensity, John C. Julian; Remo J. Silvestrini, PE, AACE Transactions, 1990
32. Contemporary Planning in the '90's, Thomas M. Trufant; Robert H. Murphy, AACE Transactions, 1990
33. Computerized Planning/Scheduling on a Board Machine, Rohit Singh, CCE, AACE Transactions, 1990
34. Planning a Capital Project, DeWitt Patterson; James R. Uz, AACE Transactions, 1990
35. Planning and Scheduling for Success, Ignacio Manzanera, CCE, AACE Transactions, 1990
36. Improving Your "Scheduling CAD" Productivity, Philip Perzanowski, CCE, AACE Transactions, 1991
37. A Winning Business Planning Process, Robert J. Kyle; Alfred Z. Matos, AACE Transactions, 1991
38. Owners Specify Contractor's Estimating/Scheduling Systems, Thomas L. Goff, AACE Transactions, 1991
39. Cashflow Planning for Residential Housing Developments, Dr. Clifford Jones, AACE Transactions, 1992
40. Starting Projects on the Right Foot, Gerard Beguinot, CCE; Richard Robinson, AACE Transactions, 1992
41. Breakthrough Planning Methodology, Joe Rizzo, AACE Transactions, 1992

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 2
42. A Survey Of Planning And Controlling Techniques Used By Construction Contractors In Saudi Arabia, A Shash; A Al-Abdullatif, Cost Engineering
Journal, 1993
43. Integrated Network Planning and Scheduling with 3-D Construction Sequence Models, Daniel P. Nevins; Ronald J. Zabilski; Bridget E. O'Reilly,
AACE Transactions, 1993
44. Considerations in Planning and Scheduling, John K. Nabors, AACE Transactions, 1994
45. Contrasting Cost-Loaded CPM Scheduling Specifications, Dr. Gui Ponce de Leon, PE; Michael J. Mix; Philip Spittler, AACE Transactions, 1994
46. A Decision Support System for Project Planning, Prasanta K. Dey; Mario T. Tabucanon; Dr. Stephen O. Ogunlana, AACE Transactions, 1996
47. Improving the Cost and Schedule Control System, Mohammed S. El-Mashaleh; Allan D. Chasey, PE, Cost Engineering Journal, 1999
48. The Planning and Execution of an International Project, Charles P. Woodward, PE CCE; Kenneth K. Humphreys, PE CCE, AACE Transactions, 1998
49. Just-In-Time Construction Materials Management, Neil D. Opfer, CCE, AACE Transactions, 1998
50. Top-Down Back-To-Front Project Planning, Faramarz Fred Rahbar; James E. Rowings Jr., PE CCE, AACE Transactions, 1998
51. The Opening Game - Project Mobilization, Edward E. (Ted) Douglas III, CCC, AACE Transactions, 1998
52. Computerized Project Planning System, P. Giridhar, AACE Transactions, 1998
53. Preproject Planning for Microelectronics Facilities, Allan D. Chasey, PE; Jia Guo, Cost Engineering Journal, 2000
54. Integration of Schedule and Cost Risk Models, Robert V. Wendling; Randal B. Lorance, PE, Cost Engineering Journal, 2000
55. Resolving Work Breakdown Structure Problems, Stephen E. Mueller, AACE Transactions, 2000
56. Developing Program Controls for a Large Program, Shawn L. Kildare; George P. Blank, AACE Transactions, 2001
57. Project Controls in the Preconstruction Phase, Ian A. Street, CCE; Joseph W. Wallwork, PE CCE, AACE Transactions, 2001
58. Selecting Planning and Scheduling Specifications, Leaf A. Ballast; Calin M. Popescu, AACE Transactions, 2001
59. Improving Productivity With Short-Interval Scheduling, Walter J. Strutt, AACE Transactions, 2001
60. Activity-Based Job Costing for Integrating Estimating, Scheduling, and Cost Control, Aminah Robinson Fayek, Cost Engineering Journal, 2001
61. Start Your Project the Right Way, Edward E. Douglas III, AACE Transactions, 2002
62. Project Scheduling Enhancements for Avoiding Litigation, Anamaria Popescu; James T. O'Connor; John D. Borcherding, AACE Transactions, 2002
63. Labor Resource Planning for Construction Projects, Anubhav Bhargava; Balkiz Oztemir; Allan D. Chasey, AACE Transactions, 2002
64. Project Planning: A Great Communicator, James E. Baar, PE, AACE Transactions, 2002
65. Project Execution Planning for Cost Engineers and Schedulers, Allen C. Hamilton, CCE, AACE Transactions, 2003
66. Contract Requirements for Construction Schedule, Win G. Li, PE CCE, AACE Transactions, 2003
67. Developing a Work Breakdown Structure as the Unifying Foundation for Project Controls Systems Development, Lee J. Hobb; Beverly M. Sheafer,
Cost Engineering Journal, 2003
68. Work and Resource Breakdown Structures for Formalized Bottom-Up Estimating, Parviz F. Rad, PE CCE; Denis F. Cioffi, Cost Engineering Journal,
2004
69. Effective Planning Techniques for the Execution of an EPC Project, Hammad Ud Din Tahir, CCE, Cost Engineering Journal, 2004
70. Beyond the Bar: Scheduling Preliminary Engineering and Launching a New Project, Richard D. Smith, PE CCE, AACE Transactions, 2004
71. Planning/Control of Professional Staff Resources, Harry W. Jarnagan, PE CCE, AACE Transactions, 2004
72. Project Management Process and Action Plans, Kul B. Uppal, PE, AACE Transactions, 2004
73. A Preconstruction Foundation for Design-Build Success, Byron J. Law, CCC, AACE Transactions, 2004
74. Project Planning--Then Scheduling, Edward E. Douglas III, CCC, AACE Transactions, 2004
75. Contractor's Schedule Submittal: Catch-22, Earl T. Glenwright Jr., AACE Transactions, 2004
76. Cost Management in Scheduling Applications: Using the Right Toolset for Cost Management, Valerie Behrendt; Rita Wulke, Cost Engineering
Journal, 2004
77. Cost and Schedule Control for Engineering Contracts, Kenneth R. Davey, CCE, Cost Engineering Journal, 2004
78. The Effect of Early Freezing of Scope on Project Schedule, Neil N. Eldin, PE, Cost Engineering Journal, 2005
79. The Case of US Projects in Europe - Guidelines to Mitigate Schedule Delay, from the Owner's Viewpoint, Massimoluigi Casinelli, PE CCE, Cost
Engineering Journal, 2005

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 3
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.
97.
98.
99.
100.

Overcoming "Gotchas" Clauses in Construction Contracts, Donald F. McDonald Jr., PE CCE, AACE Document, 1999
Does Project Control Start at Contract Award?, Stephen L. Cabano, AACE Transactions, 2005
Understanding Owner Needs, Ginette B. Basak, P.Eng., AACE Transactions, 2005
Innovative Pre-Planning for International Projects, Mark T. Chen, PE CCE, AACE Transactions, 2005
Implementing Project Constructability, Douglas D. Gransberg, PE CCE; Edward E. Douglas III, CCC PSP, AACE Transactions, 2005
Scheduling Practices and Project Success, Andrew F. Griffith, PE, AACE Transactions, 2005
Success: Use of Activity Code Structure for Project Schedule Integration and Monitoring, Gener dela Cruz, AACE Transactions, 2005
Scheduling Specifications: A Lump Sum Contractor's Perspective, Martin J. Bradley, CCC, AACE Transactions, 2005
Planning and Scheduling Department: Functional Aspects, Junaid Ahcom, ICC; Ali Ali Shash, AACE Transactions, 2005
Assessing Project Schedule Risk with Contingent Tasks by Spreadhsheet-Based Simulation, Li-Chung Chao; Sung-Lin Hsueh, Cost Engineering
Journal, 2006
The Link Between Planning and Programming Practice and the Analysis of Delay and Disruption Claims, Nuhu Braimah; Issaka Ndekugri, AACE
Transactions, 2006
Don't Create Variances During Planning, Leah V. Zimmerman, CCC PSP, AACE Transactions, 2006
Scheduling Practices for Project Success, Andrew F. Griffith, PE, Cost Engineering Journal, 2006
4D Modeling: Adding a New Dimension to CPM Scheduling, Vidya C. Dixit, CCE PSP, AACE Transactions, 2007
When is the Critical Path Not the Most Critical Path?, Murray Woolf, AACE Transactions, 2008
Project Planning Using Logic Diagramming Method, Gui Ponce de Leon, PE, AACE Transactions, 2008
Building Green--Potential Impacts to the Project Schedule, Jacqueline T. Doyle, PE; Robert B. Brown, PE; Dax Ponce de Leon; Laura Ludwig, PE,
AACE Transactions, 2009
The Great Debate: Planning and Scheduling From Substantial to Final Completion, Christopher W. Carson, PSP; John C. Potter, PSP; Mark C.
Sanders, PE CCE PSP; John J. Stauffer, PSP, AACE Transactions, 2009
Essentials of Early Planning for Megaprojects, Himansu Bhaumik, PE, AACE Transactions, 2010
Planning a Complex Project - An Under Appreciated Effort, Christopher W. Carson, PSP; Glen R. Palmer, CFCC PSP, AACE Transactions, 2010
Alternate Methods for Integrated Cost & Schedule Contingency Estimating, John K. Hollmann, PE CCE CEP, AACE Transactions, 2010

Chapter 02: Schedule Development


1. Automated Input for Construction Scheduling Systems, Martin D. Ryan; Daniel M. McCarthy, AACE Transactions, 1980
2. On-Site Minicomputer Yields a Successful Arabian Project, Donald J. Cass, CCE, AACE Transactions, 1980
3. Integration of Cost and Scheduling Systems, Paul B. Shiring, Jr., CCE, AACE Transactions, 1981
4. Cost/Schedule Integration - Panacea or Poison?, Robert R. Cook, CCE, AACE Transactions, 1982
5. Cost-Schedule Integration: Alternatives, Raad H. Hermes, AACE Transactions, 1982
6. Cost and Schedule Integration in Process Plants Construction, Chandra S. Murthy, AACE Transactions, 1983
7. Integration of Cost and Scheduling with Materials Management Function, John C. Cato; Chandra S. Murthy, AACE Transactions, 1983
8. Have the Networks Fit the Project, Donald J. Cass, CCE, AACE Transactions, 1984
9. Modern Innovations in Scheduling Techniques, Dr. James E. Rowings, Jr.; John S. Bloess, AACE Transactions, 1984
10. Enhancing Reliability of Project Duration Forecasts, Dr. Hira N. Ahuja, CCE; V. Nandakumar, AACE Transactions, 1984
11. A Scheduling Tool for Smaller Jobs, Fred Rahbar, AACE Transactions, 1984
12. Integrated Living Schedule, Raymond E. Schweikart, AACE Transactions, 1985
13. CPM - Pert Time Scaled Summary Network, Harold B. Shugar, AACE Transactions, 1985
14. ADM Versus PDM, F Rahbar, Cost Engineering Journal, 1986
15. Recognizing and Avoiding Problems Inherent in Today's Scheduling Environment, David L. Freidl, CCE, AACE Transactions, 1987
16. Schedule Risk Analysis Using Computer Simulation, Joseph J. Orczyk, PE; Dr. Donn Hancher, PE, AACE Transactions, 1987

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 4
17. Applied Scheduling, Dr. Brisbane H. Brown, Jr., AACE Transactions, 1987
18. Scheduling Technique to Control Several Minor Modification Projects, Mark A. Andrews; Kenneth L. Mortensen, PE; Edward J. Kaufmann, PE,
AACE Transactions, 1988
19. Scheduling for on Time Project, David H. Hamburger, PE, AACE Transactions, 1989
20. Assessing Project Cost and Schedule Risk, Edward W. Merrow; Mary Ellen Yarossi, AACE Transactions, 1990
21. Micro-Computer Expert System for Scheduling Construction Project, Edmond Miresco; Nicholas Chepurnix, AACE Transactions, 1990
22. Integrated Project Numbering System, Bruce A. Spence, CCE, AACE Transactions, 1990
23. Resource Scheduling - Is AI the Answer?, Richard E. Westney, PE, AACE Transactions, 1991
24. Up-front Project Scheduling in an Owner/Contractor Alliance, Murray W. Janzen, Cost Engineering Journal, 1992
25. Modular CPM's or Detail CPM Schedules at a Barchart Price, Stephen Goodman, AACE Transactions, 1992
26. Repetitive Activity Scheduling Process, F. Fred Rahbar; Dr. James E. Rowings, CCE, AACE Transactions, 1992
27. Automating the Schedule Review Process, John R. Knoke, PE; Jhan Schmitz, AACE Transactions, 1992
28. A Computerized Inquiry-Feedback Knowledge Engineering System, Dr. Janet K. Yates, AACE Transactions, 1992
29. A Statistical Evaluation Of The Impact Of Limited Resources On Project Scheduling, BM Woodworth, Cost Engineering Journal, 1993
30. BAL: An Algorithm for Scheduling and Control of Linear Projects, Tarek Hegazy; Osama Moselhi; Dr. Paul Fazio, AACE Transactions, 1993
31. Repetitive Production Method (RPM) and CPM, Lawrence L. Humphries, CCE, AACE Transactions, 1993
32. Adding Macros to Primavera (and Other Software): Functional and Productivity Improvements, A. Larry Aaron, CCE, AACE Transactions, 1994
33. Construction Scheduling Based on Resource Constraints, Yong-Il Lee; Thomas M. Gatton, AACE Transactions, 1994
34. Design to Schedule (DTOS), Dennis M. Thompson, CCC, AACE Transactions, 1995
35. Project Scheduling Risk Assessment Using Monte Carlo Methods, Eric D. Finley, PE; Dr. Deborah J. Fisher, PE, Cost Engineering Journal, 1994
36. Activity Duration Quantification Under Uncertainty: Fuzzy Set Theory Application, Jong H. Ock, Cost Engineering Journal, 1996
37. Scheduling Concerns in the Hazardous Waste Industry, Timothy C. McManus; Minosca V. Alcantara, Cost Engineering Journal, 1996
38. Developing an As-Built Schedule From Project Records, John R. Knoke, PE; Gary H. Jentzen, PE, AACE Transactions, 1996
39. Matrix Scheduling for Repetitive Residential Construction, Neil D. Opfer, CCE, AACE Transactions, 1996
40. Labor Productivity Modeling With Neural Networks, Dr. James E. Rowings Jr., PE CCE; Rifat Sonmez, AACE Transactions, 1996
41. A Multiobjective Linear Program for Scheduling Repetitive Projects, Dr. Kamal Al-Subhi Al Harbi; Dr. Shokri Z. Selim; Mazen Al-Sinan, Cost
Engineering Journal, 1996
42. Schedule Hierarchy - An Overview, Sarwar A. Samad, Cost Engineering Journal, 1998
43. Soft Logic - An Overview, Dennis Read Hanks, PE CCE, Cost Engineering Journal, 1999
44. Key Issues in Implementing Cycle Time Analysis as a Schedule Reduction Tool, Neil N. Eldin, Cost Engineering Journal, 1999
45. The Adequacy of Initial Scheduling Estimates, John M. Dye; Dr. Irtishad U. Ahmad, PE, AACE Transactions, 1998
46. Industry Crisis: Construction Scheduling Software, Jon M. Wickwire; Stuart Ockman, AACE Transactions, 2000
47. The Pitfalls of CPM Scheduling on Construction Projects, Ian A. Street, Cost Engineering Journal, 2000
48. Schedule Review Basics, Craig L. Olsen, AACE Transactions, 2000
49. Cost Estimating and Scheduling Integration, Philip D. Larson, AACE Transactions, 2000
50. Integrated Range Estimating and Stochastic Scheduling, Leroy Isidore; Edward Back, Cost Engineering Journal, 2001
51. Integrating CAD, Estimating, Scheduling, and Accounting, Philip D. Larson, AACE Transactions, 2001
52. Baseline Schedule Approval, Zartab Q. Zafar; Dean Rasmussen, Cost Engineering Journal, 2001
53. Tripping Hazards in Schedules, Donald F. McDonald Jr., AACE Transactions, 2002
54. Weather Derivatives Allow Construction to Hedge Weather Risk, Robert B. Connors, CCE, Cost Engineering Journal, 2003
55. Time-for Versus Time-of Performance, Ferdinand Fourie, AACE Transactions, 2003
56. Effect of Multiple Calendars on total Float and Critical Path, Nestor J. Scavino, CCC, Cost Engineering Journal, 2003
57. Construction Baseline Schedule Review and Submittal Timeframe, Win G. Li, PE CCE PSP; David J. Carter, Cost Engineering Journal, 2005
58. Scheduling for Estimators, Robert R. George, CCC, AACE Document, 1998

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 5
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.

Retrospective As-Built Schedule Development, Anamaria I. Popescu, PE; Andrew Avalon, PE, AACE Transactions, 2005
Documenting the Schedule Basis, Edward E. Douglas III, CCC, PSP, AACE Transactions, 2005
Benefits of Linear Scheduling, Gary Rock Spencer, PE; Rose Mary Lewis, AACE Transactions, 2005
Success: Use of Activity Code Structure for Project Schedule Integration and Monitoring, Gener dela Cruz, Cost Engineering Journal, 2005
Construction CPM Scheduling - Precision Without Accuracy, Victor M. Ostrowski, PSP, AACE Transactions, 2006
RDM - Relationship Diagramming Method, Fredric L. Plotnick, PE, AACE Transactions, 2006
Scheduling: The Good, the Bad and the Ugly, H. Lance Stephenson, CCC, AACE Transactions, 2006
Scheduling Specifications for the 21st Century, Paul Levin, PSP, AACE Transactions, 2006
Project Planning and Scheduling and its Impact to Project Outcome: A Study of EPC Projects in Canada, Janaka Y. Ruwanpura; Tanveer Nabi
Ahmed; Karim Kaba; Gerald Patrick Mulvany, AACE Transactions, 2006
CPM Schedules - Why and How, Satinder Singh Baweja, CCE, AACE Transactions, 2006
Managing Resource Leveling, Michael R. Nosbisch, CCC PSP; Ronald M. Winter, PSP, Cost Engineering Journal, 2006
Scheduling Management: Classifications vs. Levels, H. Lance Stephenson, CCC, AACE Transactions, 2007
The New Scheduling CPM: Claims Protection Methods, Edward E. Douglas, III CCC PSP, AACE Transactions, 2007
Scheduling Management: Schedule Basis Memorandum, H. Lance Stephenson, CCC, AACE Transactions, 2007
Daily Specific As-Built in As-Planned vs. As-Built Schedule Analysis, Svetlana Lyasko, Cost Engineering Journal, 2008
Primavera Project Management Software and the Claims Consultant, Anne Marie Tombros; Sunu Mohan, PSP EVP, AACE Transactions, 2008
P5 to P-Sixes: Transition from P5 to P6, J. Scott Palmer, AACE Transactions, 2008
Construction Scheduling: Keeping Relevance, Amit Sarkar, AACE Transactions, 2008
The Case for Construction Schedule Validation and Auditing, Earl T. Glenwright, Jr., PE PSP; Aldo Dorea Mattos, AACE Transactions, 2008
Advanced Scheduling Technology for Shorter Resource-Constrained Project Durations, Robert Richards, AACE Transactions, 2008
Schedule Constructability Review, Edward E. Douglas III, CCC PSP, AACE Transactions, 2008
Project Schedule Optimization Using a Genetic Algorithm Approach, John Paul Lancaster; Kai Cheng, AACE Transactions, 2008
When Less is Not More: Providing Subcontractors Early and Late Dates, John C. Livengood, PSP CFCC; Rick Gaetano Cianfaglione, PE PSP, AACE
Transactions, 2009
Total Float Distribution: A Sane Way to Manage Schedule Contingency, Anamaria I. Popescu, PE, AACE Transactions, 2009
Top Ten Scheduling Mistakes and How to Prevent Them, Joseph A. Lukas, PE CCE, AACE Transactions, 2009
"Much Ado About Dates" -- Understanding P6 Date Information, Ronald M. Winter, PSP; F. Burak Evrenosoglu, CCE PSP, AACE Transactions, 2009
Schedule Quality Assurance Procedures, Andrew Avalon, PE PSP; Curtis W. Foster, AACE Transactions, 2010
Lessons Learned - Schedule Development Using Primavera P6, Hannah E. Schumacher, PSP; Charlie Jackson, AACE Transactions, 2010
Managing Schedule Contingency, Edward E. Douglas, III CCC PSP, AACE Transactions, 2010
Schedule Risk Management for Pipeline Projects, Renna Alqasrani; Brent Kitson, P.Eng.; Richa Sahib, P.Eng., AACE Transactions, 2010

Chapter 03: Schedule Management/Control


1. A Retrospective Evaluation of a Probabilistic Schedule Analysis, Henry R. Block, CCD; Richard A. Mazzini, CCE, AACE Transactions, 1980
2. Analysis of Working Space Congestion from Scheduling Data, Dr. Paviz F. Rad, CCE, AACE Transactions, 1980
3. Project Controls - A Force-Account Approach to CM, Thomas P. Roche, AACE Transactions, 1981
4. Large Capital Project: Optimizing Project Economics Thru Schedule Management, Philip S. Heistand, AACE Transactions, 1981
5. Planning & Scheduling an International Project, Mark Grinberg, AACE Transactions, 1981
6. A Critique of Integrated Cost/Schedule Systems, William M. Sancho, CCE, AACE Transactions, 1982
7. Construction Control Schedule, Derek Mason, AACE Transactions, 1982
8. Construction Delay Claims: Treatment of Extended Overhead, Ronald F. Parisi; Robert J. Schlunt, AACE Transactions, 1983
9. Meaningful Scheduling Summaries for Management, Robert R. Cook, CCE, AACE Transactions, 1983

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 6
10. CPM Techniques Really Can Be Applied to Major Mechanical and Technical Construction, Peter J. Schappa, CCE; Dwight A. Zink, CCE, AACE
Transactions, 1983
11. Construction Delay Claims - Assessment Defense, A. J. Werderitsch, CCE; Shah Firoozi, AACE Transactions, 1983
12. The CPM Technique in Construction - A Critique, Derek Mason, AACE Transactions, 1984
13. Cost Containment and Cost Reduction, Stephen C. Wexler, PE CCE, AACE Transactions, 1985
14. CPM - Established and Then Some, Gary O. Glenn, AACE Transactions, 1985
15. Float Ownership: Specs Treatment, Dr. Gui Ponce de Leon, PE, Cost Engineering Journal, 1986
16. Progress Measurement in Engineering and Construction, Michael E. Horwitz, PE CCE, AACE Transactions, 1986
17. PDM Scheduling at EPCOT Center, James Brownell, AACE Transactions, 1986
18. Enhanced Project Management with Reference Schedules, Dr. James E. Rowings, Jr.CCE, AACE Transactions, 1986
19. Construction Projects: Change Order Management, Dr. Calin M. Popescu, AACE Transactions, 1986
20. The 5-Year Living Schedule, Ralph L. Cochran; Patricia D. Galloway, AACE Transactions, 1987
21. Controlling Job Costs Through CPM Scheduling, Philip S. Inglis, AACE Transactions, 1987
22. Minimizing Costs of Delay Construction Claims, Dwight A. Zink, AACE Transactions, 1987
23. Time is Money!, Philippe LeTherisien, CCE, AACE Transactions, 1987
24. Progress and Cost Control Basics, Dr. James N. Neil, CCE, AACE Transactions, 1987
25. Integrated Project Management Information Systems. The French Nuclear Industry Experience, Jean-Claude Jacquin; Gilles-Marie Caupin, AACE
Transactions, 1988
26. Cost and Schedule Specialist Toolkit, C. James Linck; David E. Perelli, AACE Transactions, 1988
27. Etiography: A New Discipline, Charles A. Villemain; J. P. Wojtyna; Michel L. DuRozel, AACE Transactions, 1988
28. Renovation Restoration Scheduling - Library of Congress, Robert P. Jensen, AACE Transactions, 1988
29. Achieving Construction Project Objectives in Various Situations, Dr. Alexander Laufer; Dora Cohenca-Zall, AACE Transactions, 1988
30. Salt Repository Project Schedule Integration, H. Dennis Kopp; Dr. L. J. LaFountain, AACE Transactions, 1988
31. Is Resource Constrained Project Management Software Reliable, BM Woodworth, Cost Engineering Journal, 1989
32. Managing A Turnaround Using Computerized CPM, KW Woodcock, Cost Engineering Journal, 1989
33. Construction-CAE: Integrated Planning and Cost Control, Kermit H. Gates III; Daniel A. Wickard, AACE Transactions, 1989
34. Automation of the Scheduling Analysis Process, Dr. Gary Rock Spencer; F. Fred Rahbar, AACE Transactions, 1989
35. Project Expediting, Wesley R. Querns, CCE, AACE Transactions, 1989
36. Understanding the Value of Earned Value or Where Have All Your Dollars Gone?, Lee R. Lambert, AACE Transactions, 1989
37. EV - Not Only for Large Projects, Walter F. Adamczyk, PE, AACE Transactions, 1989
38. Scheduling Comparison of Engineering/Manufacturing to Engineering/Construction, Terry F. Carlson, AACE Transactions, 1989
39. Project Control for Engineering, James M. Neil, CCE, AACE Transactions, 1989
40. Impact of Changes on Project Schedule, James M. Neil, CCE, AACE Transactions, 1989
41. Concepts and Methods of Schedule Compression, James M. Neil, CCE, AACE Transactions, 1989
42. Project Management Information System, James J. Stevenson, Jr., CCE, AACE Transactions, 1990
43. The Development and Use of Progress Curves, Barry L. Goodwin, CCE, AACE Transactions, 1990
44. A Mechanical Model for CPM Scheduling Calculations, Abhi Basu, AACE Transactions, 1990
45. Cost Scheduling Control of Paper Machine Rebuilds, William S. Speed, CCE, AACE Transactions, 1990
46. End-User Computing for Project Controls, John Mahoney; David P. Kenney, AACE Transactions, 1990
47. Effective Use of Management Control Systems, John M. Moore, CCE, AACE Transactions, 1990
48. Delay Evaluation Using "Record Schedules", Donald J. Fredlund, Jr.; Gui Ponce de Leon, PE, AACE Transactions, 1990
49. Statistical Process Control in Project Management, George P. Moore; David A. Hendrick, AACE Transactions, 1991
50. Construction Scheduling - Don't Depend on a Textbook, Brett M. McPherson; Daniel J. Whitecotton, AACE Transactions, 1991
51. Selecting As-Planned Base in Project Disputes, Calin Popescu, PE, AACE Transactions, 1991

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 7
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.

Cost/Schedule Control vs Computer Programs, Rohit Singh, CCE, AACE Transactions, 1991
Efficient Control of Multiple Small Projects, Timothy M. Wozniak, AACE Transactions, 1991
Schedule Games People Play and Some Suggested Remedies, James G. Zack, Jr., AACE Transactions, 1991
Earned Value Graphics - New, Exciting, Innovative, Donald J. Cass, CCE, AACE Transactions, 1991
Applying Earned Value Procedure to Engineering Management, Mark T. Chen, AACE Transactions, 1991
New Directions in Schedule Management, Gui Ponce de Leon, PE, AACE Transactions, 1991
Duration Analysis, Andrew Sipos, PE, Cost Engineering Journal, 1992
The Daily Report As A Job Management Tool, DA Pogorilich, Cost Engineering Journal, 1992
Integrated Cost And Schedule Control, BE Kibler, Cost Engineering Journal, 1992
Owner's Reviews of Schedules - How Far Should They Go?, Donald J. Fredlund, Jr.; Fred King, AACE Transactions, 1992
Reducing Construction Risks through Project Controls, Danny J. Whitecotton; Brett M. McPherson, AACE Transactions, 1992
OCRWM Transportation Network to Support Budget/Schedule Estimates, Gary L. Sullivan; Max W. Wankerl, AACE Transactions, 1992
Highway Design - Challenges in Controlling Cost and Schedule, Nelson E. Bonilla, CCE; Ray J. Jussila, CCE; Scott Baarman, AACE Transactions, 1992
Project Controls - Expand Your View, John P. Nolan, Sr., AACE Transactions, 1992
Third-Party CPM Scheduling - Making It Work, Terry W. Towle, Cost Engineering Journal, 1993
Out-Of-Logic Progress, Saad A. Suhail, PE CCE, Cost Engineering Journal, 1993
The Project Trend Program, Harry W. Jarnagan, PE CCE, AACE Transactions, 1993
A "New" Program Management Information System, Jeffrey C. Christiansen; Michael S. Mellick, AACE Transactions, 1993
Cost and Time Effective Outage Management, Neil D. Opfer, CCE, AACE Transactions, 1993
Capital Project Monitoring System (CPMS), Gamini A.K. Padmaperuma,CCE, AACE Transactions, 1993
Combining Risk Management And Resource Optimization In Project Management Software, OB Thomasen; L Butterfield, Cost Engineering
Journal, 1993
Field Project Control - Back To Basics, Edward E. (Ted) Douglas III, CCC, Cost Engineering Journal, 1993
Using Schedule Variance As The Only Measure Of Schedule Performance, Jim W. Short, CCC, Cost Engineering Journal, 1993
Fast Track Management For Projects With Multiple Sites, SA Samad, Cost Engineering Journal, 1994
Planning and Scheduling Cost-Limited Projects, Edward E. Douglas III, CCC, AACE Transactions, 1994
Improve Schedule Forecasting Via Earned Value, Donald J. Cass, CCE, AACE Transactions, 1994
The Effect of Resource Constraints on Project Schedules, Michael R. Just, CCE; James P. Murphy, AACE Transactions, 1994
Qualitative Criteria Combination for Total Float Distribution, Suthi Pasiphol; Calin M. Popescu, PE, AACE Transactions, 1994
A Cost-Effective Delay Analysis Technique, Mireille Battikha; Sabah Alkass, PE, AACE Transactions, 1994
Delay Analysis - Issues Not for Granted, George E. Baram, CCE, AACE Transactions, 1994
Responsibility for Delays After the Expiration of the Contract Time, Gary H. Jentzen, PE; Philip Spittler; Dr. Gui Ponce de Leon, PE, AACE
Transactions, 1994
Construction Delay Analysis Systems, Dr. Janet K. Yates; Hisham Aoude, AACE Transactions, 1995
Total Float Management in CPM Project Scheduling, Dr. Suthi Pasiphol; Dr. Calin M. Popescu, PE, AACE Transactions, 1995
Construction Time and Cost Trade-Off Optimization, Dr. Liang Y. Liu; Dr. Scott Burns, PE; Chung-Wei Feng, AACE Transactions, 1995
The Role of Project Controls, Manash K. Bagchi, AACE Transactions, 1995
Risk Reduction Performance Measuring System (RRPMS), Sarwar A. Samad, AACE Transactions, 1995
Program Scheduling: Not Exactly = Project Scheduling, Courtney James McCracken, PE; Patricia J. Auger; John H. Baratta, PE, AACE Transactions,
1995
Project Controls - A Practical Approach, Michael J. Cunningham, CCC, Cost Engineering Journal, 1994
Scheduling in an Environmental Restoration Environment, G. Darryl Walker, CCE, Cost Engineering Journal, 1995
Project Controls: Cost / Schedule / Progress Management on the NASA Wind Tunnel Restoration Project, Kelvin Yu, PE, CCE, Cost Engineering
Journal, 1996

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 8
92. The Reliability of Critical Path Method (CPM) Techniques in the Analysis and Evaluation of Delay Claims, Gasan G. Kallo, Cost Engineering Journal,
1996
93. Going for the Goal, Forecasting, Joseph M. Brown, CCC, AACE Transactions, 1996
94. The End Game - Project Demobilization and Close-Out, Edward E. (Ted) Douglas III, CCC, AACE Transactions, 1996
95. A Scheduling Tool for Tunnel Construction, K.A. Pohrte; W.W. Edgerton, PE, AACE Transactions, 1996
96. Project Controls in the Semiconductor Industry, Robert B. Edgerton; Steven Y. Kunishige, AACE Transactions, 1996
97. A Cost-Schedule Decision-Support System for Airport Renovation, Manar Shami, AACE Transactions, 1996
98. Project Capital Cost Risks and Contracting Strategies, Dr. Keith Pedwell, P.Eng.; Dr. Francis T. Hartman, P.Eng.; Dr. George F. Jergeas, P.Eng., AACE
Transactions, 1996
99. Integrated Project Control and Communications Systems, Gerard J. Hart, AACE Transactions, 1996
100. Cost/Schedule Management of Government Construction Subcontracts, Harry W. Jarnagan, PE CCE, Cost Engineering Journal, 1997
101. How to Lose Money Negotiating a Construction Claim, Michael R. Just, CCE; Brian Torone, AACE Transactions, 1997
102. Environmental Site Project Controls, Edward E. Douglas III, CCC, AACE Transactions, 1997
103. Executive Reporting System, Jeffrey C. Christiansen, AACE Transactions, 1997
104. Single-Entry Online Progress Measurement, Walter J. Strutt, PE CCE, AACE Transactions, 1997
105. Tools of the Trade: Advances in Cost Control and Schedule Management for Commercial Construction, Robert B. McCullough, PE CCE, AACE
Transactions, 1997
106. Beyond Project Controls - The Quality Improvement Approach, Michael G. Sypsomos, AACE Transactions, 1997
107. The Cost of Chasing Unrealistic Project Schedules, Christopher F. Michalak, AACE Transactions, 1997
108. Practical Applications of Probabilistic Scheduling, Dr. Gui Ponce de Leon, PE; John R. Knoke, PE, AACE Transactions, 1997
109. Optimized Scheduling for Highway Construction, Khaled El-Rayes; Osama Moselhi, PE, AACE Transactions, 1997
110. Project Scheduling Under Limited Resources, Mohammed Moizuddin; Shokri Z. Selim, AACE Transactions, 1997
111. Cost/Schedule Information System: A Human-Centered Approach, Dr. Chotchai Charoenngam; Abdul Samad Kazi, Cost Engineering Journal, 1997
112. Simplifying Project Success Metrics, Dr. Francis T. Hartman, P.Eng.; Dr. George F. Jergeas, P.Eng., Cost Engineering Journal, 1997
113. Contemporaneous Analyses of Excusable Delays, Michael Ross Finke, PE, Cost Engineering Journal, 1997
114. The Case for Critical Path, Michael A. Hatfield; James Noel, Cost Engineering Journal, 1998
115. The Five Commandments of Construction Project Delay Analysis, Hamed A. Al-Saggaf, Cost Engineering Journal, 1998
116. CPM Schedules in Construction Claims From the Contractor's Perspective, Robert B. McCullough, PE CCE, AACE Transactions, 1999
117. But-For Schedules - Analysis and Defense, James G. Zack Jr., AACE Transactions, 1999
118. Project Analysis Tools for Cost and Schedule Improvement, Peter W. Swenson, AACE Transactions, 1999
119. Managing Schedule Changes at Rocky Flats, Todd Bilstein, AACE Transactions, 1999
120. Delay Claims Management in Construction - A Step-By-Step Approach, M.A. Baki, Cost Engineering Journal, 1999
121. Delay Analysis - Eliminating the Smoke and Mirrors, Eric Z. Fruchtman, AACE Transactions, 2000
122. Concurrent Delays - What Are They and How to Deal With Them?, George E. Baram, AACE Transactions, 2000
123. The Window Methods of Analyzing Delay Claims, George E. Baram, AACE Transactions, 2000
124. Schedule Density as a Tool for Pricing Compensable Float Consumption, Michael Ross Finke, Cost Engineering Journal, 2000
125. Schedule Delay Analysis, George R. Stumpf, PE, Cost Engineering Journal, 2000
126. Notes From Your Technical Board: What is Construction Schedule Control?, Satinder S. Baweja, CCE, Cost Engineering Journal, 2003
127. Computing Near-Longest Path, Ron Winter, Cost Engineering Journal, 2003
128. Computing Near-Longest Path - Part 2: Now That I have Longest Path Value, What's It Good For?, Ron Winter, Cost Engineering Journal, 2003
129. Dissecting the Doctrine of Concurrent Delay, Thomas F. Peters, PE, AACE Transactions, 2003
130. Daily Delay Measure: A New Technique to Precisely Identify Delay, John C. Livengood; Brian G. Laush, AACE Transactions, 2003
131. Application of Appropriate Project Control Tools, Lori A. Floyd, CCC; Christopher P. Caddell, PE; David E. Wisniewski II, AACE Transactions, 2003
132. Schedule Integration -- Communication Tool Par Excellence, Rohit Singh, CCE, AACE Transactions, 2003

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 9
133.
134.
135.
136.
137.
138.
139.
140.
141.
142.
143.
144.
145.
146.
147.
148.
149.
150.
151.
152.
153.
154.
155.
156.
157.
158.
159.
160.
161.
162.
163.
164.
165.
166.
167.
168.
169.
170.
171.
172.
173.

CPM Scheduling in Construction: A Case Study, Abhi Basu, AACE Transactions, 2003
Project Schedules: Simple Checks for Accuracy, David L. Freidl, PE CCE, AACE Transactions, 2003
Computing the Near-Longest Path, Ronald M. Winter, AACE Transactions, 2003
The Necessity of Project Schedule Updating/Monitoring/Statusing, Jeffrey D. Kursave, CCC, Cost Engineering Journal, 2003
Once Upon a Time: A Scheduler's Tale, Lee Hobb, Cost Engineering Journal, 2003
Schedule Delay Analysis: Modified Windows Approach, Kirk D. Gothand, CCC, Cost Engineering Journal, 2003
Progress and Performance Measurement, Aaron W. Buntrock, ICC, Cost Engineering Journal, 2003
Claims Schedule Development and Analysis: Collapsed As-Built Scheduling for Beginners, Vera A. Lovejoy, CCC, Cost Engineering Journal, 2004
Continuous Delay Measurement and the Role of Daily Delay Values, Robert Seals, AACE Transactions, 2004
Calculating Imaginary Numbers: Time Quantification in Acceleration, John C. Livengood; Christopher R. Bryant, AACE Transactions, 2004
Determining the Actual Critical Path, Ronald M. Winter, AACE Transactions, 2004
Let's Scrap the Precedence Diagramming Method, Earl T. Glenwright Jr., AACE Transactions, 2004
"Enhanced" PDM -- Concepts and Benefits, Scott C. Herold, PE, AACE Transactions, 2004
Scheduling Case StudyFilter Removal Project, Jennifer Bates, CCE, AACE Document, 1998
Construction Scheduling Games and Ways to Win, James G. Zack Jr., AACE Document, 1998
Constructive Acceleration: Waking the Sleeping Giant, Thomas F. Peters, PE, Cost Engineering Journal, 2005
Window Analysis: The Method and the Myth, John J. Ciccarelli, PE, CCE; Mark W. Cohen, PE, AACE Transactions, 2005
Concurrent Delay Analysis for Litigation, Victor M. Ostrowski, PSP; Michael T. Midgette, PSP, AACE Transactions, 2005
CPM Scheduling and How the Industry Views Its Use, Patricia D. Galloway, PE, AACE Transactions, 2005
A Continuously Changing As-Planned Baseline?, John. C. Livengood; Mark I. Anderson, AACE Transactions, 2005
Total Float Management for Delay Analysis, Khalid S. Al-Gahtani; Satish B. Mohan, AACE Transactions, 2005
Analyse This! Project Controls Analysis, Nicholas J. Candela, AACE Transactions, 2005
A Case Study: Schedule Forecast Verification With Productivity Assessment, Win G. Li, PE CCE PSP, AACE Transactions, 2005
The Inefficiencies of Managing Projects by Fiscal Year Funding, Jeffrey D. Kursave, CCC, AACE Transactions, 2005
Is Your Schedule Late at the Starting Gate?, Abhi Basu, PE, AACE Transactions, 2005
Transparent CPM, Mark C. Sanders, PE CCE, AACE Transactions, 2005
Managing Multiple Milestones, Ron Winter, PSP, AACE Transactions, 2005
Current Delay Analysis Techniques and Improvements, Satish B. Mohan; Khalid S. Al-Gahtani, AACE Transactions, 2005
The Benefits of Monte-Carlo Schedule Analysis, Jason Verschoor, P.Eng., AACE Transactions, 2005
Effective Use of Gantt Chart for Managing Large Scale Projects, Pankaja Pradeep Kumar, CCE, Cost Engineering Journal, 2005
A Thread in the Life of AACE International's Planning and Scheduling Committee, Ron Winter, PSP, Cost Engineering Journal, 2005
A Case Study: Schedule Forecast Verification With Productivity Assessment, Win G. Li, CCE PSP, Cost Engineering Journal, 2005
Relentless Trending - Key to Effective Cost & Schedule Management, Nelson E. Bonilla, CCE, AACE Transactions, 2006
Impacts of Project Change Management on Project Cost and Schedule Performances, Yi Zou; Sang-Hoon Lee, AACE Transactions, 2006
Schedule Analysis Indices, Gary Rock Spencer, PE; Rose Mary Lewis, PE, AACE Transactions, 2006
Claims Analysis Nested in Schedule Updates, Christopher Willis Carson, AACE Transactions, 2006
Innovative Approaches to CPM Scheduling Management, Russell P. Vakharia, CCE PSP, AACE Transactions, 2006
Identifying As Built Completion Drivers, Robert B. McCullough, PE CCE; Satinder Singh Baweja, CCE, AACE Transactions, 2006
CPM Not Working Well On Small Projects, Albert Joseph Kuhn, PSP, AACE Transactions, 2006
Current Delay Analysis Techniques and Improvements, Satish B. Mohan; Khalid S. Al-Gahtani, Cost Engineering Journal, 2006
Cost-Time-Risk Diagram: Project Planning and Management, Peerapong Aramvereekul, PSP EVP; Daniel J. Seider, PE, Cost Engineering Journal,
2006
174. Total Float Management for Delay Analysis, Khalid S. Al-Gahtani; Satish B. Mohan, Cost Engineering Journal, 2007

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 10
175. How Claims Happen When Schedules Become Political An Actual Court Case Study, Michael W. Leary, PE; Craig D. Hutchison, AACE
Transactions, 2007
176. Implications of Schedule Response, John C. Hildreth; Michael C. Vorster, AACE Transactions, 2007
177. A Structured Approach To Least Cost Recovery Scheduling, Christopher W. Carson, PSP, AACE Transactions, 2007
178. Converting Linear Schedules to Critical Path Method Precedence, Douglas D. Gransberg, PE CCE, AACE Transactions, 2007
179. Risk Assessment For Scheduling Acceleration, Khalid S. Al-Gahtani, AACE Transactions, 2007
180. Risk Review of Recovery Schedules, John Ciccarelli, PE CCE PSP; Matthew Murch, AACE Transactions, 2008
181. Forensic Schedule Analysis: Example Implementation, Mark C. Sanders, PE CCE PSP, AACE Transactions, 2008
182. Turnaround Planning, Rashmi Prasad; Mohammad Altaf, AACE Transactions, 2008
183. Activity Duration Based Schedule Progress and Prediction Metrics, Scott W. Crew, PSP CCE EVP, AACE Transactions, 2009
184. Schedule Compression for Construction Projects by Interruption in LOB Scheduling, S. Mohammad Amini; Gholamreza Heravi, AACE Transactions,
2009
185. Understanding Schedule Change Management, Edward E. Douglas, III CCC PSP, AACE Transactions, 2009
186. Time-Based Schedule Performance Index, Robert C. Creese, PE CCE; Yi Fang, Cost Engineering Journal, 2010
187. Which Critical Path: As-Planned, Contemporaneous, or As-Built?, Mark F. Nagata, PSP, AACE Transactions, 2010
188. Line-of-Balance (LOB) Scheduling for Projects with Repetitive Work, Ghulam Mujtaba Shaikh, PE, AACE Transactions, 2010
189. Rapid Recovery from Schedule Slippage (RRSS), Faramarz Rahbar, AACE Transactions, 2010
190. Does Correcting Out-of-Sequence Progress Improve the Schedule?, Timothy T. Calvey, PE PSP, AACE Transactions, 2010
191. Linear Scheduling for Production Home Building, Carla Lopez del Puerto, CCC; Douglas D. Gransberg, PE FRICS, AACE Transactions, 2010
192. Rectification of CPM Schedules, Ronald M. Winter, PSP, AACE Transactions, 2010
193. The Construction Schedule Log: Charting the Project Path, Paul Levin; Mark Doran, AACE Transactions, 2010
Chapter 04: Classics
1. Critical Path Scheduling: Fundamentals And Concepts, William P. Allman, AACE Transactions, 1962
2. Critical Path Or Arrow Diagram Planning: Examples In Process Industry, V. K. Moore, AACE Transactions, 1962
3. Critical Path Scheduling - Philosophy And Experience, Robert B. Vogeler, AACE Transactions, 1962
4. Critical Path Scheduling Experience In Defense Contracts, William R. Kelley, AACE Transactions, 1962
5. Critical Path Planning, W. G. Kast, AACE Transactions, 1963
6. Planning, Scheduling And Control Of Construction Projects, E. S. Steben, AACE Transactions, 1966
7. Analytic Techniques In Corporate Planning, A. R. Eagle, AACE Transactions, 1966
8. Research Planning, Evaluation And Coordination At Warner-Lambert Research Institute, Sheldon Siegel, AACE Transactions, 1967
9. Information Centers In Management And Planning, Alan Gelberg, AACE Transactions, 1967
10. A Cost Engineering Department, C. L. Osborne; L. W. Hedrick; W. G. Clark, AACE Transactions, 1967
11. Capital Cost Control and Planning During Design, Frank W. Helyar, AACE Transactions, 1968
12. Better Project Control Through Coordinated Estimating, Cost Control And Scheduling, J. Alcabes, AACE Transactions, 1969
13. Cost And Schedule Control Of Engineering Work Using One Data Base & The Network Technique: A Concept, G. Suhanic, Jr., AACE Transactions,
1969
14. Concepts And Principles In Corporate Planning, E. R. Nightingale, Jr., AACE Transactions, 1969
15. Pre-planning Project Control, Alfred L. Dellon, AACE Transactions, 1969
16. Engineering Planning Under Conditions Of Uncertainty: A Simplified Approach to Forecasting Engineering Backlog, George T. Cooper; Ernest
Solomon; Robert E. Templeton, AACE Transactions, 1970
17. Manpower Planning In An Engineering Department, J. Harvel Ortego, AACE Transactions, 1970
18. Certification Of Contract Progress Payments Using Critical Path Schedules, J. G. Hazan; B. J. Swain, AACE Transactions, 1971
19. Scheduling And Controlling The Allocation Of Resources For Effective Project Management, S. M. Kiritsis, AACE Transactions, 1971

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 11
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.

Schedule Risk-Analysis, DW Campbell, Cost Engineering Journal, 1972


Maximum Profit Through Integrated Project Control, Gerhald L. Hollander, AACE Transactions, 1974
Interrelating Project Estimates to CPM Schedules, Albert A. Badger, AACE Transactions, 1974
Approaches to Planning and Scheduling a Project, Ed Juracek, AACE Transactions, 1974
Engineer-Constructor and Client Tools for Cost and Schedule Control, Trent O. Meacham; Richard L. Patterson, AACE Transactions, 1974
Managerial Attention to Cost and Schedule, John W. Strach, AACE Transactions, 1974
An Owner's Approach to a Planned Project Information System, Robert B. Mcknight, AACE Transactions, 1974
What is This Thing Called % Complete How to Put it to Good Use, Hami Kilic Aslan Solu, PE, AACE Transactions, 1975
Integrated Scheduling System - An Approach, Joseph R. Lorenzo; Dikshit Sharad, AACE Transactions, 1975
Problems In The Implementation of Scheduling Systems, Gui Ponce-Campos, AACE Transactions, 1975
Understanding Building Contractor's Claims for Extras, Jerome Reiss, AACE Transactions, 1975
Implementation of a New Construction Scheduling and Cost Control System in a Major Electric Utility, James L. McAnally, AACE Transactions,
1975
A Project Plan for Maximum Control, Thomas W. McKeown; Raymond A. Haarstick, AACE Transactions, 1976
Cost and Time Through Historical Models, William R. Orr, PE, AACE Transactions, 1976
Power Industry Management in Energy, Dollar, Schedule Crisis, R. Winston Gardner; William C. Drotleff, AACE Transactions, 1976
Project Management - Planning and Scheduling System, Gerald W. Duray, AACE Transactions, 1976
Project Management with Scheduling, Daniel P. Elliott, AACE Transactions, 1976
Owner Approach to Planning and Scheduling, James A. Bent; John W. Hackney, AACE Transactions, 1976
The Project Schedule: The Key to Project Communication, James M. Colvin; Larkin B. Breed, AACE Transactions, 1976
Cost Systems: Problems (and Some Solutions), Paul M. Teicholz, AACE Transactions, 1976
ABC's of a Multiproject Control System, Dick Sharad, AACE Transactions, 1977
Scheduling and Controlling Construction Sub-Contracts, James A. Bent, AACE Transactions, 1977
Cost Control Methods for Defense Systems Contracts, Alan L. Bossinger, AACE Transactions, 1977
An Integrated Cost and Schedule Control System for Power Plant Construction, Edward B. Cutting, AACE Transactions, 1977
Construction Project Planning and Cost Control, Arnold J. Quakkelaar, AACE Transactions, 1977
Short Cycle Methods for Improved Construction Control, Gui Ponce-Campos; Edward E. Pauley, AACE Transactions, 1977
Production and Scheduling of Gardern Apartments, Charles L. Osborn, AACE Transactions, 1977
A System for Measuring Cost and Schedule Performance, Richard H. Campbell, AACE Transactions, 1978
Operating Contractors Project Office - Computerized Manufacturing Scheduling Using Heuristic Procedures, Randall C. DeLozier, AACE
Transactions, 1978
Construction Reporting Small- and Medium-Size Projects, Jimmy D. Atherton, AACE Transactions, 1978
A More Effective Program to Monitor Power Plant Construction Costs, Fred S. Griggs, Jr., AACE Transactions, 1978
Work Breakdown Structures in Construction, Dr. Gui Ponce-Campos, PE; Paul Ricci, AACE Transactions, 1978
An Owner's Experience with Computerized Estimating and Scheduling, Randolph J. Brozek, AACE Transactions, 1978
Control Concepts at FPL, Joseph W. Briskin; Robert Gibson, Jr., AACE Transactions, 1978
Studies in Planning and Scheduling, Gordon G. Peterman, CCE, AACE Transactions, 1978
Second Unit Scheduling Concerns on a Dual-Unit Nuclear Project, Henry R. Block, PE CCE; Richard A. Mazzini, PE CCE, AACE Transactions, 1978
Construction Weekly Work Program, James A. Bent, CCE, AACE Transactions, 1978
Reverse Technique for Project Planning/Scheduling Controls, Duane A. Fuller, AACE Transactions, 1978
Project Control Through Performance Measurement System, Parmanand Kumar, AACE Transactions, 1979
Project Control - By Whom? Of What?, James A. Bent, CCE, AACE Transactions, 1979
Stone & Webster Engineering Management System (EMS), Remo J. Silvestrini, AACE Transactions, 1979
Cost/Performance Measurement, Melvin F. Rogers, AACE Transactions, 1979

AACE
Planning and Scheduling, Third Edition
TABLE OF CONTENTS - Page 12
62.
63.
64.
65.
66.
67.

Benefits of a Fixed Scheduling System, Cecil J. Bendy; Thomas E. Danz, AACE Transactions, 1979
Minimizing The Cost Of Delay Related Construction Claims, Dwight A. Zink, AACE Transactions, 1979
The WBS: A Synergistic Breakthrough, Jean-Claude Huot, AACE Transactions, 1979
The Integration Of Labor Cost Distribution (LCD) & Network Scheduling, Stephen C. Wexler, AACE Transactions, 1979
Control of Small Projects, Albert B. Lorenzoni, CCE; Richard E. Westney, AACE Transactions, 1980
Are We Designing Projects the Way They Should Be Built?, Jean-Claude Huot, AACE Transactions, 1980

Chapter 05: Recommended Practices


1. Responsibility and Required Skills for a Project Planning and Scheduling Professional, AACE International, Recommended Practices, 2006
2. Identification of Activities, AACE International, Recommended Practices, 2007
3. Developing Activity Logic, AACE International, Recommended Practices, 2004
4. Schedule Classification System, AACE International, Recommended Practices, 2010
5. Forensic Schedule Analysis, AACE International, Recommended Practices, 2011
6. Schedule Levels of Detail: As Applied in Engineering, Procurement and Construction, AACE International, Recommended Practices, 2010
7. Documenting the Schedule Basis, AACE International, Recommended Practices, 2009
8. Scheduling Claims Protection Methods, AACE International, Recommended Practices, 2009
9. Schedule Constructability Review, AACE International, Recommended Practices, 2009
10. Identifying the Critical Path, AACE International, Recommended Practices, 2010
11. Time Impact Analysis - As Applied In Construction, AACE International, Recommended Practices, 2006
12. Schedule Update Review - As Applied in Engineering, Procurement, and Construction, AACE International, Recommended Practices, 2008
13. Recovery Scheduling - As Applied in Engineering, Procurement, and Construction, AACE International, Recommended Practices, 2010
Author Index
Chronological Index
About the Editor

AACE Internationals Professional Practice Guide to


Earned Value, Second Edition
TABLE OF CONTENTS - Page 1
Introduction to the Second Edition
Introduction to the First Edition
Chapter I: Why Use Earned Value?
1.
2.
3.
4.
5.

Understanding the Value of Earned Value or Where Have All Your Dollars Gone?, Lee R. Lambert, AACE Transactions, 1989
EV - Not Only for Large Projects, Walter F. Adamczyk, PE, AACE Transactions, 1989
Linking Contractor Payments to Contractor Performance, Quentin W. Fleming; Joel M. Koppelman, PE, Cost Engineering
Magazine, 1995
Earned Value Project Management, Quentin W. Fleming; Joel M. Koppelman, Cost Engineering Magazine, 1997
Earned Value Project Management . . . an Introduction, Quentin W. Fleming; Joel M. Koppelman, CROSSTALK The Journal of
Defense Software Engineering, US DOE, Hill AFB, UT, July, 1999

Chapter II: Basics of Earned Value


1.
2.
3.
4.
5.
6.
7.
8.
9.

Cost Performance Measurement, B.H. Valkenhoff, Cost Engineering Magazine, 1981


Project Control for Engineering, Dr. James M. Neil, CCE, AACE Transactions, 1989
WBS Criteria for Effective Project Control, Frank D. Postula, PE CCE, AACE Transactions, 1991
Work Breakdown Structure: A Simple Tool For Complex Jobs, John Mansuy, Cost Engineering Magazine, 1991
Using Schedule Variance As The Only Measure Of Schedule Performance, Jim W. Short, CCC, Cost Engineering Magazine, 1993
The Essence and Evolution of Earned Value, Quentin W. Fleming; Joel M. Koppelman, AACE Transactions, 1994
Using Work Breakdown Structure in Cost Analysis, Neil F. Albert, JCMS Proceedings, 1999
Deliverable-Oriented Work Breakdown Structure, Dr. Parviz F. Rad, PE CCE, AACE Transactions, 1999
Advocating a Deliverable-Oriented Work Breakdown Structure, Dr. Parviz F. Rad, PE CCE, Cost Engineering Journal, 1999

Chapter III: Cost/Schedule Control System Criteria


1.
2.
3.
4.

Cost/Schedule Control System Criteria - A Lighthearted Introduction for the Non-Believer, Lee R. Lambert, AACE Transactions,
1988
CS2 in High-Tech Program Management, Nghi M. Nguyen, PE, AACE Transactions, 1988
Cases Impairing C/SCSC Application in Program Management, Nghi M. Nguyen, PE, AACE Transactions, 1989
EVMS Internal and DCAA Audit Recommendations, Dr. Sean T. Regan, CCE, AACE Transactions, 2006

Chapter IV: Actual Physical Percent Complete


1.
2.
3.
4.
5.

Monitoring the Adequacy of the Amount and Productivity of Engineering and Construction Manpower, Dwight A. Zink, CCE, AACE
Transactions, 1980
System for Establishing Drawing Status, John G. Koval, CCE, AACE Transactions, 1981
Cost Control's Missing Link - Progress Measurement, James G. Buck, AACE Transactions, 1985
Progress Measurement in Engineering and Construction, Michael E. Horwitz, PE CCE, AACE Transactions, 1986
Applying Earned Value Procedure to Engineering Management, Mark T. Chen, AACE Transactions, 1991

Chapter V: Productivity and Earned Value


1.

Productivity Defined, Jean-Claude Huot, AACE Transactions, 1981

AACE Internationals Professional Practice Guide to


Earned Value, Second Edition
TABLE OF CONTENTS - Page 2
2.
3.
4.
5.
6.
7.

Construction Productivity: Major Causes of Impact, Charles A. Leonard; Dr. Paul Fazio; Dr. Osama Moselhi, AACE Transactions,
1988
An Estimate-Independent Productivity Measurement System, A. Larry Aaron; Dr. H. Randolph Thomas, AACE Transactions, 1990
Determining Labor Productivity: A Case Study, Tom G. Mendel, Cost Engineering Magazine, 1991
Labor Productivity Impact of Varying Crew Levels, Donald J. Cass, CCE, AACE Transactions, 1992
Labor Productivity, Disruptions, and the Ripple Effect, Dr. H. Randolph Thomas, PE; Dr. Amr A. Oloufa, PE, Cost Engineering
Magazine, 1995
Labor Productivity Modeling With Neural Networks, Dr. James E. Rowings Jr., PE CCE; Rifat Sonmez, AACE Transactions, 1996

Chapter VI: Earned Value Reporting


1.
2.
3.
4.
5.

Implementing Earned Value Reporting, Fred Mahler, CCE; Mark Mazina, AACE Transactions, 1980
Earned Value Graphics - New, Exciting, Innovative, Donald J. Cass, CCE, AACE Transactions, 1991
Improve Schedule Forecasting Via Earned Value, Donald J. Cass, CCE, AACE Transactions, 1994
The Basics of Earned Value Management, Stephen P. Warhoe, PE CCE, AACE Transactions, 2004
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation, Ricardo Viana Vargas, AACE Transactions, 2004

Chapter VII: Applications of Earned Value Project Management


1.
2.
3.
4.

Application of Earned Value for Small Project Control: Panacea or Bane, S. Mukho; J. Lisanti, AACE Transactions, 1982
Applications of Cost and Schedule Integration, William R. Crean; Walter F. Adamczyk, AACE Transactions, 1982
Earned Value Back to Basics, Irwin Bromberg, CCE, AACE Transactions, 1984
Application of a Manual Earned Value System for Small Engineering Projects, John Canepari; M. J. Varrone, PE, AACE
Transactions, 1985
5. A System for Monitoring Cost and Schedule Performance of Professional Design Services, Luis F. Suarez, CCE; Howard A. Green,
AACE Transactions, 1988
6. Non-Linear Earned Value Analysis, Dr. Amarjit Singh, PE, AACE Transactions, 1993
7. Earned Value Project Management - A Powerful Tool for Software Projects, Quentin W. Fleming; Joel M. Koppelman, CROSSTALK
The Journal of Defense Software Engineering, US DOE, Hill AFB, UT, July, 1998
8. Going for the Goal, Forecasting, Joseph M. Brown, CCC, AACE Transactions, 1996
9. Earned Value Analysis in the Control of Projects: Success or Failure?, Ricardo Viana Vargas, AACE Transactions, 2003
10. Practical EVMS for an EPC Project, Tetsuya Yonezawa, CCE, AACE Transactions, 2005
Chapter VIII: Earned Value and Loss of Productivity Claims
1.
2.
3.
4.
5.

The Measured Mile: Proving Construction Inefficiency Costs, Dwight A. Zink, Cost Engineering Magazine, 1986
Using a PC to Analyze and Resolve a Loss of Productivity Claim, Donald J. Cass; James G. Zack, Jr., AACE Southern California
Section Spring Symposium, Los Angeles, CA, 1988
Impacts And Construction Inefficiency, Dwight A. Zink, Cost Engineering Magazine, 1990
Use of Productivity Factors in Construction Claims, Robert Dieterle, CCE; Alfred DeStephanis, AACE Transactions, 1992
Consequential Cost Effects, Paul R. Heather, CCE; Michael D. Summers, CCE, AACE Transactions, 1996

Chapter IX: Additional Information on Earned Value Management


1.

Comprehensive Bibliography of Earned Value Literature, Dr. David S. Christensen, Internet:


http://www.suu.edu/faculty/christensend/ev-bib.html, 2007

AACE Internationals Professional Practice Guide to


Earned Value, Second Edition
TABLE OF CONTENTS - Page 3
2.

Earned Value: The Hammer Without Nails?, Jan Evensmo; Dr. Jan Terje Karlsen, AACE Transactions, 2005

Author Index
Chronological Index
About the Editor

AACE
Construction Cost Estimating, Third Edition
TABLE OF CONTENTS - Page 1
Introduction
Chapter 01: Recommended Practices
1. Cost Engineering Terminology, AACE International, Recommended Practices, 2010
2. Profitability Methods, AACE International, Recommended Practices, 2008
3. Cost Estimate Classification System, AACE International, Recommended Practices, 2011
4. Project Code of Accounts, AACE International, Recommended Practices, 2003
5. Developing Location Factors by Factoring - As Applied in Architecture, Engineering, Procurement, and Construction, AACE International,
Recommended Practices, 2006
6. Reviewing, Validating and Documenting the Estimate, AACE International, Recommended Practices, 2009
7. Basis of Estimate, AACE International, Recommended Practices, 2010
8. Contingency Estimating - General Principles, AACE International, Recommended Practices, 2008
9. Risk Analysis and Contingency Determination Using Range Estimating, AACE International, Recommended Practices, 2008
10. Risk Analysis and Contingency Determination Using Parametric Estimating, AACE International, Recommended Practices, 2011
11. Risk Analysis and Contingency Determination Using Expected Value, AACE International, Recommended Practices, 2009
12. Recommended Practices for Risk Analysis and Cost Contingency Estimating, John K. Hollmann, PE CCE CEP, AACE Transactions, 2009
Chapter 02: Estimating Theory
1. Transforming Historical Project Data into Useful Information, Todd W. Pickett, CCC; Bruce G. Elliott, CCC, AACE Transactions, 2007
2. Work and Resource Breakdown Structures for Formalized Bottom-Up Estimating, Parviz F. Rad, PE CCE; Denis F. Cioffi, Cost Engineering Journal,
2004
3. Cost Management, Allen C. Hamilton, CCE, AACE Transactions, 2004
4. Developing Estimating Models, James D. Whiteside, II, Cost Engineering Journal, 2004
5. Fundamentals for Estimating and Developing a Scope of Work, Christopher B. Schamel, CCC, Cost Engineering Journal, 2003
6. The Organization of an Estimating Department, Larry R. Dysert; Bruce G. Elliott, Cost Engineering Journal, 2000
7. Top-Down (or Narrow-Down) Cost Estimation, Gideon Samid, PE, AACE Transactions, 1998
8. A Probabilistic Cost Estimating Model, Dr. Thomas E. Uher, Cost Engineering Journal, 1996
9. Cost Estimating Using Historical Costs, Kymberli Popham, CCE, AACE Transactions, 1996
10. Remedies for Delays in Architectural Construction, Timothy C. McManus; Daniel R. Tishman; Lisa R. Turnbaugh, Cost Engineering Journal, 1996
11. Just-in-Time: Applicability in Construction, Robert Anglin; Calin M. Popescu, PE, AACE Transactions, 1995
12. Statistical Conceptual Estimating System (SCES), A. James Poe, CCC, AACE Transactions, 1995
13. Using AHP to Allocate Contract Incentives, Dennis M. Thompson, CCE, AACE Transactions, 1994
14. Non-linear Earned Value Analysis, Amarjit Singh, AACE Transactions, 1993
15. Cash Flow Management Through Front-End Loading, Philip B. Copare, AACE Transactions, 1990
16. Controlling Construction Costs During Design, Daniel Becker, CCE, AACE Transactions, 1990
Chapter 03: Order-of-Magnitude Estimating
1. An Introduction to Parametric Estimating, Larry R. Dysert, CCC, AACE Transactions, 2008
2. Parametric Estimating for Environmental Remediation Projects, Angela R. Brunsman, ICC; Kenneth F. Robson; Douglas D. Gransberg, PE CCE,
AACE Transactions, 2008
3. Parametric Factors as Applied to Pipeline Cost Estimating, Donald Polla, CCE, Cost Engineering Journal, 2007
4. Bid Preparation Using Cost Templates and Range Estimating - An Equipment Manufacturer's Perspective, Iqbal Noor, PE CCE; Matthew Grumo;
Matthew W. Kniskern; Andrew Kopach, AACE Transactions, 2006
5. Improving Conceptual Cost Estimating Performance, Alfredo F. Serpell, AACE Transactions, 2005

AACE
Construction Cost Estimating, Third Edition
TABLE OF CONTENTS - Page 2
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

So You Think You're An Estimator?, Larry R. Dysert, CCC; Todd W. Pickett, CCC, Cost Engineering Journal, 2005
Interactive Roadmap to Conceptual Cost Estimating, Christopher L. Kinney; Nathalie Soubiran, AACE Transactions, 2004
Using Models in Parametric Estimating for Transportation Projects, Robert H. Harbuck, AACE Transactions, 2002
Conceptual Estimating, Philip D. Larson, AACE Transactions, 2002
Parametric Estimating for Design Costs, Asheesh Bajaj; Douglas D. Gransberg; Mark D. Grenz, AACE Transactions, 2002
Development and Maintenance of a Parametric Building Estimating System, Dominic L. Arioli; Joseph G. Masi, AACE Transactions, 2002
Integrated Range Estimating and Stochastic Scheduling, Leroy Isidore; Edward Back, Cost Engineering Journal, 2001
A Conceptual Cost Estimating Model for Water Reservoirs, Mohammed Al Khalil; Sadi Assaf; Walild Abdul Rahman; Mashoor Asfoor, Cost
Engineering Journal, 1999
Facility Parametric Cost Estimating, Edward R. Meyer, PE; Thomas J. Burns, PE, AACE Transactions, 1999
Parametric Estimates Made Easy, James J. Davis, PE, AACE Transactions, 1998
Developing a Project Scope/Conceptual Estimate Questionnaire, Frank B. Mitchell, Jr., AACE Transactions, 1995
A Parametric Building Cost Estimating System, John K. Hollmann, PE, AACE Transactions, 1994
Parametric Cost Estimating of Building Construction - US, Canada, and Mexico, Luis C. Hinojosa, CCE; Ramon Vazquez Del Mercado, AACE
Transactions, 1993
Square Foot Range Estimating, John R. Knoke, PE; Liang Y. Liu; John R. Spittler, AACE Transactions, 1993
Conceptual and Early Design Estimating Techniques for Building, Heating, Ventilation, and Air Conditioning Systems, Frederick M. Reynolds, CCE,
Cost Engineering Journal, 1993
Square Foot Type Estimating for Construction, Steven F. Roney, CCC, AACE Transactions, 1992
Direct Range Cost Estimating, Dr. Paul F. Mlakar; Larry M. Bryant, AACE Transactions, 1990

Chapter 04: Estimating Factors and Indices


1. Escalation Estimating: Lessons Learned in Addressing Market Demand, John K. Hollmann, PE CCE; Larry R. Dysert, CCC, AACE Transactions, 2008
2. Escalation Estimation: Working With Economics Consultants, John K. Hollmann, PE CCE; Larry R. Dysert, CCC, AACE Transactions, 2007
3. Estimating Design Fees for Transportation Projects, Carla Lopez del Puerto, ICC; Douglas D. Gransberg, PE CCE; Kenneth F. Robson, AACE
Transactions, 2006
4. Characterizing Project Performance with Quantified Indices, Parviz F. Rad, PE CCE; Ginger Levin, AACE Transactions, 2004
5. Easy Factored Estimating and Process Cost Engineering, Kul B. Uppal, PE, Cost Engineering Journal, 2003
6. Government Computerized Cost Index, Joseph A. Brown; Eugene Hajdaj, AACE Transactions, 2001
7. Developing Location Factors by Factoring, Bernard A. Pietlock, CCE, AACE Transactions, 1995
8. Meeting a Worldwide Need - Location Cost Factors, John E. Barry, AACE Transactions, 1994
9. A Different Approach to Factored Cost Estimating, Kul B. Uppal, PE, AACE Transactions, 1993
10. Developing Foreign Location Factors, BA Pietlock, Cost Engineering Journal, 1992
Chapter 05: Estimating Material Costs and Quantity Surveying
1. Quantifying Uncertainty of Construction Material Price Volatility Using Monte Carlo, Douglas D. Gransberg, PE CCE; Erin J. Kelly, Cost Engineering
Journal, 2008
2. Cost-Effective Reinforced Concrete Structural Systems, Li Shengping; Robert Tiong, AACE Transactions, 2004
3. Computer-Based Estimating, Joseph W. Wallwork, Cost Engineering Journal, 2001
4. Lean Construction: From Theory to Practice, A. Sergio I. Conte; Douglas D. Gransberg, AACE Transactions, 2001
5. An Efficient Quantity Takeoff Method for the Preliminary Design Phase, Dr. Chansik Park; Seok-In Choi; Ki-Hong Kim, AACE Transactions, 1999
6. Cost Estimation of Structures in Buildings, Dr. Surinder Singh, AACE Transactions, 1995
7. Improving Materials Cost, Dr. George Stukhart, AACE Transactions, 1993

AACE
Construction Cost Estimating, Third Edition
TABLE OF CONTENTS - Page 3
Chapter 06: Estimating Labor Costs
1. Cost Savings from Hispanic-Oriented Safety Programs, Carla Lopez del Puerto, CCC, AACE Transactions, 2007
2. Construction Productivity, James D. Whiteside, II PE, AACE Transactions, 2006
3. Modeling Labor Productivity in Steel Fabrication, Lingguang Song; Simaan M. AbouRizk, P.Eng., AACE Transactions, 2006
4. A Methodology for Estimating Engineering Details, James D. Whiteside II, PE, AACE Transactions, 2005
5. Construction Productivity in Developing Global Regions, Enno Koehn, PE; Sanjay A. Jagushte, AACE Transactions, 2005
6. Mechanical and General Construction Productivity Results, James L. Jenkins; Daryl L. Orth, Cost Engineering Journal, 2004
7. Staffing Problems on Large Construction Projects, Frank F. Moynihan, CCC, AACE Transactions, 2004
8. Labor Resource Planning for Construction Projects, Anubhav Bhargava; Balkiz Oztemir; Allan D. Chasey, AACE Transactions, 2002
9. Field Factors Affecting Masonry Productivity, Nuntapong Ovararin; Calin M. Popescu, AACE Transactions, 2001
10. Production Rates for Urban/Rural Projects in Developing Areas, Enno Koehn; Faisal Ahmed, AACE Transactions, 2001
11. Labor Productivity Impacts: A Case Study, Robert D. Kelly, AACE Transactions, 2000
12. Demonstrated Labor Efficiency: An Effective Cost Control and Analytical Tool, Bob M. McCally, Cost Engineering Journal, 1999
13. The Effect of Hot Weather on Construction Labor Productivity and Costs, Donn E. Hancher; Hesham A. Abd-Elkhalek, Cost Engineering Journal,
1998
14. Crew Synchronization in Construction, Anamaria I. Popescu; George E. Gibson, Jr., PE; John D. Borcherding, PE, AACE Transactions, 1995
15. Calculating The Cost Of Construction Labor, TA Martinez, Cost Engineering Journal, 1994
16. A Method to Calculate the Productivity Factor, Juan Fornino Gaeta; Robert R. Ruiz Gomez, AACE Transactions, 1993
17. Labor Productivity and Manpower Forecasting, Forrest D. Clark, CCE, AACE Transactions, 1985
Chapter 07: Estimating Equipment Costs
1. Chemical Processes Equipment Cost Estimation Using Parametric Models, Mohammed Reza Shabani; Reza Behradi Yekta, Cost Engineering
Journal, 2006
2. Owner-Furnished Equipment: Savings or Potential Claims?, Talal Abi-Karam, PE CCE, AACE Transactions, 2003
3. Economics of Equipment Acquisition - A Case Study, Sameer Kumar; Jeffrey Kvalheim, Cost Engineering Journal, 2003
4. The Effect of Rising Petroleum Prices on the Construction Economy, Iftikhar K. Madni, CCE; David Raymond; Pat DiNapoli, Cost Engineering
Journal, 2000
5. Tracking the Marshall & Swift Equipment Cost Index, Jude T. Sommerfeld, Cost Engineering Journal, 1999
6. A Review of Methods to Estimate Haul Fleet Production, Douglas D. Gransberg, Cost Engineering Journal, 1998
7. Equipment Compensation in US Government Construction Equitable Price Adjustments, Beni Warshawsky, Cost Engineering Journal, 1996
8. The Power of a Properly Prepared Equipment Specification, Louis J. Cabano; Lisa J. Wesen, AACE Transactions, 1995
9. Optimization of Production in Earthmoving Works, Jose P. Bendicho, AACE Transactions, 1992
10. Calculating Tunnel Advance Rates, Richard A. Roberts, PE CCE, AACE Transactions, 1992
11. Replacement of Obsolete Equipment, R. A. Harris; Dr. D. J. Leech; Dr. R. G. Williams, AACE Transactions, 1992
12. Measuring Market Influences on Equipment Costs, Dr. A. M. Gerrard, AACE Transactions, 1990
13. Energy Costs in the Construction Process, Dr. James E. Rowings, Jr., AACE Transactions, 1983
Chapter 08: Subcontracting Costs
1. Subcontract Management Through a Bankruptcy, Retta M. Sandoval; Paul Edwards, PE; Michael Peek, AACE Transactions, 2005
2. Self-Perform Versus Subcontract Decision in Construction Contracts, Khaled Nassar, AACE Transactions, 2003
3. Uniform Proposal Form for the Subcontractor, Michael J. Cook, AACE Transactions, 1998

AACE
Construction Cost Estimating, Third Edition
TABLE OF CONTENTS - Page 4
Chapter 09: Estimating Overhead and Indirect Costs
1. Estimating Preconstruction Services Fees for CM-at-Risk Projects, Douglas D. Gransberg, PE CCE; Jeremy B. Carlisle ICC, AACE Transactions, 2008
2. Human Resource Replacement Cost: Measures and Usefulness, Tang Tang, Cost Engineering Journal, 2005
3. Eichleay and Qualifying Costs, Robert D. Kelly, PSP, AACE Transactions, 2005
4. Detecting Hidden Fees in a GMP, Mark D. Steele, PE CCE; Peter A. Shannon, AACE Transactions, 2005
5. Alternative Estimation of Home Office Overhead, Jefferey L. Ottesen, PE; Jack L. Dignum, AACE Transactions, 2003
6. Owner Caused Delay - Field Overhead Charges, Matthew J. Lankenau, CCE, Cost Engineering Journal, 2003
7. Up-Front Cost Estimating of Change Orders, Osama Moselhi; Ihab Assem; Khaled El-Rayes, AACE Transactions, 2002
8. Calculation and Recovery of Home Office Overhead, James G. Zack Jr., AACE Transactions, 2001
9. Estimating the Indirect Costs of Construction, Don L. Short, AACE Document, 2000
10. Reduce Corporate Taxes by Optimizing Depreciation, Mark M. Weiner, CCE, AACE Transactions, 1997
11. New Ideas in Overhead Recovery, Michael R. Just, CCE; James P. Murphy, AACE Transactions, 1995
12. Indirect Rate Development for Government Contracts, David A. Norfleet, CCC, Cost Engineering Journal, 1995
13. The Cost of General Conditions, Daniel F. Becker, AACE Transactions, 1993
14. Understanding Contractor Overhead, Ron Cilensek, CCE, Cost Engineering Journal, 1991
15. Evaluating Performance Bonds, Guarantees, And Letters Of Credit, PK Nicholson, Cost Engineering Journal, 1988
Chapter 10: Profit, Contingencies, and Mark-Ups
1. Contingency Modifier Tool, J.D. (Jim) Whiteside, II PE, AACE Transactions, 2007
2. A Construction Cost Contingency Tracking System (CTS), John F. Rowe, PE, Cost Engineering Journal, 2006
3. Contingency in Levelized Capital Cost Estimation, Geoffrey Rothwell, AACE Transactions, 2005
4. Cost Contingency as the Standard Deviation of the Cost Estimate, Geoffrey Rothwell, Cost Engineering Journal, 2005
5. Management of Project Contingency and Allowance, Jan Terje Karlson; Jon Lereim, Cost Engineering Journal, 2005
6. Contingency! Who Owns and Manages It?, Peter W. Ripley, CCC, AACE Transactions, 2004
7. Contingency Misuse and Other Risk Management Pitfalls, Iqbal Noor, PE CCE; Robert L. Tichacek, PE, AACE Transactions, 2004
8. Improve Profitability through Effective Project Management and TCM, Nick J. Lavingia, PE, AACE Transactions, 2003
9. Contingency, Quantifying the Uncertainty, Riaan Burger, CCE, Cost Engineering Journal, 2003
10. Analysis of Change Order Markup Allowances on Stipulated Price Building Contracts, Aminah Robinson Fayek; Moses Y. Nkuah, Cost Engineering
Journal, 2002
11. Cost Contingency Analysis for Construction Projects Using Speadsheets, Khaled Nassar, Cost Engineering Journal, 2002
12. Evaluating and Calculating Contingency, James A. Bent, AACE Transactions, 2001
13. Optimization for Bidder Profitability and Contractor Selection, Dr. Amarjit Singh, P.Eng.; Max M. Shoura, PE, Cost Engineering Journal, 1998
14. Risk Assessment and Contingency Estimating, Dr. Osama Moselhi, PE, AACE Transactions, 1997
15. Competitively-Bid Construction Contracts, Randy R. Rapp, PE, Cost Engineering Journal, 1997
16. General Conditions and Fee Risk Analysis, Lorry T. Bannes, PE, AACE Transactions, 1995
17. Impact of Estimating Accuracy on Markup, Dr. Richard E. Larew, PE, AACE Transactions, 1995
18. The Effect of Market Conditions on Tendering and Price Forecasting, Robert G. Pearl, AACE Transactions, 1994
19. Bid Pricing Strategy-Optimal Profit Margin, EM Silberman, Cost Engineering Journal, 1993
20. Contingency Allocation: A Computer-Aided Approach, Irtishad Ahmad, AACE Transactions, 1992
Chapter 11: Estimating International Construction Costs
1. Estimating International Hydroelectric Projects, Paul Martin Hewitt, AACE Transactions, 2008
2. Innovative Pre-Planning for International Projects, Mark T. Chen, PE CCE, AACE Transactions, 2005
3. Construction and Corruption in Developing Regions, Enno Koehn, PE; Ranjit K. Tandoor, AACE Transactions, 2004

AACE
Construction Cost Estimating, Third Edition
TABLE OF CONTENTS - Page 5
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.

The Role and Application of Quotas, Yu Wen Wei, AACE Transactions, 2003
Construction Practices in the Former Soviet States, V.L. Khazanet, Cost Engineering Journal, 2002
Measured Mile Analysis and International Mega-Projects, Dan Crowley; John C. Livengood, AACE Transactions, 2002
Estimating Using International Factors, Rodney L. Russell, AACE Transactions, 2002
Location Factors for Southeast Asia, Kenichi Yoshihara; Shigeyasu Tametoh, AACE Transactions, 2002
Estimating for a Worldwide Company, Rodney L. Russell; Robert P. Jones, AACE Transactions, 2001
Project Controls in an International Arena, Desmond G. Pellicena, AACE Transactions, 2000
Project Overhead Costs in Saudi Arabia, Sadi A. Assaf; Abdulaziz A. Bubshait; Solaiman Atiyah; Mohammed Al-Shahri, Cost Engineering Journal,
1999
A Cost Analysis Information System for Developing and Underdeveloped Countries, Abdul Samad Kazi; Dr. Chotchai Charoenngam, Cost
Engineering Journal, 1999
Production Rates for International Projects in Asia, Dr. Enno (Ed) Koehn, PE; Moin U. Ahmed, Cost Engineering Journal, 1999
International Projects Cost Estimating, Allen C. Hamilton, CCE, AACE Transactions, 1998
IT and Quantity Surveying - The Australian Perspective, Peter V. Smith, AACE Transactions, 1998
Finding Building Product and Construction Cost Data Internationally, Hugh T. Sharp, Cost Engineering Journal, 1997
Cost Comparison of Pacific Rim Countries, John G. McConville, CCC, AACE Transactions, 1997
Inter-American Construction Costs, Leopoldo G. Varela, CCE; Roger J. Grant, AACE Transactions, 1997
Cost Estimating Challenges Facing Eastern Europe, Richard A. Selg, CCE, AACE Transactions, 1997
Understanding the Chinese Construction Costing System, Dr. He Zhi, Cost Engineering Journal, 1996
Capital Cost Estimating for the Frontier Regions of the World: Questions a Savvy Estimator Should Ask First, Joseph R. Jeffery, Cost Engineering
Journal, 1996
Managing Risk on Global Projects, Charles P. Woodward, PE CCE; Kartar Singh, PE, AACE Transactions, 1996
Productivity of Construction in Developing Areas: India, Enno Koehn, PE; V. R. Ganapathiraju, AACE Transactions, 1996
Construction Production Factors in International Areas, Dr. Enno Koehn; Chih-Shing Pan; Jen-Yuan Liu; Rana P. Pingili; Sirichai Tanratanawong,
AACE Transactions, 1995
Construction Costs in the Former Soviet Union, Ram Dabadghav, PE, CCE, AACE Transactions, 1995
Building Price Modeling and Price Information Management in South Africa, Dr. Paul A. Bowen, AACE Transactions, 1994
Cost Estimating of Overseas Construction Projects, John G. McConville, CCC, AACE Transactions, 1994
International Labor Productivity, JK Yates; S Guhathakurta, Cost Engineering Journal, 1993
Developing Foreign Location Factors, BA Pietlock, Cost Engineering Journal, 1992
Productivity in the U.K. Construction Industry, Les Ruddock, AACE Transactions, 1991
Labor Cost Calculations in International Construction, Dr. Enno Koehn, PE; D. C. Regmi, AACE Transactions, 1991

Chapter 12: Heavy Civil Project Estimating


1. Highway Cost Estimating and Estimate Management: A Concept to Completion Process Approach, Jennifer S. Shane; Keith R. Molenaar; Stuart D.
Anderson, PE; Cliff J. Schexnayder, PE, Cost Engineering Journal, 2010
2. Heavy Civil & Infrastructure WBS, Paul Martin Hewitt, AACE Transactions, 2006
3. Conceptual Planning of Highway Construction Projects, Ahmed Hassanein, P.Eng., AACE Transactions, 2006
4. Risk Analysis and Optimization of the (Un)Balanced Bid, Jon Hoogenboom, PE; W. Stephen Dale; Craig Martell, AACE Transactions, 2006
5. Estimating Problems in Heavy Construction Organizations, John Jeffrey Hannon, AACE Transactions, 2005
6. Risk Analysis In Transit Project, Jeffrey Allen; Ali Touran, PE, AACE Transactions, 2005
7. Competitive Bidding for Highway Construction Projects, Robert H. Harbuck, PE CCE, AACE Transactions, 2004
8. Cost Models of Highway Bridge Rehabilitation, John O. Sobanjo, AACE Transactions, 2004
9. Quantifying Pavement Life Cycle Cost Inflation Uncertainty, Douglas D. Gransberg, PE CCE; James Diekmann, AACE Transactions, 2004

AACE
Construction Cost Estimating, Third Edition
TABLE OF CONTENTS - Page 6
10. Warranty as a Real Option for DOT Projects, Qingbin Cui; Mehmet Emre Bayraktar; Makarand Hastak, CCE; Issam Minkarah, AACE Transactions,
2003
11. Cost Analysis of FRP Bridge Decks, Pratik Roychoudhury; Robert C. Creese, AACE Transactions, 2001
12. Parametric Estimating Methodology for Transit Project Planning, Robert H. Harbuck, AACE Transactions, 2001
13. The Effect of Innovative Highway Construction Contract Methods, Douglas D. Gransberg; Daniel F. Runde; James Stergios, AACE Transactions,
2000
14. Preliminary Cost Estimation of Highway Construction Using Neural Networks, Hashem Al-Tabtabai; Alex P. Alex; Maha Tantash, Cost Engineering
Journal, 1999
15. Statistical Cost Estimating for Public Works, Dr. John D. Bledsoe, PE CCE, AACE Transactions, 1998
16. Cost Scale-Up Factors for Airport Construction, Donald S. Remer, PE; Christopher Wong, Cost Engineering Journal, 1996
17. Highway Estimating Using a Standard Form, Ernest Wolski, AACE Transactions, 1996
18. How to Unbalance a Bid and Win the Job, Richard A. Roberts, PE, CCE, AACE Transactions, 1994
19. Cost Variations in Nighttime Construction, Ashish Kumar; Dr. Ralph D. Ellis, Jr., PE, AACE Transactions, 1994
20. Preliminary Estimating for Heavy Construction, Steve R. Sanders; Robert R. Maxwell, AACE Transactions, 1992
21. Estimating Railroad Reconstruction Under Service, Stewart D. Winn, Jr., PE; P. Takis Salpeas, AACE Transactions, 1991
Chapter 13: Estimating Specialty Projects
1. Cost Impact Factors for Utility Replacement and Repair Projects, Tariq Shehab; Mohamad Farooq, Cost Engineering Journal, 2009
2. Estimating Todays Mega Projects, Waymon D. Lofton, AACE Transactions, 2009
3. General Liquids Pipeline Projects Scope and Cost Estimating Challenges, Brent Kitson, P.Eng., AACE Transactions, 2009
4. Concrete Corrosion, Methods to Control this Perennial Problem in the Middle East, Sam Mathew, CCE, Cost Engineering Journal, 2006
5. Air Quality Permitting: Best Available Control Technology Development Impacts, Thomas Edward Emmel, CCE, Cost Engineering Journal, 2005
6. A Budget Estimating Method of Environmental Cost for Multiple Housing Projects, Chansik Park; Sungho Hong; Changwan Kim; Jaeho Lee, AACE
Transactions, 2003
7. DOE Environmental Management Applied Cost Engineering Team, Richard A. Selg, CCE; Bryan Skokan, PE CCE, AACE Transactions, 2003
8. Hazardous, Toxic, and Radiological Waste Remedial Action Work Breakdown Structure, John A. Gutierrez, Cost Engineering Journal, 2002
9. Estimating for EPA Drinking Water Regulations, Kin K. Chao; Faysal Bekdash; Rajiv Khera, AACE Transactions, 2000
10. A Conceptual Cost Estimating Model for Water Reservoirs, Mohammed Al Khalil; Sadi Assaf; Walild Abdul Rahman; Mashoor Asfoor, Cost
Engineering Journal, 1999
11. Parametric Cost Estimating for Environmental Remediation Projects, Jacqueline Rast, PE; Kate M. Peterson, PE, AACE Transactions, 1999
12. Utility Cost Estimating, William R. Fletcher, AACE Transactions, 1996
13. Evaluating Environmental Restoration Cost Estimating Systems, W. David Featherman; Dr. R.F. Shangraw Jr., AACE Transactions, 1996
14. Definitive Estimating for Construction Projects at Remote Sites, Bennett W. Cleveland, PE CCE, Cost Engineering Journal, 1995
15. Shocks, Jolts, and Temors: Cost Impacts of the Base-Isolation Structural System, John R. Reser, CCE, Cost Engineering Journal, 1995
16. Water-Supply Distribution-System Cost-Estimating, RG Eilers, AACE Transactions, 1992
17. Resource Estimating for Technology-Intensive Projects, Dr. Hans J. Thamhain, AACE Transactions, 1992
Chapter 14: Scheduling Input to the Estimate and Change Orders
1. Linking the Estimate, the Schedule and the Cost Control through a Standardized WBS, Marie-Helene Biffi, P.Eng., AACE Transactions, 2008
2. Assessing Project Schedule Risk with Contingent Tasks by Spreadhsheet-Based Simulation, Li-Chung Chao; Sung-Lin Hsueh, Cost Engineering
Journal, 2006
3. Measuring and Managing Cost Escalation, Peter Morris; William F. Willson, AACE Transactions, 2006
4. CPM Scheduling and How the Industry Views Its Use, Patricia D. Galloway, PE, AACE Transactions, 2005
5. Benefits of Linear Scheduling, Gary Rock Spencer, PE; Rose Mary Lewis, AACE Transactions, 2005

AACE
Construction Cost Estimating, Third Edition
TABLE OF CONTENTS - Page 7
6.
7.
8.
9.
10.
11.
12.
13.

Effective Management of Project Change Orders, Edward E. Douglas III, CCC, AACE Transactions, 2003
Owner Caused Delay - Field Overhead Charges, Matthew J. Lankenau, CCE, Cost Engineering Journal, 2003
Analysis of Change Order Markup Allowances on Stipulated Price Building Contracts, Aminah Robinson Fayek; Moses Y. Nkuah, Cost Engineering
Journal, 2002
Improving Productivity With Short-Interval Scheduling, Walter J. Strutt, AACE Transactions, 2001
Optimized Scheduling for Highway Construction, Khaled El-Rayes; Osama Moselhi, PE, AACE Transactions, 1997
Matrix Scheduling for Repetitive Residential Construction, Neil D. Opfer, CCE, AACE Transactions, 1996
Quantifying and Apportioning Delay on Construction Projects, Lee Schumacher, PE, Cost Engineering Journal, 1995
Duration Analysis, Andrew Sipos, PE, Cost Engineering Journal, 1992

Chapter 15: Bidding Decisions


1. Automation of Pre-Bidding Process for Construction Projects, Rajesh Kandanala; Mohamed Al-Hussein; Aubrey Vanderstar, Cost Engineering
Journal, 2005
2. Using Spreadsheets to Optimally Unbalance a Construction Bid, Khaled Nassar, Cost Engineering Journal, 2004
3. Is There a Right Price in Construction Bids?, Joseph W. Wallwork, PE CCE, Cost Engineering Journal, 1999
4. Bid Markup Methodologies, Dr. Kwaku A. Tenah; Dr. Carleton Coulter III, PE, Cost Engineering Journal, 1999
5. Competitive Bidding System, Dr. Ali A. Shash, Cost Engineering Journal, 1995
6. How to Relate a Construction Cost Estimate to the Prevailing Bid Market for Government and Institutional Projects, Nissim Zelouf, CCE, Cost
Engineering Journal, 1995
7. Cost Effective Bid Packaging for Building Construction, Nyal E. Nelson. CCE, AACE Transactions, 1980
Chapter 16: Computer Applications to Construction Cost Estimating
1. Estimating in 3D: The Next Dimension, Aziz E. Barmania; Leslie E. McMullan, AACE Transactions, 2006
2. The Use of 3-D Scanners for Automated Progress Reporting on Construction Activities, Osama El Sayed Moselhi, P.Eng.; Samir El-Omari, AACE
Transactions, 2005
3. Cautions of Computerized Estimating, Barrett L. Richards, CCC, AACE Transactions, 2005
4. Best Value IT Procurement for Construction Organizations, Srinath Perera; Gayani Karunasena, AACE Transactions, 2004
5. Exploring Data to Detect Project Problems, Mark D. Steele, PE CCE; William A. Huber, AACE Transactions, 2004
6. Benefits of Expert Estimating Systems, Waymon D. Lofton; Michael D. Monteith, AACE Transactions, 2003
7. Implementing Estimating Software, Stephen C. Burgan, AACE Transactions, 2002
8. Integrating CAD, Estimating, Scheduling, and Accounting, Philip D. Larson, AACE Transactions, 2001
9. Preliminary Cost Estimation of Highway Construction Using Neural Networks, Hashem Al-Tabtabai; Alex P. Alex; Maha Tantash, Cost Engineering
Journal, 1999
10. Guidelines for Purchasing Software, Kevin Miller, Cost Engineering Journal, 1998
11. Estimating Costs With Fuzzy Logic, Anthony K. Mason, PE; Donald J. Kahn, Sr., AACE Transactions, 1997
12. Implementing a Database Estimating System, Robert H. Harbuck, PE CCE, AACE Transactions, 1996
13. Electronic Bidding: The Future is Now, William C. Epstein, PE; Dr. Ralph D. Ellis, Jr., PE, AACE Transactions, 1995
14. Cost Estimation of Timber Bridges Using Neural Networks, Dr. Robert C. Creese; Li Li, Cost Engineering Journal, 1995
15. Computerized Databases for Reliable Cost Estimates, Keith G. Decker, AACE Transactions, 1993
16. CAD Estimating for Design-Builders, Peter L. Haines, CCE, AACE Transactions, 1992
17. Database Development and Computerized Cost Estimating, Joseph F. Galluzzo, PE CCE, Cost Engineering Journal, 1991

AACE
Construction Cost Estimating, Third Edition
TABLE OF CONTENTS - Page 8
Chapter 17: Estimating Using Building Information Modeling
1. Underdeveloped and Underutilized: Cost Estimating in BIM, Tamera L. McCuen, AACE Transactions, 2010
2. The Quantification Process and Standards for BIM, Tamera L. McCuen, AACE Transactions, 2009
3. Constructability Assessment Using BIM/4D CAD Simulation Model, Wissam Hijazi; Sabah Alkass, P.Eng.; Tarek Zayed, AACE Transactions, 2009
4. Scheduling, Estimating, and BIM: a Profitable Combination, Tamera Lee McCuen, AACE Transactions, 2008
5. Challenges in Estimating Costs Using Building Information Modeling, William E. Kraus, PE CCE; Steve Watt; Philip D. Larson, CCE PSP, AACE
Transactions, 2007
6. Estimators Functional Role Change with BIM, John Jeffrey Hannon, AACE Transactions, 2007
Chapter 18: Estimating Life Cycle Costs
1. Infrastructure Asset Life Cycle Cost Analysis Issues, Douglas D. Gransberg, PE CCE FRICS; Eric Scheepbouwer, AACE Transactions, 2010
2. Life Cycle Cost Analysis for Transportation Projects, Robert H. Harbuck, PE CCE CEP, AACE Transactions, 2009
3. Whole Life Cycle Cost for Chicago Type Bascule Bridge, Yingchun Zhang; David A. Novick, PE; Ahmad Hadavi, PE; Raymond J. Krizek, PE, Cost
Engineering Journal, 2008
4. Estimating Uncertainty for a Life-Cycle Cost Management Program, Dan Melamed, CCC; Bryan Skokan, PE; Mathew Zenkowich; Dan Kocher, Cost
Engineering Journal, 2008
5. Ratio of Operating and Maintenance Costs to Initial Costs of Building Services Systems, Shaomin Wu; Derek Clements-Croome, Cost Engineering
Journal, 2007
Author Index
Chronological Index
About the Editors

AACE Internationals Professional Practice Guide to


Cost Engineering in the Utility Industries, Second Edition
TABLE OF CONTENTS - Page 1
Introduction to the Second Edition
Introduction to the First Edition
Chapter I: Project Management
Volume 1
1. Guidelines for Managing Lump Sum Engineering Projects, S. N. Mukho; L. R. Doris, AACE Transactions, 1984
2. The Cost Engineer's Role in Legal Proceedings, Otto Mendel, CCE, AACE Transactions, 1985
3. A System to Manage Retrofit Project Budgets, Charles W. Henderson, AACE Transactions, 1987
4. Outage Project Management: Tool or Whip?, Dale R. Probasco, AACE Transactions, 1987
5. Project Management for Operating Facilities, Dale R. Kern; Jane A. Anderson, AACE Transactions, 1988
6. Managing (Controlling) Small Utility Projects, Govind R. Boloor, PE; J. Larry Basham, AACE Transactions, 1988
7. Starting a Project Management Organization - A Utility Perspective, Peter F. Santoro; Leo J. Nadeau, AACE Transactions, 1988
8. A Winning Business Planning Process, Robert J. Kyle; Alfred Z. Matos, AACE Transactions, 1991
9. Managing Small Projects Within a Utility, Vincent Scatuccio, Jr., AACE Transactions, 1992
10. Accurate Estimates Start With Clear Pictures, Randal S. Zentner, AACE Transactions, 1996
Volume 2
11. Understanding Owner Needs, Ginette B. Basak, P.Eng., AACE Transactions, 2005
12. Selecting the Right Engineer, Contractor, and Supplier, Mark T. Chen, AACE Transactions, 2000
13. Preparing a Proposal for a Build, Operate, and Transfer (BOT) Project, Jim W. Short, CCC, AACE Transactions, 1998
14. Project Scope Management, Asadullah Khan, Cost Engineering Journal, 2006
15. Opportunity and the Project Realization Process, Keith R. Webb, AACE Transactions, 2003
16. Infrastructure Asset Management: An Emerging Direction, Ron F. Cagle, AACE Transactions, 2003
17. Lowering Pipeline Costs Through Applied Technology, Andy Jenkins, P.Eng.; Tom Babuk, P.Eng.; Mo Mohitpour, PE, AACE
Transactions, 2005
18. Organization and Benefits of Systematic Project Experience Data Transfer, Robert Laan, AACE Transactions, 2000
19. Time-Constrained Project Delivery Issues, Robert B. Brown, PE; Michael B. Rowe; Hoang Nguyen, PE; John R. Spittler, PE, AACE
Transactions, 2001
20. Competency Development at an Owners Organization, Paul Teklenburg; Sep Serfontein, AACE Transactions, 2006
21. Attracting and Retaining Project Resources, Stephen L. Cabano, AACE Transactions, 2006
Chapter II: Investment and Financial Analysis
Volume 1
1. Mass Property Valuation Using Cost Indexes, James Goggan, CCE, AACE Transactions, 1980
2. Calculating Utility Prudence Issue Costs, Kris R. Nielsen, AACE Transactions, 1985
3. Utility Prudency Time Impact Evaluation, Patricia D. Galloway, PE, AACE Transactions, 1985
4. Rationalising an Unprofitable Gas Utility, Edward O. Naughton, AACE Transactions, 1987
5. Regulatory Treatment of Nuclear Plant Costs -- An Overview, Patrick L. Baryenbruch, AACE Transactions, 1987
6. Property Asset Reports -- Why Are They Needed?, Sandi L. Tracy, AACE Transactions, 1987
7. "Here Come the Auditors", Deborah Flannagan, AACE Transactions, 1988
8. Unit Process Cost Allocations for Rate Studies, Kees W. Corssmit, AACE Transactions, 1988
9. Combining Purpa, Prudence, And Avoided Cost Rate Design, PD Galloway; KR Nielsen, Cost Engineering Journal, 1989
10. Utility Financial Concepts, Rodney B. Adams, CCE, AACE Transactions, 1990
11. Benefit/Cost Analysis of Trenchless Alternatives, Ralph H. Clark, PE CCE; Kurt R. Browning, PE, AACE Transactions, 1992

AACE Internationals Professional Practice Guide to


Cost Engineering in the Utility Industries, Second Edition
TABLE OF CONTENTS - Page 2
12. Project Economic Evaluation Model (PEEM), Dennis H. Lougeay, PE; David R. Krumholz, AACE Transactions, 1993
Volume 2
13. Acceptable Project Investment Criteria, Tamuno Olumide Olu-Tima, AACE Transactions, 2003
14. Power Plant Financial Pro Forma Analysis, Gordon V.Z. Beard, PE CCE, AACE Transactions, 2003
15. A Financial Analysis of Comparative Petroleum and Mineral Project Investments, Paul Pierce, Cost Engineering Journal, 2003
16. Valuation and Opportunity of Large Energy Industry Capital Investments, Rob Graber; Geoffrey Rothwell, Cost Engineering
Journal, 2006
17. Economic Analysis of Pumping Alternatives for the A.D. Edmonston Pumping Plant, David A. Hamilton, PE CCE, Cost Engineering
Journal, 2004
18. A Path to Enhanced Value, Arild Sigurdsen, Cost Engineering Journal, 2007
19. Suitable Method for Capital Cost Estimation in Chemical Processes Industries, Mohammed Reza Shabani; Reza Behradi Yekta,
Cost Engineering Journal, 2006
20. Evaluating the Costs of Trenchless Sewer Repairs, Iqbal Noor, AACE Transactions, 2000
21. Economic Evaluation of Trenchless Technology, Robert H. Harbuck, AACE Transactions, 2000
22. Decision Support System for Pipeline Route Selection, Prasanta Kumar Dey; Soumitra S. Gupta, Cost Engineering Journal, 1999
23. Simulation-Based Pipeline Route Selection Tool, Cary Hirst; Janaka Y. Ruwanpura, Cost Engineering Journal, 2006
24. Controlling Non-Construction Costs, Peter R. Bredehoeft, Jr., AACE Transactions, 2005
Chapter III: Planning and Scheduling
Volume 1
1. Development Of The IMPACS Materials Management System At Tennessee Gas Transmission, WA Danko; RJ Owen,, Cost
Engineering Journal, 1985
2. Fossil and Nuclear Outage Planning -- A Critique, Ronald P. Vigue; Frank J. Ponzio, AACE Transactions, 1986
3. Keeping the Pace at River Bend, Kenneth J. Aupperle; John W. Paveglio, AACE Transactions, 1986
4. Maintenance of Plant Drawings, W. H.Miller, Jr.; E. Zakis, AACE Transactions, 1986
5. Utility Rate Case - Schedule Analysis, Anthony J. Werderitsch,PE CCE; Clive D. Francis, CCE, AACE Transactions, 1987
6. The 5-Year Living Schedule, Ralph L. Cochran; Patricia D. Galloway, AACE Transactions, 1987
7. IEEE's Energy Industry Identification System, Sam. N. Mukho; Lewis T. Gordon; John L. Parris, AACE Transactions, 1989
8. Continuous Improvement of Project Productivity, HR Macklin; HE Picard, Cost Engineering Journal, 1992
9. A Productivity Challenge in a Utility's Reliability Construction Program, H. Leon Ellis; Dr. Saied Gouda, PE; Scott Trowbridge, PE,
AACE Transactions, 1993
10. Power Plant Outage Project Productivity Improvement, Hans E. Picard; Harley R. Macklin, PE, AACE Transactions, 1993
11. The Unique Problems of Upgrade Projects, Sterling Stoddard; Lewis G. Manwaring, Jr., PE, AACE Transactions, 1995
12. Plan Local, Buy Global, Dennis M. Thompson, CCE, AACE Transactions, 1996
13. TVA's Continuous Outage Productivity Measurement/Improvement, Dr. Hans E. Picard; C. Robert Seay Jr., AACE Transactions,
1996
Volume 2
14. Scheduling Practices and Project Success, Andrew F. Griffith, PE, AACE Transactions, 2005
15. Project Planning and Scheduling and its Impact to Project Outcome: A Study of EPC Projects in Canada, Janaka Y. Ruwanpura;
Tanveer Nabi Ahmed; Karim Kaba; Gerald Patrick Mulvany, AACE Transactions, 2006
16. Effective Construction Work Packages, George Richard Gardner, AACE Transactions, 2006
17. Barbecues to Ball Joints: Procedure Planning, Philip J. Morrill, AACE Transactions, 2000
18. Work Management - Agent for Change at PLGS, Bruce R. Mulholland, AACE Transactions, 2000
19. Successful Managing Backlogs and Resources, Anthony J. Werderitsch, PE CCE; Timothy H. Orr, CCC; Kenneth R. Cross, PE,
AACE Transactions, 1999

AACE Internationals Professional Practice Guide to


Cost Engineering in the Utility Industries, Second Edition
TABLE OF CONTENTS - Page 3
20.
21.
22.
23.
24.

Improving Productivity With Short-Interval Scheduling, Walter J. Strutt, AACE Transactions, 2001
Retrospective As-Built Schedule Development, Anamaria I. Popescu, PE; Andrew Avalon, PE, AACE Transactions, 2005
Benefits of Linear Scheduling, Gary Rock Spencer, PE; Rose Mary Lewis, AACE Transactions, 2005
Innovative Approaches to CPM Scheduling Management, Russell P. Vakharia, CCE PSP, AACE Transactions, 2006
Great Expectations From Learning Curves, Lawrence W. Louie, PE, AACE Transactions, 2002

Chapter IV: Cost and Schedule Control


Volume 1
1. A Utility's Approach to Construction Cost Planning and Control for Electric Generating Plants, James R. Sapp, Jr., CCE; Richard A.
.Loftin, CCE, AACE Transactions, 1980
2. Applications of Cost and Schedule Integration, William R. Crean; Walter F. Adamczyk, AACE Transactions, 1982
3. Project Control for Maintenance / Modification Projects - "Back to Basics", Ronald P. Vigue, AACE Transactions, 1984
4. Controlling Nuclear Retrofit Costs, CO Gruber, Cost Engineering Journal, 1985
5. Transmission and Distribution - Projects Control System, Albert Barsody; Paul Nochaharli, AACE Transactions, 1988
6. EV - Not Only for Large Projects, Walter F. Adamczyk, PE, AACE Transactions, 1989
7. Cost Control in the Operational Environment, David J. Peeples, CCE, AACE Transactions, 1989
8. TAG: A Cost Engineering Resource, Darryl R. Brown, AACE Transactions, 1990
9. Understanding the Costs and Schedule of Hydroelectric Projects, Edward W. Merrow; Brett R. Schroeder, AACE Transactions,
1991
10. Capital Project Monitoring System (CPMS), Gamini A.K. Padmaperuma,CCE, AACE Transactions, 1993
11. Cost/Schedule Systems for a Utility Organization, Daniel J. Martin, CCC, Cost Engineering Journal, 1994
Volume 1
12. Improving Cost Control for Skeptical Managers, Morris E. Fleishman, PE CCE, AACE Transactions, 2004
13. SCCS - The Next Step Ahead, Gudmund Vigerust, CCC, AACE Transactions, 1998
14. Controlling Design-Phase Scope Creep, John A. Kuprenas, PE; Elhami B. Nasr, AACE Transactions, 2003
15. Design Cost Management Through Control Charts, John A. Kuprenas, PE; Elhami B. Nasr, AACE Transactions, 2001
16. Earned Value Programs for US Department of Energy Projects, Donald J. Cass, Cost Engineering Journal, 2000
17. Craft Curves for Estimating and Project Evaluation, James D. Whiteside II, AACE Transactions, 2002
18. Construction Performance Benchmarking Measurement, Hans E. Picard, AACE Transactions, 2002
19. Effective Use of Gantt Chart for Managing Large Scale Projects, Pankaja Pradeep Kumar, CCE, Cost Engineering Journal, 2005
20. COSTMAN: A Real-Time Commitment to Cost Management, Stefan C. Michalski, CCE, Cost Engineering Journal, 2005
21. Cost-Time-Risk Diagram: Project Planning and Management, Peerapong Aramvereekul, PSP EVP; Daniel J. Seider, PE, Cost
Engineering Journal, 2006
22. Project Historical Databases for the Canadian Oilsands, Bruce G. Elliott, CCC, AACE Transactions, 2005
Chapter V: Cost Estimating
Volume 1
1. Energy Cost Committee Forum: Estimating Costs for Life Extension Projects, Thomas C. Ponder, Jr. PE CCE, AACE Transactions,
1987
2. How To Determine The Cost of Dismantling A Fossil-Fueled Electric Power Plant, Alan Carlstrom, Cost Engineering Journal, 1989
3. PC-Based Estimating of Power Generation Costs, Joseph J. Coen, AACE Transactions, 1989
4. Power Plant Dismantling Cost Studies, Ted W. Wilson, PE CCE; James H. Norwood, PE, AACE Transactions, 1991
5. Integrated Estimating Technique, Arun Chakravartty, PE, AACE Transactions, 1992
6. Water-Supply Distribution-System Cost-Estimating, RG Eilers, AACE Transactions, 1992

AACE Internationals Professional Practice Guide to


Cost Engineering in the Utility Industries, Second Edition
TABLE OF CONTENTS - Page 4
7.
8.
9.
10.

Estimating Planning Level Costs of Pumped Storage Projects, Ram Dabadghav, PE CCE, AACE Transactions, 1992
Utility Cost Estimating, William R. Fletcher, AACE Transactions, 1996
Thirty-Five Years of Hydroelectric Estimating, George H.S. Duddy, P.Eng., AACE Transactions, 1996
Costs of Electricity From Pressurized Fluidized-Bed Combustion Power Plants: A Literature Review, Dr. Jack A. Fuller; Dr. Frederick
C. Scherr, Cost Engineering Journal, 1997
11. A Conceptual Cost Estimating Model for Water Reservoirs, Mohammed Al Khalil; Sadi Assaf; Walild Abdul Rahman; Mashoor Asfoor,
Cost Engineering Journal, 1999
12. Nuclear Fuel Cycle Cost Estimate Model, Kee-Hwan Moon; Dr. Ki-Dong Song; Dr. Man-Ki Lee; Seung-Su Kim; Dr. Kyu-Nam Chae,
AACE Transactions, 1998
Volume 2
13. International Projects Cost Estimating, Allen C. Hamilton, CCE, AACE Transactions, 1998
14. Cost Containment Estimating for Construction, Alan J. Barltrop, AACE Transactions, 1999
15. To Skid or Not to Skid?, Robert T. Bryden, AACE Transactions, 2000
16. Value Engineering Perspectives on Cost Estimating, Charles R. McDuff, AACE Transactions, 2000
17. Cost Engineering Implications of High-Energy Pipe, Paul W. Smith, AACE Transactions, 2000
18. What's in ISBL, OSBL, and The Factors?, Christopher L. Kinney; Rafaele Gauche, AACE Transactions, 2006
19. Unraveling the Chaos in Topsides Metrics, Lawrence W. Louie, AACE Transactions, 2001
20. Estimating for EPA Drinking Water Regulations, Kin K. Chao; Faysal Bekdash; Rajiv Khera, AACE Transactions, 2000
21. The Process of Estimating the Construction Cost of a Secondary Clarifier for a Wastewater Treatment Plant, James L. Matthews,
Cost Engineering Journal, 2004
22. D-PIPE: A Worker Hour Rates Data Warehouse for Estimating Industrial Pipe Construction, Mohamed Al-Hussein; Aubrey
Vanderstar; Rajesh Kandanala, Cost Engineering Journal, 2005
23. A Primer on Decommissioning Cost Estimation in the Gulf of Mexico, Mark J. Kaiser, Cost Engineering Journal, 2006
Chapter VI: Risk Assessment
Volume 1
1. Escalation Modeling, Forecasting and Tracking, James J. Stevenson, Jr., CCE, AACE Transactions, 1984
2. Definitive Cost Modeling, Ken O. Adkisson, CCE, AACE Transactions, 1984
3. Nuclear Power Investment Risk Economic Model, Frank D. Postula; William J. Houghton, AACE Transactions, 1986
4. Flue Gas Desulfurization: Costs and Concerns, David P. Burford, AACE Transactions, 1987
5. Power Plant Economy of Scale -- Revisited, James J. Stevenson Jr.,CCE; Paul H. Walker, CCE, AACE Transactions, 1987
6. Coal Supply Risk Evaluation for Site Selection, Endre Mozes, CCE, AACE Transactions, 1988
7. Joint Participation in Large Power Projects, James J. Stevenson, Jr., CCE; Philip Saunders, AACE Transactions, 1988
8. Baseline for Coal Powered Plants, Farid Mansour, CCE, AACE Transactions, 1989
9. PFBC - An Advanced Coal Fired Generating Systems For The 1990S, JD Mcclung, Cost Engineering Journal, 1991
10. A Risk-Based Maintenance Model for Cross-Country Pipelines, Prasanta K. Dey; Stephen O. Ogunlana; Saumitra S. Gupta; Mario T.
Tabucanon, Cost Engineering Journal, 1998
Volume 2
11. Guidelines for Successful Risk Facilitating and Analysis, Dr. Iqbal Noor, PE CCE; Thomas J. Rye, AACE Transactions, 1999
12. A Neural Network Approach to Risk Assessment and Contingency Allocation, Dong Chen; Francis T. Hartman, AACE Transactions,
2000
13. Evaluating and Calculating Contingency, James A. Bent, AACE Transactions, 2001
14. Basic Techniques for Analyzing and Presentation of Cost Risk Analysis, Randal B. Lorance; Robert V. Wendling, Cost Engineering
Journal, 2001

AACE Internationals Professional Practice Guide to


Cost Engineering in the Utility Industries, Second Edition
TABLE OF CONTENTS - Page 5
15. Challenges of Implementing Risk Management Processes, Iqbal (Bob) Noor, PE CCE; Terry Joyner; Robert J. Martin Jr., AACE
Transactions, 2002
16. No Stone Unturned - Forecasting Revisited, F. Sam Griggs Jr., CCE, AACE Transactions, 2002
17. Exploration Risk Management and Business Development in the Petroleum Industry, Varoujan K. Minassian; George F. Jergeas,
P.Eng., AACE Transactions, 2003
18. Managing Risk for Global Energy Projects, Nick J. Lavingia, PE, AACE Transactions, 2005
19. Multi-Attribute Utility Model for Quantifying Schedule and Cost Overruns in Pipe-line Projects, Ahmed Eldieb; Mohamed Marzouk;
Moheeb Elsaid, AACE Transactions, 2005
20. Significance of WBS in Contingency Modeling, John Gengxin Zhao, AACE Transactions, 2006
21. Advanced Cost Estimating and Strategic Planning, Zoran Vojinovic; Rainer Seidel; Vojislav Kecman, AACE Transactions, 2000
22. Cost Contingency as the Standard Deviation of the Cost Estimate, Geoffrey Rothwell, Cost Engineering Journal, 2005
Chapter VII: Case Studies
Volume 1
1. Wind Energy Research Project and Associated Costs, James E. Pfluger, AACE Transactions, 1980
2. Estimating Commercial Electric Energy Conversion Costs at Liquid-dominated Geothermal Reservoirs, George; WO Jacobsen; DG
Van Newell; LG Wagenen; JW Caroll, AACE Transactions, 1980
3. Solar One Project, Norman J. De Haven, AACE Transactions, 1980
4. Conceptual Estimating of Power Plants Use of the Construction Labor Demand System, John R. Healy, AACE Transactions, 1981
5. Geothermal Power Generation, George K. Crane, AACE Transactions, 1981
6. Analysis of Published Data for Parametric Estimating of Boiler Plants - Part II, Laxmidas V. Popat, CCE, AACE Transactions, 1981
7. Heavy Water Makes Heavy Weather, EA Stallworthy; OP Kharbanda, Cost Engineering Journal, 1981
8. Parametric Estimating Applied to Power Plant, Laxmidas V. Popat, CCE, AACE Transactions, 1980
9. TVA'S Modular Concepts for Detailed Estimating, James A. Johnson; Ronald W. Clevenger, AACE Transactions, 1981
10. Cost Evaluation of Electric Distribution System Outages, Luis Raul Talamas; Gerez G.; J. Rafael Ochoa, AACE Transactions, 1982
11. The Economics of Geothermal Power, Laxmidas F. ("LV") Popat, CCE, AACE Transactions, 1982
12. Co-Generation Economics--A Case for the HTGR, B. B. Sibold, AACE Transactions, 1982
13. Fossil Based Electricity Generation Economics, B. N. Murthy; R. C. Maxwell; A. N. Mann, AACE Transactions, 1982
14. Slurry Pipeline Cost Estimates, Charles A. Larson, CCE, AACE Transactions, 1983
15. Landfill Gas -- A Viable Energy Source, M. D. Bracy; Charles L. Devore, AACE Transactions, 1983
16. The Cogeneration Alternative, Ronald F. Schnorr, AACE Transactions, 1983
Volume 2
17. How Accurate Are Piping Estimating Methods?, Chris P. Caddell; Gerald P. Klanac; Thomas J. Rye, AACE Transactions, 1999
18. Capital Construction Project Design Cost Models, John A. Kuprenas, AACE Transactions, 2000
19. Construction Productivity: A Survey of Industry Practices, George F. Jergeas; Mohammad S. Chishty; Marko J. Leitner, AACE
Transactions, 2000
20. Performance Comparison of Project Delivery Techniques, John A. Kuprenas, AACE Transactions, 2002
21. Supply Chain Management in Construction Through Partnership, Prasanta Kumar Dey, AACE Transactions, 2002
22. A Practical Approach to Managing Multiple Small Projects, Adrian Ilincuta; George F. Jergeas, P.Eng., AACE Transactions, 2003
23. Revitalizing Project Controls: A Roadmap to Excellence, Christopher F. Michalak; H. Lance Stephenson, CCC, AACE Transactions,
2006
24. A Study of Advanced Project Control System for Korean Nuclear Power Plant Construction Project, Myung Youl Yoon; Jae Hee Han,
AACE Transactions, 2006
25. Construction Productivity, James D. Whiteside, II PE, AACE Transactions, 2006

AACE Internationals Professional Practice Guide to


Cost Engineering in the Utility Industries, Second Edition
TABLE OF CONTENTS - Page 6
26. Assessing Performance Trends on Industrial Construction Mega Projects, Aminah Robinson Fayek; Stephen O. Revay, CCC; Doug
Rowan; Donald Mousseau, Cost Engineering Journal, 2006
27. Fuel Cell Town - A Feasibility Study, Iftikhar Madni, CCE, Cost Engineering Journal, 2007
Author Index
Chronological Index
About the Editor

AACE Internationals Professional Practice Guide to


Contingency, Third Edition
TABLE OF CONTENTS - Page 1
Introduction
Chapter 01: General Topics on Contingency
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

Estimate Contingency, Risk, and Accuracy - What Do They Mean?, Raleigh S. Williamson; Jack F. Browder, CCC; William R.
Donnell IV, AACE Transactions, 1980
Contingency It Demands Equal Time, JR Duenas, Cost Engineering Journal, 1981
Contingency Funds Evaluation, John R. Healy, CCE, AACE Transactions, 1982
An Overview Of Contingency Considerations, MW Graf, Cost Engineering Journal, 1984
Contingency Evaluation in Capital Cost, Lawrence C. Bacher, CCE, AACE Transactions, 1984
Determining Meaningful Estimate Contingency, JJ Stevenson, Cost Engineering Journal, 1984
The Why and How of Contingency Management, Richard Lee Jackson; John W. Kinsey; Wayne E. Cotton; Susan K. Moore, AACE
Transactions, 1985
Cost Contingency for Investment Estimates Involving New/Evolving Technology, Louis J. Cabano, AACE Transactions, 1989
Managing Change: Making the Most of Contingency, Daniel W. Jordan, CCE, AACE Transactions, 1989
The Project Manager - Risk Taker and Contingency Planner, David H. Hamburger, PE, AACE Transactions, 1989
What is Contingency, Anyway?, Wesley R. Querns, CCE, AACE Transactions, 1989
How to Deal With Accuracy and Contingency, C. Peter Rapier, AACE Transactions, 1990
Contingency Allocation: A Computer-Aided Approach, Irtishad Ahmad, AACE Transactions, 1992
Contingency Revisited, Gideon Samid, PE, Cost Engineering Journal, 1994
Contingency Management on DOE Projects, Edward E. Douglas, III, CCC, AACE Transactions, 2001
Monte Carlo Analysis: Ten Years of Experience, Dale E. Clark, Cost Engineering Journal, 2001
Contingency! Who Owns and Manages It?, Peter W. Ripley, CCC, AACE Transactions, 2004
Total Float Distribution: A Sane Way to Manage Schedule Contingency, Anamaria I. Popescu, PE, AACE Transactions, 2009

Chapter 02: Cost Estimating and Contingency


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

Escalation Modeling, Forecasting and Tracking, James J. Stevenson, Jr., CCE, AACE Transactions, 1984
Applied Contingency Analysis, John W. Hackney, CCE, AACE Transactions, 1985
Contingency Management for the Hong Kong Airport Care Program (ACP), Jhan Schmitz; Norman H. Shotwell, AACE
Transactions, 1993
Contingency Estimating for Environmental Remediation Projects, Donald Wendel, CCC, Cost Engineering Journal, 1995
Evaluating and Calculating Contingency, James A. Bent, AACE Transactions, 2001
Cost Contingency Analysis for Construction Projects Using Speadsheets, Khaled Nassar, Cost Engineering Journal, 2002
Contingency, Quantifying the Uncertainty, Riaan Burger, CCE, Cost Engineering Journal, 2003
Exploring Techniques for Contingency Setting, Scott E. Burroughs; Gob Juntima, AACE Transactions, 2004
A Methodology for Estimating Engineering Details, James D. Whiteside II, PE, AACE Transactions, 2005
Contingency in Levelized Capital Cost Estimation, Geoffrey Rothwell, AACE Transactions, 2005
Cost Contingency as the Standard Deviation of the Cost Estimate, Geoffrey Rothwell, Cost Engineering Journal, 2005
A Construction Cost Contingency Tracking System (CTS), John F. Rowe, PE, Cost Engineering Journal, 2006
The Monte-Carlo Challenge: A Better Approach, John K. Hollmann, PE CCE, AACE Transactions, 2007
Cost Contingency - Analysis and Evaluation, Rashmi Prasad, AACE Transactions, 2008
Contingency Misuse and Other Risk Management Pitfalls, Iqbal Noor, PE CCE; Robert L. Tichacek, PE, Cost Engineering Journal,
2009

AACE Internationals Professional Practice Guide to


Contingency, Third Edition
TABLE OF CONTENTS - Page 2
16. A Prototype Risk Analysis for Determining Contingency Using Approximate Reasoning Method, Varoujan K. Minassian; George F.
Jergeas, P.Eng., Cost Engineering Journal, 2009
17. Risk-Based Estimate Self-Modeling, Ovidiu Cretu, PE; Terry Berends, PE, AACE Transactions, 2009

Chapter 03: Risk Analysis and Contingency


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

Simplified Risk Analysis in Project Economics, Julian A. Piekarski, CCE, AACE Transactions, 1984
Range Estimating Operating and Manufacturing Costs, Michael W. Curran, AACE Transactions, 1986
Range Estimating: Contingencies with Confidence, Michael W. Curran, AACE Transactions, 1989
A PERT Approach to Cost Risk Analysis, Pedro V. Aquino, AACE Transactions, 1992
Contingency Draw-Down Using Risk Analysis, Randal B. Lorance, PE, AACE Transactions, 1992
Managing Risk on Capital Projects, Joseph A. Lukas, PE, CCE, AACE Transactions, 1995
Risk Assessment and Contingency Estimating, Dr. Osama Moselhi, PE, AACE Transactions, 1997
Techniques for Developing Cost Risk Analysis Models, Randal B. Lorance, PE; Robert V. Wendling, AACE Transactions, 1999
Integration of Schedule and Cost Risk Models, Robert V. Wendling; Randal B. Lorance, PE, AACE Transactions, 1999
A Neural Network Approach to Risk Assessment and Contingency Allocation, Dong Chen; Francis T. Hartman, AACE Transactions,
2000
The Role of Risk Series: Understanding Risk, Michael W. Curran, Cost Engineering Journal, 1999
Risk Response and Contingency Strategies Among Contractors in Sydney, Australia, Deepak Bajaj, AACE Transactions, 2001
Knowledge Gaps Impacts on Risk Management, Iqbal Noor, PE CCE; Robert J. Martin Jr.; Joseph A. Treige, P.Eng., AACE
Transactions, 2003
Contingency Misuse and Other Risk Management Pitfalls, Iqbal Noor, PE CCE; Robert L. Tichacek, PE, AACE Transactions, 2004
Risk Assessments: Value of the Process, Christopher P. Caddell, PE; Sherri R. Crepinsek; Gerald P. Klanac, AACE Transactions,
2004
Risk Management on Research and Development Projects, Steven W. Wageman, CCC, AACE Transactions, 2004
Implementation of Successful Risk-Based Portfolio Management, Iqbal Noor, PE CCE; Robert Martin; Douglas Bowman, AACE
Transactions, 2005
Managing Project Cost Risk, Dan Patterson, AACE Transactions, 2006
Bid Risk and Contingency Analysis, Amarjit Singh, PE; Sharilyn Shiramizu; Kamal Gantam, Cost Engineering Journal, 2007
Practical Risk Analysis, Waymon D. Lofton; Robert J. Coppo, AACE Transactions, 2007
Contingency Modifier Tool, J.D. (Jim) Whiteside, II PE, AACE Transactions, 2007
Handling the Truth in Risk Management, Kevin M. Curran; Michael W. Curran, Cost Engineering Journal, 2008
A Practical Application of Monte Carlo Simulation in Forecasting, James D. Whiteside II, PE, AACE Transactions, 2008
Recommended Practices for Risk Analysis and Cost Contingency Estimating, John K. Hollmann, PE CCE CEP, AACE
Transactions, 2009

Chapter 04: Other Related Topics


1.
2.
3.
4.
5.

Design of a Viable System for Process Plant Estimating, John W. Hackney, CCE, AACE Transactions, 1980
The Many Facets of Escalation, James V. Padrnos, AACE Transactions, 1981
Sharing the Risks of the Cost of Inflation, George Stukhart, AACE Transactions, 1982
How to Do a Good Coal Plant Quick Estimate in Less Than an Hour (Or What to Do Until Some Engineering is Done), Tom B.
Thamm. CCE, AACE Transactions, 1983
Quantifying Risks in Capital Estimates, Patricia A. Owen; John K. Nabors, AACE Transactions, 1983

AACE Internationals Professional Practice Guide to


Contingency, Third Edition
TABLE OF CONTENTS - Page 3
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.

Determining Overrun Probabilities, John W. Hackney, CCE, AACE Transactions, 1986


Cost Trend of USA Nuclear Power, Farid F. Mansour, PE CCE, AACE Transactions, 1987
Achieving Construction Project Objectives in Various Situations, Dr. Alexander Laufer; Dora Cohenca-Zall, AACE Transactions,
1988
Economic Risk of Offshore Field Development, Rolf Skjong; Jon Lereim, AACE Transactions, 1988
Estimating Factors for Process Plants, John R. Heizelman, AACE Transactions, 1988
How Accurate are Capital Cost Estimates?, G. Stevens; T. Davis, AACE Transactions, 1988
Accuracy of Hazardous Waste Project Estimates, John W. Hackney, CCE, AACE Transactions, 1989
Government Estimating vs. General Contractor Estimating, Joseph A. Brown, CCE, AACE Transactions, 1989
Parametric Estimating - In Search of Expert Systems, Rino Gosselin; Leslie E. McMullan, AACE Transactions, 1989
Scheduling for on Time Project, David H. Hamburger, PE, AACE Transactions, 1989
Upgrading Capital Estimation Factors and Correlations, Ivan V. Klumpar, CCE, AACE Transactions, 1990
Construction Competitive in the 21st Century, Dr. Janet K. Yates, AACE Transactions, 1991
How to Uncover Program Cost Risks, Robert M. Smith, PE, AACE Transactions, 1991
A Project Definition Methodology for Environmental Restoration Projects, J. L. Poldy; W. R. Shangraw; R. F. Shangraw, Jr., AACE
Transactions, 1992
Integrated Estimating Technique, Arun Chakravartty, PE, AACE Transactions, 1992
Project Control in the Norwegian Road Administration, Kjell Ottar Berge, AACE Transactions, 1992
A Different Approach to Factored Cost Estimating, Kul B. Uppal, PE, AACE Transactions, 1993
Analyzing Cost Impacts of Technology Changes, Tom G. Mendel, CCC, AACE Transactions, 1994
Construction Claims Practice: USA versus Brazil, Joao Otavio Goulart Brizola, AACE Transactions, 1994
Partnering and CE: A Construction Attorney's Perspective, Marc T. Richardson, PE, AACE Transactions, 1995
Estimating Delay Damages, Gary H. Jentzen, PE; Robin A. Collins, PE; Dr. Gui Ponce de Leon, PE, AACE Transactions, 1996
Factored Estimating Guidelines - Refinery/Petrochemical Projects, Robert S. Smith, PE, AACE Transactions, 1996
Forward Pricing Impact on Construction Projects, Brian E. Kasen; Victor C. Oblas, PE, AACE Transactions, 1996
Pacing Delays - The Practical Effect, James G. Zack Jr., AACE Transactions, 1999
But-For Schedules - Analysis and Defense, James G. Zack Jr., AACE Transactions, 1999
Project Analysis Tools for Cost and Schedule Improvement, Peter W. Swenson, AACE Transactions, 1999
Parametric Cost Estimating for Environmental Remediation Projects, Jacqueline Rast, PE; Kate M. Peterson, PE, AACE
Transactions, 1999
Developing a Parametric Model for Estimating Process Control Costs, Larry R. Dysert, CCC, AACE Transactions, 1999
Project Cost Estimating for Major Renovation Projects, James Sutherland, AACE Transactions, 1999
Project Alignment: The Key to Successful Cost Engineering, Gregory J. Skulmoski; Dr. Francis T. Hartman, P.Eng., AACE
Transactions, 1999
Improving the Cost and Schedule Control System, Mohammed S. El-Mashaleh; Allan D. Chasey, PE, Cost Engineering Journal,
1999
Advocating a Deliverable-Oriented Work Breakdown Structure, Parviz F. Rad, PE CCE, Cost Engineering Journal, 1999
The Estimate Review and Validation Process, Larry Dysert; Bruce G. Elliott, AACE Transactions, 2000
Extreme Order-of-Magnitude Estimating, Thomas E. Simpson, CCE, AACE Transactions, 2000
Construction Productivity: A Survey of Industry Practices, George F. Jergeas; Mohammad S. Chishty; Marko J. Leitner, AACE
Transactions, 2000
How to Reduce Your Project Cost, Ramy Zaghloul Mohamed; Francis T. Hartman, AACE Transactions, 2000
Cost Estimating and Scheduling Integration, Philip D. Larson, AACE Transactions, 2000
Probabilistic Selection of Project Alternatives, Leroy J. Isidore; Adetokunbo A. Oyetunji, AACE Transactions, 2000
A Capital Investment Review Process, Larry R. Dysert, CCC, AACE Transactions, 2002
Cost Estimating Best Practices, Allen C. Hamilton; Richard E. Westney, AACE Transactions, 2002

AACE Internationals Professional Practice Guide to


Contingency, Third Edition
TABLE OF CONTENTS - Page 4
46. Development and Maintenance of a Parametric Building Estimating System, Dominic L. Arioli; Joseph G. Masi, AACE Transactions,
2002
47. Leadership--The Invisible Cost Category, Lee R. Lambert, AACE Transactions, 2002
48. Best Practice of Cost Estimates, Kul B. Uppal, PE, AACE Transactions, 2003
49. Budget Busts: The Influence of Demand in the Construction Market, Jonathan Moss, CCC, Cost Engineering Journal, 2003
50. Concept Modeling for Aircraft Manufacturing, Richard Curran; Ajoy Kundu; Stephen Crosby; S. Raghunathan, AACE Transactions,
2003
51. Fundamentals for Estimating and Developing a Scope of Work, Christopher B. Schamel, CCC, Cost Engineering Journal, 2003
52. Best Practices in Cost Engineering, Nick J. Lavingia, PE, AACE Transactions, 2004
53. Cost Trending throughout the Design Phase, Peter Bredehoeft Jr., AACE Transactions, 2004
54. Improving Cost Control for Skeptical Managers, Morris E. Fleishman, PE CCE, AACE Transactions, 2004
55. Is Cost Estimating Only About Hard Facts?, Finn H. Sandberg; Per Willy Hetland; Oddbjoern Tolo, AACE Transactions, 2005
56. Management of Project Contingency and Allowance, Jan Terje Karlson; Jon Lereim, Cost Engineering Journal, 2005
57. Improving Conceptual Cost Estimating Performance, Alfredo F. Serpell, AACE Transactions, 2005
58. Controlling Non-Construction Costs, Peter R. Bredehoeft, Jr., AACE Transactions, 2005
59. Significance of WBS in Contingency Modeling, John Gengxin Zhao, AACE Transactions, 2006
60. Capturing How Cost Engineers Think, Oliver W. Houseman; Fiona Coley; Rajkumar Roy, AACE Transactions, 2006
61. Core Competencies, Expectations, and Career Path for an Estimating Professional, John K. Hollmann, PE CCE; Bruce G. Elliott,
CCC, AACE Transactions, 2006
62. A Computerized Approach to Design Cost Analysis, Saeed Karshenas, AACE Transactions, 2007
63. Essentials of Design Phase Cost Management and Budget Control, Venkataramani Sundaram, CCE, Cost Engineering Journal,
2008
64. Linking Project Controls Implementation Planning and Project Success: the Northern Canadian Mining Projects Lessons, Akinlolu
Isaac Oni, CCE, AACE Transactions, 2008
65. An Introduction to Parametric Estimating, Larry R. Dysert, CCC, AACE Transactions, 2008
66. Linking the Estimate, the Schedule and the Cost Control through a Standardized WBS, Marie-Helene Biffi, P.Eng., AACE
Transactions, 2008
67. Danish Infrastructure Projects and a New Budgeting Method -- A Rational Process to Manage Decisions, Dion Lind Andersen, Cost
Engineering Journal, 2009
68. Applications of Monte Carlo simulations in Dispute Resolution and Claims Work, Rod C. Carter; Richard J. Long, PE, AACE
Transactions, 2009
69. Cost Estimating, Project Performance and Life Cycle, Kul B. Uppal, PE CEP, AACE Transactions, 2009
Chapter 05: AACE International Recommended Practices
1.
2.
3.
4.
5.
6.
7.
8.

Cost Engineering Terminology, AACE International, Recommended Practices, 2010


Cost Estimate Classification System - As Applied in Engineering, Procurement, and Construction for the Process Industries, AACE
International, Recommended Practices, 2005
Basis of Estimate, AACE International, Recommended Practices, 2007
Contingency Estimating - General Principles, AACE International, Recommended Practices, 2008
Risk Analysis and Contingency Determination Using Range Estimating, AACE International, Recommended Practices, 2008
Risk Analysis and Contingency Determination Using Parametric Estimating, AACE International, Recommended Practices, 2009
Risk Analysis and Contingency Determination Using Parametric Estimating - Example Models as Applied for the Process Industries,
AACE International, Recommended Practices, 2009
Risk Analysis and Contingency Determination Using Expected Value, AACE International, Recommended Practices, 2009

AACE Internationals Professional Practice Guide to


Contingency, Third Edition
TABLE OF CONTENTS - Page 5
Author Index
Chronological Index
About the Editor

AACE Internationals Professional Practice Guide to


Project Delivery Methods, Second Edition
TABLE OF CONTENTS - Page 1
Chapter 01: Introduction
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

Project Delivery Systems for Construction: An Overview, Kwaku A. Tenah, Cost Engineering Journal, 2001
Construction Trends and the Cost Engineer, Talal Abi-Karam, PE CCE, Cost Engineering Journal, 2006
Construction Management - Presumed Dead, But Still Alive!, Talal Abi-Karam, PE CCE, AACE Transactions, 2006
Private Sector Project Delivery, John E. Schaufelberger, AACE Transactions, 2002
Best Value Contracting: Breaking the Low-Bid Paradigm, Dr. Douglas D. Gransberg, PE; Michael A. Ellicott, PE, AACE
Transactions, 1996
Analysis of Best-Value Pricing, Dean T. Kashiwagi, PE; John Savicky, AACE Transactions, 2002
Converting From Design-Bid-Build to Design-Build, Roger A. Stutz, AACE Transactions, 2000
Project Delivery Comparison Using Performance Metrics, Douglas D. Gransberg, PE CCE; Gayla M. Badillo-Kwiatkowski; Keith
R. Molenaar, AACE Transactions, 2003
The Effect of Innovative Highway Construction Contract Methods, Douglas D. Gransberg; Daniel F. Runde; James Stergios,
AACE Transactions, 2000
Selecting the Right Engineer, Contractor, and Supplier, Mark T. Chen, AACE Transactions, 2000
Preparing Cost Engineers for Today's Construction Industry Challenges, Kenneth Robson; Douglas D. Gransberg, PE CCE,
Cost Engineering Journal, 2004
Design/Build: The Professional Services Race, Talal Abi-Karam, PE, AACE Transactions, 1999
Design-Build Delivery System on Trial, Sami Fahmy, P.Eng.; George F. Jergeas, P.Eng., AACE Transactions, 2004
A Performance-Based Procurement System Used by the State of Wyoming, Dean T. Kashiwagi, PE; Ziad Al-Sharmani, Cost
Engineering Journal, 1997
Effective Contract Management, James A. Bent, CCC, AACE Transactions, 1989
Life-Cycle Costing, Louis C. Amadio, AACE Transactions, 1979
Quantifying Pavement Life Cycle Cost Inflation Uncertainty, Douglas D. Gransberg, PE CCE; James Diekmann, AACE
Transactions, 2004
The Total Cost Management (TCM) Framework, John K. Hollmann; Wesley R. Querns, Cost Engineering Journal, 2001
Improve Profitability through Effective Project Management and TCM, Nick J. Lavingia, PE, AACE Transactions, 2003
Privatization: A Closer Look, Terry Tyborowski; Michelle Primack; Kelly Matthews, AACE Transactions, 1997
Conditional Lump-Sum Pricing, John R. Spittler, PE; Robert B. Brown, PE, AACE Transactions, 2002
Performance Comparison of Project Delivery Techniques, John A. Kuprenas, AACE Transactions, 2002

Chapter 02: Design-Bid-Build (DBB) Section A: DBB Estimating


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

Competitively-Bid Construction Contracts, Randy R. Rapp, PE, Cost Engineering Journal, 1997
A Bidding Strategy Based On ESPE, M Gates; A Scarpa, Cost Engineering Journal, 1983
General Conditions and Fee Risk Analysis, Lorry T. Bannes, PE, AACE Transactions, 1995
The Effect of Market Conditions on Tendering and Price Forecasting, Robert G. Pearl, AACE Transactions, 1994
The Cost of General Conditions, Daniel F. Becker, AACE Transactions, 1993
Bid Pricing Strategy-Optimal Profit Margin, EM Silberman, Cost Engineering Journal, 1993
Understanding Contractor Overhead, Ron Cilensek, CCE, Cost Engineering Journal, 1991
Indirect Rate Development for Government Contracts, David A. Norfleet, CCC, Cost Engineering Journal, 1995
Bidding in Times of Escalating Inflation, Dr. Zohar Herbsman, AACE Transactions, 1979
Bid Markup Methodologies, Dr. Kwaku A. Tenah; Dr. Carleton Coulter III, PE, Cost Engineering Journal, 1999
Highway Estimating Using a Standard Form, Ernest Wolski, AACE Transactions, 1996
How to Unbalance a Bid and Win the Job, Richard A. Roberts, PE, CCE, AACE Transactions, 1994

AACE Internationals Professional Practice Guide to


Project Delivery Methods, Second Edition
TABLE OF CONTENTS - Page 2
13.
14.
15.
16.

Unbalanced Bidding, Marvin Gates, Cost Engineering Journal, 1965


Enhancing Profitability for Unit Price Contracts, Robert H. Mayer, Jr.; James E. Diekmann, AACE Transactions, 1982
Competitive Bidding for Highway Construction Projects, Robert H. Harbuck, PE CCE, AACE Transactions, 2004
Estimating Design Fees for Transportation Projects, Carla Lopez del Puerto, ICC; Douglas D. Gransberg, PE CCE; Kenneth F.
Robson, AACE Transactions, 2006
17. Project Planning and Scheduling and its Impact to Project Outcome: A Study of EPC Projects in Canada, Janaka Y. Ruwanpura;
Tanveer Nabi Ahmed; Karim Kaba; Gerald Patrick Mulvany, AACE Transactions, 2006

Chapter 02: Design-Bid-Build (DBB) Section B: DBB Scheduling


1.
2.
3.
4.
5.

Optimized Scheduling for Highway Construction, Khaled El-Rayes; Osama Moselhi, PE, AACE Transactions, 1997
The Pitfalls of CPM Scheduling on Construction Projects, Ian A. Street, Cost Engineering Journal, 2000
Top-Down Back-To-Front Project Planning, Faramarz Fred Rahbar; James E. Rowings Jr., PE CCE, AACE Transactions,
1998
Schedule Hierarchy - An Overview, Sarwar A. Samad, Cost Engineering Journal, 1998
Construction Scheduling Based on Resource Constraints, Yong-Il Lee; Thomas M. Gatton, AACE Transactions, 1994

Chapter 02: Design-Bid-Build (DBB) Section C: DBB Project Management


1.
2.

Project Cash Flow, William M. Sancho, AACE Transactions, 1977


Tools of the Trade: Advances in Cost Control and Schedule Management for Commercial Construction, Robert B. McCullough,
PE CCE, AACE Transactions, 1997

Chapter 03: Construction Management (CM) Section A: CM Estimating


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

A Probabilistic Cost Estimating Model, Dr. Thomas E. Uher, Cost Engineering Journal, 1996
Developing a Project Scope/Conceptual Estimate Questionnaire, Frank B. Mitchell, Jr., AACE Transactions, 1995
Statistical Conceptual Estimating System (SCES), A. James Poe, CCC, AACE Transactions, 1995
Direct Range Cost Estimating, Dr. Paul F. Mlakar; Larry M. Bryant, AACE Transactions, 1990
Square Foot Range Estimating, John R. Knoke, PE; Liang Y. Liu; John R. Spittler, AACE Transactions, 1993
A Different Approach to Factored Cost Estimating, Kul B. Uppal, PE, AACE Transactions, 1993
Conceptual and Early Design Estimating Techniques for Building, Heating, Ventilation, and Air Conditioning Systems, Frederick
M. Reynolds, CCE, Cost Engineering Journal, 1993
Square Foot Type Estimating for Construction, Steven F. Roney, CCC, AACE Transactions, 1992
Range Estimating: Reasoning with Risk, Michael W. Curran, AACE Transactions, 1988
Conceptual Estimation and Budget Control, William Noble, AACE Transactions, 1987
Conceptual Estimating, John J. Suarez, AACE Transactions, 1986
Predesign Estimate of Elevator Cost in Multistory Buildings, Saeed Karshenas; Zafar S. Yousuf, AACE Transactions, 1985
A Study of Cost Indices, Ron Dubois, AACE Transactions, 1980
Projecting Construction Costs With Tempered Cost Indices, John F. Ball Jr.; Daniel T. Petrowski, AACE Transactions, 2007

AACE Internationals Professional Practice Guide to


Project Delivery Methods, Second Edition
TABLE OF CONTENTS - Page 3
Chapter 03: Construction Management (CM) Section B: CM Scheduling
1.
2.
3.
4.
5.

The Adequacy of Initial Scheduling Estimates, John M. Dye; Dr. Irtishad U. Ahmad, PE, AACE Transactions, 1998
Project Scheduling Under Limited Resources, Mohammed Moizuddin; Shokri Z. Selim, AACE Transactions, 1997
Qualitative Criteria Combination for Total Float Distribution, Suthi Pasiphol; Calin M. Popescu, PE, AACE Transactions, 1994
Up-front Project Scheduling in an Owner/Contractor Alliance, Murray W. Janzen, Cost Engineering Journal, 1992
Project Risk Management Using Monte Carlo Simulation, Mohamed K. Khedr, PSP, AACE Transactions, 2006

Chapter 03: Construction Management (CM) Section C: CM Project Management


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

Cash Flow Management Through Front-End Loading, Philip B. Copare, AACE Transactions, 1990
Project Controls in the Preconstruction Phase, Ian A. Street, CCE; Joseph W. Wallwork, PE CCE, AACE Transactions, 2001
Controlling Costs Using Design Quality Workshops, James T. Brown, AACE Transactions, 2002
An Integrated Cost Control Model, Mohamed K. El-Choum, AACE Transactions, 2000
Design Phase Cost Control, James A. Young III, CCC, AACE Transactions, 1997
Managing Changes and Claims on Design Contracts, Stephen F. Rusteika, Jr.; Gary H. Jentzen, PE, AACE Transactions,
1995
The Best Estimating Methodology for Project Owners, Alejandro Stern, PE, AACE Transactions, 1994
Guidelines for Managing Lump Sum Engineering Projects, S. N. Mukho; L. R. Doris, AACE Transactions, 1984
Contractor Proposal Evaluation Program, James A. Bent, CCE, AACE Transactions, 1984
Establish A System For Contractor Proposal Evaluation, KR Cressman, Cost Engineering Journal, 1981
The Control Estimate, Marshall S. Zewe, AACE Transactions, 1977
Extended Services - A CM Alternative, Julian A.J. Anderson, AACE Transactions, 2000
Expert Rules-of-Thumb for Effective Design Coordination, Dr. Tarek M. Hegazy; Dr. Jameel Khalifa, PE, AACE Transactions,
1996
The Pre-Construction Services Roadmap, Richard D. Smith, PE CCE, AACE Transactions, 2007

Chapter 04: Design-Build (DB) Section A: DB Estimating


1.
2.
3.
4.

CAD Estimating for Design-Builders, Peter L. Haines, CCE, AACE Transactions, 1992
Risk Assessment and Contingency Estimating, Dr. Osama Moselhi, PE, AACE Transactions, 1997
A Parametric Building Cost Estimating System, John K. Hollmann, PE, AACE Transactions, 1994
Parametric Cost Estimating of Building Construction - US, Canada, and Mexico, Luis C. Hinojosa, CCE; Ramon Vazquez Del
Mercado, AACE Transactions, 1993
5. Parametric Cost Estimating - A Guide, John W. Hackney, CCE; Kay Hudson; Lesley Gasperow, AACE Transactions, 1987
6. Preliminary Cost Estimating for Highway Construction Projects, Lansford C. Bell; Ghazanfer A. Bozai, AACE Transactions,
1987
7. Parametric Estimating of Buildings, Norman A. Koenigseker, Cost Engineering Journal, 1982
8. Capital Construction Project Design Cost Models, John A. Kuprenas, AACE Transactions, 2000
9. Framework for Comparing Project Delivery Costs, Keith R. Molenaar, Cost Engineering Journal, 2004
10. Controlling Construction Costs During Design, Daniel Becker, CCE, AACE Transactions, 1990
11. Estimating Costs With Fuzzy Logic, Anthony K. Mason, PE; Donald J. Kahn, Sr., AACE Transactions, 1997
12. Evaluating Environmental Restoration Cost Estimating Systems, W. David Featherman; Dr. R.F. Shangraw Jr., AACE
Transactions, 1996

AACE Internationals Professional Practice Guide to


Project Delivery Methods, Second Edition
TABLE OF CONTENTS - Page 4
13.
14.
15.
16.
17.
18.
19.

Cost Estimating Using Historical Costs, Kymberli Popham, CCE, AACE Transactions, 1996
Composite-Factored Estimating, Masahide Nishimura, AACE Transactions, 1995
Contingency Allocation: A Computer-Aided Approach, Irtishad Ahmad, AACE Transactions, 1992
Preliminary Estimating for Heavy Construction, Steve R. Sanders; Robert R. Maxwell, AACE Transactions, 1992
Estimating the Cost of Construction Inspection, Ralph D. Ellis, Jr., AACE Transactions, 1990
Case History - Parametric Estimating System, Tom G. Mendel, AACE Transactions, 1989
Parametric Estimating Factors for Demolition Costs, William E. Gallagher; T. C. Ponder, Jr. PE CCE; Juan M. Castro, PE CCE,
AACE Transactions, 1987
20. A Study of Design-Build Estimates at the 10 Percent Completion Level, Dan E. Schottlander, CCE, AACE Transactions, 2007

Chapter 04: Design-Build (DB) Section B: DB Scheduling


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.

Design Cost Management Through Control Charts, John A. Kuprenas, PE; Elhami B. Nasr, AACE Transactions, 2001
Managing Value Objectives for Design/Build Projects, Del L. Younker, CCC, AACE Transactions, 2001
Time-Constrained Project Delivery Issues, Robert B. Brown; Michael B. Rowe; Hoang Nguyen; John R. Spittler, Cost
Engineering Journal, 2002
Parametric Estimating Methodology for Transit Project Planning, Robert H. Harbuck, AACE Transactions, 2001
Evaluating and Calculating Contingency, James A. Bent, AACE Transactions, 2001
Managing Risk in Design-Build, Talal Abi-Karam, AACE Transactions, 2001
Factors Affecting Design-Build for Laboratory Projects, Roger A. Stutz, CCE, AACE Transactions, 2004
A Preconstruction Foundation for Design-Build Success, Byron J. Law, CCC, AACE Transactions, 2004
Design/Build Selection Process: Art or Science?, Talal Abi-Karam, PE CCE, AACE Transactions, 2004
The Design-Build Approach: An Overview, Kwaku A. Tenah, Cost Engineering Journal, 2000
Review of a Design-Build Option, Roger A. Stutz, CCC, AACE Transactions, 1999
Cost Control in Design-Build, John G. Fish, CCE, AACE Transactions, 1991
Project Control for Engineering, James M. Neil, CCE, AACE Transactions, 1989
State of Hawaii Selects 'Best Value' by Artificial Intelligence, Dean T. Kashiwagi; Richard E. Mayo, Cost Engineering Journal,
2001
Preparing a Proposal for a Build, Operate, and Transfer (BOT) Project, Jim W. Short, CCC, AACE Transactions, 1998
Evaluating Best Value Contract Proposals, Dr. Douglas D. Gransberg, PE, AACE Transactions, 1997
Measurement of Engineering Productivity: An Approach, Sharad Dikshit, AACE Transactions, 1973
Cost Awareness in Design: The Role of Data Commonality, David P. Hoult; C. Lawrence Meador; John Deyst; Maresi Dennis,
Cost Engineering Journal, 1996
The Effectiveness of Project Management as a Design Team Organizational Structure, Dr. P. A. Bowen; M. J. Wyrley-Birch,
AACE Transactions, 1995
Value Management Assistance in Design-Build, Stephen J. Kirk, AACE Document, 1999
Fast-Track Cost Control, James A. Young III, AACE Transactions, 1995
Design to Schedule (DTOS), Dennis M. Thompson, CCC, AACE Transactions, 1995
Work Packaging Using Design Components, Kyungrai Kim; Calin M. Popescu, PE; Gary D. Hamilton, AACE Transactions,
1994
Advocating a Deliverable-Oriented Work Breakdown Structure, Parviz F. Rad, PE CCE, Cost Engineering Journal, 1999
Effective Management of Turnkey Projects, P. Giridhar; K. Ramesh, AACE Transactions, 1998
Public Sector Design-Build Selection Criteria, Neil D. Opfer; Jaeho Son; Thomas Korman, AACE Transactions, 2002
Ten Critical Principles For Successful Design-Build Projects, George Jergeas; Sami Fahmy, P.Eng., AACE Transactions, 2005

AACE Internationals Professional Practice Guide to


Project Delivery Methods, Second Edition
TABLE OF CONTENTS - Page 5
Chapter 04: Design-Build (DB) Section C: DB Project Management
1.

Basic Techniques for Analyzing and Presenting Schedule Risk Analysis, Robert V. Wendling; Randal B. Lorance, PE, AACE
Transactions, 1999
2. Parametric Project Scheduling of Milestones, Joseph Orczyk, PE; Luh-Maan Chang, AACE Transactions, 1990
3. Concepts and Methods of Schedule Compression, James M. Neil, CCE, AACE Transactions, 1989
4. Highway Design - Challenges in Controlling Cost and Schedule, Nelson E. Bonilla, CCE; Ray J. Jussila, CCE; Scott Baarman,
AACE Transactions, 1992
5. Project Scheduling Risk Assessment Using Monte Carlo Methods, Eric D. Finley, PE; Dr. Deborah J. Fisher, PE, Cost
Engineering Journal, 1994
6. Total Float Management in CPM Project Scheduling, Dr. Suthi Pasiphol; Dr. Calin M. Popescu, PE, AACE Transactions, 1995
7. Practical Risk Analysis in Scheduling, Abhi Basu, PE, AACE Transactions, 1998
8. Practical Applications of Probabilistic Scheduling, Dr. Gui Ponce de Leon, PE; John R. Knoke, PE, AACE Transactions, 1997
9. Integrated Range Estimating and Stochastic Scheduling, Leroy Isidore; Edward Back, Cost Engineering Journal, 2001
10. Integrating CAD, Estimating, Scheduling, and Accounting, Philip D. Larson, AACE Transactions, 2001
11. Selecting Planning and Scheduling Specifications, Leaf A. Ballast; Calin M. Popescu, AACE Transactions, 2001

Chapter 05: Constructability


1.
2.
3.
4.
5.
6.
7.
8.
9.

Constructability and the Cost Engineer, Robert H. Harbuck, PE, AACE Transactions, 1991
Value Engineering and Constructability, James M. Neil, CCE; Brisbane H. Brown, Jr., AACE Transactions, 1987
Leveraging Value Engineering for Negotiated Work, David Moyer, AACE Transactions, 2003
VE Is Not a "Group Cost Cutting", Mustansir Hussain Raj, AACE Transactions, 2002
Constructability, "The Stretch Version", Robert J. Geile, PE, AACE Transactions, 1996
Constructability: The Key to Reducing Investment Risk, Allan D. Chasey; Ann M. Schexnayder, AACE Transactions, 2000
Constructability in the Design Firm, James A. Young III, CCC, Cost Engineering Journal, 1998
Improving Constructability in Concrete Construction, Neil D. Opfer, CCE, AACE Transactions, 1994
The Benefits Of Constructability Reviews During The Design Of Environmental Capital Projects, Henry C. Pepper III, PE CCE,
Cost Engineering Journal, 1994
10. Seal Coat Constructability Program, Dr. Douglas D. Gransberg, PE CCE; Dr. Sanjaya P. Senadheera; Ilker Karaca, AACE
Transactions, 1999
11. Implementing Project Constructability, Douglas D. Gransberg, PE CCE; Edward E. Douglas III, CCC PSP, AACE Transactions,
2005
12. Designing for Constructability, Walter J. Boyce, AACE Transactions, 1991

Chapter 06: Building Information Modeling


1.
2.
3.

Challenges in Estimating Costs Using Building Information Modeling, William E. Kraus, PE CCE; Steve Watt; Philip D. Larson,
CCE PSP, AACE Transactions, 2007
Estimators' Functional Role Change with BIM, John Jeffrey Hannon, AACE Transactions, 2007
A Computerized Approach to Design Cost Analysis, Saeed Karshenas, AACE Transactions, 2007

AACE Internationals Professional Practice Guide to


Project Delivery Methods, Second Edition
TABLE OF CONTENTS - Page 6
Chapter 07: International Project Delivery
1.
2.
3.
4.
5.
6.

Overseas Construction Projects: Critical Costing Considerations, Kweku K. Bentil, AACE Transactions, 1988
Managing Risk on Global Projects, Charles P. Woodward, PE CCE; Kartar Singh, PE, AACE Transactions, 1996
Ten Commandments of International Cost Engineering, John E. Barry, AACE Transactions, 1993
Deliverable Based Service Contract -- A Challenge for Bidders, J. Ajith Kumar, Cost Engineering Journal, 2001
Conceptual Fixed Price Estimating, Richard D. Smith, AACE Transactions, 2000
Capital Cost Estimating for the Frontier Regions of the World: Questions a Savvy Estimator Should Ask First, Joseph R. Jeffery,
Cost Engineering Journal, 1996
7. Tax Considerations When Involved With Construction Outside The Home Country, MF Faillace; C Nieuwenhuis, Cost
Engineering Journal, 1980
8. Cost Estimating of Overseas Construction Projects, John G. McConville, CCC, AACE Transactions, 1994
9. Developing Foreign Location Factors, BA Pietlock, Cost Engineering Journal, 1992
10. Techniques and Tools for Project Cash Flow Prediction in the Australian Construction Industry, Timothy R. O'Leary; Selwyn
Tucker, AACE Transactions, 1996

Chapter 08: Partnering


1.
2.
3.
4.
5.
6.
7.

Measuring Partnered Project Performance, Dr. Douglas D. Gransberg, PE CCE; Howard L. Reynolds; Jack W. Boyd, AACE
Transactions, 1998
Partnering Construction Contracts: A Conflict Avoidance Process, Richard B. Fisher, AACE Transactions, 2004
Key Partnering Success Factors, Jennifer L. Krahn; George F. Jergeas; Sami Fahmy, AACE Transactions, 2001
Partnering: An Innovative and Effective Project Organization Concept, Abdulaziz A. Bubshait, Cost Engineering Journal, 2001
Partnering in Public Works Construction, Talal S. Abi-Karam, PE, AACE Transactions, 1999
Project Controls Within a Partnering Agreement, James E. Krebs, PE; Alan J. Epstein, CCC, AACE Transactions, 1996
Partnering and CE: A Construction Attorney's Perspective, Marc T. Richardson, PE, AACE Transactions, 1995

Author Index

Chronological Index

About the Editors

AACE Internationals Professional Practice Guide to


Environmental Remediation and Decommissioning, Second Edition
TABLE OF CONTENTS - Page 1
Introduction

Chapter 01: Environmental Remediation Planning and Scheduling Methodology


1.
2.
3.
4.
5.
6.
7.
8.

Salt Repository Project Schedule Integration, H. Dennis Kopp; Dr. L. J. LaFountain, AACE Transactions, 1988
Cost and Schedule Baseline Development, Marc A. Zocher; Gary E. Thompson, AACE Transactions, 1992
Scheduling Concerns in the Hazardous Waste Industry, Timothy C. McManus; Minosca V. Alcantara, AACE Transactions, 1994
Scheduling in an Environmental Restoration Environment, G. Darryl Walker, CCE, Cost Engineering Journal, 1995
Planning for Closure at Rocky Flats, Larry T. Murphy, AACE Transactions, 1998
A Cost-Effective Waste Management Plan, Thomas H. Mills; Eric Showalter; David Jarman, Cost Engineering Journal, 1999
Managing Schedule Changes at Rocky Flats, Todd Bilstein, AACE Transactions, 1999
Project Analysis Tools for Cost and Schedule Improvement, Peter W. Swenson, AACE Transactions, 1999

Chapter 02: Cost Estimating, Project Controls, Cost Modeling and Reporting
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

Environmental Cost in Building Nuclear Power Plants, F. L. Pfischner; S.T. Su, AACE Transactions, 1976
A Systems Evaluation Model for Selecting Spent Nuclear Fuel Storage Concepts, F.D. Postula; W. C. Finch; R. P. Morissette, AACE
Transactions, 1982
Computerized Cost Model for Superfund Technologies, William F. Kemner; John Abraham, PE; Jay Palmisano, AACE
Transactions, 1987
Energy Cost Committee Forum: Estimating Costs for Life Extension Projects, Thomas C. Ponder, Jr. PE CCE, AACE Transactions,
1987
Flue Gas Desulfurization: Costs and Concerns, David P. Burford, AACE Transactions, 1987
Parametric Tools for Hazardous Waste Cleanup Projects, Brett Schroeder; Dr. Ralph Shangraw, AACE Transactions, 1990
A Project Definition Methodology for Environmental Restoration Projects, J. L. Poldy; W. R. Shangraw; R. F. Shangraw, Jr., AACE
Transactions, 1992
Cost-Effective Capital Budgeting for Environmental Projects, Richard A. Selg, CCE, AACE Transactions, 1994
Estimating On-Site Thermal Treatment Projects, Ronald G. Stillman, PE CCE, Cost Engineering Journal, 1994
ABC Estimating for Environmental Operations, Michael C. Ray, PE, CCE, AACE Transactions, 1995
Environmental Site Project Controls, Edward E. Douglas III, CCC, AACE Transactions, 1997
Addressing Closure Project Cost With Integrated Logistics Simulation, Larry J. Smith; J.W. Keller; B. Plott; Larry F. Burdge; Peter W.
Swenson, AACE Transactions, 1999
Multi-Project Costing and Reporting Techniques, Erin Bognar; Chris Schoenbauer, AACE Transactions, 1999
Parametric Cost Estimating for Environmental Remediation Projects, Jacqueline Rast, PE; Kate M. Peterson, PE, AACE
Transactions, 1999
A Budget Estimating Method of Environmental Cost for Multiple Housing Projects, Chansik Park; Sungho Hong; Changwan Kim;
Jaeho Lee, AACE Transactions, 2003
DOE Environmental Management Applied Cost Engineering Team, Richard A. Selg, CCE; Bryan Skokan, PE CCE, AACE
Transactions, 2003

AACE Internationals Professional Practice Guide to


Environmental Remediation and Decommissioning, Second Edition
TABLE OF CONTENTS - Page 2
Chapter 03: Contingency Management, Risk Analysis and Environmental Regulations
1.
2.
3.
4.
5.

Environmental Studies For Ontario Hydro's Thermal Generating Stations, W.R. Effer, Cost Engineering Journal, 1975
The Impact of Environmental Regulation on the U.S. Contractor, James M. Neil; Sam A. Damico, AACE Transactions, 1981
A Technique for Assessing Cost Uncertainty, Carl R. Hudson, AACE Transactions, 1992
Incorporating Environmental Regulation Impacts to Project Plans, William A. Zbitnoff, PE CCE, AACE Transactions, 1992
The Cost of Increased Regulatory Rigor, Larry G. Medley, Sr., CCE; Mahendra N. Lakumb, PE; Wiley W. Byers, AACE
Transactions, 1992
6. Contingency Revisited, Gideon Samid, PE, Cost Engineering Journal, 1994
7. Effective Risk Management for Remediation Projects, Timothy C. McManus; Robert Goltz, PE; Lisa R. Turnbaugh, AACE
Transactions, 1996
8. Pricing the Risk of Liability Associated With Environmental Clean-Up Projects, Dr. Joon H. Paek, AACE Transactions, 1996
9. Real Estate Development - Environmental Regulations Overview, Bruce D. Harrigan, PE CCE, AACE Transactions, 1996
10. Risk Analysis for Environmental Remediation Projects: A Comprehensive Approach, James E. Diekmann, Cost Engineering
Journal, 1997
11. Contingency Management on DOE Projects, Edward E. Douglas, III, CCC, AACE Transactions, 2001
12. The Use of Historical Costs from the Rocky Flats Environmental Technology Site for Estimating Uncertainty for the Life-Cycle Cost of
the US Department of Energy Environmental Management Program, Dan Melamed; Bryan Skokan, PE; Mathew Zenkowich; Dan
Kocher, AACE Transactions, 2007

Chapter 04: Benchmarking and Lessons Learned


1.
2.

DOE Benchmarking for Cost Management, Pramrod Mallick; Stephen W. Meador, PE; R. F. Shangraw, Jr.; John R. Selman, AACE
Transactions, 1994
Facilities Management Benchmarks: Lessons Learned - An Analysis of Facility Benchmarks Conducted at DOE Sites, G. Allan
Engebretson, CCC; Bryan Skokan, CCE, AACE Transactions, 1997

Chapter 05: Economics of Environmental Remediation and Waste Management


1.
2.
3.
4.
5.
6.

Economic Feasibility of Recovering Fines from Waste Streams of Mineral Processing Plants, L. A. Khan; S. B. Bhagwat; J. W.
Baxter, AACE Transactions, 1986
Owner Control of Environmental Projects, Charles G. Poulton, PE CCE; Michael J. Shannon, AACE Transactions, 1988
What Makes an Environmental Cost Engineer?, Marc A. Zocher, AACE Transactions, 1993
Stakeholder Involvement In Does Cost Improvement Initiative For Environmental Restoration And Waste Management Activities, J
Jackson; JL Gillette; MS Goldberg; CS Hooper, Cost Engineering Journal, 1994
Strategic Environmental Mangement - Competitive Solutions for the Twenty-First Century, Dr. Neil L. Drobny, PE, Cost Engineering
Journal, 1994
The Role of Environmental Economics in the Cost Management of Projects, Dr. Craig Langston; Caroline Mackley, AACE
Transactions, 1998

AACE Internationals Professional Practice Guide to


Environmental Remediation and Decommissioning, Second Edition
TABLE OF CONTENTS - Page 3
Chapter 06: Cost-Effective Waste Minimization and Pollution Prevention
1.
2.
3.
4.
5.
6.
7.

Engineering Contractor's Role in Developing Economical Solutions to Pollution Problems, Robert E. Templeton, AACE
Transactions, 1974
Oil Shale-A Clean Energy Source, Sidney Katell; Reid Stone; Paul Wellman, AACE Transactions, 1974
Cost Analyses for Zero Discharge, C. Leon Parker, AACE Transactions, 1977
Estimating Pollution Control Costs for the Clean Air Act Amendments of 1977, Thomas C. Ponder, PE CCE; Yatendra Shah. PE;
Larry Gibbs; Richard Jenkins, AACE Transactions, 1978
Cost-Effective Waste Minimization Techniques, Richard A. Selg, CCE; Albert J. Norkus, AACE Transactions, 1992
New Initiatives to Stimulate Pollution-Prevention Investments, Richard A. Selg, CCE, Cost Engineering Journal, 1994
Cost-Effective Waste Minimization for Construction Managers, Hal Johnston; William R. Mincks, Cost Engineering Journal, 1995

Chapter 07: Design, Construction Practices and Other Related Topics


1.
2.
3.
4.
5.

Pyritic Sulfur Removal From Coal, E. F. Hensley, AACE Transactions, 1975


The Grand Canal Concept, Thomas W. Kierans, AACE Transactions, 1984
Re-Coating Existing Structures - The Lead Primer Issue, Theodore D. Taylor, CCE, AACE Transactions, 1993
A TQM Project Team - Closure of a Radioactive Disposal Area, Andrew S. Dowd, Jr., AACE Transactions, 1994
The Benefits Of Constructability Reviews During The Design Of Environmental Capital Projects, Henry C. Pepper III, PE CCE, Cost
Engineering Journal, 1994
6. Assessing Environmental Parameters for Commercial Buildings, Dr. James Sommerville; Dr. G. Galbraith; S. Craig, AACE
Transactions, 1996
7. Thermal Treatment of PCB-Contaminated Soils, William E. Gallagher, PE; Thomas C. Ponder Jr., PE CCE, AACE Transactions,
1997
8. Competing With Environment-Friendly Construction Practices, Dr. Alfred B. Ngowi, AACE Transactions, 1999
9. Transitioning to an M&I From an M&O Contractor, Larry F. Burdge, AACE Transactions, 1999
10. Successfully Managing One-Of-A-Kind Projects, Richard A. Selg, CCE; David Richard Rihel, AACE Transactions, 2007
11. Environmental Management Applied Cost Engineering Team Costing Efforts, Bryan A. Skokan; Pramod Mallick; Kin Chao, AACE
Document, 2000

Chapter 08: Standardized Approach to Estimating Decommissioning Cost


1.
2.
3.

Guidelines For Estimating Nuclear Power Plant Decommissioning Costs, T Laguardia; D Williams, Cost Engineering Journal, 1989
How To Determine The Cost of Dismantling A Fossil-Fueled Electric Power Plant, Alan Carlstrom, Cost Engineering Journal, 1989
Standardized Cost Structure for the Environmental Industry, Bryan Skokan, PE CCE; Mohammad A. Khan, CCE; G. Allan
Engebretson, CCC, AACE Transactions, 1998

Chapter 09: Decontamination and Decommissioning Estimating Approaches


1.
2.
3.

Nuclear Power Plant Decommissioning Cost Estimate, Balarko Gupta, AACE Transactions, 1985
Decommissioning Nuclear Power Plants: How Much Will It Cost?, Roger E. Huebner, AACE Transactions, 1982
Cost Effective Selection of Environmental Remediation Processes, Jeffrey S. Brackeen; Samuel D. Gibson, CCE, AACE
Transactions, 1995

AACE Internationals Professional Practice Guide to


Environmental Remediation and Decommissioning, Second Edition
TABLE OF CONTENTS - Page 4
4.
5.
6.
7.

Environmental Project Controls - A Government Perspective, Marc A. Zocher; Gary E. Thompson, AACE Transactions, 1991
Estimating Transportable Thermal Treatment Projects, R. (Gary) Stillman, PE CCE, AACE Transactions, 1993
Productivity Study for Hazardous and Toxic Waste Remediation Projects, Andrew G. Reape, CCE, Cost Engineering Journal, 1996
Contingency Estimating for Environmental Remediation Projects, Donald Wendel, CCC, Cost Engineering Journal, 1995

Chapter 10: Development of Decontamination and Decommissioning Cost Estimating Models


1.
2.
3.

Parametric Modeling of Decontamination and Decommissioning Costs Using MCACES Gold, Michael G. Dieters, PE CCE, Cost
Engineering Journal, 1997
A Computerized Cost Estimating System for the Decommissioning of Contaminated Facilities, Volkert Bobeldijk, PE CCE, Cost
Engineering Journal, 1995
Evaluating Environmental Restoration Cost Estimating Systems, W. David Featherman; Dr. R.F. Shangraw Jr., AACE Transactions,
1996

Chapter 11: Decontamination and Decommissioning Estimating Issues and Challenges


1.
2.
3.

Power Plant Dismantling Cost Studies, Ted W. Wilson, PE CCE; James H. Norwood, PE, AACE Transactions, 1991
Put Decommissioning Costs Where They Belong, GW Woerner, Cost Engineering Journal, 1989
Project Controls on Federal Remediation Contracts, R. Gary Stillman, PE, CCE, AACE Transactions, 1995

Author Index

Chronological Index

About the Editor

AACE Internationals Professional Practice Guide to


Construction Project Controls, Second Edition
TABLE OF CONTENTS - Page 1
Introduction
Chapter 01: Introduction to Construction Project Controls
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

The Role of Project Controls, Manash K. Bagchi, AACE Transactions, 1995


Understanding Owner Needs, Ginette B. Basak, P.Eng., AACE Transactions, 2005
Application of Appropriate Project Controls Tools for Contract Type, Lori A. Floyd, CCC, Cost Engineering Journal, 2004
Project Controls - Where It Fits In, Michael C. Ray, PE CCE, AACE Transactions, 1998
Construction Project Performance Metrics, Douglas D. Gransberg; Monica E. Villarreal Buitrago, AACE Transactions, 2002
Does Project Control Start at Contract Award?, Stephen L. Cabano, AACE Transactions, 2005
Project Controls in the Preconstruction Phase, Ian A. Street, CCE; Joseph W. Wallwork, PE CCE, AACE Transactions, 2001
Establishing a Project Controls Organization, Edward E. (Ted) Douglas III, CCC, AACE Transactions, 1999
Effective Implementation of a Project Control System, Pradip M. Mehta, CCE PSP, Cost Engineering Journal, 2008
The Business Impact of Outsourced Project Control, Christopher F. Michalak, AACE Transactions, 2001
A Case for Third Party Project Controls, Randall S. Wyandt, AACE Transactions, 2009
Effective Use of Outsourced Project Controls, Christopher F. Michalak; Paul G. Williams, Cost Engineering Journal, 2006
Subcontractor Project Controls Reporting Requirements, Dale A. Pearson, CCE, Cost Engineering Journal, 1995
Regaining Control of Project Control, Stephen L. Cabano, AACE Transactions, 2003
Practical Control Methods for Large Programs, Dave Draper, AACE Transactions, 2004
Establishing a First Class Project Controls Organization for Managing Large Complex Projects, George B. Bradshaw, PE CCE,
AACE Transactions, 2008
17. Successfully Managing One-Of-A-Kind Projects, Richard A. Selg, CCE; David Richard Rihel, AACE Transactions, 2007
Chapter 02: Cost Control
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

Best Owner Practices for Project Control, John K. Hollmann, PE CCE, Cost Engineering Journal, 2003
The Control Estimate, Marshall S. Zewe, AACE Transactions, 1977
An Integrated Cost Control Model, Mohamed K. El-Choum, AACE Transactions, 2000
Essentials of Cost Management, Scott Cullen, AACE Transactions, 2004
Essentials of Design Phase Cost Management and Budget Control, Venkataramani Sundaram, CCE, Cost Engineering Journal,
2008
Capital Construction Project Design Cost Models, John A. Kuprenas, AACE Transactions, 2000
Public Sector Project Total Cost Models, John A. Kuprenas, PE, AACE Transactions, 2006
Controlling Design-Phase Scope Creep, John A. Kuprenas, PE; Elhami B. Nasr, AACE Transactions, 2003
Cash Flow Management Through Front-End Loading, Philip B. Copare, AACE Transactions, 1990
Fast-Track Cost Control, James A. Young III, AACE Transactions, 1995
Mega-Project Control: Effective Program, Project, and WBS Granularity Decisions, Paul Verveniotis, PE, AACE Transactions, 2008
Cost Control in Design-Build, John G. Fish, CCE, AACE Transactions, 1991
Contingency Management on DOE Projects, Edward E. Douglas, III, CCC, AACE Transactions, 2001

Chapter 03: Schedule Control


1.
2.
3.
4.

Scheduling Management: Schedule Basis Memorandum, H. Lance Stephenson, CCC, AACE Transactions, 2007
Advocating a Deliverable-Oriented Work Breakdown Structure, Parviz F. Rad, PE CCE, Cost Engineering Journal, 1999
Schedule Hierarchy - An Overview, Sarwar A. Samad, Cost Engineering Journal, 1998
Scheduling Management: Classifications vs. Levels, H. Lance Stephenson, CCC, AACE Transactions, 2007

AACE Internationals Professional Practice Guide to


Construction Project Controls, Second Edition
TABLE OF CONTENTS - Page 2
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

Avoiding Project Controls Pitfalls, Marlene M. Hyde, CCE, AACE Transactions, 2003
Activity Duration Based Schedule Progress and Prediction Metrics, Activity Duration Based Schedule Progress and Prediction
Metrics, AACE Transactions, 2009
A Method to Calculate the Productivity Factor, Juan Fornino Gaeta; Robert R. Ruiz Gomez, AACE Transactions, 1993
Converting Linear Schedules to Critical Path Method Precedence, Douglas D. Gransberg, PE CCE, AACE Transactions, 2007
Design to Schedule (DTOS), Dennis M. Thompson, CCC, AACE Transactions, 1995
The Case for Construction Schedule Validation and Auditing, Earl T. Glenwright, Jr., PE PSP; Aldo Dorea Mattos, AACE
Transactions, 2008
Cost and Schedule Control for Engineering Contracts, Kenneth R. Davey, CCE, Cost Engineering Journal, 2004
The Opening Game - Project Mobilization, Edward E. (Ted) Douglas III, CCC, AACE Transactions, 1998
The End Game - Project Demobilization and Close-Out, Edward E. (Ted) Douglas III, CCC, Cost Engineering Journal, 1997
Project Scheduling Under Limited Resources, Mohammed Moizuddin; Shokri Z. Selim, AACE Transactions, 1997
Planning and Scheduling Cost-Limited Projects, Edward E. Douglas III, CCC, AACE Transactions, 1994
Change Control and Tracking, Mark T. Chen, PE CCE, AACE Transactions, 1992
Impact of Changes on Project Schedule, James M. Neil, CCE, AACE Transactions, 1989
Quantifying and Apportioning Delay on Construction Projects, Lee Schumacher, PE, Cost Engineering Journal, 1995
Managing Value Objectives for Design/Build Projects, Del L. Younker, CCC, AACE Transactions, 2001

Chapter 04: Quality Control


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

Concurrent Management of Total Cost and Total Quality, Bryan R. McConachy, P.Eng., AACE Transactions, 1996
Quality Control, Assurance and Verification in Service and Construction Contracts, Terry L. Borne, PE CCE, AACE Transactions,
2009
Cost of Quality, Valerie G. Venters, CCC, AACE Transactions, 2004
Modeling Customer Satisfaction for the AEC Industry, Christian Brockmann, AACE Transactions, 2002
A Promising Planning Tool: Quality Function Deployment, Neil Eldin, Cost Engineering Journal, 2002
Beyond Project Controls - The Quality Improvement Approach, Michael G. Sypsomos, AACE Transactions, 1997
Cost Engineering and Continuous Performance Improvement, Peter W. Ripley, CCC, AACE Transactions, 1996
Linking Contractor Payments to Contractor Performance, Quentin W. Fleming; Joel M. Koppelman, AACE Transactions, 1995
Project Controls and ISO 9000, Desmond G. Pellicena; Geoff J. Hill, AACE Transactions, 1994
Influence of Quality on Construction Costs, John A. Kuprenas, PE, AACE Transactions, 2008
Cost, Quality and Sarbanes Oxley, Rodney B. Adams, CCE, AACE Transactions, 2004
Warranty as a Real Option for DOT Projects, Qingbin Cui; Mehmet Emre Bayraktar; Makarand Hastak, CCE; Issam Minkarah, AACE
Transactions, 2003
Measuring Performance When Customer Service Is Not Enough, Haydee Hernandez de Trujillo; Carlos G. Taborda M., PE, AACE
Transactions, 1999
Use of Statistical Control Charts in Construction, Satinder S. Baweja, CCE, AACE Transactions, 1997
Implementing Project Constructability, Douglas D. Gransberg, PE CCE; Edward E. Douglas III, CCC PSP, AACE Transactions,
2005
Constructability and the Cost Engineer, Robert H. Harbuck, PE, AACE Transactions, 1991
Value Engineering and Constructability, James M. Neil, CCE; Brisbane H. Brown, Jr., AACE Transactions, 1987
Designing for Constructability, Walter J. Boyce, AACE Transactions, 1991

AACE Internationals Professional Practice Guide to


Construction Project Controls, Second Edition
TABLE OF CONTENTS - Page 3
Chapter 05: Document Control
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

Notes from your Technical Board: Construction Document Control, Edward E. Douglas III, Cost Engineering Journal, 2003
Document Management and Project Controls, Paul D. Kuhlken, CCC, AACE Transactions, 2003
Construction Audit - An Essential Project Controls Function, Alexia Nalewaik, CCE, Cost Engineering Journal, 2007
Engineering Document Planning and Progress Control, C. Henrik Lund; Jon Ostensvig, AACE Transactions, 1984
Controlling Costs Using Design Quality Workshops, James T. Brown, AACE Transactions, 2002
Managing Changes and Claims on Design Contracts, Stephen F. Rusteika, Jr.; Gary H. Jentzen, PE, AACE Transactions, 1995
Linking the Estimate, the Schedule and the Cost Control through a Standardized WBS, Marie-Helene Biffi, P.Eng., AACE
Transactions, 2008
Lessons Learned in Using Earned Value Systems, (a Case Study), Harry W. Jarnagan, PE CCE, AACE Transactions, 2009
The Use of 3-D Scanners for Automated Progress Reporting on Construction Activities, Osama El Sayed Moselhi, P.Eng.; Samir ElOmari, AACE Transactions, 2005
The ABCs of Earned Value Application, Mark T. Chen, PE CCE, AACE Transactions, 2008
Performance Based Payments (PBPs): If It Walks, Talks and Quacks Like EVM It Must Be EVM, Quentin W. Fleming; Joel M.
Koppelman, PE, Cost Engineering Journal, 2008
Application of Earned Value for Small Project Control: Panacea or Bane, S. Mukho; J. Lisanti, AACE Transactions, 1982
Implementing Earned Value Reporting, Fred Mahler, CCC; Mark Mazina, AACE Transactions, 1980
Improve Schedule Forecasting Via Earned Value, Donald J. Cass, CCE, AACE Transactions, 1994
Non-linear Earned Value Analysis, Amarjit Singh, AACE Transactions, 1993
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation, Ricardo Viana Vargas, AACE Transactions, 2004

Chapter 06: Computer Applications


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

Guidelines for Purchasing Software, Kevin Miller, Cost Engineering Journal, 1998
Implementing Integrated Project Controls Software, Mike Milinusic, P.Eng., Cost Engineering Journal, 2002
Best Value IT Procurement for Construction Organizations, Srinath Perera; Gayani Karunasena, AACE Transactions, 2004
Implementing a Database Estimating System, Robert H. Harbuck, PE CCE, AACE Transactions, 1996
Implementation of Computer-Based Planning and Estimating Tools for a Public Utility, Janaka Y. Ruwanpura; Simaan M. AbouRizk;
Siri Fernando, Cost Engineering Journal, 2001
A Parametric Building Cost Estimating System, John K. Hollmann, PE, AACE Transactions, 1994
A Computerized Approach to Design Cost Analysis, Saeed Karshenas, AACE Transactions, 2007
Cautions of Computerized Estimating, Barrett L. Richards, CCC, AACE Transactions, 2005
Benefits of Expert Estimating Systems, Waymon D. Lofton; Michael D. Monteith, AACE Transactions, 2003
Neural Networks for Cost Estimation (Part 2), Bina R. Setyawati; Robert C. Creese, PE CCE; Sidharta Sahirman, AACE
Transactions, 2003
A Conceptual Cost Estimating Computer System for Building Projects, Ahmad Jrade; Sabah Alkass, AACE Transactions, 2001
Managing Project Cost Risk, Dan Patterson, AACE Transactions, 2006
Risk Management in IT Implementation: A Human Factor, Wayne S. Magro; William T. Kellow, AACE Transactions, 2004
Multi-Level Stochastic Networks and a Simulation Tool for Project Cost and Time Risk Assessments, Mohamed Moussa, P.Eng.;
Janaka Ruwanpura; George Jergeas, P.Eng., Cost Engineering Journal, 2009
Effective Use of Gantt Chart for Managing Large Scale Projects, Pankaja Pradeep Kumar, CCE, Cost Engineering Journal, 2005
4D Modeling: Adding a New Dimension to CPM Scheduling, Vidya C. Dixit, CCE PSP, AACE Transactions, 2007
The Quantification Process and Standards for BIM, Tamera L. McCuen, AACE Transactions, 2009
Constructability Assessment Using BIM/4D CAD Simulation Model, Wissam Hijazi; Sabah Alkass, P.Eng.; Tarek Zayed, AACE
Transactions, 2009

AACE Internationals Professional Practice Guide to


Construction Project Controls, Second Edition
TABLE OF CONTENTS - Page 4
19. Scheduling, Estimating, and BIM: a Profitable Combination, Tamera Lee McCuen, AACE Transactions, 2008
20. Challenges in Estimating Costs Using Building Information Modeling, William E. Kraus, PE CCE; Steve Watt; Philip D. Larson, CCE
PSP, AACE Transactions, 2007
21. Estimators Functional Role Change with BIM, John Jeffrey Hannon, AACE Transactions, 2007
Chapter 07: International Project Controls
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

Project Controls in an International Arena, Desmond G. Pellicena, AACE Transactions, 2000


Establishing Project Controls for International Projects - the Esperanto of Project Controls, Christopher F. Michalak, AACE
Transactions, 1992
Managing International Contract Administration, Niall Reynolds, AACE Transactions, 2008
Innovative Pre-Planning for International Projects, Mark T. Chen, PE CCE, AACE Transactions, 2005
The Planning and Execution of an International Project, Charles P. Woodward, PE CCE; Kenneth K. Humphreys, PE CCE, AACE
Transactions, 1998
AACE International Recommended Practices in Action: A Case Study, John J. Ciccarelli, PE CCE PSP; Michael J. Bennink, PE CCE
PSP, AACE Transactions, 2009
Achieving Cycle-Time Excellence in the Global Economy: The Impact of Speed, Katherine A. Edward, AACE Transactions, 2001
EVM for World Class Project Controls, Willem J. Viljoen, ICC, AACE Transactions, 2008
Worldwide Sources of Cost and Project Information, Allen C. Hamilton, AACE Document, 2000
Database for Elemental Cost Planning, Joe Martin, AACE Transactions, 2004
Managing Risks of Large Scale Construction Projects, Prasanta Dey, Cost Engineering Journal, 2009
Construction and Corruption in Developing Regions, Enno Koehn, PE; Ranjit K. Tandoor, AACE Transactions, 2004
The JASA (Japanese/American System Approach) of Planning and Scheduling, Roy Singh, CCE, AACE Transactions, 1997
Techniques and Tools for Project Cash Flow Prediction in the Australian Construction Industry, Timothy R. O'Leary; Selwyn Tucker,
AACE Transactions, 1996
The Marketing Process of Chinese Civil Costing, Yan Ling; Yin Yilin, AACE Transactions, 2003
Linking Project Controls Implementation Planning and Project Success: the Northern Canadian Mining Projects Lessons, Akinlolu
Isaac Oni, CCE, AACE Transactions, 2008
Managing Construction Industry Development in China, Deepak Bajaj, PE; Rui Zhang, AACE Transactions, 2003
Project Coding Conundrum As it Relates to Project Controls: a Study of EPC Project/s in Canada, Tanveer Nabi Ahmed, CCE; Peter
D. George; Schalk W. van Heerden; Janaka Y. Ruwanpura, AACE Transactions, 2008
Project Management and Total Cost Management in Italy, Gianluca di Castri, Cost Engineering Journal, 2000
Cost Management of the Three Gorges Project, Xinmin Shi; Meidi Wang, AACE Transactions, 1998
SCCS - The Next Step Ahead, Gudmund Vigerust, CCC, AACE Transactions, 1998
Lump-Sum Contract Performance - Singapore Experience, Dr. Surinder Singh, AACE Transactions, 1997

Author Index
Chronological Index
About the Editors

AACE Internationals Professional Practice Guide to


Parametric and Conceptual Estimating, Second Edition
TABLE OF CONTENTS - Page 1
Introduction to the Second Edition
Introduction to the First Edition
Chapter I: Parametric/Conceptual Estimating Overview
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

Preliminary Estimates of Process Plant Investments Can be Realistic, Gustav Enyedy, Jr., AACE Transactions, 1976
Toolmaking for Better Conceptual Estimates, C. Peter Rapier, AACE Transactions, 1977
An Introduction to Parametric Estimating, Tom E. Krieg, PE CCE, AACE Transactions, 1979
Feasibility of Feasibility Estimates, John Cran, Cost Engineering, 1980
Time Saving Devices in Estimating, Jack D. Shiles, AACE Transactions, 1981
Application of Parametric Estimating to Cost Engineering, James H. Black, CCE, AACE Transactions, 1984
Theoretical And Practical Aspects Of Conceptual Estimating, Robert D. Bakewell, Cost Engineering, 1985
Applied Estimating - Conceptual Estimates, Kweku K. Bentil, AACE Transactions, 1987
Conceptual Estimation and Budget Control, William Noble, AACE Transactions, 1987
Parametric Cost Estimating: A Design Function, Edwin B. Dean, AACE Transactions, 1989
The Dangers of Early Estimates, Charles G. Poulton, PE CCE, AACE Transactions, 1989
Conceptual Estimating Systems and Their Benefits, Rollin A. Kreps; John W. Slomba, AACE Transactions, 1990
Integrated Estimating Technique, Arun Chakravartty, PE, AACE Transactions, 1992
Contractor Risks in Conceptual Estimating, Joon Hong Paek, Cost Engineering, 1994
Estimating Engineered Equipment Costs, Kul B. Uppal, PE, AACE Transactions, 1996
Estimating? Number/Confidence/Resources or What?, Kul B. Uppal, PE, AACE Transactions, 1999
Advanced Cost Estimating and Strategic Planning, Zoran Vojinovic; Rainer Seidel; Vojislav Kecman, AACE Transactions, 2000
Easy Factored Estimating and Process Cost Engineering, Kul B. Uppal, PE, AACE Transactions, 2001
Interactive Roadmap to Conceptual Cost Estimating, Christopher L. Kinney; Nathalie Soubiran, Cost Engineering, 2004

Chapter II: Estimate Classification


1.
2.
3.

AACE International Recommended Practice No. 17R-97 Cost Estimate Classification System", AACE International, AACE
International Recommended Practices & Standards, 1997
AACE International Recommended Practice No. 18R-97 Cost Estimate Classification System - As Applied in Engineering,
Procurement, and Construction for the Process Industries", AACE International, AACE International Recommended Practices &
Standards, 1998
Conceptual Estimating Requirements & Conditions (That Impact Construction Costs & Time Frame), John Di Natale, CCE, AACE
Transactions, 1980

Chapter III: Parametric/Conceptual Estimating Methodology


1.
2.
3.
4.
5.
6.
7.

Developing Short-Cut Estimating Techniques, Stanley A. Gertz; Donald Brosnan; Walter Brower; Charles F. Chatfield; Robert F.
Dennee; Wesley Dodge; Elsie Eaves; Martin J. Gibson; Kenneth M. Guthrie; Joseph Shapiro, AACE Transactions, 1961
Factored Estimates, John Cran, AACE Transactions, 1971
Preparation and Application of Refined Lang Factor Costing Techniques, S. G. Kirkham, AACE Bulletin, 1972
Regression Analysis - Its Application and Its Acceptance, Laurnet Villenueve, AACE Transactions, 1974
Selecting From Candidate Parametric Estimating Relationships, Tom E. Krieg, CCE, AACE Transactions, 1980
The Process Step Scoring Method For Making Quick Capital Estimates, J. H. Taylor, Cost Engineering, 1980
A Discussion and Comparison of Methods Used In Developing Estimating Factors, Peter J. Ohlrichs, CCE, Cost Engineering, 1981

AACE Internationals Professional Practice Guide to


Parametric and Conceptual Estimating, Second Edition
TABLE OF CONTENTS - Page 2
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

Step Counting Methods For Preliminary Capital Cost Estimation, A. V. Bridgewater, Cost Engineering, 1981
Techniques for Capital Cost Estimating with Minimal Data, Gregory K. Cabral, CCE, Cost Engineering, 1982
The Fast Cost Estimating Models, Frank R. Freiman, AACE Transactions, 1983
Development of a Fuzzy Cost Data Bank, Ilkka Turunen; Martti Jarvelainen; Mirko Dohnal, AACE Transactions, 1984
Cost Estimating for Chemical Plants, Roland H. Rodl; Peter Prinzing; Dieter Aichert, AACE Transactions, 1985
Cost Models: Development and Use, James J. Stevenson, Jr., CCE, AACE Transactions, 1985
Parametric Cost Estimating - A Guide, John W. Hackney, CCE; Kay Hudson; Lesley Gasperow, AACE Transactions, 1987
Modular Factored Estimating: The New Wave, Walter J. Strutt, PE CCE, AACE Transactions, 1992
R&D Phase - Capital Cost Estimating, Kul B. Uppal, PE; Hans Van Gool, AACE Transactions, 1992
Computerized Databases for Reliable Cost Estimates, Keith G. Decker, AACE Transactions, 1993
Composite-Factored Estimating, Masahide Nishimura, AACE Transactions, 1995
Cost Estimating Using Historical Costs, Kymberli Popham, CCE, AACE Transactions, 1996
Estimating Costs With Fuzzy Logic, Anthony K. Mason, PE; Donald J. Kahn, Sr., AACE Transactions, 1997
Neural Networks for Cost Estimation, Jurgen Bode, Cost Engineering, 1998
Strategic Site Development and Required Utilities, Rodney L. Russell, AACE Transactions, 1999
Developing a Parametric Model for Estimating Process Control Costs, Larry R. Dysert, CCC, Cost Engineering, 2001
Parametric Estimating for Design Costs, Asheesh Bajaj; Douglas D. Gransberg; Mark D. Grenz, AACE International Transactions,
2002
25. Cost Model Performance, James D. Whiteside II, PE, AACE International Transactions, 2003
26. Costing R&D Projects: A Bottom-Up Framework, Mohammed Jahangir, CCC, Cost Engineering, 2003
27. Developing Estimating Models, James D. Whiteside, II, Cost Engineering, 2004
Chapter IV: Capacity Factoring
1.
2.
3.
4.
5.
6.
7.
8.
9.

Project Conceptual Estimating: A Systematic Approach, Burt D. Hulbert, AACE Transactions, 1980
Scaling Operating Costs by Cost-Capacity Factors, James E. Black, CCE, AACE Transactions, 1982
How to Do a Good Coal Plant Quick Estimate in Less Than an Hour (Or What to Do Until Some Engineering is Done), Tom B.
Thamm. CCE, AACE Transactions, 1983
Operating Cost-Capacity Factors Revisited, James H. Black, CCE, AACE Transactions, 1985
Chemical Plant Costs From Capacity, Kevin W. Tolson; Jude T. Sommerfeld, Cost Engineering, 1990
Cost Scaling Factors, James R. Bielefeld, Jr.; G. David Rucklos, CCE, Cost Engineering, 1992
Cost Scale-Up Factors for Airport Construction, Donald S. Remer, PE; Christopher Wong, Cost Engineering, 1996
Cost-to-Capacity Analysis for Estimating Waste-to-Energy Facility Costs, Richard K. Ellsworth, PE, Cost Engineering, 1998
Estimating Scale-Up Cost Factors for Commercial Jet Airplanes, Christopher P. Holcomb; Donald S. Remer, Cost Engineering,
2004

Chapter V: Parametric/Conceptual Estimating in the Process Industries


1.
2.
3.
4.
5.
6.
7.

Estimating Capital Costs From Process Flowsheets, W. E. Hand, AACE Transactions, 1958
Order-of-magnitude Capital Cost Estimate Of A Distillation Unit, W. E. Hand, AACE Transactions, 1963
Order-of-Magnitude Capital Cost of a Distillation Unit, W.E. Hand, AACE Bulletin, 1964
Module Estimating Technique As An Aid In Developing Plant Capital Cost, Leslie J. Hellenack; Douglas R. Carnegie; Victor Bych, Jr.;
E.J. Johnson; Wesley J. Dodge; Edmund F. O'Connell, AACE Bulletin, 1964
An Approach To Process Equipment Estimation, Francis P. O'Connell, AACE Transactions, 1965
Factor Estimating Refined For Appropriation of Funds, C. A. Miller, AACE Bulletin, 1965
Computer Simulation of Definitive Estimates, Herbert G. Blecker, AACE Transactions, 1973

AACE Internationals Professional Practice Guide to


Parametric and Conceptual Estimating, Second Edition
TABLE OF CONTENTS - Page 3
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.

Estimating Machinery and Equipment Erection Costs, Lawrence J. Bloch, AACE Transactions, 1973
Preliminary Estimation of Costs for Air and Water Pollution Control, D. L. Brandt; A. N. Mann, AACE Transactions, 1973
The Functional Unit Approach to Rapid Cost Estimation, A. V. Bridgwater, AACE Bulletin, 1976
Sectionalized Cost Estimating for the Solids Processing Industries, J. C. Agarwal, CCE; I. V. Klumpar,CCE, AACE Transactions,
1978
Parametric Estimating Applied to Power Plant, Laxmidas V. Popat, CCE, AACE Transactions, 1980
Analysis of Published Data for Parametric Estimating of Boiler Plants - Part II, Laxmidas V. Popat, CCE, AACE Transactions, 1981
How To Make Rapid Electrical Estimates For Large Industrial Plants, Kalliana R. Krishnan, Cost Engineering, 1983
Instrumentation Cost Estimating by Loops, Don P. Kidwell, AACE Transactions, 1983
Rapid Capital Estimation Based on Process Modules, Ivan V. Klumpar, CCE; Richard F. Brown; Jorg W. Fromme, AACE
Transactions, 1983
Budgeting By Criteria Not Cost Per Square Foot, Donald E. Parker, CCE, AACE Transactions, 1984
Conceptual Estimating: Motor Wiring and Control, Kalliana R. Krishnan, Cost Engineering, 1984
Electronic Spreadsheets in Feasibility Studies, M. S. A. Vrijland; K. R. Westerterp, AACE Transactions, 1984
Estimating Engineering Costs for the Appropriation of Funds Without Drawing Counts, C. Arthur Miller, CCE, AACE Transactions,
1984
Preliminary Cost Estimating For The Nuclear Industry, Ivan V. Klumpar, CCE; Kenneth M. Soltz, Cost Engineering, 1985
Conceptual Estimating, John J. Suarez, AACE Transactions, 1986
Estimating Factors for Process Plants, John R. Heizelman, AACE Transactions, 1988
Capital Cost of Pulp and Paper Capacity, Michael F. Davy, AACE Transactions, 1989
Upgrading Capital Estimation Factors and Correlations, Ivan V. Klumpar, CCE, AACE Transactions, 1990
Cost Estimating Electrical High-voltage Distribution Systems in Industrial Facilities, Kiran Jani, PE, AACE Transactions, 1992
Cost Estimating Techniques for Pilot Plants, Stan Yoslov, AACE Transactions, 1992
Estimating from Process Flow Diagrams: A Conceptual Approach, Alex W. Krokowski, AACE Transactions, 1992
A Different Approach to Factored Cost Estimating, Kul B. Uppal, PE, AACE Transactions, 1993
Factored Estimating Guidelines - Refinery/Petrochemical Projects, Robert S. Smith, PE, AACE Transactions, 1996
Extreme Order-of-Magnitude Estimating, Thomas E. Simpson, CCE, AACE Transactions, 2000
Reappraisal of Module Factors, Yoshimi Saito, AACE International Transactions, 2000
Easy Factored Estimating and Process Cost Engineering, Kul B. Uppal, PE, Cost Engineering, 2003
Sharpen Your Cost Estimating Skills, Larry Dysert, CCC, Cost Engineering, 2003

Chapter VI: Parametric/Conceptual Estimating in the Non-Process Industries


1.
2.
3.
4.
5.
6.

Early Estimating and a Systems Approach in the Construction Management Process, Oliver D. Filley, AACE Transactions, 1975
Parametric Estimating of Buildings, Norman A. Koenigseker, Cost Engineering, 1982
Predesign Estimate of Elevator Cost in Multistory Buildings, Saeed Karshenas; Zafar S. Yousuf, AACE Transactions, 1985
Preliminary Cost Estimating for Highway Construction Projects, Lansford C. Bell; Ghazanfer A. Bozai, AACE Transactions, 1987
Preliminary Estimating for Heavy Construction, Steve R. Sanders; Robert R. Maxwell, AACE Transactions, 1992
Preliminary Estimating Models For Infrastructure Projects, Steve R. Sanders; Robert R. Maxwell; Charles R. Glagola, Cost
Engineering, 1992
7. Square Foot Type Estimating for Construction, Steven F. Roney, CCC, AACE Transactions, 1992
8. Conceptual and Early Design Estimating Techniques for Building, Heating, Ventilation, and Air Conditioning Systems, Frederick M.
Reynolds, CCE, Cost Engineering, 1993
9. Parametric Cost Estimating of Building Construction - US, Canada, and Mexico, Luis C. Hinojosa, CCE; Ramon Vazquez Del
Mercado, AACE Transactions, 1993
10. Square Foot Range Estimating, John R. Knoke, PE; Liang Y. Liu; John R. Spittler, AACE Transactions, 1993

AACE Internationals Professional Practice Guide to


Parametric and Conceptual Estimating, Second Edition
TABLE OF CONTENTS - Page 4
11. A Parametric Building Cost Estimating System, John K. Hollmann, PE, AACE Transactions, 1994
12. Developing a Project Scope/Conceptual Estimate Questionnaire, Frank B. Mitchell, Jr., AACE Transactions, 1995
13. Computer Assistance in Conceptual Estimating for Buildings, Christopher Nelson; Doug Powell, PE; Mark O. Federle, PE CCE,
AACE Transactions, 1998
14. Neural Networks for Cost Estimating of Structural Steel Buildings, Osama Moselhi, PE; Ines Siqueira, AACE Transactions, 1998
15. Parametric Estimates Made Easy, James J. Davis, PE, AACE Transactions, 1998
16. A Conceptual Cost Estimating Model for Water Reservoirs, Mohammed Al Khalil; Sadi Assaf; Walild Abdul Rahman; Mashoor Asfoor,
Cost Engineering, 1999
17. A Cost Model for the Pultrusion Process, Robert C. Creese, PE CCE; Taher B. Patrawala, AACE Transactions, 1999
18. Preliminary Cost Estimation of Highway Construction Using Neural Networks, Hashem Al-Tabtabai; Alex P. Alex; Maha Tantash,
Cost Engineering, 1999
19. The Empirical Method of Budget Pricing for Prisons, Iftikhar Kamil Madni, CCE, Cost Engineering, 1999
20. An Integrated System for Conceptual Cost Estimating of Building Projects, Ahmad Jrade; Sabah Alkass, Cost Engineering, 2002
21. Conceptual Estimating, Philip D. Larson, AACE International Transactions, 2002
22. Using Models in Parametric Estimating for Transportation Projects, Robert H. Harbuck, AACE International Transactions, 2002
23. Development and Maintenance of a Parametric Building Cost Estimating System, Joseph George Masi, CCC, Cost Engineering,
2003
24. Metrics Improve Software Cost Estimating, Ralph Porter; Joseph Lees, Cost Engineering, 2003
25. Parametric Cost Estimating Model for Buildings, Kan Phaobunjong; Calin M. Popescu, PE, AACE International Transactions, 2003
Chapter VII: Parametric/Conceptual Estimating Systems
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

"Flame" Factored Labor and Material Estimates, Lawrence J. Bloch, AACE Transactions, 1975
Estimating Building Construction Costs - A Better Approach Through Models, Marshall S. Zewe, AACE Transactions, 1978
Design of a Viable System for Process Plant Estimating, John W. Hackney, CCE, AACE Transactions, 1980
Automated Estimating Systems: Army/ Navy/Air Force, John E. Williams, AACE Transactions, 1985
Cost Estimation as a Complexity Modeling Problem, Celestine A. Ntuen; Arup K. Mallik, PE, AACE Transactions, 1987
Capital Plant Factorial Estimating System (FACTEST), Mike G. Leese, AACE Transactions, 1988
Parametric Software Cost Estimation with an Adaptable Model, Robert E. Park, AACE Transactions, 1988
Case History - Parametric Estimating System, Tom G. Mendel, AACE Transactions, 1989
Development of Conceptual Estimating Support Systems at Kodak, John K. Hollmann; Larry Dysert, AACE Transactions, 1989
FACET - Oil and Gas Production Facilities Cost Estimating and Control Techniques, C. W. (Cled) Cole; I. J. (Steve) Banszky, AACE
Transactions, 1989
Parametric Estimating - In Search of Expert Systems, Rino Gosselin; Leslie E. McMullan, AACE Transactions, 1989
IEST: An Interactive System for Estimating, Charles J. Golde; Michael A. Hauser, AACE Transactions, 1990
Statistical Conceptual Estimating System (SCES), A. James Poe, CCC, AACE Transactions, 1995
The Evolution of Estimating Systems at Kodak, John K. Hollmann, PE CCE; Larry R. Dysert, CCC, AACE Transactions, 1996
Facility Parametric Cost Estimating, Edward R. Meyer, PE; Thomas J. Burns, PE, AACE Transactions, 1999
Parametric Cost Estimating for Environmental Remediation Projects, Jacqueline Rast, PE; Kate M. Peterson, PE, AACE
Transactions, 1999
Benefits of Expert Estimating Systems, Waymon D. Lofton; Michael D. Monteith, AACE International Transactions, 2003
Government Estimating Tools, Joseph A. Brown, CCE; Gene Hajdaj, PE, AACE International Transactions, 2003
Experiences with Front-End Integrated Estimating Tools, Albert van der Werf, CCE, AACE International Transactions, 2004

AACE Internationals Professional Practice Guide to


Parametric and Conceptual Estimating, Second Edition
TABLE OF CONTENTS - Page 5
Author Index
Chronological Index
About the Editors

AACE Internationals Professional Practice Guide to


Portfolio and Program Management, Second Edition
TABLE OF CONTENTS - Page 1
Introduction to the Second Edition
Introduction to the First Edition
Chapter I: Enterprise Management: General Imperatives and Concerns
1. International Aspects Of Business, Lawrence J. Tidrick, AACE Transactions, 1968
2. The Owner as a Project Manager, B. Fletcher; D. Haeney, AACE Transactions, 1974
3. Organization Planning - Concepts & Implications, S.L.G. Jain, AACE Transactions, 1981
4. A Winning Business Planning Process, Robert J. Kyle; Alfred Z. Matos, AACE Transactions, 1991
5. Visioning and Strategic Planning - The Measure of Departmental Self-Esteem, Paul E. Martin, Cost Engineering Journal, 1992
6. The Global Economy, David E. Bond, Cost Engineering Journal, 1996
7. Can Government Contracting Be Reengineered?, Larry G. Medley Sr., CCC, AACE Transactions, 1997
8. The Role of Risk Series: Understanding Risk, Michael W. Curran, Cost Engineering Journal, 1999
9. Total Cost Management in the Internet Age, Paul Doherty, AACE Transactions, 1998
10. The Leadership Factor: Leading the Way Toward the Next Millennium, Deborah S. Kezsbom, AACE Transactions, 1998
11. Principles of Business Process Reengineering, TQM, and the Learning Organization, Victor S. Sohmen, CCC, AACE
Transactions, 1998
12. Business Process Reengineering on Materials Management, Prasanta K. Dey; Devinder K. Banwet, AACE Transactions, 1999
13. Leadership, Teamwork, and Empowerment: Management Toward 2000, Carlos G. Taborda M., PE, AACE Transactions, 1999
14. Relationship Marketing in the Construction Industry, Peter R. Davis, AACE Transactions, 1999
15. Creating Teamwork in Virtual Teams, Deborah S. Kezsbom, Cost Engineering Journal, 2000
16. Assessing Human Performance in a Dynamic Business Environment, Rodney B. Adams, CCE, Cost Engineering Journal,
2000
17. Leadership, Teamwork, and Empowerment: Future Management Trends, Carlos G. Taborda M., PE, Cost Engineering
Journal, 2000
18. Beyond "Survival": Strategies for Creating Innovative Teams, Deborah S. Kezsbom, AACE Transactions, 2001
19. Unleash Your Leadership Potential, Christine Harvey, Cost Engineering Journal, 2001
20. Electronic Project Documentation: Legal and Practical Problems, James G. Zack Jr., AACE Transactions, 2002
21. A Business Managers Role in Improving Capital Stewardship, Nick J. Lavingia, AACE Transactions, 2002
22. Leadership--The Invisible Cost Category, Lee R. Lambert, AACE Transactions, 2002
23. Knowledge Management Improves Performance, David Thomas; Tara Keithley, AACE Transactions, 2002
24. Grooming Project Managers for Company Leadership, Randy R. Rapp, PE CCE, Cost Engineering Journal, 2004
25. Surviving the Perfect Storm, Valerie Behrendt, Cost Engineering Journal, 2005
26. Understanding Risk, Michael W. Curran, AACE Document, 1998
27. How to Avoid the Ten Biggest Marketing Mistakes Businesses Make, Peter Koeppel, Cost Engineering Journal, 2005
28. Ten Steps to Deploying Self-Directed Teams, Joe Phelps, Cost Engineering Journal, 2005
29. The Human Factor I: Attracting, Retaining, and Motivating Capable People, Minnesh Kaliprasad, CCE, Cost Engineering
Journal, 2006
30. The Human Factor II: Creating a High Performance Culture in an Organization, Minnesh Kaliprasad, CCE, Cost Engineering
Journal, 2006
31. Sarbanes-Oxley and Cost Engineering, W. Doug Creech, CCC, Cost Engineering Journal, 2006
Chapter II: Asset Requirements Elicitation and Analysis
1. Analytic Techniques In Corporate Planning, A. R. Eagle, AACE Transactions, 1966
2. The Commercial Intelligence Center, William Levitz, AACE Transactions, 1969
3. The Delphi Process: A Tool For Business Forecasting, Lawrence S. Hill, AACE Transactions, 1970

AACE Internationals Professional Practice Guide to


Portfolio and Program Management, Second Edition
TABLE OF CONTENTS - Page 2
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

Marketing - Research And Development, Leon J. Fiegel, AACE Transactions, 1972


Expert Systems for Financial Planning, Peter S. Brandon, AACE Transactions, 1988
Executive Reporting System, Jeffrey C. Christiansen, AACE Transactions, 1997
What Is a Competitive Advantage in the Construction Industry?, Alfred B. Ngowi; Pantaleo D. Rwelamila, Cost Engineering
Journal, 1999
Are Contractors, Engineers, and Architects Ready for a Crisis?, Janine Reid, Cost Engineering Journal, 1999
The Role of Environmental Economics in the Cost Management of Projects, Dr. Craig Langston; Caroline Mackley, AACE
Transactions, 1998
Competing With Environment-Friendly Construction Practices, Dr. Alfred B. Ngowi, AACE Transactions, 1999
Assessing Human Performance in Our Dynamic Business Environment, Rodney B. Adams, CCE, AACE Transactions, 1999
From Business Opportunity to Cost Target, Herman C. Poortinga, CCE, AACE Transactions, 1999
Organization and Benefits of Systematic Project Experience Data Transfer, Robert Laan, AACE Transactions, 2000
Data Center Outsourcing and the Bottom Line, Gregg D. Michael, Cost Engineering Journal, 2002
Projects, Operations, and Capabilities in Evaluation of a Strategic Plan, Corrado Gatti; Gianluca Vagnani, AACE Transactions,
2002
Resolving the Process Paradox -- A Strategy for Launching Meaningful Business Process Improvement, Cherian Varghese,
CCE, Cost Engineering Journal, 2004
Reliability and Efficiency in a Changing Market, Larry Romine; Amy Cooper, Cost Engineering Journal, 2005
Human Resource Replacement Cost: Measures and Usefulness, Tang Tang, Cost Engineering Journal, 2005
Better Service for Taxpayers through Public Private Partnerships, Simon Taylor, Cost Engineering Journal, 2007

Chapter III: Asset Planning and Investment Decision-Making


1. An Outline For Venture Analysis, James S. Murphy, AACE Transactions, 1967
2. Tax Policy And Business Investment, Melvin I. White, AACE Transactions, 1967
3. Essential Planning In Investment Analysis, John R. Hays, AACE Transactions, 1968
4. Technical Planning For Research And Development, Julian A. Piekarski, AACE Transactions, 1972
5. Construction Management, R. A. Porter, AACE Transactions, 1974
6. Capital Budgeting for Construction Vehicles, Julian A. Piekarski; James G. Bachman, AACE Transactions, 1976
7. Capital Estimates and Cost Control for a Long Term Construction Program, A. S. Jarvis, AACE Transactions, 1976
8. Cost Control in Building Design - Determining the Right Strategy, Peter Brandon, AACE Transactions, 1976
9. Capital Budgeting Techniques, Douglas J. Warne, AACE Transactions, 1978
10. Improving Capital Productivity, Jerry L. Hamlin, PE, CCE, AACE Transactions, 1979
11. Practical Capital Budgeting, Charles Poulton, P.Eng. CCE, AACE Transactions, 1985
12. Capital Budgeting - An Owner Company's Method, Charles Poulton, P.Eng. CCE; S. F. Prest, AACE Transactions, 1986
13. Optimize Equipment Replacement Costs, Akhilesh Kumar, AACE Transactions, 1988
14. The Dangers of Early Estimates, Charles G. Poulton, PE CCE, AACE Transactions, 1989
15. Cost-Effective Capital Budgeting for Environmental Projects, Richard A. Selg, CCE, AACE Transactions, 1994
16. Constructability, "The Stretch Version", Robert J. Geile, PE, AACE Transactions, 1996
17. Risk and Capital Budgeting, Reza Amirkhalili, AACE Transactions, 1997
18. An Evolutionary Approach to the Capital Budgeting of Construction Projects, Hashem Al-Tabtabai; Alex P. Alex, Cost
Engineering Journal, 1998
19. Revitalizing Cost Engineering With Systems Thinking, Nicolaas Duursema, CCE, AACE Transactions, 1999
20. Cost Engineering Taking on Capital Management, Bernard A. Pietlock, AACE Transactions, 2000
21. Key Partnering Success Factors, Jennifer L. Krahn; George F. Jergeas; Sami Fahmy, AACE Transactions, 2001
22. Builders Warned Terrorist Attacks Will Change 21st Century Facility Construction and Ownership Costs, Michael Dell'Isola,
Cost Engineering Journal, 2002

AACE Internationals Professional Practice Guide to


Portfolio and Program Management, Second Edition
TABLE OF CONTENTS - Page 3
23.
24.
25.
26.
27.

A Business Plan is a Must, Elaine Biech, Cost Engineering Journal, 2002


Notes From Your Technical Board: Easy (?) Decision-Making, Randy R. Rapp, PE CCE, Cost Engineering Journal, 2002
Company Profitability through Direct Costing, Andrew P.F. Bourget, AACE Transactions, 2003
Planning/Control of Professional Staff Resources, Harry W. Jarnagan, PE CCE, AACE Transactions, 2004
A Best Practice Methodology for Conducting SAP Team Alignments on Capital Projects, Suzanne L. Gaut, CCE, Cost
Engineering Journal, 2004
28. Lead With Clarity: How to Make Effective Decisions, Luda Kopeikina, Cost Engineering Journal, 2006
Chapter IV: Asset Performance Assessment and Change Management
1. BenchMARk For Profitability, Fred R. Douglas; Richard A. Bellin; B. J. Blewitt; W. H. Kapfer; F. V. Marsik; Arthur P. Narins; L.
W. Pullen, AACE Transactions, 1968
2. A Venture Analysis Of An Existing Business, Arthur L. Squyres, AACE Transactions, 1969
3. Application Of Risk Analysis To Evaluation Of Research Projects, Warner J. G. Cudmore; J. B. Corns, AACE Transactions,
1972
4. The Effect Of Working Capital Requirements On Return On Investment, Leon J. Fiegel, AACE Transactions, 1972
5. The Role of the Evaluation Group in the Corporate Structure, Julian A. Piekarski, AACE Transactions, 1974
6. Profitability - An Evasive Concept, F.C. Jelen, AACE Transactions, 1975
7. Accounting for Cost of Quality, Charles A. Raz, CCE, AACE Transactions, 1985
8. Capital Project Monitoring System (CPMS), Gamini A.K. Padmaperuma,CCE, AACE Transactions, 1993
9. Advanced Managerial Costing in Industry, Julian A. Piekarski, PE, CCE, AACE Transactions, 1994
10. Quantifying Benefits Attributable to Electronic Technologies, W. Edward Back; Lansford C. Bell, PE, AACE Transactions, 1994
11. Concurrent Management of Total Cost and Total Quality, Bryan R. McConachy, P.Eng., AACE Transactions, 1996
12. The Challenge of Change, Sarwar A. Samad, Cost Engineering Journal, 1996
13. Why Is Traditional Accounting Failing Managers?, Gary Cokins, AACE Transactions, 1998
14. ABC ManagementWhere Does It Fit In?, Michael C. Ray, PE CCE, AACE Transactions, 1998
15. Balanced Scorecard Performance Measurement for Cost Engineering, Nicolaas Duursema, CCE, AACE Transactions, 1999
16. Project History Retrieval and History, Douglas W. Leo, AACE Transactions, 1999
17. Measuring Performance When Customer Service Is Not Enough, Haydee Hernandez de Trujillo; Carlos G. Taborda M., PE,
AACE Transactions, 1999
18. Measuring Partnered Project Performance, Douglas D. Gransberg; Howard L. Reynolds; Jack Boyd, Cost Engineering
Journal, 1999
19. The Transformation of Change, Scott C. Bartsch, AACE Transactions, 2000
20. Measuring Costs Across the Supply Chain, Gary Cokins, AACE Transactions, 2000
21. Integrate Analysis: A New Company Evaluation Method, Nicolae Postavaru, AACE Transactions, 2000
22. Appraisal of High-Tech Industrial Assets, Giancarlo Guenzi, PE CCE; Giovanni Cannistra, PE CCE, AACE Transactions, 2002
23. Budget Busts: The Influence of Demand in the Construction Market, Jonathan Moss, CCC, Cost Engineering Journal, 2003
24. Using Independent Assessments to Improve Company Performance, Andrew S. Dowd Jr., AACE Transactions, 2003
25. Performance Management: Making It Work, Gary Cokins, AACE Transactions, 2006
Chapter V: Program Management
1. Cases Impairing C/SCSC Application in Program Management, Nghi M. Nguyen, PE, AACE Transactions, 1989
2. Program Management as a Team Effort, Timothy M. Culligan; Crosby Mecham, PE, AACE Transactions, 1993
3. A "New" Program Management Information System, Jeffrey C. Christiansen; Michael S. Mellick, AACE Transactions, 1993
4. Program Scheduling: Not Exactly = Project Scheduling, Courtney James McCracken, PE; Patricia J. Auger; John H. Baratta,
PE, AACE Transactions, 1995
5. Multi-Project Costing and Reporting Techniques, Erin Bognar; Chris Schoenbauer, AACE Transactions, 1999

AACE Internationals Professional Practice Guide to


Portfolio and Program Management, Second Edition
TABLE OF CONTENTS - Page 4
6.
7.

Managing Changes in Large Programs, Ashish Kumar, AACE Transactions, 2000


Challenges of Managing Multiple Small Reconstruction Projects, Mohamed Attalla; Tarek Hegazy; Sheila Penny, AACE
Transactions, 2000
8. Developing Program Controls for a Large Program, Shawn L. Kildare; George P. Blank, AACE Transactions, 2001
9. Staffing Problems on Large Construction Projects, Frank F. Moynihan, CCC, AACE Transactions, 2004
10. Portfolio Approach to Program Management, Robert B. Connors, PE CCE, AACE Transactions, 2004
Author Index
Chronological Index
About the Editor

AACE Internationals Professional Practice Guide to


Life-Cycle Cost Analysis
TABLE OF CONTENTS - Page 1
Introduction
Chapter I: Life-Cycle Cost Theory
Disciplined Transition from Projects to Operations, William Kellow; John O'Keefe Jr.; Greg Swanberg, AACE
Transactions, 2005
Prepare a Stress-Free Project Final Report, Mark T. Chen, PE CCE, AACE Transactions, 2004
Construction Trends and the Cost Engineer, Talal Abi-Karam, PE CCE, AACE Transactions, 2004
The Total Cost Management (TCM) Framework, John K. Hollmann; Wesley R. Querns, Cost Engineering Journal,
2001
Value Management Assistance in Design-Build, Stephen J. Kirk, AACE Document, 1999
Value Engineering and Total Cost Management, Farid Fam Mansour, PE, CCE, AACE Transactions, 1994
Basic Engineering Economics, Julian A. Piekarski, CCE, AACE Transactions, 1987
Chapter II: Life-Cycle Cost Calculation Methods
Feasibility Studies: A Case For Using A Stochastic Approach, Sabah Alkass, P.Eng.; Saad Al-Jibouri; Vipha
Techakosol, AACE Transactions, 2006
Estimating Cost Growth From Schedule Changes: A Regression, John V. Bielecki; Edward D. White, Cost Engineering
Journal, 2005
Best Practices in Cost Engineering, Nick J. Lavingia, PE, AACE Transactions, 2004
Characterizing Project Performance with Quantified Indices, Parviz F. Rad, PE CCE; Ginger Levin, AACE
Transactions, 2004
Preliminary Economic Decisions - A Simplified Approach, Gustavo A. Perez, Cost Engineering Journal, 2003
The Future Net Present Value of Investment Alternatives, Maarten S.A. Vrijland, AACE Transactions, 2000
Life Cycle Project Management, Dr. Douglas D. Gransberg, PE; Michael A. Ellicott, PE, AACE Transactions, 1997
TCM: Managing Cost Before It Occurs, Larry G. Medley, Sr., CCC, AACE Transactions, 1994
Simulation Analysis In Project Life Cycle Cost, He Zhi, Cost Engineering Journal, 1993
A Comprehensive Capital Investment Evaluation System, Alan J. Stevens, AACE Transactions, 1993
Life Cycle Costing: A Practice Tool?, Allan Ashworth, Cost Engineering Journal, 1989
Techniques of Life Cycle Costing, J. W. Griffith; B. J. Keely, Cost Engineering Journal, 1978
Using Economic Analysis to Achieve Cost, Rosalie T. Ruegg, AACE Transactions, 1977
Chapter III Determining Discount Rate

Acceptable Project Investment Criteria, Tamuno Olumide Olu-Tima, AACE Transactions, 2003
Risk and Capital Budgeting, Reza Amirkhalili, AACE Transactions, 1997
Inflation Adjustments on Construction Projects, Jose Elias Campos Castillo, PE, AACE Transactions, 1995
Selection of Discount Rates for Project Evaluation: Principles and Pitfalls, A. Lawrence Kolbe, AACE Transactions,
1983

AACE Internationals Professional Practice Guide to


Life-Cycle Cost Analysis
TABLE OF CONTENTS - Page 2
The Use of Commodity Futures in Estimating Long Range Construction Projects, Benjamin E. Lazar, AACE
Transactions, 1977
Chapter IV: Estimating Capital Cost of Design and Construction
Lowering Pipeline Costs Through Applied Technology, Andy Jenkins, P.Eng.; Tom Babuk, P.Eng.; Mo Mohitpour, PE,
AACE Transactions, 2005
Project Estimate Reviews, Douglas W. Leo, CCC; Scott W. Knotowicz, CCC, AACE Transactions, 2005
A Fast Track Value Analysis Methodology for Major Design-Build Construction Projects, William F. Brouillard Jr., CCC,
Cost Engineering Journal, 2003
The Effect of Innovative Highway Construction Contract Methods, Douglas D. Gransberg; Daniel F. Runde; James
Stergios, AACE Transactions, 2000
A Different Approach to Factored Cost Estimating, Kul B. Uppal, PE, AACE Transactions, 1993
Planning a Capital Project, DeWitt Patterson; James R. Uz, AACE Transactions, 1990
Cost Management Models for Design Application, Garvin T. Dreger, AACE Transactions, 1988
Estimating Capital Cost Dynamics of New Technologies, Giorgio Gottardi; Luis Copolla, AACE Transactions, 1988
Application of Parametric Estimating to Cost Engineering, James H. Black, CCE, AACE Transactions, 1984
Chapter V: Estimating Operations Costs
Controlling Non-Construction Costs, Peter R. Bredehoeft, Jr., AACE Transactions, 2005
Experiences with Front-End Integrated Estimating Tools, Albert van der Werf, CCE, AACE Transactions, 2004
Estimation of a Double S-Curve Model, Kun-Jung Hsu, AACE Transactions, 2003
Selecting Optimum Mechanical Systems for Office Buildings, John E. Schaufelberger; Raymond H. Jacobson, Cost
Engineering Journal, 2000
Airport Maintenance Costs, Leopoldo Varela, CCE, AACE Transactions, 1992
Economic Building Performance Modes (EBPM), Stephen J. Kirk, AACE Transactions, 1977

Chapter VI: Estimating Salvage/Residual Value


Replacement of Obsolete Equipment, R. A. Harris; Dr. D. J. Leech; Dr. R. G. Williams, AACE Transactions, 1992
Optimize Equipment Replacement Costs, Akhilesh Kumar, AACE Transactions, 1988
Project Material & Equipment Control (Conception to In-Service), W. C. Legrow; Mark Pakan, AACE Transactions,
1983
Investment and Depreciation Analysis, Jagdish C. Agarwal; Dolph G. Ebeling, AACE Transactions, 1973
Chapter VII: Estimating Sustainability
Budgeting Green: A Comprehensive Methodology, Peter Morris; Lisa Fay Matthiessen, AACE Transactions, 2005
Going the Distance: The Impact of Sustainability on Programming and Budgeting, Wade L. Martin, Cost Engineering
Journal, 2005

AACE Internationals Professional Practice Guide to


Life-Cycle Cost Analysis
TABLE OF CONTENTS - Page 3
Quantifying the Benefits of Sustainable Buildings, Benson Kwong, PE CCE, AACE Transactions, 2004
A Budget Estimating Method of Environmental Cost for Multiple Housing Projects, Chansik Park; Sungho Hong;
Changwan Kim; Jaeho Lee, AACE Transactions, 2003
Competing With Environment-Friendly Construction Practices, Alfred B. Ngowi, Cost Engineering Journal, 2000
The Role of Environmental Economics in the Cost Management of Projects, Dr. Craig Langston; Caroline Mackley,
AACE Transactions, 1998
Estimating National Costs Associated with Public Law 92-500 (the Federal Water Pollution Control Act Amendments of
1972), Michael D. Giggey; Stanley D. Elkerton, AACE Transactions, 1976
Chapter VIII: Life-Cycle Cost Risk Analysis
Construction Trends and the Cost Engineer, Talal Abi-Karam, PE CCE, Cost Engineering Journal, 2006
Project Risk Identification and Management, Mark W. Cohen, PE; Glen R. Palmer, AACE Transactions, 2004
Quantifying Pavement Life Cycle Cost Inflation Uncertainty, Douglas D. Gransberg, PE CCE; James Diekmann, AACE
Transactions, 2004
The Real Cost of Mitigating Delays, John J. Ciccarelli, PE CCE, AACE Transactions, 2004
Project Management Oversight: An Effective Risk Management Tool for EPC/Design-Build Contracts, George E. Baram,
P.Eng. CCE, AACE Transactions, 2003
Project Risk Management: A Combined Analytic Hierarchy Process and Decision Tree Approach, Prasanta Kumar Dey,
Cost Engineering Journal, 2002
Project Capital Cost Risks and Contracting Strategies, Keith Pedwell, P.Eng.; Dr. Francis T. Hartman, P.Eng.; Dr.
George F. Jergeas, P.Eng, Cost Engineering Journal, 1998
Linking Contractor Payments to Contractor Performance, Quentin W. Fleming; Joel M. Koppelman, AACE
Transactions, 1995
Chapter IX: Life-Cycle Cost Case Studies
Fuel Cell Town: A Feasibility Study, Iftikhar Kamil Madni, CCE, AACE Transactions, 2006
Life Cycle Costs and Economic Feasibility of the Atmospheric Fluidized Bed Combustion Power Plants, Richard
Holstein, AACE Transactions, 1984
The Economics of Geothermal Power, Laxmidas F. ("LV") Popat, CCE, AACE Transactions, 1982
Life Cycle Analysis for Power Industry, Dr. Yue-Chau Wong, AACE Transactions, 1979
Life Cycle Costing In Manufacturing Industries, M. Kent Anderson, AACE Transactions, 1978
Chapter X: Life-Cycle Cost Analysis in the International Context
Project Planning and Scheduling and its Impact to Project Outcome: A Study of EPC Projects in Canada, Janaka Y.
Ruwanpura; Tanveer Nabi Ahmed; Karim Kaba; Gerald Patrick Mulvany, AACE Transactions, 2006
A Study of Advanced Project Control System for Korean Nuclear Power Plant Construction Project, Myung Youl Yoon;
Jae Hee Han, AACE Transactions, 2006
Managing Risk for Global Energy Projects, Nick J. Lavingia, PE, AACE Transactions, 2005

AACE Internationals Professional Practice Guide to


Life-Cycle Cost Analysis
TABLE OF CONTENTS - Page 4
Assessment of the Problems of Application of Life Cycle Costing in Construction Projects, Sadi A. Assaf; Abdulmohsen
Al-Hammad; Osama A. Jannadi; Sami Abu Saad, Cost Engineering Journal, 2002
Risk Management in Construction: An Approach for Contractors in South Korea, Soon Kim; Deepak Bajaj, Cost
Engineering Journal, 2000
Environmental Investment Blueprint in Southern Africa, Thomas Richard Muller, Cost Engineering Journal, 1997
A Look at Planning & Scheduling in the Middle East, Dr. Khaled A. Bu-Bushait; Ignacio Manzanera, CCE, AACE
Transactions, 1989
Life Cycle Costs in the West German Construction Industry, Klaus L. Wuebbenhorst, AACE Transactions, 1984
Author Index
Chronological Index
About the Editors

Cost Engineering in the Global Environment, Second Edition


TABLE OF CONTENTS - Page 1
Introduction
Chapter 01: General Topics on International Projects
1. Labor Cost Calculations in International Construction, Dr. Enno Koehn, PE; D. C. Regmi, AACE Transactions, 1991
2. Professional Development Certificate - A Step Toward the European Engineer, Ruth Haug, AACE Transactions, 1992
3. Establishing Project Controls for International Projects - the Esperanto of Project Controls, Christopher F. Michalak, AACE Transactions, 1992
4. Project Management for Eastern Europe, Gunter Rattay, AACE Transactions, 1992
5. Japanese Cost Management Methodology for CIM Implementation, Kurazo Yokoyama, AACE Transactions, 1993
6. Ten Commandments of International Cost Engineering, John E. Barry, AACE Transactions, 1993
7. International Project Cost Model, D Parkinson, Cost Engineering Journal, 1993
8. Building Grain Storage Facilities In China-International Contract Negotiation, MA Nixon, Cost Engineering Journal, 1994
9. Meeting a Worldwide Need - Location Cost Factors, John E. Barry, AACE Transactions, 1994
10. The Role and Operations of Multinational Organizations, Sarwar A. Samad, AACE Transactions, 1994
11. Managing Technology Transfer in Construction Joint Ventures, Govindan Sridharan, CCE, AACE Transactions, 1994
12. Transaction Exposure Management in International Construction, Hans Fritsche, AACE Transactions, 1994
13. Project Controls and ISO 9000, Desmond G. Pellicena; Geoff J. Hill, AACE Transactions, 1994
14. Construction Production Factors in International Areas, Dr. Enno Koehn; Chih-Shing Pan; Jen-Yuan Liu; Rana P. Pingili; Sirichai Tanratanawong,
AACE Transactions, 1995
15. International Cost and Resource Database, Peter Christensen, AACE Transactions, 1995
16. Construction Claims Practice: USA versus Brazil, Joao Otavio Goulart Brizola, AACE Transactions, 1994
17. Project Ownership in the Third World, Ram Dabadghav, PE CCE, AACE Transactions, 1996
18. Environmental Investment Blueprint in Southern Africa, Thomas Richard Muller, AACE Transactions, 1996
19. International Standards: The US Construction Industry's Competitiveness, Dr. Janet K. Yates; Dr. Stylianos C. Aniftos, PE, Cost Engineering Journal,
1996
20. The Investment Process for International Construction projects, Dr. V. L. Khazanet, Cost Engineering Journal, 1996
21. The Global Economy, David E. Bond, Cost Engineering Journal, 1996
22. Finding Building Product and Construction Cost Data Internationally, Hugh T. Sharp, Cost Engineering Journal, 1997
23. Understanding Interaction in International Projects, Kim Wikstrm; Stefan Storholm, Cost Engineering Journal, 1997
24. Using a Coding System to Improve Benchmarking, Finn H. Sandberg, AACE Transactions, 1997
25. Malaysia - A Country Looking Ahead with Vision 2020, Stephen P. Warhoe, PE CCE, Cost Engineering Journal, 1997
26. International Cost Data, 0, Cost Engineering Journal, 1998
27. Production Rates for International Projects in Asia, Dr. Enno Koehn, PE; Moin U. Ahmed, AACE Transactions, 1998
28. International or Cross-Cultural Projects, Irving M. Fogel, PE, AACE Transactions, 1998
29. The Planning and Execution of an International Project, Charles P. Woodward, PE CCE; Kenneth K. Humphreys, PE CCE, AACE Transactions, 1998
30. The International Cost Engineering Council: A Worldwide Source of Cost and Project Information, Dr. Kenneth K. Humphreys, PE CCE; Allen C.
Hamilton, CCE, AACE Transactions, 1999
31. International Cost Data, 0, Cost Engineering Journal, 2000
32. International Cost Data, 0, Cost Engineering Journal, 2000
33. International Cost Data, 0, Cost Engineering Journal, 2001
34. The Total Cost Management (TCM) Framework, John K. Hollmann; Wesley R. Querns, Cost Engineering Journal, 2001
35. Dirol Plant KV23 Novgorod, Russia, David Whitehouse; Andrew Ainsworth, Cost Engineering Journal, 2001
36. Arbitration of Disputes in International Construction, Talal Abi-Karam, AACE Transactions, 2001
37. Project Controls in the Preconstruction Phase, Ian A. Street, CCE; Joseph W. Wallwork, PE CCE, AACE Transactions, 2001

Cost Engineering in the Global Environment, Second Edition


TABLE OF CONTENTS - Page 2
38. Reengineering Project Management of Caribbean Organizations: Opportunities for Enterprise Resource Planning, Prasanta Kumar Dey; Stephen
O. Ogunlana, AACE Transactions, 2001
39. Production Rates for Urban/Rural Projects in Developing Areas, Enno Koehn; Faisal Ahmed, AACE Transactions, 2001
40. Private, Economically Motivated Construction in Poland, Frederick William Mueller, AACE Transactions, 2001
41. Up-Front Cost Estimating of Change Orders, Osama Moselhi; Ihab Assem; Khaled El-Rayes, AACE Transactions, 2002
42. Best Owner Practices for Project Control, John K. Hollmann, AACE Transactions, 2002
43. Best Practices by Owners for Controlling Cost and Schedules on Large Projects, Marlene M. Hyde, CCE EVP; John P. Orr, PSP; Michael A. Peek, PE,
AACE Transactions, 2010
44. Project Development and Cost Estimating in Russia, Stephen D. Weeks; Vijay S. Jambhekar, AACE Transactions, 2010
45. Recommended Practices for Risk Analysis and Cost Contingency Estimating, John K. Hollmann, PE CCE CEP, AACE Transactions, 2009
46. Project Development and Cost Estimating--A Business Perspective, Gordon K. Good, P.Eng., AACE Transactions, 2009
47. A Challenge to Traditional Best Practice Methodologies: Improving Project Cost Estimate Accuracy Through the Use of the Lichtenberg Successive
Principle, Joel M. Friendman, Cost Engineering Journal, 2009
48. Global Terrorism for Project Management Professionals, J. K. Yates; Bogdan Claianu, Cost Engineering Journal, 2009
49. A Macro Approach to Estimate Engineering and Manufacturing Development Cost Growth, Brandon M. Lucas; Edward D. White, Cost
Engineering Journal, 2009
50. Linking Project Controls Implementation Planning and Project Success: the Northern Canadian Mining Projects Lessons, Akinlolu Isaac Oni, CCE,
AACE Transactions, 2008
51. Change Management During FEED an Owner's Case Study, Vijay S. Jambhekar; Stephen D. Weeks, AACE Transactions, 2008
52. Factors Affecting the Accuracy of a Pre-Tender Cost Estimate in Nigeria, Kaleola T. Odusami; Henry N. Onukwube, Cost Engineering Journal, 2008
53. Essentials of Design Phase Cost Management and Budget Control, Venkataramani Sundaram, CCE, Cost Engineering Journal, 2008
54. Construction Contract Risk Management: A Study of Practices in the United Kingdom, Francis K. Adams, Cost Engineering Journal, 2008
55. A Computerized Approach to Design Cost Analysis, Saeed Karshenas, AACE Transactions, 2007
Chapter 02: Applicable AACE International Recommended Practices
1. Cost Estimate Classification System - As Applied in Engineering, Procurement, and Construction for the Process Industries, AACE International,
Recommended Practices, 2011
2. Basis of Estimate, AACE International, Recommended Practices, 2010
3. AACE International Recommended Practices in Action: A Case Study, John J. Ciccarelli, PE CCE PSP; Michael J. Bennink, PE CCE PSP, AACE
Transactions, 2009
4. Cost Engineering Terminology, AACE International, Recommended Practices, 2010
5. Required Skills and Knowledge of Cost Engineering, AACE International, Recommended Practices, 2006
6. Cost Estimate Classification System, AACE International, Recommended Practices, 2011
7. Schedule Classification System, AACE International, Recommended Practices, 2010
8. Schedule Levels of Detail: As Applied in Engineering, Procurement and Construction, AACE International, Recommended Practices, 2010
9. Documenting the Schedule Basis, AACE International, Recommended Practices, 2009
10. Contingency Estimating - General Principles, AACE International, Recommended Practices, 2008
11. Risk Analysis and Contingency Determination Using Range Estimating, AACE International, Recommended Practices, 2008
12. Risk Analysis and Contingency Determination Using Parametric Estimating, AACE International, Recommended Practices, 2011
13. Risk Analysis and Contingency Determination Using Parametric Estimating - Example Models as Applied for the Process Industries, AACE
International, Recommended Practices, 2011
14. Risk Analysis and Contingency Determination Using Expected Value, AACE International, Recommended Practices, 2009

Cost Engineering in the Global Environment, Second Edition


TABLE OF CONTENTS - Page 3
Chapter 03: Cost Estimating Methodology
1. Piping Cost Estimating Expert System (EXPERTUB), Pedro Lopez; Ana Maria Balderrama, AACE Transactions, 1993
2. International Estimating: A Never-Ending Saga, Keith G. Decker, AACE Transactions, 1994
3. Understanding the Chinese Construction Costing System, Dr. He Zhi, Cost Engineering Journal, 1996
4. Developing Location Factors by Factoring, Bernard A. Pietlock, Cost Engineering Journal, 1996
5. Cost Comparison of Pacific Rim Countries, John G. McConville, CCC, AACE Transactions, 1997
6. Inter-American Construction Costs, Leopoldo G. Varela, CCE; Roger J. Grant, AACE Transactions, 1997
7. Cost Estimating Challenges Facing Eastern Europe, Richard A. Selg, CCE, AACE Transactions, 1997
8. International Projects Cost Estimating, Allen C. Hamilton, CCE, AACE Transactions, 1998
9. Estimating? Number/Confidence/Resources or What?, Kul B. Uppal, PE, AACE Transactions, 1999
10. Conceptual Fixed Price Estimating, Richard D. Smith, AACE Transactions, 2000
11. International "All-In" Workhour Rate alculation Model, Hans F. Knagenhjelm, AACE Transactions, 2000
12. Developing a Parametric Model for Estimating Process Control Costs, Larry R. Dysert, Cost Engineering Journal, 2001
13. Estimating for a Worldwide Company, Rodney L. Russell; Robert P. Jones, AACE Transactions, 2001
14. Cost Estimates: A Decision-Making Tool, Douglas W. Leo; Scott W. Knotowicz, AACE Transactions, 2001
15. Development and Maintenance of a Parametric Building Estimating System, Dominic L. Arioli; Joseph G. Masi, AACE Transactions, 2002
16. Best Practices in Cost Engineering, Nick J. Lavingia, PE, AACE Transactions, 2004
17. Preparing a Basis of Estimate, Todd Pickett, CCC, AACE Transactions, 2005
18. Innovative Pre-Planning for International Projects, Mark T. Chen, PE CCE, AACE Transactions, 2005
19. Factored Estimating for Process Industries, Kul B. Uppal, PE, AACE Transactions, 2007
20. Modeling Projects Scopes for Conceptual Cost Estimating, Alfredo F. Serpell, AACE Transactions, 2010
21. Pitfalls of Early Estimates and Scope of Work, Kul B. Uppal, PE CEP, AACE Transactions, 2010
22. Integrated Cost Budgeting and Estimating Model for Building Projects, Sarmad Al-Mashta; Sabah Alkass, P.Eng., AACE Transactions, 2010
23. Underdeveloped and Underutilized: Cost Estimating in BIM, Tamera L. McCuen, AACE Transactions, 2010
24. Modeling Project's Scope for Conceptual Cost Estimating, Alfredo F. Serpell, Cost Engineering Journal, 2010
25. Modeling Historical Cost Data For Probabalistic Range Estimating, Faik Burak Evrenosoglu, CCE PSP, Cost Engineering Journal, 2010
26. Cost Estimating, Project Performance and Life Cycle, Kul B. Uppal, PE CEP, AACE Transactions, 2009
27. Bid Preparation for Contractors (Avoiding Estimating Errors), Todd W. Waddle, CCC, AACE Transactions, 2009
28. Estimating Todays Mega Projects, Waymon D. Lofton, AACE Transactions, 2009
29. Estimating Preconstruction Services Fees for CM-at-Risk Projects, Douglas D. Gransberg, PE CCE; Jeremy B. Carlisle ICC, AACE Transactions, 2008
30. An Introduction to Parametric Estimating, Larry R. Dysert, CCC, AACE Transactions, 2008
31. Scheduling, Estimating, and BIM: a Profitable Combination, Tamera Lee McCuen, AACE Transactions, 2008
32. Projecting Construction Costs With Tempered Cost Indices, John F. Ball Jr.; Daniel T. Petrowski, AACE Transactions, 2007
33. Parametric Factors as Applied to Pipeline Cost Estimating, Donald Polla, CCE, Cost Engineering Journal, 2007
Chapter 04: Risk and Contingency
1. Managing Risk on Global Projects, Charles P. Woodward, PE CCE; Kartar Singh, PE, Cost Engineering Journal, 1997
2. Risk Management in Construction: An Approach for Contractors in South Korea, Soon Kim; Deepak Bajaj, Cost Engineering Journal, 2000
3. Risk Response and Contingency Strategies Among Contractors in Sydney, Australia, Deepak Bajaj, AACE Transactions, 2001
4. Enterprise IT Risk Management: A Case Study, Iqbal Noor; Richard B. Dillon; Ray Williams, AACE Transactions, 2001
5. Knowledge Gaps Impacts on Risk Management, Iqbal Noor, PE CCE; Robert J. Martin Jr.; Joseph A. Treige, P.Eng., AACE Transactions, 2003
6. The Role of Risk, Michael W. Curran, AACE Document, 1999
7. Managing Risk for Global Energy Projects, Nick J. Lavingia, PE, AACE Transactions, 2005
8. Implementing Risk Management on Transit Mega-Projects, Shawn L. Kildare; George P. Blank, AACE Transactions, 2006

Cost Engineering in the Global Environment, Second Edition


TABLE OF CONTENTS - Page 4
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.

Proactive Risk Management, Minnesh Kaliprasad, CCE, Cost Engineering Journal, 2006
Escalation Estimation: Working With Economics Consultants, John K. Hollmann, PE CCE; Larry R. Dysert, CCC, AACE Transactions, 2007
Contingency Modifier Tool, J.D. (Jim) Whiteside, II PE, AACE Transactions, 2007
The Monte-Carlo Challenge: A Better Approach, John K. Hollmann, PE CCE, AACE Transactions, 2007
Risk Assessment For Scheduling Acceleration, Khalid S. Al-Gahtani, AACE Transactions, 2007
Why Is Risk So Hard To Communicate?, Finn H. Sandberg, AACE Transactions, 2010
Schedule Risk Management for Pipeline Projects, Renna Alqasrani; Brent Kitson, P.Eng.; Richa Sahib, P.Eng., AACE Transactions, 2010
A Comparative Study of Capital Project's Risk Development and Management, Abhijnan Datta, CCE, AACE Transactions, 2010
Systemic Risk Management Using Lean Construction Methods, Robert F. Wells, CEP, AACE Transactions, 2010
Integrated Cost and Schedule Risk Analysis: A Draft AACE Recommended Practice, David T. Hulett, AACE Transactions, 2010
Handling the Truth in Risk Management, Kevin M. Curran; Michael W. Curran, AACE Transactions, 2010
Alternate Methods for Integrated Cost & Schedule Contingency Estimating, John K. Hollmann, PE CCE CEP, AACE Transactions, 2010
Mitigation of Risks in Using Parallel Project Schedules, Patrick M. Kelly, PSP; Christopher W. Carson, PSP, AACE Transactions, 2010
Managing Schedule Contingency, Edward E. Douglas, III CCC PSP, AACE Transactions, 2010
Changing the Boundaries of Client/Contractor Shared Risk, Douglas A. Findley, CCC EVP PSP, AACE Transactions, 2010
The Spearin Doctrine Revisited, Jean-Paul Prentice, CCE, AACE Transactions, 2010
Risk-Based Estimate Self-Modeling, Ovidiu Cretu, PE; Terry Berends, PE, AACE Transactions, 2009
Defining Risk and Contingency for Pipeline Projects, F. Cristina Figueiredo, P.Eng.; Brent Kitson, P.Eng., AACE Transactions, 2009
A Recommended Total Project Cost Risk Model Approach, Christopher P. Caddell, PE, AACE Transactions, 2009
A Fresh Look at Some Past Risk Management Techniques, David A. Norfleet, CCC CFCC, AACE Transactions, 2009
The Changing Face of Owner Project Risks, Stephen L. Cabano, AACE Transactions, 2009
Applications of Monte Carlo simulations in Dispute Resolution and Claims Work, Rod C. Carter; Richard J. Long, PE, AACE Transactions, 2009
Managing Risks of Large Scale Construction Projects, Prasanta Dey, Cost Engineering Journal, 2009
Contingency Misuse and Other Risk Management Pitfalls, Iqbal Noor, PE CCE; Robert L. Tichacek, PE, Cost Engineering Journal, 2009
A Prototype Risk Analysis for Determining Contingency Using Approximate Reasoning Method, Varoujan K. Minassian; George F. Jergeas, P.Eng.,
Cost Engineering Journal, 2009
Knowledge-Based Proactive Project Risk Management, James Arrow, AACE Transactions, 2008
Cost Contingency - Analysis and Evaluation, Rashmi Prasad, AACE Transactions, 2008
Risk Review of Recovery Schedules, John Ciccarelli, PE CCE PSP; Matthew Murch, AACE Transactions, 2008
Handling the Truth in Risk Management, Kevin M. Curran; Michael W. Curran, Cost Engineering Journal, 2008

Chapter 05: Miscellaneous Topics


1. Parametric Screening of International Venture Estimates, Carlton W. Karlik, PE, AACE Transactions, 1991
2. Developing Foreign Location Factors, BA Pietlock, Cost Engineering Journal, 1992
3. Quality Management in Technology Transfer, Dick Sharad, AACE Transactions, 1992
4. Cost Engineering Skills Required for Global Programs, John E. Barry, Cost Engineering Journal, 1995
5. Labor Productivity, Disruptions, and the Ripple Effect, Dr. H. Randolph Thomas, PE; Dr. Amr A. Oloufa, PE, Cost Engineering Journal, 1995
6. Plan Local, Buy Global, Dennis M. Thompson, CCE, AACE Transactions, 1996
7. Lump-Sum Contract Performance - Singapore Experience, Dr. Surinder Singh, AACE Transactions, 1997
8. Facing the Market and Bidding Openly, Wang Meidi; Xinmin Shi, Cost Engineering Journal, 1998
9. Build-Operate-Transfer: Evaluating Efficiency During the Operation Phase, Dr. Anthony B. Taylor Jr., Cost Engineering Journal, 1998
10. Construction Contracts: Shifting Risk or Generating a Claim?, Donald F. McDonald, Jr., PE CCE; John O. Evans III, AACE Transactions, 1998
11. Cost Management of the Three Gorges Project, Xinmin Shi; Meidi Wang, AACE Transactions, 1998
12. SCCS - The Next Step Ahead, Gudmund Vigerust, CCC, AACE Transactions, 1998

Cost Engineering in the Global Environment, Second Edition


TABLE OF CONTENTS - Page 5
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.

Construction Productivity as a Competitive Edge, Dr. Hans E. Picard, AACE Transactions, 1998
Value Engineering in Capital Expenditure Projects, Prakash S. Mashelkar, AACE Transactions, 1998
Contracting Strategies for Technology Transfer Projects, Anwar El Missirie, AACE Transactions, 1999
How to Speed Designs and Evaluations With Knowledge-Based Tools, Dr. Robert L. Steinberger, AACE Transactions, 1999
Weather Delays and Impacts, Donald F. McDonald Jr., Cost Engineering Journal, 2000
Be Prepared for Construction ClaimsGlobally, Rohit Singh, AACE Transactions, 2000
Creating Teamwork in Virtual Teams, Deborah S. Kezsbom, Cost Engineering Journal, 2000
Leadership, Teamwork, and Empowerment: Future Management Trends, Carlos G. Taborda M., PE, Cost Engineering Journal, 2000
Project Management and Total Cost Management in Italy, Gianluca di Castri, Cost Engineering Journal, 2000
Containing Costs in the Slovenian Health Insurance System, Peter Pustaticnik; Franc Kosir, AACE Transactions, 2000
Project Controls in an International Arena, Desmond G. Pellicena, AACE Transactions, 2000
Variation in Construction Productivity: Developing Countries, Enno "Ed" Koehn; Sheikh Arif Ahmed; Satyanarayana Jayanti, AACE Transactions,
2000
EPC Project Management - The SNC-Lavalin Approach, George E. Baram; David M. Barken, AACE Transactions, 2001
Achieving Cycle-Time Excellence in the Global Economy: The Impact of Speed, Katherine A. Edward, AACE Transactions, 2001
But-For Schedules -- Analysis and Defense, James G. Zack Jr., Cost Engineering Journal, 2001
High speed Maglev train to premiere in China, but may ease Pittsburghs transportation needs by 2006, Marvin Gelhausen, Cost Engineering
Journal, 2001
Claim Evaluation for Combined Effect of Multiple Claim Factors, Amarjit Singh, Cost Engineering Journal, 2001
The Estimate Review and Validation Process, Larry Dysert; Bruce G. Elliott, Cost Engineering Journal, 2002
Implementing Integrated Project Controls Software, Mike Milinusic, P.Eng., Cost Engineering Journal, 2002
Tripping Hazards in Schedules, Donald F. McDonald Jr., AACE Transactions, 2002
A Business Managers Role in Improving Capital Stewardship, Nick J. Lavingia, AACE Transactions, 2002
Time-Constrained Project Delivery Issues, Robert B. Brown; Michael B. Rowe; Hoang Nguyen; John R. Spittler, Cost Engineering Journal, 2002
A Capital Investment Review Process, Larry R. Dysert, CCC, AACE Transactions, 2002
Knowledge Management Improves Performance, David Thomas; Tara Keithley, AACE Transactions, 2002
Supply Chain Management in Construction Through Partnership, Prasanta Kumar Dey, AACE Transactions, 2002
Dissecting the Doctrine of Concurrent Delay, Thomas F. Peters, PE, AACE Transactions, 2003
Regaining Control of Project Control, Stephen L. Cabano, AACE Transactions, 2003
Construction Cost Comparison of OECD Nations, Rabiu Olatunbosun Ojeniyi, AACE Transactions, 2003
Improve Profitability through Effective Project Management and TCM, Nick J. Lavingia, PE, AACE Transactions, 2003
Project Management for Cost Engineering Professionals: Project Cycle Time, Kul B. Uppal, PE, Cost Engineering Journal, 2002
Identifying Risks and Opportunities Using EAC, H. Lance Stephenson, CCC, AACE Transactions, 2004
Construction Trends and the Cost Engineer, Talal Abi-Karam, PE CCE, AACE Transactions, 2004
Charting a Successful Global Dispute Resolution, Osmond F. Belcher, AACE Transactions, 2004
Value Engineering's Contribution to Project Success, Farid Fam Mansour, PE CCE, AACE Document, 1999
Can Past Project History Affect Future Project Success?, Larry R. Dysert, CCC, AACE Document, 1999
Project Historical Databases for the Canadian Oilsands, Bruce G. Elliott, CCC, AACE Transactions, 2005
Construction Productivity in Developing Global Regions, Enno Koehn, PE; Sanjay A. Jagushte, AACE Transactions, 2005
Implementing Project Constructability, Douglas D. Gransberg, PE CCE; Edward E. Douglas III, CCC PSP, AACE Transactions, 2005
Reducing Time and Cost With Pre-facilitating Techniques, Allan D. Chasey PE; Neesha Regmi, AACE Transactions, 2005
Developing an Equitable and Fair Compensation Scheme for Multi-National Project Teams Using Published Industry Data and Purchasing Power
Parity, Paul D. Giammalvo, CCE, Cost Engineering Journal, 2005
Concrete Corrosion, Methods to Control this Perennial Problem in the Middle East, Sam Mathew, CCE, Cost Engineering Journal, 2006

Cost Engineering in the Global Environment, Second Edition


TABLE OF CONTENTS - Page 6
54. Scope Definition for Expanding Operating Projects, Amitab Sharma, CCE; Chitram Lutchman, AACE Transactions, 2006
55. Global Experience of Benchmarking Facility Maintenance and Turnaround Contracted Services, Trudi Bissett; John G. Buchan, AACE Transactions,
2006
56. Sarbanes-Oxley Act, Making the Case for Effective Project Management!, Talal Abi-Karam, PE CCE, AACE Transactions, 2006
57. Significance of WBS in Contingency Modeling, John Gengxin Zhao, AACE Transactions, 2006
58. Feasibility Studies: A Case For Using A Stochastic Approach, Sabah Alkass, P.Eng.; Saad Al-Jibouri; Vipha Techakosol, AACE Transactions, 2006
59. Are Today's Project Cost Professionals a Bunch of Bean Counters?, James A. Bent, ECCC, Cost Engineering Journal, 2006
60. Is Estimate Accuracy an Oxymoron?, Larry Dysert, CCC, Cost Engineering Journal, 2007
61. Construction Claims in Egypt: Contrasts and Similarities With Published Literature, Amr A.G. Hassanein; Waleed M. El Nemr, AACE Transactions,
2007
62. Development of an International Cost Database, Paul Martin Hewitt, AACE Transactions, 2007
63. The Russian Approach to Project Management in the Oil Industry, Thomas J. Devine, AACE Transactions, 2007
64. The Great Debate: Planning and Scheduling From Substantial to Final Completion, Christopher W. Carson, PSP; John C. Potter, PSP; Mark G.
Sanders, PE CCE PSP; John J. Stauffer, PSP, Cost Engineering Journal, 2010
65. Effect of Escalation on Large Construction Programs, Ali Touran, PE; Payam Bakhshi, AACE Transactions, 2010
66. Understanding Merge Bias in Schedule Risk Analysis, Jeffrey Valdahl; Christopher P. Caddell, PE CCE, AACE Transactions, 2010
67. Essentials of Early Planning for Megaprojects, Himansu Bhaumik, PE, AACE Transactions, 2010
68. Expanded Facility Condition Assessment Becomes Strategic Facility Consulting, Michael D. Dell'Isola, PE FRICS; Benjamin Dutton, AACE
Transactions, 2010
69. Timely Time Extensions: The Owners Duty, John P. Orr, PSP, AACE Transactions, 2010
70. Earned Value on Fixed-Price Projects, Carol J. Christensen-Day, EVP PSP, AACE Transactions, 2010
71. Change is the Only Constant, Alexia A. Nalewaik, MRICS CCE, AACE Transactions, 2010
72. Project Baseline Management and Change Control, Steven W. Wageman, CCC EVP PSP, AACE Transactions, 2010
73. Differing Site Conditions - Why, What and How?, F. Burak Evrenosoglu, CCE PSP, AACE Transactions, 2010
74. BIM: Sharing Project Data Reduces Conflict, William R. Zollinger, III, PE; David L. Sutton, PE; Gary Montler, PSP; Mark M. Seifried, PE, AACE
Transactions, 2010
75. Challenges Reporting Project Costs and Risks to Owner Decisionmakers, Alexia A. Nalewaik, CCE MRICS; Jeffrey Witt, Cost Engineering Journal,
2010
76. Understanding Schedule Change Management, Edward E. Douglas, III CCC PSP, AACE Transactions, 2009
77. Challenges Reporting Project Costs and Risks to Owner Decisionmakers, Alexia A. Nalewaik, CCE MRICS; Jeffrey Witt, AACE Transactions, 2009
78. Total Float Distribution: A Sane Way to Manage Schedule Contingency, Anamaria I. Popescu, PE, AACE Transactions, 2009
79. When Less is Not More: Providing Subcontractors Early and Late Dates, John C. Livengood, PSP CFCC; Rick Gaetano Cianfaglione, PE PSP, AACE
Transactions, 2009
80. Contractor Cash Flow and Profitability Analysis Between Best Value and Low Bid, Kenneth T. Sullivan; Yan Guo, Cost Engineering Journal, 2009
81. Multi-Level Stochastic Networks and a Simulation Tool for Project Cost and Time Risk Assessments, Mohamed Moussa, P.Eng.; Janaka
Ruwanpura; George Jergeas, P.Eng., Cost Engineering Journal, 2009
82. Linking the Estimate, the Schedule and the Cost Control through a Standardized WBS, Marie-Helene Biffi, P.Eng., AACE Transactions, 2008
83. Establishing a First Class Project Controls Organization for Managing Large Complex Projects, George B. Bradshaw, PE CCE, AACE Transactions,
2008
84. The Case for Construction Schedule Validation and Auditing, Earl T. Glenwright, Jr., PE PSP; Aldo Dorea Mattos, AACE Transactions, 2008
85. The Industry's Perspective on Workforce Planning for Major Projects, Lloyd Kenneth Rankin; Tim Slootman; George F. Jergeas, P.Eng., AACE
Transactions, 2008
86. Escalation Estimating: Lessons Learned in Addressing Market Demand, John K. Hollmann, PE CCE; Larry R. Dysert, CCC, AACE Transactions, 2008

Cost Engineering in the Global Environment, Second Edition


TABLE OF CONTENTS - Page 7
Author Index
Chronological Index
About the Editor

AACE Internationals Professional Practice Guide to


Public Sector Estimating
TABLE OF CONTENTS - Page 1
Introduction
Chapter I: Basis of Estimates
1. Government and Contractors' Estimates: Needs and Intents, James E. Rich, PE CCE, AACE Transactions, 1993
2. Government Estimating vs. General Contractor Estimating, Joseph A. Brown, CCE, AACE Transactions, 1989
3. Government Estimating Tools, Joseph A. Brown, CCE; Gene Hajdaj, PE, AACE Transactions, 2003
4. Cost Estimating For The Commercial Markets Versus Government And Institutional Projects, Nissim Zelouf, CCE, Cost
Engineering Journal, 1991
Chapter II: Labor Costs
1. Productivity - Open vs. Closed Shop, John R. Heizelman, AACE Transactions, 1981
2. Productivity in Construction - With Relation to Union and Nonunion Operation, John P. Trimmer, AACE Transactions, 1974
3. Project Labor Agreements for Public Agencies, Neil D. Opfer; Jaeho Son; John Gambatese, AACE Transactions, 2001
4. D/WBE Regulations: Cost/Benefits for Construction, Enno Koehn; K. H. Chyan, AACE Transactions, 1989
Chapter III: Overhead and Profit
1. A Spreadsheet Checklist to Analyze and Estimate Prime Contractor Overhead, Walter B. Jones, CCC, Cost Engineering
Journal, 1996
2. Eichleay and Qualifying Costs, Robert D. Kelly, PSP, AACE Transactions, 2005
3. Eichleay Update, Paul E. Makris, PE, AACE Transactions, 2004
4. An Alternative to Eichleay, Gui Ponce de Leon, PE, AACE Transactions, 1992
5. Alternative Estimation of Home Office Overhead, Jefferey L. Ottesen, PE; Jack L. Dignum, AACE Transactions, 2003
Chapter IV: Soft Costs
1. Public Sector Project Total Cost Models, John A. Kuprenas, PE, AACE Transactions, 2006
Chapter V: Bid/Estimate Reconciliation
1. Accurate Estimates In Less Than a Minute, Glenn C. Butts, CCC, AACE Transactions, 2006
2. Statistical Cost Estimating for Public Works, Dr. John D. Bledsoe, PE CCE, AACE Transactions, 1998
3. Post-Bid Analysis for Public Works Projects, Scott Downing, AACE Transactions, 2004
4. How to Relate a Construction Cost Estimate to the Prevailing Bid Market for Government and Institutional Projects, Nissim
Zelouf, CCE, Cost Engineering Journal, 1995
Chapter VI: Change Orders
1. False Claims on Public Projects: Don't Bet Your Business on It, Kayhan Fatemi; Matthew J. Lankenau, CCE, AACE
Transactions, 2004
2. False Claims: Road Embankment Construction Proves to Be a Slippery Slope for Contractors, Kurt Rossetti, CCE; Michael T.
McKeeman, Cost Engineering Journal, 2007
Author Index
Chronological Index
About the Editor

AACE Internationals Professional Practice Guide to


Green Building
TABLE OF CONTENTS - Page 1
Introduction
Chapter I: Recognition of Affects and Economic Costs on the Environment
1. One Minute to Twelve, William B. Reese, AACE Transactions, 1980
2. Preliminary Estimation of Costs for Air and Water Pollution Control, D. L. Brandt; A. N. Mann, AACE Transactions, 1973
3. The Cost Of Water Pollution, James J. Flannery, AACE Transactions, 1966
4. Engineering Contractor's Role in Developing Economical Solutions to Pollution Problems, Robert E. Templeton, AACE
Transactions, 1974
Chapter II: Formulating Ways of Addressing Green Building Strategies and Associated Economic Costs
1. New Initiatives to Stimulate Pollution-Prevention Investments, Richard A. Selg, CCE, Cost Engineering Journal, 1994
2. Competing With Environment-Friendly Construction Practices, Alfred B. Ngowi, Cost Engineering Journal, 2000
Chapter III: Specific Green Building Strategies and Project Costs
1. Managing Deconstruction Projects For Sustainability, Manar Shami, AACE Transactions, 2007
2. Ship Deconstruction Cost Models, Robert C. Creese; Ashutosh Nandeshwar; Pooja Sibal, AACE Transactions, 2002
3. Cost-Effective Waste Minimization for Construction Managers, Hal Johnston; William R. Mincks, Cost Engineering Journal,
1995
4. A Cost-Effective Waste Management Plan, Thomas H. Mills; Eric Showalter; David Jarman, Cost Engineering Journal, 1999
5. End-of-Life Electronics Recycling Facility, Richard Turton, PE; Cyril Logar; Thomas Ponzurick, AACE Transactions, 2003
6. Recycled Rubber in Asphalt Concrete Mixtures, Katrina D. Washington, AACE Transactions, 1996
7. Evaluating the Costs of Trenchless Sewer Repairs, Iqbal Noor, AACE Transactions, 2000
8. Sun Spot, Richard Kauffman, Cost Engineering Journal, 1996
9. The Cogeneration Alternative, Ronald F. Schnorr, AACE Transactions, 1983
10. Integrating Traditional Commercial Buildings With Intelligent Building Concepts, Kenny Chan, Cost Engineering Journal, 2007
Chapter IV: Budgeting and Justifying the Cost of Sustainable Practices
1. Budgeting Green: A Comprehensive Methodology, Peter Morris; Lisa Fay Matthiessen, AACE Transactions, 2005
2. A Budget Estimating Method of Environmental Cost for Multiple Housing Projects, Chansik Park; Sungho Hong; Changwan Kim;
Jaeho Lee, AACE Transactions, 2003
3. Quantifying the Benefits of Sustainable Buildings, Benson Kwong, PE CCE, AACE Transactions, 2004
4. Drivers for Energy Efficiency Decisions in a Competitive Residential Construction Market, Kenneth D. Walsh; Howard H.
Bashford; David K. Pijawka; Tanya R. Carinci; Mark Upton, Cost Engineering Journal, 2002
5. Environmental Investment Blueprint in Southern Africa, Thomas Richard Muller, Cost Engineering Journal, 1997
Chapter V: Evaluating Competing Sustainable Strategies: Using Value Engineering
1. The Value of Sustainability, John E. Koga; Theresa Lehman, Save International, 2005
2. Sustainability/ LEED and Life Cycle Costing - Their Role in Value Based Design Decision Making, Stephen J. Kirk; Alphonse J.
Dell'Isola, Save International, 2004
3. From Value to Sustainability Index: Value Analysis as a Method to Manage Complexity for Sustainable Development, Pier Luigi
Maffei; Raffaele Boccaccini, Save International, 2007
4. Managing School Design for Life Cycle Cost Effective, Sustainable, Culturally Responsive Value, Stephen J. Kirk; Michael M.
Paquette, Save International, 2005

AACE Internationals Professional Practice Guide to


Green Building
TABLE OF CONTENTS - Page 2
Chapter VI: Evaluating Competing Sustainable Strategies: Other Techniques
1. Going the Distance: The Impact of Sustainability on Programming and Budgeting, Wade L. Martin, Cost Engineering Journal,
2005
2. The Role of Environmental Economics in the Cost Management of Projects, Dr. Craig Langston; Caroline Mackley, AACE
Transactions, 1998
3. Risk Evaluation of Alternative Energy Sources, W. C. Finch; F. D. Postula, AACE Transactions, 1983
4. Simplified Approach to Probabilistic Cost Benefit Analysis: Architectural Lighting Example, Khaled Nassar; Abdullah AlMohaisen, Cost Engineering Journal, 2006
5. Decision-Making Using Matrix Analysis, Leo R. Zanchettin, PE, AACE Transactions, 1992
6. An Expert System for Cost-Effective Energy Efficiency Calculations, Maria B. Bosch, CCC, Cost Engineering Journal, 1996
Author Index
Chronological Index
About the Editor

AACE Internationals Professional Practice Guide to


Leadership and Management of People
TABLE OF CONTENTS - Page 1
Introduction
Chapter 01: Leadership

Productivity Improvement Through Communications: C O G, A. Larry Aaron, AACE Transactions, 1989


Project Controls Unplugged, Gary E. Chase; Victoria A. Flores, CCE, AACE Transactions, 2004
Overcoming the Responsibility-Authority Gap: An Investigation of Effective Project Team Leadership for a New Decade, Dr. Richard
G. Donnelly; Dr. Deborah S. Kezsbom, Cost Engineering Journal, 1994
The Root Causes of Poor Communication, Sue Dyer, Cost Engineering Journal, 2006
Tactics of Great Mentors, Barton Goldsmith, Cost Engineering Journal, 2005
The Leadership Factor: Leading the Way Toward the Next Millennium, Deborah S. Kezsbom, AACE Transactions, 1998
Bringing Order To Chaos: Pinpointing Sources of Conflict in the Nineties, Deborah S. Kezsbom, Cost Engineering Journal, 1992
Leadership and Influence: The Challenge of Project Management, Dr. Deborah S. Kezsbom, AACE Transactions, 1988
Business Process Reengineering: What It Is, What It Is Not!, Dr. Deborah S. Kezsbom, AACE Transactions, 1996
The "Cool Hand Luke" Theory of Project Communication, William E. Kraus, PE CCE, AACE Transactions, 2006
Leadership and Management of Project People, Ginger Levin, Skills & Knowledge of Cost Engineering, 2007
Grooming Project Managers for Company Leadership, Randy R. Rapp, PE CCE, Cost Engineering Journal, 2004
The Heart of the Art of Management, Richard A. Selg, CCE, AACE Transactions, 1993
Successfully Managing One-Of-A-Kind Projects, Richard A. Selg, CCE; David Richard Rihel, AACE Transactions, 2007

Chapter 02: Teams

Partnering in Public Works Construction, Talal S. Abi-Karam, PE, AACE Transactions, 1999
Partnering: Contracting For The Future, Scott T. Baker, Cost Engineering Journal, 1990
Teambuilding in the Construction Industry, William J. Bender, PE; Darlene M. Septelka, AACE Transactions, 2002
Empowered Team-Based Project Management in Developing Countries, Nicoline Boshoff; Pierre M. van Zyl, AACE Transactions,
1997
Partnering: An Innovative and Effective Project Organization Concept, Abdulaziz A. Bubshait, Cost Engineering Journal, 2001
Team Building and Project Success, Abdulaziz A. Bubshait; Gulam Farooq, Cost Engineering Journal, 1999
Applying the High Performance Work Team to EPC, Mark T. Chen, AACE Transactions, 2002
Partnering - A New Philosophy in Business, Philip B. Copare, AACE Transactions, 1994
Do Project Teams "Walk Their Talk?" Survey Reseach on Project Team Effectiveness, Dr. Richard G. Donnelly; Dr. Deborah S.
Kezsbom, AACE Transactions, 1994
Partnering Construction Contracts: A Conflict Avoidance Process, Richard B. Fisher, AACE Transactions, 2004
Measuring Partnered Project Performance, Douglas D. Gransberg; Howard L. Reynolds; Jack Boyd, Cost Engineering Journal,
1999
Authentic Community Concept Applied to A/E/C, John Jeffrey Hannon, AACE Transactions, 2006
The Human Factor II: Creating a High Performance Culture in an Organization, Minnesh Kaliprasad, CCE, Cost Engineering
Journal, 2006
Creating Teamwork in Virtual Teams, Deborah S. Kezsbom, Cost Engineering Journal, 2000
On Becoming a "Change Master" - Change Management for Creating Innovative, Competitive Environments, Dr. Deborah S.
Kezsbom, AACE Transactions, 1997
Management Responsibilities in Creating Team-Based Empowered Organizations, Dr. Deborah S. Kezsbom, AACE Transactions,
1995

AACE Internationals Professional Practice Guide to


Leadership and Management of People
TABLE OF CONTENTS - Page 2

Beyond "Survival": Strategies for Creating Innovative Teams, Deborah S. Kezsbom, AACE Transactions, 2001
A Personal Viewpoint... Team Building Lessons We Still Need To Learn, Deborah S. Kezsbom, Cost Engineering Journal, 2002
Integrating People with Technology: A Paradigm for Building Project Teams, Dr. Deborah Kezsbom, AACE Transactions, 1993
Managing the Chaos: Conflict Among Project Teams, Dr. Deborah S. Kezsbom, AACE Transactions, 1989
Key Partnering Success Factors, Jennifer L. Krahn; George F. Jergeas; Sami Fahmy, AACE Transactions, 2001
Use of Teams for Organizational Change, William E. Kraus, PE CCE, AACE Transactions, 1991
Ten Steps to Deploying Self-Directed Teams, Joe Phelps, Cost Engineering Journal, 2005
Project Success Attributes, Parviz F. Rad, PE CCE, Cost Engineering Journal, 2003
Project Management Sophistication and EPMO, Parviz F. Rad, PE CCE; Ginger Levin, AACE Transactions, 2007
Is Your Organization Friendly to Projects?, Parviz F. Rad, PE CCE; Ginger Levin, AACE Transactions, 2003
Partnering Construction Projects - Worth the Time?, Ken A. Rice, AACE Transactions, 1995
Leadership, Teamwork, and Empowerment: Management Toward 2000, Carlos G. Taborda M., PE, AACE Transactions, 1999
Implementing Best Practices for the 21st Century, Simon Taylor; Peter Morris, AACE Transactions, 2005

Chapter 03: Leadership Roles

Attracting and Retaining Project Resources, Stephen L. Cabano, AACE Transactions, 2006
Planning/Control of Professional Staff Resources, Harry W. Jarnagan, PE CCE, AACE Transactions, 2004
Process-Driven Project Management Office Implementation, Mark A. Johnson; Terri G. Joyner; Robert J. Martin Jr., AACE
Transactions, 2002
Team-Based Organizations and the Changing Role of the Project Manager, Deborah S. Kezsbom, AACE Transactions, 1994
A Business Manager's Role in Improving Capital Stewardship, Nick J. Lavingia, AACE Transactions, 2002
Staffing Problems on Large Construction Projects, Frank F. Moynihan, CCC, AACE Transactions, 2004
Human Side of Project Management, Madhu P. Pillai, CCC, AACE Transactions, 2006
Preparing Cost Engineers for Today's Construction Industry Challenges, Kenneth Robson; Douglas D. Gransberg, PE CCE, Cost
Engineering Journal, 2004
Critical Performance Competencies for Cost Engineers, Greg J. Skulmoski, AACE Transactions, 2000
Leadership, Teamwork, and Empowerment: Future Management Trends, Carlos G. Taborda M., PE, Cost Engineering Journal,
2000
Leadership, Teamwork, and Empowerment: Management Toward 2000, Carlos G. Taborda M., PE, AACE Transactions, 1999
Resolving the Process Paradox -- A Strategy for Launching Meaningful Business Process Improvement, Cherian Varghese, CCE,
Cost Engineering Journal, 2004

Chapter 04: Motivation

Factors Which Influence Productivity on Large Projects, Dr. John D. Borcherding, AACE Transactions, 1978
Motivation and Productivity of Craftsmen and Foremen on Large Projects, John D. Borcherding; Douglas F. Garner, AACE
Transactions, 1980
Achieving a Successful Project by Motivating the Project Team, Dorothy Ann Brenner, Cost Engineering Journal, 2007
Cost Management Through Employee Participation Programs, Robert F. Cox; Yvan J. Beliveau, PE, AACE Transactions, 1994
Motivational Theories and Their Application in Construction, Hassan Ali Halepota, PE CCE, Cost Engineering Journal, 2005
Improving Construction Productivity: The Case for Motivation, G. Douglas Jenkins, Jr.; Alexander Laufer, AACE Transactions, 1982
The Human Factor I: Attracting, Retaining, and Motivating Capable People, Minnesh Kaliprasad, CCE, Cost Engineering Journal,
2006

AACE Internationals Professional Practice Guide to


Leadership and Management of People
TABLE OF CONTENTS - Page 3

Motivation and Productivity in the Engineering Environment, Gary L. Leach, AACE Transactions, 1981
Project Control Strategies for Motivating Management, Richard A. Mazzini, PE CCE, AACE Transactions, 1985
Psychology and the Cost Engineer, Bruce H. Pickover, AACE Transactions, 1974

Chapter 05: Ethics

Uniform Standards of Professional Appraisal Practice Applicable to Machinery and Equipment, John Alico, PE, CCE, AACE
Transactions, 1994
The Top Ten Lessons Learned in Construction Contracting, Dr. William W. Badger; Steven W. Gay, Cost Engineering Journal,
1996
Construction and Corruption in Developing Regions, Enno Koehn, PE; Ranjit K. Tandoor, AACE Transactions, 2004
Red Light/Green Light Ethics, Dr. Michael Yeo, Cost Engineering Journal, 1994

Author Index
Chronological Index
About the Editor

AACE Internationals Professional Practice Guide to


Forensic Schedule Analysis
TABLE OF CONTENTS - Page 1
Introduction
Chapter 01: Recommended Practice No. 29R-03 Forensic Schedule Analysis
1.

Forensic Schedule Analysis, AACE International, AACE International Recommended Practice, 2007

Chapter 02: Synopsis of Recommended Practice


1.
2.
3.
4.
5.

The New AACE Recommended Practice on Forensic Schedule Analysis -- Part One of a Five Part Series -- The Methodology
Debate, John Livengood, PSP CFCC, Construction Claims Advisor, 2007
The New AACE Recommended Practice on Forensic Schedule Analysis -- Part Two of a Five Part Series -- Baseline Schedules and
Updates, John Livengood, PSP CFCC, Construction Claims Advisor, 2007
The New AACE Recommended Practice on Forensic Schedule Analysis -- Part Three of a Five Part Series -- Methods of Forensic
Schedule Delay Analysis, John Livengood, PSP CFCC, Construction Claims Advisor, 2007
The New AACE Recommended Practice on Forensic Schedule Analysis -- Part Four of a Five Part Series -- Analysis Evaluation -Topics Affecting All Methods, John Livengood, PSP CFCC, Construction Claims Advisor, 2008
The New AACE Recommended Practice on Forensic Schedule Analysis -- Part Four of a Five Part Series -- Choosing the Right
Methodology, John Livengood, PSP CFCC, Construction Claims Advisor, 2008

Chapter 03: Basics of Schedule Delay Analysis


1.
2.
3.
4.
5.
6.

Construction Delay Claims - Assessment Defense, A. J. Werderitsch, CCE; Shah Firoozi, AACE Transactions, 1983
Delay Analysis - Issues Not for Granted, George E. Baram, CCE, AACE Transactions, 1994
Construction Delay Analysis Systems, Dr. Janet K. Yates; Hisham Aoude, AACE Transactions, 1995
Construction Project Delay Analysis, Zartab Q. Zafar, PE CCE, Cost Engineering Journal, 1996
The Five Commandments of Construction Project Delay Analysis, Hamed A. Al-Saggaf, Cost Engineering Journal, 1998
CPM Schedules in Construction Claims From the Contractor's Perspective, Robert B. McCullough, PE CCE, AACE Transactions,
1999
7. Delay Claims Management in Construction - A Step-By-Step Approach, M.A. Baki, Cost Engineering Journal, 1999
8. Delay Analysis - Eliminating the Smoke and Mirrors, Eric Z. Fruchtman, AACE Transactions, 2000
9. Schedule Delay Analysis, George R. Stumpf, PE, Cost Engineering Journal, 2000
10. Construction Delay Analysis Method, Jae-Seob Lee, AACE Transactions, 2003
Chapter 04: Method Implementation Protocol Observational/Static/Gross
1.
2.
3.

Selecting As-Planned Base in Project Disputes, Calin Popescu, PE, AACE Transactions, 1991
Daily Specific As-Built in As-Planned vs. As-Built Schedule Analysis, Svetlana Lyasko, Cost Engineering Journal, 2008
Retrospective TIAs: Time to Lay Them to Rest, John C. Livengood, PSP, AACE Transactions, 2007

AACE Internationals Professional Practice Guide to


Forensic Schedule Analysis
TABLE OF CONTENTS - Page 2
Chapter 05: Method Implementation Protocol Observational/Static/Periodic
1.

A Cost-Effective Delay Analysis Technique, Mireille Battikha; Sabah Alkass, PE, AACE Transactions, 1994

Chapter 06: Method Implementation Protocol Observational/Dynamic/Contemporaneous As-Is


1.
2.
3.
4.

Delay Analysis: A Systematic Approach, Joseph S. Reams, Cost Engineering Journal, 1989
Substantiation And Use Of The Planned Schedule In A Delay Analysis, Joseph S. Reams, CCE, Cost Engineering Journal, 1990
Contemporaneous Analyses of Excusable Delays, Michael Ross Finke, PE, Cost Engineering Journal, 1997
Forensic Schedule Analysis: Example Implementation, Mark C Sanders PE CCE PSP, AACE Transactions, 2008

Chapter 07: Method Implementation Protocol Observational/Dynamic/Contemporaneous Split


1.
2.

Quantifying and Apportioning Delay on Construction Projects, Lee Schumacher, PE, Cost Engineering Journal, 1995
Claims Analysis Nested in Schedule Updates, Christopher Willis Carson, AACE Transactions, 2006

Chapter 08: Method Implementation Protocol Observational/Dynamic/Modified or Recreated


1.
2.
3.

Daily Delay Measure: A New Technique to Precisely Identify Delay, John C. Livengood; Brian G. Laush, AACE Transactions, 2003
Continuous Delay Measurement and the Role of Daily Delay Values, Robert Seals, AACE Transactions, 2004
Measuring Delay Using the Contemporaneous Period Analysis, Mark F. Nagata, PSP, AACE Transactions, 2006

Chapter 09: Method Implementation Protocol Modeled/Additive/Single Base


1.
2.
3.
4.

CPM Schedules In Construction Claims, Robert B. McCullough, Cost Engineering Journal, 1989
The Window Methods of Analyzing Delay Claims, George E. Baram, AACE Transactions, 2000
Schedule Delay Analysis: Modified Windows Approach, Kirk D. Gothand, CCC, Cost Engineering Journal, 2003
The Great Debate -- TIA vs WINDOWS A Better Path for Retrospective Delay Analysis?, Bruce Evans Hallock, PSP CFCC; Pradip
M. Mehta, AACE Transactions, 2007

Chapter 10: Method Implementation Protocol Modeled/Additive/Multiple Base


1.
2.
3.
4.
5.
6.
7.
8.

Delay Evaluation Using "Record Schedules", Donald J. Fredlund, Jr.; Gui Ponce de Leon, PE, AACE Transactions, 1990
System Dynamic Modeling of Delay and Disruption Claims, William Ibbs; Min Liu, Cost Engineering Journal, 2005
Window Analysis: The Method and the Myth, John J. Ciccarelli, PE, CCE; Mark W. Cohen, PE, AACE Transactions, 2005
Concentrated Window Analysis Results, Jeffery L. Ottesen, PE PSP, AACE Transactions, 2006
Additional Practical Applications of the Window Analysis, John J. Ciccarelli, PE CCE PSP, AACE Transactions, 2007
Delay Analysis Under Multiple Baseline Updates, Tarek M. Hegazy, P.Eng.; Wail Menesi, AACE Transactions, 2007
Delay Analysis Considering Dynamic Resource Allocation and Multiple Baselines, Tarek M Hegazy P.Eng.; Wail Menesi, AACE
Transactions, 2008
Schedule Control for PCM Projects, Patricia D. Galloway; Kris R. Nielsen, The Nielsen-Wurster Group, 1981

AACE Internationals Professional Practice Guide to


Forensic Schedule Analysis
TABLE OF CONTENTS - Page 3
9. The Use of Schedules in Claim Preparation, Patricia D. Galloway, The Nielsen-Wurster Group, 1983
10. Proof Development for Construction Litigation, Patricia D. Galloway; Kris R. Nielsen, The Nielsen-Wurster Group, 1984
11. Window Analyses: An Innovative Concept to Schedule Delay Analyses, Patricia D. Galloway; Kris R. Nielsen, The Nielsen-Wurster
Group, 1984
12. Analyzing Schedule Delays By Use of Window Analyses, Patricia D. Galloway, PE, The Nielsen-Wurster Group, 1988
Chapter 11: Method Implementation Protocol Modeled/Subtractive/Single Simulation
1.
2.
3.
4.
5.
6.
7.
8.
9.

Developing an As-Built Schedule From Project Records, John R. Knoke, PE; Gary H. Jentzen, PE, AACE Transactions, 1996
But-For Schedules - Analysis and Defense, James G. Zack Jr., AACE Transactions, 1999
Claims Schedule Development and Analysis: Collapsed As-Built Scheduling for Beginners, Vera A. Lovejoy, CCC, Cost
Engineering Journal, 2004
Determining the Actual Critical Path, Ronald M. Winter, AACE Transactions, 2004
Retrospective As-Built Schedule Development, Anamaria I. Popescu, PE; Andrew Avalon, PE, AACE Transactions, 2005
Identifying As Built Completion Drivers, Robert B. McCullough, PE CCE; Satinder Singh Baweja, CCE, AACE Transactions, 2006
Schedule and Delay Analysis Methodologies, Richard J. Long, PE; Andrew Avalon, PE PSP; Ronald J. Rider, Long International,
2008
Collapsed As-Built CPM Analysis, Kenji P. Hoshino, Kenji P. Hoshino, 1995
Collapsed As-Built: The Right Way, Kenji P. Hoshino, Kenji P. Hoshino, 2000

Chapter 12: Non-CPM Schedule Delay Analysis Techniques


1.

Delay Analysis Using Linear Schedule in Construction, Jae-Seob Lee, AACE Transactions, 2007

Chapter 13: General Schedule Delay Analysis Articles


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

Time Extension In Construction Contracts, Steven G. Revay, CCE, Cost Engineering Journal, 1979
How to Save a Delayed Project, Wesley R. Querns, CCE, AACE Transactions, 1986
Weather-Related Delays on Government Contracts, Michael R. Finke, AACE Transactions, 1990
Utilities' Forced Delays - Controllable or Uncontrollable?, Patricia D. Galloway; Kris R. Nielsen, AACE Transactions, 1986
Project Commencement Delays on Architectural Projects, Stephen F. Rusteika, Jr., AACE Transactions, 1991
Responsibility for Delays After the Expiration of the Contract Time, Gary H. Jentzen, PE; Philip Spittler; Dr. Gui Ponce de Leon, PE,
AACE Transactions, 1994
Remedies for Delays in Architectural Construction, Timothy C. McManus; Daniel R. Tishman; Lisa R. Turnbaugh, AACE
Transactions, 1995
The Reliability of Critical Path Method (CPM) Techniques in the Analysis and Evaluation of Delay Claims, Gasan G. Kallo, Cost
Engineering Journal, 1996
Construction Documentation Used as Indicators of Delays, Hala Elnagar; Janet K. Yates, Cost Engineering Journal, 1997
Analyzing the Impact of Change Orders on a Schedule, Jeffrey A. Veenendaal, Cost Engineering Journal, 1998
Simplified Spreadsheet Solutions: Models for Critical Path Method and Time-Cost-Tradeoff Analysis, Tarek Hegazy; Amr Ayed, Cost
Engineering Journal, 1999
Pacing Delays - The Practical Effect, James G. Zack Jr., AACE Transactions, 1999
Interruptible or Continuous Activity Durations?, Dr. Joseph J. Orczyk, PE, AACE Transactions, 1999

AACE Internationals Professional Practice Guide to


Forensic Schedule Analysis
TABLE OF CONTENTS - Page 4
14. Weather Delays and Impacts, Donald F. McDonald Jr., Cost Engineering Journal, 2000
15. Analyzing Weather-Related Construction Claims, Osama Moselhi, P.Eng.; Khaled El-Rayes, Cost Engineering Journal, 2002
16. Business Interruption Claims -- Delay Analysis Considerations, Donald J. Fredlund Jr.; Robert B. Brown, PE; Frank DeLessio, AACE
Transactions, 2003
17. Calculating Imaginary Numbers: Time Quantification in Acceleration, John C. Livengood; Christopher R. Bryant, AACE
Transactions, 2004
18. Total Float Management for Delay Analysis, Khalid S. Al-Gahtani; Satish B. Mohan, AACE Transactions, 2005
19. The Link Between Planning and Programming Practice and the Analysis of Delay and Disruption Claims, Nuhu Braimah; Issaka
Ndekugri, AACE Transactions, 2006
20. Current Delay Analysis Techniques and Improvements, Satish B. Mohan; Khalid S. Al-Gahtani, AACE Transactions, 2005
21. Concurrent Delay Analysis in Litigation, Victor M. Ostrowski, PSP; Michael T. Midgette, PSP, Cost Engineering Journal, 2006
22. Delay Analysis Considering Productivity, Jae-Seob Lee, AACE Transactions, 2006
23. Performing Forensic Delay Analyses From Deep Within the Black Tent, Thomas F. Peters, PE CFCC, AACE Transactions, 2007
24. Use of Relational Databases in Forensic Delay Analysis, Faik Burak Evrenosoglu CCE PSP, AACE Transactions, 2008
25. A Synthesis of Forensic Schedule Analysis Techniques, J Scott Lowe; Mark F Nagata PSP, AACE Transactions, 2008
26. Primavera Project Management Software and the Claims Consultant, Anne Marie Tombros; Sunu Mohan PSP EVP, AACE
Transactions, 2008
27. When is the "Critical Path" Not the Most Critical Path?, Murray Woolf, AACE Transactions, 2008
28. Concurrent Schedule Delay in International Contracts, Patricia D. Galloway, PE; Kris R. Nielsen, The Nielsen-Wurster Group, 1990
29. Evaluating the Contractor's Right to Finish Early, Patricia D. Galloway, PE; Kris R. Nielsen, The Nielsen-Wurster Group, 1990
30. Overcoming Schedule Delay - Analyzing and Resolving This Project Nemesis (An International Perspective for Australian
Application), Kris R. Nielsen; Patricia D. Galloway, PE, The Nielsen-Wurster Group, 1991
Author Index
Chronological Index
About the Editor

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 1
Introduction

Chapter 01: General Topics on Process Industries


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.

Project History - Closing the Loop, John K. Hollmann, PE, CCE, AACE Transactions, 1995
Value Engineering Enriches TCM Careers, Farid Fam Mansour, PE, CCE, AACE Transactions, 1995
Value Engineering: A Well-Kept Secret, James J. O'Brien, PE, AACE Transactions, 1995
Taking Value Engineering/Value Analysis Into the Twenty-First Century, Sol Mendelsohn; Howard B. Greenfield, Cost Engineering
Journal, 1995
A Innovative Project Report, Mark T. Chen, Cost Engineering Journal, 1996
Assessing Environmental Parameters for Commercial Buildings, Dr. James Sommerville; Dr. G. Galbraith; S. Craig, AACE
Transactions, 1996
Evaluating Environmental Restoration Cost Estimating Systems, W. David Featherman; Dr. R.F. Shangraw Jr., AACE Transactions,
1996
Implementing a Database Estimating System, Robert H. Harbuck, PE CCE, AACE Transactions, 1996
Business Process Reengineering: What It Is, What It Is Not!, Dr. Deborah S. Kezsbom, AACE Transactions, 1996
A Project Management Outline for Base Closures and Reuse - A New Frontier, Timothy C. McManus; William Burke, AACE
Transactions, 1996
Expert Rules-of-Thumb for Effective Design Coordination, Dr. Tarek M. Hegazy; Dr. Jameel Khalifa, PE, AACE Transactions, 1996
Understanding Direct Digital Controls for HVAC Systems, Krista Reeves, CCE, Cost Engineering Journal, 1996
The Challenge of Change, Sarwar A. Samad, Cost Engineering Journal, 1996
The Life-Cycle Perspective: Managing Cost Before it Occurs, Larry G. Medley, Sr., Cost Engineering Journal, 1996
Cost Awareness in Design: The Role of Data Commonality, David P. Hoult; C. Lawrence Meador; John Deyst; Maresi Dennis, Cost
Engineering Journal, 1996
The Monetary System of Economy Management: A Primer for Cost Engineers, Dr. Amarjit Singh, P. Eng., Cost Engineering
Journal, 1997
Value Engineering and the Texas Prison System Expansion, Robert Paul, Cost Engineering Journal, 1997
Parametric Modeling of Decontamination and Decommissioning Costs Using MCACES Gold, Michael G. Dieters, PE CCE, Cost
Engineering Journal, 1997
A Strategy for the Development of a Cost Estimating Database, Columba Michael Geaney, CCC, Cost Engineering Journal, 1997
A Value Engineering Approach to Determine Quality Lightweight Concrete Aggregates, Dr. Jamal A. Al-Duaij; Khalid E. El-Laithy;
Reena James Payappilly, Cost Engineering Journal, 1997
Best-Value Contracting Criteria, Dr. Douglas D. Gransberg, PE; Michael A. Ellicott, PE, Cost Engineering Journal, 1997
Lifelong Learning for Engineers: Riding the Whirlwind, Ernest T. Smerdon, Cost Engineering Journal, 1997
Facilities Management Benchmarks: Lessons Learned - An Analysis of Facility Benchmarks Conducted at DOE Sites, G. Allan
Engebretson, CCC; Bryan Skokan, CCE, AACE Transactions, 1997
Can Government Contracting Be Reengineered?, Larry G. Medley Sr., CCC, AACE Transactions, 1997
Privatization: A Closer Look, Terry Tyborowski; Michelle Primack; Kelly Matthews, AACE Transactions, 1997
Evaluating Best Value Contract Proposals, Dr. Douglas D. Gransberg, PE, AACE Transactions, 1997
Estimating Archiving Costs for Engineering Records, Roger Alan Stutz, CCE, AACE Transactions, 1997
EDI System Aids Cost Management, Walter J. Strutt, PE CCE, AACE Transactions, 1997
Building a Cost Engineering Data Warehouse, Keith G. Decker; Anthony J. Oaks; Max Salinas, AACE Transactions, 1997
Developing a New Project Execution Model, Gudmund Vigerust, CCC, AACE Transactions, 1997
Value Engineering During the Project Execution Phase, Dr. George F. Jergeas, P.Eng.; Vernon G. Cooke, AACE Transactions,
1997

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 2
32. Cost/Schedule Information System: A Human-Centered Approach, Dr. Chotchai Charoenngam; Abdul Samad Kazi, Cost
Engineering Journal, 1997
33. A Performance-Based Procurement System Used by the State of Wyoming, Dean T. Kashiwagi, PE; Ziad Al-Sharmani, Cost
Engineering Journal, 1997
34. A Review of Methods to Estimate Haul Fleet Production, Douglas D. Gransberg, Cost Engineering Journal, 1998
35. Build-Operate-Transfer: Evaluating Efficiency During the Operation Phase, Dr. Anthony B. Taylor Jr., Cost Engineering Journal,
1998
36. Cost Segregation Analysis: The Role of the Cost Engineer, John A. Kuprenas; James Y. Chang, Cost Engineering Journal, 1998
37. Total Cost Management in the Internet Age, Paul Doherty, AACE Transactions, 1998
38. Principles of Business Process Reengineering, TQM, and the Learning Organization, Victor S. Sohmen, CCC, AACE Transactions,
1998
39. Value Engineering in Capital Expenditure Projects, Prakash S. Mashelkar, AACE Transactions, 1998
40. A New Look at Total Cost Management, John K. Hollmann, PE CCE, AACE Document, 1998
41. Estimating Change Orders: Cost or Opportunity?, Michael B. Carringer, AACE Document, 1998
42. Value Engineering Incentive Clauses, George F. Jergeas; Vernon G. Cooke; Francis T. Hartman, Cost Engineering Journal, 1999
43. Parametric Cost Estimating for Environmental Remediation Projects, Jacqueline Rast, PE; Kate M. Peterson, PE, AACE
Transactions, 1999
44. Facility Parametric Cost Estimating, Edward R. Meyer, PE; Thomas J. Burns, PE, AACE Transactions, 1999
45. An Integrated Value Management Approach, Dr. George F. Jergeas, P.Eng.; Stephen O. Revay, CCC, AACE Transactions, 1999
46. Value Engineering's Contribution to Project Success, Farid Fam Mansour, PE CCE, AACE Document, 1999
47. Conceptual Cost Estimating for Building Construction, Philip D. Larson, CCE, AACE Document, 1999
48. Can Past Project History Affect Future Project Success?, Larry R. Dysert, CCC, AACE Document, 1999
49. Value Engineering for Lean Manufacturing, Drew M. Algase, AACE Document, 1999
50. Using Work Breakdown Structure in Cost Analysis, Neil F. Albert, AACE Document, 1999
51. The Keys to Forecasting - #1 Scope, James E. Baar; Stephen M. Jacobson, CCC, Cost Engineering Journal, 2004
52. The Keys to Forecasting - #2 Work Breakdown Structure, James E. Baar; Stephen M. Jacobson, CCC, Cost Engineering Journal,
2004
53. The Keys to Forecasting - #4 Data Flow, James E. Baar; Stephen M. Jacobson, CCC, Cost Engineering Journal, 2004
54. Cost of Quality, Valerie G. Venters, CCC, AACE Transactions, 2004
55. Developing Estimating Models, James D. Whiteside II, PE, AACE Transactions, 2004
56. The Cost Estimator's Dilemma, Melvin W. Perrott, CCE, AACE Transactions, 2004
57. Value Cost Management, James W. Hudson; Stephen P. Hudson, AACE Transactions, 2004
58. A Methodology for Estimating Engineering Details, James D. Whiteside II, PE, AACE Transactions, 2005
59. Preparing a Basis of Estimate, Todd Pickett, CCC, AACE Transactions, 2005
60. Profitability Estimation of Pioneering R&D Project, Mikko Varila; Matti Sievanen, AACE Transactions, 2005
61. Reliability and Accuracy of Estimates, Steven G.J. Boeschoten, AACE Transactions, 2005
62. So You Think You're An Estimator?, Larry R. Dysert, CCC; Todd W. Pickett, CCC, Cost Engineering Journal, 2005
63. Effective Cost Management - Back to Basics, Robert L. Tichacek, PE, Cost Engineering Journal, 2006
64. Project Scope Management, Asadullah Khan, Cost Engineering Journal, 2006
65. Measuring and Managing Cost Escalation, Peter Morris; William F. Willson, AACE Transactions, 2006
66. Core Competencies, Expectations, and Career Path for an Estimating Professional, John K. Hollmann, PE CCE; Bruce G. Elliott,
CCC, AACE Transactions, 2006
67. Is "Estimate Accuracy" an Oxymoron?, Larry R. Dysert, CCC, AACE Transactions, 2006
68. Bad Estimates Just Don't Happen, Joseph A. Lukas, PE CCE, AACE Transactions, 2006
69. So - Is this the Estimate?, Kul B. Uppal, PE, AACE Transactions, 2006
70. Estimate Reconciliations, Barrett L. Richards, CCC PSP, AACE Transactions, 2006

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 3
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.

Accurate Estimates In Less Than a Minute, Glenn C. Butts, CCC, AACE Transactions, 2006
A Pragmatic Setup for Cost Estimation, Junaid Ahcom, ICC; Shafi Uddin; Ali Ali Shash, AACE Transactions, 2006
Estimating at Owner Companies, Waymon D. Lofton, AACE Transactions, 2006
Front-end Specifications: Tool or Trouble?, Sidney J. Hymes, AACE Transactions, 2006
Competency Development at an Owners Organization, Paul Teklenburg; Sep Serfontein, AACE Transactions, 2006
Value Engineering for Hazardous Waste Projects, Richard A. Selg, CCE, AACE Transactions, 2006
Performing Value Analysis on Construction Project Variation Orders, Jamal Al Duaij; Tareq Awida; A.E. Kollarayam, Cost
Engineering Journal, 2007
Parametric Factors as Applied to Pipeline Cost Estimating, Donald Polla, CCE, Cost Engineering Journal, 2007
Is the Theory of Cumulative Impact a Provable Reality?, Stephen P. Warhoe, PE CCE CFCC, Cost Engineering Journal, 2007
Escalation Estimation: Working With Economics Consultants, John K. Hollmann, PE CCE; Larry R. Dysert, CCC, AACE
Transactions, 2007
Transforming Historical Project Data into Useful Information, Todd W. Pickett, CCC; Bruce G. Elliott, CCC, AACE Transactions,
2007
Factored Estimating for Process Industries, Kul B. Uppal, PE, AACE Transactions, 2007
Contingency Modifier Tool, J.D. (Jim) Whiteside, II PE, AACE Transactions, 2007
Project Estimate Reviews for Oil and Gas Projects, YuTeck Chuong, PE CCE, AACE Transactions, 2007
Escalation: How Much is Enough?, Glenn Butts, CCC, AACE Transactions, 2007
The Theory of Indirect Costs, David A. Norfleet, CCC, AACE Transactions, 2007
Challenges in Estimating Costs Using Building Information Modeling, William E. Kraus, PE CCE; Steve Watt; Philip D. Larson, CCE
PSP, AACE Transactions, 2007
ABC of Cash Flow Projections, Mark T. Chen, PE CCE, AACE Transactions, 2007
What is Cost Engineering and How is Cost and Schedule Management an Engineering Function?, John K. Hollmann, PE CCE,
Cost Engineering Journal, 2007
Bid Risk and Contingency Analysis, Amarjit Singh, PE; Sharilyn Shiramizu; Kamal Gantam, Cost Engineering Journal, 2007
An Introduction to Parametric Estimating, Larry R. Dysert, CCC, AACE Transactions, 2008
What is the U.S. Gulf Coast Baseline when Estimating Site Productivity?, Bruce E. Bradley, AACE Transactions, 2008
Estimating Preconstruction Services Fees for CM-at-Risk Projects, Douglas D. Gransberg, PE CCE; Jeremy B. Carlisle ICC, AACE
Transactions, 2008
Earned Value Analysis Why it Doesn't Work, Joseph A Lukas, PE CCE, AACE Transactions, 2008

Chapter 02: Cost Estimating Methodology


1.
2.

ABC Estimating for Environmental Operations, Michael C. Ray, PE, CCE, AACE Transactions, 1995
Cost Effective Selection of Environmental Remediation Processes, Jeffrey S. Brackeen; Samuel D. Gibson, CCE, AACE
Transactions, 1995
3. Impact of Estimating Accuracy on Markup, Dr. Richard E. Larew, PE, AACE Transactions, 1995
4. Cost Estimating System Reengineering, Frank D. Postula, PE, CCE; Richard L. Wall, AACE Transactions, 1995
5. Cost Estimation of Structures in Buildings, Dr. Surinder Singh, AACE Transactions, 1995
6. Estimating? - Yesterday, Today, and Tomorrow, Kul B. Uppal, PE, AACE Transactions, 1995
7. Composite-Factored Estimating, Masahide Nishimura, AACE Transactions, 1995
8. Managing Changes and Claims on Design Contracts, Stephen F. Rusteika, Jr.; Gary H. Jentzen, PE, AACE Transactions, 1995
9. Developing Location Factors by Factoring, Bernard A. Pietlock, CCE, AACE Transactions, 1995
10. Pulp and Paper Capital Costs, Michael F. Davy; Dr. K. M. Thompson, AACE Transactions, 1995
11. Expert System Applications in Cost Engineering, Abhi Basu, PE, AACE Transactions, 1995

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 4
12. A New Approach to Cost Engineering, Edward P. Camaya, AACE Transactions, 1995
13. Essential Cost Engineering Tools, Ignacio Manzaneera, CCC; Dr. Kahled Bu-Bshait, AACE Transactions, 1995
14. 'The Number' or 'The Result' - Reliability, Accuracy, Precision, Confidence, or What?, AACE International Technology Directorate;
Donald F. McDonald Jr., PE CCE, Cost Engineering Journal, 1995
15. Rapid Method for Capital Investment Decisions, Richard E. Winston, Cost Engineering Journal, 1995
16. Cost Estimation of Timber Bridges Using Neural Networks, Dr. Robert C. Creese; Li Li, Cost Engineering Journal, 1995
17. The Past and Future of Cost Engineering, Gideon Samid, Cost Engineering Journal, 1995
18. Estimating Remediation Costs for the Montclair Radium Superfund Sites, Mark J. Turner, CCC, Cost Engineering Journal, 1995
19. The Development of Cost Estimates for the Pricing of Commemorative Coins at the US Mint, Michael E. Kess, Cost Engineering
Journal, 1995
20. How to Establish an Estimating Department, Kul B. Uppal; AACE International Cost Estimating Committee, Cost Engineering
Journal, 1995
21. Definitive Estimating for Construction Projects at Remote Sites, Bennett W. Cleveland, PE CCE, Cost Engineering Journal, 1995
22. Shocks, Jolts, and Temors: Cost Impacts of the Base-Isolation Structural System, John R. Reser, CCE, Cost Engineering Journal,
1995
23. Economics of Pipe Replacement/Installation Using Trenchless Technology, Dr. Robert A. McKim, Cost Engineering Journal, 1996
24. Real World Issues in Practical Cost Estimating, Dr. Amarjit Singh, P.Eng., Cost Engineering Journal, 1996
25. A Probabilistic Cost Estimating Model, Dr. Thomas E. Uher, Cost Engineering Journal, 1996
26. Estimation Knowledge: A Conceptual Framework for Cost Estimation, Gideon Samid, Cost Engineering Journal, 1996
27. An Oil Company Estimating Process from A to Z, Walter Weathersbee, ICEC Transactions, 1996
28. Cost Engineering in this Global Economy, John E. Barry, ICEC Transactions, 1996
29. Capital Cost Estimating for the Frontier Regions of the World: Questions a Savvy Estimator Should Ask First, Joseph R. Jeffery, Cost
Engineering Journal, 1996
30. Internal Contracts, Cost Engineering, and Organizational Problems, Dr. Michel Nakhla; Dr. Louis Georges Soler, AACE
Transactions, 1996
31. Cost Engineering Considerations in Privatization, Marc A. Zocher, CCC; Dr. Orman H. Paananen; Carol Sohn, AACE Transactions,
1996
32. Utility Cost Estimating, William R. Fletcher, AACE Transactions, 1996
33. The Evolution of Estimating Systems at Kodak, John K. Hollmann, PE CCE; Larry R. Dysert, CCC, AACE Transactions, 1996
34. Pharmaceutical Cost Estimation, Gideon Samid, PE, AACE Transactions, 1996
35. Estimating Engineered Equipment Costs, Kul B. Uppal, PE, AACE Transactions, 1996
36. Cost Estimating Using Historical Costs, Kymberli Popham, CCE, AACE Transactions, 1996
37. Thirty-Five Years of Hydroelectric Estimating, George H.S. Duddy, P.Eng., AACE Transactions, 1996
38. Using Cost Engineering Techniques to Upgrade Your Personal Finances (and Increase Your Investment Portfolio), F. Sam Griggs
Jr., CCE, AACE Transactions, 1996
39. Cost Engineering and Continuous Performance Improvement, Peter W. Ripley, CCC, AACE Transactions, 1996
40. Engineering at the Millennium: A New Vision, National Research Council, Cost Engineering Journal, 1996
41. Factored Estimating Guidelines - Refinery/Petrochemical Projects, Robert S. (Steve) Smith, PE CCE, Cost Engineering Journal,
1997
42. Estimating? Past, Present and 21st Century, Kul B. Uppal, PE, AACE Transactions, 1997
43. Estimating Costs With Fuzzy Logic, Anthony K. Mason, PE; Donald J. Kahn, Sr., AACE Transactions, 1997
44. Scope Development Problems in Estimating, Larry Dysert, CCC, AACE Transactions, 1997
45. Five Core Competencies of Cost Engineering, Bernard A. Pietlock, CCC, AACE Transactions, 1997
46. Scope Definition Is a Company Affair, Douglas McCue, AACE Transactions, 1997
47. Cost Engineering as an Academic Discipline, Patrick Sik-Wah Fong; Dodo Ka-Yan Ip, AACE Transactions, 1998
48. Parametric Estimates Made Easy, James J. Davis, PE, AACE Transactions, 1998

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 5
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.

Estimating the Cost of Change Orders, Dr. Osama Moselhi, PE, AACE Transactions, 1998
Documenting and Presenting Estimates, Robert D. Bakewell, CCC, AACE Transactions, 1998
Project Estimating for the 21st Century, Douglas W. Leo, AACE Transactions, 1998
An Auditable Parametric Based Estimating System, Earl W. King, AACE Document, 1998
Parametric Estimation of Overhead Rates, Susan M. Dobson; Gene Lucas; Shari Sands, AACE Document, 1998
Process Based Estimating Within the NASA/Air Force Cost Model (NAFCOM98), L. Keith Smith, AACE Document, 1998
The Complete Estimating Tool Kit, James Collins, AACE Document, 1998
Developing a Parameteric System Engineering Cost Model, Ivan Vincenzini, AACE Document, 1998
A Conceptual Cost Estimating Model for Water Reservoirs, Mohammed Al Khalil; Sadi Assaf; Walild Abdul Rahman; Mashoor Asfoor,
Cost Engineering Journal, 1999
Project Cost Estimating for Major Renovation Projects, James Sutherland, AACE Transactions, 1999
Estimating? Number/Confidence/Resources or What?, Kul B. Uppal, PE, AACE Transactions, 1999
How Accurate Are Piping Estimating Methods?, Chris P. Caddell; Gerald P. Klanac; Thomas J. Rye, AACE Transactions, 1999
Overcoming "Gotchas" Clauses in Construction Contracts, Donald F. McDonald Jr., PE CCE, AACE Document, 1999
Process Cost Engineering in the 21st Century, Kul B. Uppal, AACE Transactions, 2000
Cost Management, Allen C. Hamilton, CCE, AACE Transactions, 2004
What is Cost Engineering?, John K. Hollmann, PE CCE, Cost Engineering Journal, 2006
Total Cost Management Framework to be Released at AACE International's 2006 Annual Meeting, John K. Hollmann, PE CCE, Cost
Engineering Journal, 2006

Chapter 03: Project Management


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

Team-Based Cost Management, Christopher O. Gruber, CCC; Stephen A. Flannery, CCE, AACE Transactions, 1995
Management Responsibilities in Creating Team-Based Empowered Organizations, Dr. Deborah S. Kezsbom, AACE Transactions,
1995
The Effectiveness of Project Management as a Design Team Organizational Structure, Dr. P. A. Bowen; M. J. Wyrley-Birch, AACE
Transactions, 1995
The Nelson Funnel Experiment, Gershon Blumstein, AACE Transactions, 1995
Total Cost Management of Capital Projects, Gamini A. K. Padmaperuma, CCE; Khalid A. Al-Mansour; Nasser F. Akeel, AACE
Transactions, 1995
The Unique Problems of Upgrade Projects, Sterling Stoddard; Lewis G. Manwaring, Jr., PE, AACE Transactions, 1995
Innovative Sludge Stabilization Method, Jack D. Riggenbach, PE, Cost Engineering Journal, 1995
So, the Budget Ran Over ... Because?, Michael Putzer, Cost Engineering Journal, 1995
Waste Not, Pollute Not, Carol Ehrle, Cost Engineering Journal, 1995
Energy and Cost TCM Management Discussion: The Global Gas Industry, Roger M. Batten, Cost Engineering Journal, 1995
Too Much Project Management: A Vice in Disguise (and How to Minimize It), Gideon Samid, PE, Cost Engineering Journal, 1995
Cost and Project Management: Residential Air Conditioning in Saudi Arabia, Mitza Kurshid Arshad, CCE, Cost Engineering
Journal, 1995
TCM: A New Look at Total Cost Management, John K. Hollmann, Cost Engineering Journal, 1996
M/EPCC Replaces EPCM, Charles Poulton, PE CCE, AACE Transactions, 1996
Simplified Project Economic Evaluation, Mark T. Chen, PE CCE, AACE Transactions, 1996
Impact of Information Technology on Construction Project Management, Abhi Basu, PE, AACE Transactions, 1996
A Decision Support System for Project Planning, Prasanta K. Dey; Mario T. Tabucanon; Dr. Stephen O. Ogunlana, AACE
Transactions, 1996
ROI for Management, R. Eugene Reed Jr., PE CCE, AACE Transactions, 1996

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 6
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.

Concurrent Management of Total Cost and Total Quality, Bryan R. McConachy, P.Eng., AACE Transactions, 1996
Focus: Total Cost Management, Jean-Paul Prentice, CCE, AACE Transactions, 1996
The Project Manager for "Concurrent Engineering", William F. Geritz III, Cost Engineering Journal, 1996
The Modern Project Manager, Mark T. Chen, PE CCE, Cost Engineering Journal, 1997
Empowered Team-Based Project Management in Developing Countries, Nicoline Boshoff; Pierre M. van Zyl, AACE Transactions,
1997
Life Cycle Project Management, Dr. Douglas D. Gransberg, PE; Michael A. Ellicott, PE, AACE Transactions, 1997
Life-Cycle Costs!!!!!?????, Joseph W. Wallwork, PE CCE, Cost Engineering Journal, 1998
Project Teams: The Role of the Project Office, Quentin W. Fleming; Joel M. Koppelman, Cost Engineering Journal, 1998
The Leadership Factor: Leading the Way Toward the Next Millennium, Deborah S. Kezsbom, AACE Transactions, 1998
Effective Management of Turnkey Projects, P. Giridhar; K. Ramesh, AACE Transactions, 1998
Top-Down Back-To-Front Project Planning, Faramarz Fred Rahbar; James E. Rowings Jr., PE CCE, AACE Transactions, 1998
The Opening Game - Project Mobilization, Edward E. (Ted) Douglas III, CCC, AACE Transactions, 1998
Team Building and Project Success, Abdulaziz A. Bubshait; Gulam Farooq, Cost Engineering Journal, 1999
Successful Managing Backlogs and Resources, Anthony J. Werderitsch, PE CCE; Timothy H. Orr, CCC; Kenneth R. Cross, PE,
AACE Transactions, 1999
The Management Information Tool System, Shawn L. Kildare; George P. Blank, AACE Transactions, 1999
Leadership, Teamwork, and Empowerment: Management Toward 2000, Carlos G. Taborda M., PE, AACE Transactions, 1999
Project Alignment: The Key to Successful Cost Engineering, Gregory J. Skulmoski; Dr. Francis T. Hartman, P.Eng., AACE
Transactions, 1999
Practical Dispute Management, James G. Zack Jr., AACE Document, 1999
Creating Teamwork in Virtual Teams, Deborah S. Kezsbom, Cost Engineering Journal, 2000
The Project Achilles Heel: Misalignment, Gregory J. Skulmoski; Francis T. Hartman, Cost Engineering Journal, 2000
Improve Profitability through Effective Project Management and TCM, Nick J. Lavingia, PE, AACE Transactions, 2003
Is Your Organization Friendly to Projects?, Parviz F. Rad, PE CCE; Ginger Levin, AACE Transactions, 2003
Portfolio Approach to Program Management, Robert B. Connors, PE CCE, AACE Transactions, 2004
Teaching Project Management and Cost Engineering, Glenn Maples; Anna Greco; Ron Heady; John Tanner, AACE Transactions,
2005
Introduction Management and Controls to Field, Sean T. Regan, CCE, AACE Transactions, 2005
Cost Management in the Stage-Gate System, Ugo Ibusuki, AACE Transactions, 2005
Implementing Project Constructability, Douglas D. Gransberg, PE CCE; Edward E. Douglas III, CCC PSP, AACE Transactions,
2005
A Formalized Model for Managing a Portfolio of Internal Projects, Parviz F. Rad, PE CCE; Ginger Levin, AACE Transactions, 2005
Implementing Best Practices for the 21st Century, Simon Taylor; Peter Morris, AACE Transactions, 2005
The Root Causes of Poor Communication, Sue Dyer, Cost Engineering Journal, 2006
How to Create a World Class Project Management Organization, Nick J. Lavingia, PE, AACE Transactions, 2006
Project Management Maturity Assessment, Parviz F. Rad, PE CCE; Ginger Levin, AACE Transactions, 2006
The "Cool Hand Luke" Theory of Project Communication, William E. Kraus, PE CCE, AACE Transactions, 2006
Human Side of Project Management, Madhu P. Pillai, CCC, AACE Transactions, 2006
Achieving a Successful Project by Motivating the Project Team, Dorothy Ann Brenner, Cost Engineering Journal, 2007
Project Management Sophistication and EPMO, Parviz F. Rad, PE CCE; Ginger Levin, AACE Transactions, 2007
Lessons Learned Process Aligns with Project Life-Cycle, Operations and Engineering Governance, Ewa Piatkiewicz, AACE
Transactions, 2007
Management of Uncertainties and Consequential Costs for Construction Projects in China, Dan Tong Cao; Shou Qing Wang; Robert
Tiong, Cost Engineering Journal, 2008

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 7
57. Estimating Uncertainty for a Life-Cycle Cost Management Program, Dan Melamed, CCC; Bryan Skokan, PE; Mathew Zenkowich;
Dan Kocher, Cost Engineering Journal, 2008
58. The Role of Project Managers in Construction Industry Development, Martyn James Hills; Paul William Fox; Martin Skitmore; Carol
K. H. Hon; Patrick Sik-Wah Fong, AACE Transactions, 2008
59. Project Management, Cost Engineering, Project Definition, Action Plans or What?, Kul B. Uppal, PE, AACE Transactions, 2008
60. What is Project Portfolio Management?, Parviz F Rad, PE CCE; Ginger Levin, AACE Transactions, 2008
61. Using the TCM Framework for Consistency and Comparability of Various Types of Environmental Cost Estimates, Gordon Lee
Ballentine; Amy Gignac, AACE Transactions, 2008

Chapter 04: International Projects


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.

Construction Production Factors in International Areas, Dr. Enno Koehn; Chih-Shing Pan; Jen-Yuan Liu; Rana P. Pingili; Sirichai
Tanratanawong, AACE Transactions, 1995
International Cost and Resource Database, Peter Christensen, AACE Transactions, 1995
Development of a Standard Cost-Coding System, Peter Christensen; Gudmund Vigerust, AACE Transactions, 1995
Cost Engineering Skills Required for Global Programs, John E. Barry, Cost Engineering Journal, 1995
Understanding the Chinese Construction Costing System, Dr. He Zhi, Cost Engineering Journal, 1996
Sources of International Cost Data, Kenneth K. Humphreys, ICEC Transactions, 1996
Techniques and Tools for Project Cash Flow Prediction in the Australian Construction Industry, Timothy R. O'Leary; Selwyn Tucker,
AACE Transactions, 1996
Total Cost Management for Mega Projects Constructed by the Korean Public Corporation, Yong-Eok Lee, AACE Transactions,
1996
Managing Risk on Global Projects, Charles P. Woodward, PE CCE; Kartar Singh, PE, AACE Transactions, 1996
Plan Local, Buy Global, Dennis M. Thompson, CCE, AACE Transactions, 1996
Project Ownership in the Third World, Ram Dabadghav, PE CCE, AACE Transactions, 1996
Productivity of Construction in Developing Areas: India, Enno Koehn, PE; V. R. Ganapathiraju, AACE Transactions, 1996
International Standards: The US Construction Industry's Competitiveness, Dr. Janet K. Yates; Dr. Stylianos C. Aniftos, PE, Cost
Engineering Journal, 1996
The Global Economy, David E. Bond, Cost Engineering Journal, 1996
Understanding Interaction in International Projects, Kim Wikstrom; Stefan Storholm, Cost Engineering Journal, 1997
Lump-Sum Contract Performance - Singapore Experience, Dr. Surinder Singh, AACE Transactions, 1997
Cost Comparison of Pacific Rim Countries, John G. McConville, CCC, AACE Transactions, 1997
Cost Estimating Challenges Facing Eastern Europe, Richard A. Selg, CCE, AACE Transactions, 1997
1996 Japanese Chemical Plant Cost Trends, Yoshimi Saito, AACE Transactions, 1997
Malaysia - A Country Looking Ahead with Vision 2020, Stephen P. Warhoe, PE CCE, Cost Engineering Journal, 1997
International Projects Cost Estimating, Allen C. Hamilton, CCE, AACE Transactions, 1998
International or Cross-Cultural Projects, Irving M. Fogel, PE, AACE Transactions, 1998
The Planning and Execution of an International Project, Charles P. Woodward, PE CCE; Kenneth K. Humphreys, PE CCE, AACE
Transactions, 1998
Project Overhead Costs in Saudi Arabia, Sadi A. Assaf; Abdulaziz A. Bubshait; Solaiman Atiyah; Mohammed Al-Shahri, Cost
Engineering Journal, 1999
Modeling and Forecasting Asias Infrastructure Growth, Abdul Samad Kazi, AACE Transactions, 1999
International Cost Data, 0, Cost Engineering Journal, 2000
Be Prepared for Construction Claims -- Globally, Rohit Singh, AACE Transactions, 2000
International Cost Data, 0, Cost Engineering Journal, 2000

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 8
29. Project Management and Total Cost Management in Italy, Gianluca di Castri, Cost Engineering Journal, 2000
30. Construction Inspection Practices in Southeastern Asia, Enno Koehn, PE; Abu Abdullah Almamun; I.S.M. Mostaque Haider, AACE
Transactions, 2003
31. Managing Construction Industry Development in China, Deepak Bajaj, PE; Rui Zhang, AACE Transactions, 2003
32. 2003 Japanese Chemical Plant Cost Trends, Yoshimi Saito, AACE Transactions, 2004
33. Performance Measurement in the UK Construction Industry, Joe Martin, AACE Transactions, 2004
34. Construction and Corruption in Developing Regions, Enno Koehn, PE; Ranjit K. Tandoor, AACE Transactions, 2004
35. Cost Risk Management in West Rail Project of Hong Kong, Chen Hua; S.W. Poon; F.F. Ng, AACE Transactions, 2004
36. Innovative Pre-Planning for International Projects, Mark T. Chen, PE CCE, AACE Transactions, 2005
37. Construction Productivity in Developing Global Regions, Enno Koehn, PE; Sanjay A. Jagushte, AACE Transactions, 2005
38. Charting a Successful Global Dispute Resolution, Osmond F. Belcher, Cost Engineering Journal, 2005
39. A Study of Advanced Project Control System for Korean Nuclear Power Plant Construction Project, Myung Youl Yoon; Jae Hee Han,
AACE Transactions, 2006
40. Global Experience of Benchmarking Facility Maintenance and Turnaround Contracted Services, Trudi Bissett; John G. Buchan,
AACE Transactions, 2006
41. Construction Claims in Egypt: Contrasts and Similarities With Published Literature, Amr A.G. Hassanein; Waleed M. El Nemr, AACE
Transactions, 2007
42. Development of an International Cost Database, Paul Martin Hewitt, AACE Transactions, 2007
43. The Russian Approach to Project Management in the Oil Industry, Thomas J. Devine, AACE Transactions, 2007
44. World-Class Project Performance with Value Improving Practices, Nick J. Lavingia, PE, AACE Transactions, 2007
45. Women in International Business, Women in Project Controls Task Force of AACE International, AACE Transactions, 2008
46. Evaluating Best Practices for Oil Sands Projects, James Peter Lozon, P. Eng.; George F. Jergeas, P. Eng., AACE Transactions,
2008

Chapter 05: Scheduling


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

Total Float Management in CPM Project Scheduling, Dr. Suthi Pasiphol; Dr. Calin M. Popescu, PE, AACE Transactions, 1995
Design to Schedule (DTOS), Dennis M. Thompson, CCC, AACE Transactions, 1995
Quantifying and Apportioning Delay on Construction Projects, Lee Schumacher, PE, Cost Engineering Journal, 1995
Planning the Work - An Evolution in Progress, Pete J. Salcido; AACE International Planning and Scheduling Committee, Cost
Engineering Journal, 1995
Concurrent Delays in Construction Litigation, Dr. David Arditi; Mark A. Robinson, PE, Cost Engineering Journal, 1995
Activity Duration Quantification Under Uncertainty: Fuzzy Set Theory Application, Jong H. Ock, Cost Engineering Journal, 1996
The Reliability of Critical Path Method (CPM) Techniques in the Analysis and Evaluation of Delay Claims, Gasan G. Kallo, Cost
Engineering Journal, 1996
An Integrated and Proactive Approach for Avoiding Delay Claims on Major Capital Projects, Lee Schumacher, PE, Cost
Engineering Journal, 1996
Estimating Delay Damages, Gary H. Jentzen, PE; Robin A. Collins, PE; Dr. Gui Ponce de Leon, PE, AACE Transactions, 1996
Going for the Goal, Forecasting, Joseph M. Brown, CCC, AACE Transactions, 1996
Developing an As-Built Schedule From Project Records, John R. Knoke, PE; Gary H. Jentzen, PE, AACE Transactions, 1996
A Scheduling Tool for Tunnel Construction, K.A. Pohrte; W.W. Edgerton, PE, AACE Transactions, 1996
A Contract Clause for Allocating Risks, Dr. George F. Jergeas, P.Eng.; Dr. Francis T. Hartman, P.Eng., AACE Transactions, 1996
Applying Multimedia Technology to Mitigate Claims, Liang Y. Liu; John R. Knoke, Cost Engineering Journal, 1996
Planning and Scheduling With Multiple Decision Points, Fritz Ehrenreich-Hansen, P.Eng. CCE; S.W. (Bill) Wilson, P.Eng., Cost
Engineering Journal, 1997

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 9
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.

Construction Claims Preparation Under ADR, Douglas A. Findley, AACE Transactions, 1997
Resolution of Disputes: The Next Generation, James G. Zack Jr., AACE Transactions, 1997
Construction Defects Claims Analysis and Mitigation, Neil D. Opfer, CCE, AACE Transactions, 1997
The Cost of Chasing Unrealistic Project Schedules, Christopher F. Michalak, AACE Transactions, 1997
Resource Loading in a Multiproject Environment, Jim W. Short, CCC, AACE Transactions, 1997
Practical Applications of Probabilistic Scheduling, Dr. Gui Ponce de Leon, PE; John R. Knoke, PE, AACE Transactions, 1997
Optimized Scheduling for Highway Construction, Khaled El-Rayes; Osama Moselhi, PE, AACE Transactions, 1997
Project Scheduling Under Limited Resources, Mohammed Moizuddin; Shokri Z. Selim, AACE Transactions, 1997
Simplifying Project Success Metrics, Dr. Francis T. Hartman, P.Eng.; Dr. George F. Jergeas, P.Eng., Cost Engineering Journal,
1997
The Case for Critical Path, Michael A. Hatfield; James Noel, Cost Engineering Journal, 1998
Schedule Hierarchy - An Overview, Sarwar A. Samad, Cost Engineering Journal, 1998
Analyzing the Impact of Change Orders on a Schedule, Jeffrey A. Veenendaal, Cost Engineering Journal, 1998
Delay Damages - Some Owner Defenses, James G. Zack Jr., AACE Transactions, 1998
Effective Claims Presentations: Making Your Point, Michael R. Just, CCE; Bill Ogden, AACE Transactions, 1998
The Adequacy of Initial Scheduling Estimates, John M. Dye; Dr. Irtishad U. Ahmad, PE, AACE Transactions, 1998
Scheduling for Estimators, Robert R. George, CCC, AACE Document, 1998
Forensic Estimating and Impact Cost Determination, Robert H. Pratt, AACE Document, 1998
CPM Schedules in Construction Claims From the Contractors Perspective, Robert B. McCullough, PE CCE, AACE Transactions,
1999
Developing Construction Claims for Arbitration: An Arbitrators Viewpoint, Dr. Douglas D. Gransberg, PE CCE; Charles A. Joplin,
AACE Transactions, 1999
Interruptible or Continuous Activity Durations?, Dr. Joseph J. Orczyk, PE, AACE Transactions, 1999
Managing Schedule Changes at Rocky Flats, Todd Bilstein, AACE Transactions, 1999
Forensic Estimating of Project Owner Damages, Robert H. Pratt, AACE Document, 1999
Fallacy of the Contract Schedule of Values, Don L. Short II, AACE Document, 1999
Weather Delays and Impacts, Donald F. McDonald Jr., Cost Engineering Journal, 2000
Delay Analysis - Eliminating the Smoke and Mirrors, Eric Z. Fruchtman, AACE Transactions, 2000
Behind-the-Scenes Hurdles to Settlement, Stephen O. Revay, AACE Transactions, 2000
Alternate Dispute Resolution: The Mini-Trial Approach, Michael C. Ray, AACE Transactions, 2000
Pacing Delays -- The Practical Effect, James G. Zack Jr., Cost Engineering Journal, 2000
Schedule Delay Analysis, George R. Stumpf, PE, Cost Engineering Journal, 2000
Cost Management in Lean Manufacturing Enterprises, Robert C. Creese, AACE Transactions, 2000
Project Schedules: Simple Checks for Accuracy, David L. Freidl, PE CCE, AACE Transactions, 2003
Determining the Actual Critical Path, Ronald M. Winter, AACE Transactions, 2004
Project Planning--Then Scheduling, Edward E. Douglas III, CCC, AACE Transactions, 2004
Contractor's Schedule Submittal: Catch-22, Earl T. Glenwright Jr., AACE Transactions, 2004
Concurrent Delay Analysis for Litigation, Victor M. Ostrowski, PSP; Michael T. Midgette, PSP, AACE Transactions, 2005
CPM Scheduling and How the Industry Views Its Use, Patricia D. Galloway, PE, AACE Transactions, 2005
A Continuously Changing As-Planned Baseline?, John. C. Livengood; Mark I. Anderson, AACE Transactions, 2005
Retrospective As-Built Schedule Development, Anamaria I. Popescu, PE; Andrew Avalon, PE, AACE Transactions, 2005
Total Float Management for Delay Analysis, Khalid S. Al-Gahtani; Satish B. Mohan, AACE Transactions, 2005
Documenting the Schedule Basis, Edward E. Douglas III, CCC, PSP, AACE Transactions, 2005
Success: Use of Activity Code Structure for Project Schedule Integration and Monitoring, Gener dela Cruz, AACE Transactions,
2005
Is Your Schedule Late at the Starting Gate?, Abhi Basu, PE, AACE Transactions, 2005

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 10
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.

Transparent CPM, Mark C. Sanders, PE CCE, AACE Transactions, 2005


Managing Multiple Milestones, Ron Winter, PSP, AACE Transactions, 2005
Scheduling Specifications: A Lump Sum Contractor's Perspective, Martin J. Bradley, CCC, AACE Transactions, 2005
Planning and Scheduling Department: Functional Aspects, Junaid Ahcom, ICC; Ali Ali Shash, AACE Transactions, 2005
Benefits of Linear Scheduling, Gary Rock Spencer, PE; Rose Mary Lewis, AACE Transactions, 2005
Project Schedule Delay vs. Strategic Project Planning, Massimoluigi Casinelli, PE, CCE, AACE Transactions, 2005
The Benefits of Monte-Carlo Schedule Analysis, Jason Verschoor, P.Eng., AACE Transactions, 2005
Estimating Cost Growth From Schedule Changes: A Regression, John V. Bielecki; Edward D. White, Cost Engineering Journal,
2005
Evaluating CPM Reliability: A Linguistic Approach, Lee J. Hobb, Cost Engineering Journal, 2006
Construction CPM Scheduling - Precision Without Accuracy, Victor M. Ostrowski, PSP, AACE Transactions, 2006
Development and Training of the Planning and Scheduling Professional, Edward E. Douglas, III CCC PSP, AACE Transactions,
2006
The Great Negative Lag Debate, Edward E. Douglas, III CCC PSP; Timothy T. Calvey, PE PSP; Donald F. McDonald, Jr. PE CCE
PSP; Ronald M. Winter, PSP, AACE Transactions, 2006
Schedule Analysis Indices, Gary Rock Spencer, PE; Rose Mary Lewis, PE, AACE Transactions, 2006
Scheduling: The Good, the Bad and the Ugly, H. Lance Stephenson, CCC, AACE Transactions, 2006
Innovative Approaches to CPM Scheduling Management, Russell P. Vakharia, CCE PSP, AACE Transactions, 2006
Scheduling Specifications for the 21st Century, Paul Levin, PSP, AACE Transactions, 2006
CPM Schedules - Why and How, Satinder Singh Baweja, CCE, AACE Transactions, 2006
Scheduled Overtime and Loss of Productivity: Fact or Fiction? A Business Roundtable Report, Robert Seals, PSP; Josette
Rodriguez, Cost Engineering Journal, 2006
Scheduling Practices for Project Success, Andrew F. Griffith, PE, Cost Engineering Journal, 2006
A Schedule Success: Hartsfield-Jackson Atlanta Airports Runway Delivered 11 Days Early and $102 Million Under Budget, Richard
Sappe, Cost Engineering Journal, 2007
Performing Forensic Delay Analyses From Deep Within the Black Tent, Thomas F. Peters, PE CFCC, AACE Transactions, 2007
Productivity Claims: Beyond Smoke and Mirrors, John Gerard Boyle, AACE Transactions, 2007
How Design Documents Create Claims and What to Do About It, Bryan Payne, PE CCE, AACE Transactions, 2007
How Claims Happen When Schedules Become Political An Actual Court Case Study, Michael W. Leary, PE; Craig D. Hutchison,
AACE Transactions, 2007
Concurrent Schedule Delay Between Main Contractor and Subcontractor, Massimoluigi Casinelli, PE CCE; Aldo De Angelis, AACE
Transactions, 2007
A Structured Approach To Least Cost Recovery Scheduling, Christopher W. Carson, PSP, AACE Transactions, 2007
Innovative Schedule Performance Measurements, Donna J. Nardella, PE PSP, AACE Transactions, 2007
Scheduling Management: Classifications vs. Levels, H. Lance Stephenson, CCC, AACE Transactions, 2007
Converting Linear Schedules to Critical Path Method Precedence, Douglas D. Gransberg, PE CCE, AACE Transactions, 2007
Scheduling Management: Schedule Basis Memorandum, H. Lance Stephenson, CCC, AACE Transactions, 2007
Schedule and Cost Risk Evaluation, Rashmi Prasad, AACE Transactions, 2007
Forensic Schedule Analysis: Example Implementation, Mark C. Sanders, PE CCE PSP, AACE Transactions, 2008
Total Float Management: Renovating a Misused and Abused Approach, Anamaria I. Popescu, PE; John Jerz, AACE Transactions,
2008
Business Rules in CPM Scheduling Software, Abhi Basu, PE PSP, AACE Transactions, 2008
Who Should Own the Float?, Ron Winter, PSP; Timothy T. Calvey, PE PSP, AACE Transactions, 2008
When is the Critical Path Not the Most Critical Path?, Murray Woolf, AACE Transactions, 2008

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 11
Chapter 06: Construction Activities
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.

Model Building Strategy for Construction Cost Overruns, Dr. Mohamed K. El-Choum, AACE Transactions, 1995
Cost-Effective Waste Minimization for Construction Managers, Hal Johnston; William R. Mincks, Cost Engineering Journal, 1995
The Port Authority of New York and New Jersey's Organizational Strategy for Recovering the World Trade Center After the February
26, 1993 Terrorist Bombing, Robert N. Harvey, Cost Engineering Journal, 1995
Applying Total Quality Management to the North American Construction Industry, Dr. R. A. McKim; H. Kiani, Cost Engineering
Journal, 1995
How to Relate a Construction Cost Estimate to the Prevailing Bid Market for Government and Institutional Projects, Nissim Zelouf,
CCE, Cost Engineering Journal, 1995
Unique Kiel Center Arena Project, Joseph J. Diesko, Jr., Cost Engineering Journal, 1995
Construction Project Delay Analysis, Zartab Q. Zafar, PE CCE, Cost Engineering Journal, 1996
The Top Ten Lessons Learned in Construction Contracting, Dr. William W. Badger; Steven W. Gay, Cost Engineering Journal,
1996
Subcontracting Out Scope: According to Plan, Quentin W. Fleming; Joel M. Koppelman, AACE Transactions, 1996
Construction in an Operating Environment, David W. Derkach, CCC, AACE Transactions, 1996
Labor Productivity Modeling With Neural Networks, Dr. James E. Rowings Jr., PE CCE; Rifat Sonmez, AACE Transactions, 1996
Construction Productivity: Continuous Improvement Is Normal, Dr. Richard E. Larew, PE CCE, AACE Transactions, 1996
Constructability in the Design Firm, James A. Young III, CCC, AACE Transactions, 1996
Constructability, "The Stretch Version", Robert J. Geile, PE, AACE Transactions, 1996
Selection of Appropriate Trenchless Technologies for the Repair and Rehabilitation of Underground Infrastructure Systems, Dr.
Robert A. McKim, P.Eng., AACE Transactions, 1996
Construction Cost Reducation: Is it Myth, Window-dressing, or an Omen of Things to Come?, Adek Apfelbaum, Cost Engineering
Journal, 1996
A Spreadsheet Checklist to Analyze and Estimate Prime Contractor Overhead, Walter B. Jones, CCC, Cost Engineering Journal,
1996
An Evaluation of Construction Crew Design Processes, Amr A. G. Hassanein; John W. Melin, Cost Engineering Journal, 1996
A New Twist on Construction Arbitration Rules, Gordon Beveridge, Cost Engineering Journal, 1996
Construction Industry Safety Measures, Nancy Terrero; Janet K. Yates, Cost Engineering Journal, 1997
Construction Estimating and Bidding Strategy, Joseph A. Brown, CCE, AACE Transactions, 1997
Workhour Estimation for the Construction of Tanks, Jayant Kumar B. Shukla; P. Giridhar, AACE Transactions, 1997
Use of Statistical Control Charts in Construction, Satinder S. Baweja, CCE, AACE Transactions, 1997
Construction Documentation Used as Indicators of Delays, Hala Elnagar; Janet K. Yates, Cost Engineering Journal, 1997
Competitively-Bid Construction Contracts, Randy R. Rapp, PE, Cost Engineering Journal, 1997
Bidding Strategies for Trenchless Technologies, Robert A. McKim, Cost Engineering Journal, 1998
The Effect of Hot Weather on Construction Labor Productivity and Costs, Donn E. Hancher; Hesham A. Abd-Elkhalek, Cost
Engineering Journal, 1998
The Five Commandments of Construction Project Delay Analysis, Hamed A. Al-Saggaf, Cost Engineering Journal, 1998
Are Any Construction Overtime "Studies" Reliable?, Richard E. Larew, Cost Engineering Journal, 1998
Inter-American Construction Costs, Leopoldo G. Varela; Roger J. Grant, Cost Engineering Journal, 1998
An Evolutionary Approach to the Capital Budgeting of Construction Projects, Hashem Al-Tabtabai; Alex P. Alex, Cost Engineering
Journal, 1998
Construction Contracts: Shifting Risk or Generating a Claim?, Donald F. McDonald, Jr., PE CCE; John O. Evans III, AACE
Transactions, 1998
What Is a Competitive Advantage in the Construction Industry?, Alfred B. Ngowi; Pantaleo D. Rwelamila, Cost Engineering
Journal, 1999

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 12
34.
35.
36.
37.
38.
39.
40.
41.

Is There a Right Price in Construction Bids?, Joseph W. Wallwork, PE CCE, Cost Engineering Journal, 1999
Are Contractors, Engineers, and Architects Ready for a Crisis?, Janine Reid, Cost Engineering Journal, 1999
Construction Claims: Making It Simple, Michael Marenghi; Anthony J. Werderitsch, PE CCE, AACE Transactions, 1999
Cost Containment Estimating for Construction, Alan J. Barltrop, AACE Transactions, 1999
Project Options: What Is Their Value?, Robert E. Reed Jr., PE CCE, AACE Transactions, 1999
An Integrated Construction Activity Cost System, Dr. Mohamed K. El-Choum, AACE Transactions, 1999
Review of a Design-Build Option, Roger A. Stutz, CCC, AACE Transactions, 1999
Seal Coat Constructability Program, Dr. Douglas D. Gransberg, PE CCE; Dr. Sanjaya P. Senadheera; Ilker Karaca, AACE
Transactions, 1999
42. Decision Support System for Pipeline Route Selection, Prasanta Kumar Dey; Soumitra S. Gupta, Cost Engineering Journal, 1999
43. Appraisal of Contractual Claims, Gianluca di Castri, AACE Transactions, 2000
44. Effective Construction Work Packages, George Richard Gardner, AACE Transactions, 2006

Chapter 07: Risk Management


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

Construction Delay Analysis Systems, Dr. Janet K. Yates; Hisham Aoude, AACE Transactions, 1995
Managing Risk on Capital Projects, Joseph A. Lukas, PE, CCE, AACE Transactions, 1995
240 Aerospace Cost Indexes and Escalation, Joseph A. Brown, CCE, AACE Transactions, 1995
AACE International's Risk Management Dictionary, AACE International Risk Management Committee, Cost Engineering Journal,
1995
Contingency Estimating for Environmental Remediation Projects, Donald Wendel, CCC, Cost Engineering Journal, 1995
Risk Management (Risk Analysis and Control), Samuel L. Shafer, ICEC Transactions, 1996
Contract Negotiations in Developing Countries and Risks Analysis, Francois Rigaud, ICEC Transactions, 1996
Risk Analysis Checklist, Robert M. Smith, ICEC Transactions, 1996
Effective Risk Management for Remediation Projects, Timothy C. McManus; Robert Goltz, PE; Lisa R. Turnbaugh, AACE
Transactions, 1996
Project Capital Cost Risks and Contracting Strategies, Dr. Keith Pedwell, P.Eng.; Dr. Francis T. Hartman, P.Eng.; Dr. George F.
Jergeas, P.Eng., AACE Transactions, 1996
Risk Management Through Sensitivity Analysis, Dr. Ted G. Eschenbach, PE, AACE Transactions, 1996
'Risk Sharing' - Good Concept, Bad Name, James G. Zack Jr., Cost Engineering Journal, 1996
...Project Risks and Risk Allocation, John A. Rutgers; H. Dean Haley, Cost Engineering Journal, 1996
A Realistic Approach To Risk, Ian B. Parr, AACE Transactions, 1997
Risk and Capital Budgeting, Reza Amirkhalili, AACE Transactions, 1997
A Cost-Effective Maintenance Program Through Risk Analysis, Tusar Bandyopadhyay; Prasanta K. Dey; Saumitro S. Gupta, AACE
Transactions, 1997
Risk Assessment and Contingency Estimating, Dr. Osama Moselhi, PE, AACE Transactions, 1997
A Risk-Based Maintenance Model for Cross-Country Pipelines, Prasanta K. Dey; Stephen O. Ogunlana; Saumitra S. Gupta; Mario T.
Tabucanon, Cost Engineering Journal, 1998
Practical Risk Analysis in Scheduling, Abhi Basu, PE, AACE Transactions, 1998
Understanding Risk, Michael W. Curran, AACE Document, 1998
The Time Value of Project Change, David Chick, Cost Engineering Journal, 1999
The Role of Risk Series: Understanding Risk, Michael W. Curran, Cost Engineering Journal, 1999
Basic Techniques for Analyzing and Presenting Cost Risk Analysis, Randal B. Lorance, PE; Robert V. Wendling, AACE
Transactions, 1999
Techniques for Developing Cost Risk Analysis Models, Randal B. Lorance, PE; Robert V. Wendling, AACE Transactions, 1999

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 13
25. Basic Techniques for Analyzing and Presenting Schedule Risk Analysis, Robert V. Wendling; Randal B. Lorance, PE, AACE
Transactions, 1999
26. The Role of Risk, Michael W. Curran, AACE Document, 1999
27. Integrating Risk Analysis With Cost Estimating Relationships, Peter Yu, AACE Document, 1999
28. Guidelines for Successful Risk Facilitating and Analysis, Iqbal Noor, PE CCE; Thomas J. Rye, Cost Engineering Journal, 2000
29. Integration of Schedule and Cost Risk Models, Robert V. Wendling; Randal B. Lorance, PE, Cost Engineering Journal, 2000
30. Risk Management Implementation and Analysis, Sean T. Regan, CCE, AACE Transactions, 2003
31. Contingency! Who Owns and Manages It?, Peter W. Ripley, CCC, AACE Transactions, 2004
32. Project Risk Identification and Management, Mark W. Cohen, PE; Glen R. Palmer, AACE Transactions, 2004
33. Risk Assessments: Value of the Process, Christopher P. Caddell, PE; Sherri R. Crepinsek; Gerald P. Klanac, AACE Transactions,
2004
34. Do We Truly Understand Project Risk?, Stephen L. Cabano, AACE Transactions, 2004
35. Contingency Misuse and Other Risk Management Pitfalls, Iqbal Noor, PE CCE; Robert L. Tichacek, PE, AACE Transactions, 2004
36. Simplified Risk Assessment for Construction Clients, William J. Bender, PE, AACE Transactions, 2004
37. Risk Management on Research and Development Projects, Steven W. Wageman, CCC, AACE Transactions, 2004
38. Identifying Risk Transfer Traps, Sidney J. Hymes, AACE Transactions, 2005
39. Dispute Resolution Strategy and Decision Analysis, Jon Hoogenboom, PE; W. Stephen Dale, AACE Transactions, 2005
40. Contingency in Levelized Capital Cost Estimation, Geoffrey Rothwell, AACE Transactions, 2005
41. Managing Risk for Global Energy Projects, Nick J. Lavingia, PE, AACE Transactions, 2005
42. Risk Management for Pharmaceutical Project Schedules, Alexia Nalewaik, CCE, AACE Transactions, 2005
43. Risk Analysis In Transit Project, Jeffrey Allen; Ali Touran, PE, AACE Transactions, 2005
44. The Application of Risk Management in Infrastructure Projects, Rashed Ali, CCE, Cost Engineering Journal, 2005
45. Formalized Risk Management: Vital Tool for Project - and Business - Success, Peter Cook, Cost Engineering Journal, 2005
46. Management of Project Contingency and Allowance, Jan Terje Karlson; Jon Lereim, Cost Engineering Journal, 2005
47. Value-Based Risk Management (VBRM), Kevin M. Curran, Cost Engineering Journal, 2006
48. A Construction Cost Contingency Tracking System (CTS), John F. Rowe, PE, Cost Engineering Journal, 2006
49. Change Management for Today's Projects - A Process Approach, Stephen E. Goodman, AACE Transactions, 2006
50. Project Risk Management Using Monte Carlo Simulation, Mohamed K. Khedr, PSP, AACE Transactions, 2006
51. Implementing Risk Management on Transit Mega-Projects, Shawn L. Kildare; George P. Blank, AACE Transactions, 2006
52. Significance of WBS in Contingency Modeling, John Gengxin Zhao, AACE Transactions, 2006
53. Risk Analysis and Optimization of the (Un)Balanced Bid, Jon Hoogenboom, PE; W. Stephen Dale; Craig Martell, AACE
Transactions, 2006
54. Proactive Risk Management, Minnesh Kaliprasad, CCE, Cost Engineering Journal, 2006
55. How to Reduce Risk in Project Schedules and Portfolios, Sarim Khan, Cost Engineering Journal, 2007
56. Why Traditional Risk Management Fails in the Oil and Gas Sector: Empirical Front-Line Evidence and Effective Solutions, Brett
Schroeder; Jan A. Jackson, AACE Transactions, 2007
57. Schedule and Cost Risk: An Integrated Part of Risk Management Process in the Ormen Lange Project, Svein Olav Aslaksen;
Gudmund Vigerust, AACE Transactions, 2007
58. The Monte-Carlo Challenge: A Better Approach, John K. Hollmann, PE CCE, AACE Transactions, 2007
59. Risk Assessment For Scheduling Acceleration, Khalid S. Al-Gahtani, AACE Transactions, 2007
60. Handling the Truth in Risk Management, Kevin M. Curran; Michael W. Curran, Cost Engineering Journal, 2008
61. A Practical Application of Monte Carlo Simulation in Forecasting, James D. Whiteside II, PE, AACE Transactions, 2008
62. Escalation Estimating: Lessons Learned in Addressing Market Demand, John K. Hollmann, PE CCE; Larry R. Dysert, CCC, AACE
Transactions, 2008

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 14
Chapter 08: Project Controls
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.

The Role of Project Controls, Manash K. Bagchi, AACE Transactions, 1995


Project Controls on Federal Remediation Contracts, R. Gary Stillman, PE, CCE, AACE Transactions, 1995
Fast-Track Cost Control, James A. Young III, AACE Transactions, 1995
Subcontractor Project Controls Reporting Requirements, Dale A. Pearson, CCE, Cost Engineering Journal, 1995
Project Controls: Cost / Schedule / Progress Management on the NASA Wind Tunnel Restoration Project, Kelvin Yu, PE, CCE, Cost
Engineering Journal, 1996
Advances in Cost Control and Schedule Management for Commercial Construction, Rob McCullough, ICEC Transactions, 1996
The End Game - Project Demobilization and Close-Out, Edward E. (Ted) Douglas III, CCC, AACE Transactions, 1996
Cost Managing by Project Deliverables, Walter J. Strutt, PE CCE, AACE Transactions, 1996
Project Controls Within a Partnering Agreement, James E. Krebs, PE; Alan J. Epstein, CCC, AACE Transactions, 1996
Cost Forecasting - Beyond the Crystal Ball, Leslie E. McMullan, AACE Transactions, 1996
Integrated Project Control and Communications Systems, Gerard J. Hart, AACE Transactions, 1996
Getting the Most From Advanced Process Control, Jim Anderson; Ton Backx; Joost Van Loon; Myke King, Cost Engineering
Journal, 1996
An Estimating and Cost Control Standard for Radiography Inspection, W. A. (Tony) Halse, Cost Engineering Journal, 1997
Design Phase Cost Control, James A. Young III, CCC, AACE Transactions, 1997
Change-Order Management, Bob M. McCally, AACE Transactions, 1997
Environmental Site Project Controls, Edward E. Douglas III, CCC, AACE Transactions, 1997
Beyond Project Controls - The Quality Improvement Approach, Michael G. Sypsomos, AACE Transactions, 1997
Risk Analysis for Environmental Remediation Projects: A Comprehensive Approach, James E. Diekmann, Cost Engineering
Journal, 1997
A Project Cost Control Model, Jim (Gaowu) Zhan, Cost Engineering Journal, 1998
Why Is Traditional Accounting Failing Managers?, Gary Cokins, AACE Transactions, 1998
ABC Management: Where Does It Fit In?, Michael C. Ray, PE CCE, AACE Transactions, 1998
Earned Value Programs for DOE Projects, Donald J. Cass, CCE, AACE Transactions, 1998
RFIs - Use, Abuse, Control, James G. Zack Jr., AACE Transactions, 1998
Project Controls - Where It Fits In, Michael C. Ray, PE CCE, AACE Transactions, 1998
Establishing a Project Controls Organization, Edward E. (Ted) Douglas III, CCC, AACE Transactions, 1999
Document Management and Project Controls, Paul D. Kuhlken, CCC, AACE Transactions, 2003
The Keys to Forecasting - #3 Change Control, James E. Baar; Stephen M. Jacobson, CCC, Cost Engineering Journal, 2004
Essentials of Cost Management, Scott Cullen, AACE Transactions, 2004
Improving Cost Control for Skeptical Managers, Morris E. Fleishman, PE CCE, AACE Transactions, 2004
Project Controls Unplugged, Gary E. Chase; Victoria A. Flores, CCE, AACE Transactions, 2004
Does Project Control Start at Contract Award?, Stephen L. Cabano, AACE Transactions, 2005
Effective Use of Outsourced Project Controls, Christopher F. Michalak; Paul G. Williams, AACE Transactions, 2005
Analyse This! Project Controls Analysis, Nicholas J. Candela, AACE Transactions, 2005
Controlling Non-Construction Costs, Peter R. Bredehoeft, Jr., AACE Transactions, 2005
Construction Audit - An Essential Project Controls Function, Alexia A. Nalewaik, CCE, AACE Transactions, 2006
Six Steps for Successful Change Order Management, Katherine K. Molly, CCC, Cost Engineering Journal, 2007
Project Controls: a Roadmap to a Choice Career, Nyssa-Dawn Amelinda Corria-Simpson; Bernd R. Langer; Pamela Handor, AACE
Transactions, 2008

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 15
Chapter 09: Applicable AACE International Recommended Practices
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.

Total Cost Management Framework: An Integrated Approach to Portfolio, Program, and Project Management, John K. Hollmann, PE
CCE CEP, Editor, AACE International, 2006
10S-90: Cost Engineering Terminology, AACE International, AACE International Recommended Practice, 2009
11R-88: Required Skills and Knowledge of Cost Engineering, AACE International, AACE International Recommended Practice,
2006
14R-90: Responsibility and Required Skills for a Project Planning and Scheduling Professional, AACE International, AACE
International Recommended Practice, 2006
16R-90: Conducting Technical and Economic Evaluations: As Applied for the Process and Utility Industries, AACE International,
AACE International Recommended Practice, 1991
17R-97: Cost Estimate Classification System, AACE International, AACE International Recommended Practice, 1997
18R-97: Cost Estimate Classification System: As Applied in Engineering, Procurement, and Construction for the Process Industries,
AACE International, AACE International Recommended Practice, 2005
19R-97: Estimate Preparation Costs: As Applied for the Process Industries, AACE International, AACE International
Recommended Practice, 1998
21R-98: Project Code of Accounts: As Applied in Engineering, Procurement, and Construction for the Process Industries, AACE
International, AACE International Recommended Practice, 2003
22R-01: Direct Labor Productivity Measurement: As Applied in Construction and Major Maintenance Projects, AACE International,
AACE International Recommended Practice, 2004
24R-03: Developing Activity Logic, AACE International, AACE International Recommended Practice, 2004
25R-03: Estimating Lost Labor Productivity in Construction Claims, AACE International, AACE International Recommended
Practice, 2004
28R-03: Developing Location Factors by Factoring: As Applied in Architecture, Engineering, Procurement and Construction, AACE
International, AACE International Recommended Practice, 2006
29R-03: Forensic Schedule Analysis, AACE International, AACE International Recommended Practice, 2009
30R-03: Implementing Project Constructability, AACE International, AACE International Recommended Practice, 2009
34R-05: Basis of Estimate, AACE International, AACE International Recommended Practice, 2007
36R-08: Development of Cost Estimate Plans - As Applied in Engineering, Procurement, and Construction for the Process Industries,
AACE International, AACE International Recommended Practice, 2009
40R-08: Contingency Estimating: General Principles, AACE International, AACE International Recommended Practice, 2008
41R-08: Risk Analysis and Contingency Determination Using Range Estimating, AACE International, AACE International
Recommended Practice, 2008
42R-08: Risk Analysis and Contingency Determination Using Parametric Estimating, AACE International, AACE International
Recommended Practice, 2009
43R-08: Risk Analysis and Contingency Determination Using Parametric Estimating Example Models as Applied for the Process
Industries, AACE International, AACE International Recommended Practice, 2009
44R-08: Risk Analysis and Contingency Determination Using Expected Value, AACE International, AACE International
Recommended Practice, 2009
53R-06: Schedule Update Review: As Applied in Engineering, Procurement, and Construction, AACE International, AACE
International Recommended Practice, 2008

Author Index

AACE Internationals Professional Practice Guide to


Cost Engineering in the Process Industries
TABLE OF CONTENTS - Page 16
Chronological Index

About the Editor

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Pa ge 1
1.
2.
3.
4.
5.
6.
7.

8.

9.
10.

11.
12.
13.

14.

15.

16.
17.
18.

19.

Chapter 01: General Productivity Management

Documenting the Schedule Basis, Edward E. Douglas III, CCC, PSP, AACE Transactions, 2005
A Conceptual Aspect of Project Management: Point of No Return, Dr. Yash P. Gupta, AACE
Transactions, 1981
A Definition Of Productivity, ML Boyle, Cost Engineering Journal, 1973
A Productivity Challenge in a Utilitys Reliability Construction Program, H. Leon Ellis; Dr. Saied
Gouda, PE; Scott Trowbridge, PE, AACE Transactions, 1993
A Program to Improve Productivity of Field Directed Construction Operations, Michael H. Casten, AACE Transactions, 1981
An Industry Ripe With Paradox Emerges As A Productivity Paradigm, Xerox Engineering Systems, Cost Engineering Journal, 1994
Can the Mystery of Productivity be Solved?, Ralph P. ONeal, Jr., CCE, AACE Transactions,
1990
Construction Performance Benchmarking Measurement, Hans E. Picard, AACE Transactions,
2002
Construction Productivity, James D. Whiteside, II PE, AACE Transactions, 2006
Construction Productivity and Progress Control, Robert E. Sheffield, CCE, AACE Transactions,
1978
Construction Productivity as a Competitive Edge, Dr. Hans E. Picard, AACE Transactions, 1998
Construction Productivity Management, R Cardell, Cost Engineering Journal, 1986
Construction Productivity: A Survey of Industry Practices, George F. Jergeas; Mohammad S.
Chishty; Marko J. Leitner, AACE Transactions, 2000
Construction Productivity: An Auditing and Measuring Tool, George F. Jergeas; Robert McTague, AACE Transactions, 2002
Construction Productivity: Continuous Improvement Is Normal, Dr. Richard E. Larew, PE CCE,
AACE Transactions, 1996
Productivity, AB Lorenzoni, Cost Engineering Journal, 1979
Productivity Defined, Jean-Claude Huot, AACE Transactions, 1981
Revisiting Lost Productivity: A Primer and Update for the Industry, John J. Ciccarelli, PE CCE
PSP; Michael J. Bennink, PE CCE PSP, AACE Transactions, 2010
Understanding the Word Productivity: What It Means And What Is Behind It, Marjatta
Strandell, AACE Transactions, 1982

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 2
20. Increasing Onsite Production, Andrew G. Smith, CCE, AACE Transactions, 1987
21. Productivity And Management: The Challenge For Survival, Delmar R. Rediger, Cost Engineering Journal, 1986
22. ProductivityAn Updated Concept of Management, H. Murray Hohns, AACE Transactions,
1979
23. Project Performance in a Changing Environment, Murtala A. Oladapo, AACE Transactions,
2000
24. Productivity Issues, Melanie L. Longmore; Doug Major; Jose L. Maldonado, AACE Transactions, 2002
25. Productivity Management, Dr. James M. Neil, CCE, AACE Transactions, 1987
26. The Megaproject And Productivity, MA Muspratt, Cost Engineering Journal, 1984
27. Construction Labor Productivity Changes in Bell Canada, Christopher Beckman, AACE Transactions, 1979
28. Construction Production Factors in International Areas, Dr. Enno Koehn; Chih-Shing Pan; JenYuan Liu; Rana P. Pingili; Sirichai Tanratanawong, AACE Transactions, 1995
29. Construction Productivity in Developing Global Regions, Enno Koehn, PE; Sanjay A. Jagushte,
AACE Transactions, 2005
30. International Labor Productivity, JK Yates; S Guhathakurta, Cost Engineering Journal, 1993
31. Labor Productivity in Third World Environments, Dr. James E. Rowings, Jr.CCE; Hashiem, AACE
Transactions, 1986
32. Labor-Productivity For Overseas Construction-Projects, EJ Mark, Cost Engineering Journal,
1975
33. Incremento En La Productividad De Los Recursos Humanos Para Abatir Los Costos De Construccion (SPANISH), Jorge Boysselle De La Mora, AACE Transactions, 1973
34. Productivity in the U.K. Construction Industry, Les Ruddock, AACE Transactions, 1991
35. Variation in Construction Productivity: Developing Countries, Enno Ed Koehn; Sheikh Arif
Ahmed; Satyanarayana Jayanti, AACE Transactions, 2000
36. A Performance-Based Procurement System Used by the State of Wyoming, Dean T. Kashiwagi,
PE; Ziad Al-Sharmani, Cost Engineering Journal, 1997
37. Construction Labor Productivity During Nuclear Power Plant Construction, William B. Murray,
AACE Transactions, 1980

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 3
1.

2.
3.

4.

5.
6.

7.

8.

9.
10.

11.

12.

13.

14.

15.

16.

Chapter 02: Estimating and Planning Productivity

A Review of Methods to Estimate Haul Fleet Production, Douglas D. Gransberg, Cost Engineering Journal, 1998
Conceptual Estimating Productivity Improvements at Kodak, Joseph A. Lukas, AACE Transactions, 1991
D-PIPE: A Worker Hour Rates Data Warehouse for Estimating Industrial Pipe Construction,
Mohamed Al-Hussein; Aubrey Vanderstar; Rajesh Kandanala, Cost Engineering Journal, 2005
Estimating and Improving Excavation Performance, Dr. Peter J. Tarkoy, AACE Transactions,
1990
Estimating Labor Productivity, Joseph A. Brown, CCE, AACE Transactions, 1986
Estimating Labor-Productivity And Its Eect On Construction-Costs, L Dallavia, AACE Transactions, 1960
Estimating Manning Levels for Process Plants, W. A. Alkhayat; Dr. A. M. Gerrard, AACE Transactions, 1984
Forward Pricing Impact on Construction Projects, Brian E. Kasen; Victor C. Oblas, PE, AACE
Transactions, 1996
Productivity Aspects of Capital Cost Estimating, John W. Hackney, AACE Transactions, 1974
Up-Front Cost Estimating of Change Orders, Osama Moselhi; Ihab Assem; Khaled El-Rayes,
AACE Transactions, 2002
Utilizing Productivity Adjustment Formulas in Cost Estimating Spreadsheets, Rick Hentschel,
AACE Document, 2000
What is the U.S. Gulf Coast Baseline when Estimating Site Productivity?, Bruce E. Bradley,
AACE Transactions, 2008
Construction Cost Escalation And Labor Productivity - What Can We Do About It, Joseph Andrew Brown, AACE Transactions, 1971
Cost Impact of Constructability Analysis in Mega Projects, Farshid Gholami; Janaka Y. Ruwanpura; Mahsa Taghi Zadeh, AACE Transactions, 2010
Crew Synchronization in Construction, Anamaria I. Popescu; George E. Gibson, Jr., PE; John D.
Borcherding, PE, AACE Transactions, 1995
Productivity Study for Hazardous and Toxic Waste Remediation Projects, Andrew G. Reape,
CCE, Cost Engineering Journal, 1996

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 4
17. Signicant Elements of Construction Productivity, Dr. Carleton Coulter III; Victor F. Spruill,
AACE Transactions, 1983
18. TVAs Project-Baselining and Improvement Process, Thomas E. Simpson, CCC; C. Robert Seay
Jr, AACE Transactions, 1996
19. Construction Industry Factors Impairing Productivity, P. Fazio; Don Chutter; G. Bourassa; Dr.
Alan D. Russell, AACE Transactions, 1984
20. Cost Indexes Without Productivity Mean Little, Wilbur L. Nelson, AACE Transactions, 1968
21. Rational Basis for Application of Productivity Factors in a DOE/EPCC Construction Cost Estimate, Chris Thomson, PE CCE, Cost Engineering Journal, 2009
22. The Use of the Learning Curve, Jack H. Chellew, AACE Transactions, 1974
23. Unit Pricing as Index of Productivity, Jorge A. Rebata, PE, AACE Transactions, 1979
24. DACE Labor Productivity Norms The New Gulf Coast?, Martin S. J. van Vliet, AACE Transactions, 2011
25. Learning Curves and Work Interruptions in Construction, Vassilios Frantzolas, AACE Transactions, 1984
26. Learning Curves: Theory And Practice, B. R. Elder, AACE Transactions, 1963
27. Labor Resource Planning for Construction Projects, Anubhav Bhargava; Balkiz Oztemir; Allan
D. Chasey, AACE Transactions, 2002
28. Resource Loading in a Multiproject Environment, Jim W. Short, CCC, AACE Transactions,
1997
29. The Productivity Baseline, Ronald Gulezian; Frederick Z. Samelian, AACE Transactions, 2003
30. Production Planning With Nonlinear Cost Considerations, W Conley, Cost Engineering Journal, 1986
31. Cost Estimating of Overseas Construction Projects, John G. McConville, CCC, AACE Transactions, 1994
32. Production Rates for International Projects in Asia, Dr. Enno (Ed) Koehn, PE; Moin U. Ahmed,
Cost Engineering Journal, 1999
33. Production Rates for Urban/Rural Projects in Developing Areas, Enno Koehn; Faisal Ahmed,
AACE Transactions, 2001
34. Cost Comparison of Pacic Rim Countries, John G. McConville, CCC, AACE Transactions, 1997
35. Productivity of Construction in Developing Areas: India, Enno Koehn, PE; V. R. Ganapathiraju,
AACE Transactions, 1996

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 5
1.

2.
3.

4.
5.

6.

7.

8.

9.

10.

11.

12.
13.
14.
15.
16.

17.
18.

Chapter 03: Productivity Measurement and Analyses

An Estimate-Independent Productivity Measurement System, A. Larry Aaron; Dr. H. Randolph


Thomas, AACE Transactions, 1990
Direct Labor Productivity Measurement - As Applied in Construction and Major Maintenance Projects, AACE International, Recommended Practices, 2004
A Methodology for Measuring Construction Productivity, Foster M. Burton, AACE Transactions,
1991
A More Eective Program to Monitor Productivity, Fred S. Griggs, Jr., AACE Transactions, 1980
A Proposal For The Evaluation And Measurement Of Engineering Performance And Eciency, GW
Moorehouse, Cost Engineering Journal, 1971
An Automated Piping Isometric Pricing and Progress Measuring System, Britton L. Wolf; Marian
Walsh, Cost Engineering Journal, 1998
An Improved Technique of Productivity Measurements, Steven G. Revay, CCC, AACE Transactions,
1984
Assessing Methodologies for Quantifying Lost Productivity, Mark C. Sanders, PE; Mark F. Nagata,
AACE Transactions, 2003
Department of Energy/Savannah River Site Productivity Measurement and Continuous Improvement, Richard A. Selg, CCE; Donald C. Thomas, PE, AACE Transactions, 2004
Design Manpower Request Analysis and Performance Measurement, Shawn L. Kildare; George P.
Blank, AACE Transactions, 2003
Developments in Firm-Level Productivity Measurement, Jerry L. Hamlin, CCE, AACE Transactions,
1978
Field Progress Measurement System - Direct Hire Job, SD Toth, Cost Engineering Journal, 1983
Measurement of Engineering Productivity: An Approach, Sharad Dikshit, AACE Transactions, 1973
Measurement of Physical Accomplishments: An Approach, D. Sharad, AACE Transactions, 1974
Measuring Capital Productivity, Jerry L. Hamlin, CCE, AACE Transactions, 1981
Measuring Construction Labor Productivity by Daily Visits, Dr. Iqbal Noor, PE CCE, AACE Transactions, 1998
Measuring Construction Productivity, LM Chang, Cost Engineering Journal, 1991
Measuring Labor-Requirements For Dierent Types Of Construction, JA Mark; M Ziegler, Cost Engineering Journal, 1973

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 6
19. Methods for Construction Productivity Measurement, Jerey S. Russell; Dr. Luh-Maan Chang,
AACE Transactions, 1987
20. Problems In Measuring Production Eciency, LJ Emond, Cost Engineering Journal, 1971
21. Productivity: Measurement and Management, Vic Alby, PE, CCE, AACE Transactions, 1994
22. The Productivity Measurement of Construction Labor Using Work Sampling, Ira B. Gregerman,
AACE Transactions, 1981
23. Tracking and Control of Earthmoving Operations Using Spatial Technologies, Adel Alshibani, Cost
Engineering Journal, 2008
24. TVAs Continuous Outage Productivity Measurement/Improvement, Dr. Hans E. Picard; C. Robert
Seay Jr., AACE Transactions, 1996
25. Work Sampling And Unit Man-hours, Enno Koehn, Cost Engineering Journal, 1983
26. Worker Productivity: Characteristics and Measurement, Ira B. Gregerman, AACE Transactions,
1981
27. Activity Survey Impact on Construction Productivity, Stephen G. Goranson, AACE Transactions,
1988
28. Craftsman Questionnaire Sampling for Construction Productivity, Luh-Maan Chang; Dr. John
Borcherding, AACE Transactions, 1984
29. Criteria And Techniques For Meaningful Work Sampling Productivity Studies, James B. Scarfuto,
Cost Engineering Journal, 1985
30. Productivity Committee Meeting and Productivity - Guess It or Measure It, Ralph P. ONeal, Jr.
CCE, AACE Transactions, 1989
31. Productivity Improvement Through Work Sampling, James L. Jenkins; Daryl L. Orth, Cost Engineering Journal, 2004
32. A Case Study: Schedule Forecast Verication With Productivity Assessment, Win G. Li, CCE PSP,
Cost Engineering Journal, 2005
33. A Method to Calculate the Productivity Factor, Juan Fornino Gaeta; Robert R. Ruiz Gomez, AACE
Transactions, 1993
34. A Model for Analyzing Jobsite Productivity, David D. Chitester, PE, AACE Transactions, 1992
35. A Repricing Model For Production Rate Or Quantity Revisions, Victor Zaloom, PE, Cost Engineering Journal, 1985
36. Analysis of Working Space Congestion from Scheduling Data, Dr. Paviz F. Rad, CCE, AACE Transactions, 1980

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 7
37. Analytical Techniques to Improve Construction Productivity, LM Chang, AACE Transactions,
1988
38. Analyzing Construction Productivity, Joseph J. Orczyk, PE, AACE Document, 1999
39. Are Any Construction Overtime Studies Reliable?, Richard E. Larew, Cost Engineering Journal,
1998
40. Assessing Performance Trends on Industrial Construction Mega Projects, Aminah Robinson
Fayek; Stephen O. Revay, CCC; Doug Rowan; Donald Mousseau, Cost Engineering Journal, 2006
41. Benchmarking Productivity for Electrical Projects, Min-Jae Lee; Awad S. Hanna; Jerey S. Russell, AACE Transactions, 2002
42. Construction Production Forecasting: A Modeling Approach, William Ne Patten, Cost Engineering Journal, 1987
43. Economic Analysis and Productivity of Hazardous Waste Landll Automation, Dr. Amarjit Singh,
PE, AACE Transactions, 1993
44. Estimating Cost Growth From Schedule Changes: A Regression, John V. Bielecki; Edward D.
White, Cost Engineering Journal, 2005
45. Labor Productivity and Manpower Forecasting, Forrest D. Clark, CCE, AACE Transactions, 1985
46. Large Project Dynamics, Jean-Claude Huot; Kenneth G. Cooper, AACE Transactions, 1982
47. Monitoring Productivity with Earned Value Analysis A New Approach, Aldo D. Mattos; Ricardo
Delarue, AACE Transactions, 2010
48. Monitoring the Adequacy of the Amount and Productivity of Engineering and Construction
Manpower, Dwight A. Zink, CCE, AACE Transactions, 1980
49. Multiple Improvement Curve Eects Upon Productivity, Dr. Robert C. Creese; B. P. Madhu Sudhan, AACE Transactions, 1991
50. Optimization of Production in Earthmoving Works, Jose P. Bendicho, AACE Transactions, 1992
51. Performance Management: Making It Work, Gary Cokins, AACE Transactions, 2006
52. Performance Measures By Means of Activity Sampling, Kurt G. R. Heinze, PE CCE, AACE Transactions, 1984
53. Power Plant Outage Project Productivity Improvement, Hans E. Picard; Harley R. Macklin, PE,
AACE Transactions, 1993
54. Predicting Productivity, James M. Neil, CCE; Lee E. Knack, AACE Transactions, 1984
55. Project Productivity Analysis: What Is 1.0?, Charles P. Woodward, PE CCE, AACE Transactions,
2003

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 8
56. The Cumulative Eect of Change, Bob M. McCally, AACE Transactions, 2006
57. Continuous Improvement of Project Productivity, HR Macklin; HE Picard, Cost Engineering Journal, 1992
58. Demonstrated Labor Eciency: An Eective Labor Cost Control and Analytical Tool, Bob M. McCally, AACE Transactions, 1998
59. Determining Labor Productivity: A Case Study, TG Mendel, Cost Engineering Journal, 1991
60. Engineering Performance in the US Industrial Construction Sector, Maged E. Georgy; Luh-Maan
Chang; Lei Zhang, Cost Engineering Journal, 2005
61. Improving Capital Productivity, Jerry L. Hamlin, PE, CCE, AACE Transactions, 1979
62. Mechanical and General Construction Productivity Results, Daryl L. Orth; James L. Jenkins, AACE
Transactions, 2003
63. Mechanical and General Construction Productivity Results, James L. Jenkins; Daryl L. Orth, Cost
Engineering Journal, 2004
64. Productivity Analysis - A Case Study, Charles J. Peles, AACE Transactions, 1977
65. Productivity Control on Large Power Projects, Jude P. Laspa, AACE Transactions, 1980
66. Productivity in Power Plant Construction, Marjatta Strandell, AACE Transactions, 1976
67. Promoting Power Plant Construction Project Productivity, Johannes E. Picard; John Hutcheson,
AACE Transactions, 2008
68. The Productivity of U.S. Manufacturing, Paul C. Nystrom; Richard H. Franke, AACE Transactions,
1977
69. A Systems Approach to Project Management Measurements of Productivity and Cost Control,
Howard M. Sanderson, AACE Transactions, 1976
70. Labor Productivity Modeling With Neural Networks, Dr. James E. Rowings Jr., PE CCE; Rifat Sonmez, AACE Transactions, 1996
71. Modeling Labor Productivity in Steel Fabrication, Lingguang Song; Simaan M. AbouRizk, P.Eng.,
AACE Transactions, 2006
72. Practical EVMS for an EPC Project, Tetsuya Yonezawa, CCE, AACE Transactions, 2005
73. System Dynamic Modeling of Delay and Disruption Claims, William Ibbs; Min Liu, Cost Engineering Journal, 2005
74. Understanding Change of Scope Eects on DBB Projects Using Systems Thinking, Stephen P.
Warhoe, PE CCE CFCC; Paul D. Giammalvo, CCE, AACE Transactions, 2011

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 9
1.

2.
3.
1.
2.

3.

4.
5.

6.
7.
8.

9.

10.
11.
12.

13.

14.

Chapter 04: Productivity in Manufacturing and Industrial settings

Increased Productivity Through Inventory & Production Control, Michael J. Beringer, AACE
Transactions, 1986
Industrial Construction Eciency and Productivity, Hans E. Picard, AACE Transactions, 2000
Industrial Productivity In The United States, O. T. Zimmerman, AACE Transactions, 1966
Chapter 05: Acceleration and other Inuences on Productivity

Cause and Eect: How Schedule Acceleration Aects Productivity, Matthew Christopher Baker,
CCT, Cost Engineering Journal, 2012
Constructive Acceleration A Global Tour, James G. Zack, Jr., FRICS CFCC, AACE Transactions,
2011
Constructive Acceleration: Waking the Sleeping Giant, Thomas F. Peters, PE, Cost Engineering
Journal, 2005
Impact of Overtime on Construction, Irwin Bromberg, PE, AACE Transactions, 1988
Impact of Overtime on Construction Labor Planning, Awad S. Hanna, PE; Kenneth T. Sullivan, Cost
Engineering Journal, 2004
Overtime In Construction, Weldon McGlaun, Cost Engineering Journal, 1973
Schedule Acceleration What, Why and How?, Sunu Mohan, PSP EVP, AACE Transactions, 2008
Schedule Compression for Construction Projects by Interruption in LOB Scheduling, S. Mohammad Amini; Gholamreza Heravi, AACE Transactions, 2009
Scheduled Overtime and Loss of Productivity: Fact or Fiction? A Business Roundtable Report,
Robert Seals, PSP; Josette Rodriguez, Cost Engineering Journal, 2006
The Basics of Constructive Acceleration, James G. Zack Jr., CFCC, Cost Engineering Journal, 2012
Extended Overtime and Construction Productivity, John Smith, AACE Transactions, 1975
Construction Productivity: Major Causes of Impact, Charles A. Leonard; Dr. Paul Fazio; Dr. Osama
Moselhi, AACE Transactions, 1988
Construction Site Utilization: Impact of Material Movement and Storage on Productivity and
Cost, Frederick B. Muehlhausen, AACE Transactions, 1991
Design Phase Inuences on Construction Change Order Costs, John A. Kuprenas, PE, AACE Transactions, 2007

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 10
15. Factors Aecting Productivity, Leon Morrison, AACE Transactions, 1975
16. Factors Which Inuence Productivity on Large Projects, Dr. John D. Borcherding, AACE Transactions, 1978
17. Field Conditions Impacting Construction Budgets, John Dinatale, CCE, AACE Transactions, 1987
18. Field Factors Aecting Masonry Productivity, Nuntapong Ovararin; Calin M. Popescu, AACE
Transactions, 2001
19. Human Skills - Keys to Eectiveness, Stephen M. Roberts, Cost Engineering Journal, 1992
20. Impact: The Real Eect Of Change Orders, Carroll J. Collins, AACE Transactions, 1970
21. Impacts And Construction Ineciency, Dwight A. Zink, Cost Engineering Journal, 1990
22. Impacts of Modications to the Change Order Process, G. Steve Gardner, PE; Roy W. Block, AACE
Transactions, 2004
23. Impacts of Project Change Management on Project Cost and Schedule Performances, Yi Zou;
Sang-Hoon Lee, AACE Transactions, 2006
24. Improving Construction Productivity: The Case for Motivation, G. Douglas Jenkins, Jr.; Alexander
Laufer, AACE Transactions, 1982
25. Improving Productivity With Short-Interval Scheduling, Walter J. Strutt, AACE Transactions, 2001
26. Improving Your Scheduling CAD Productivity, Philip Perzanowski, CCE, AACE Transactions,
1991
27. Inuence of Quality on Construction Costs, John A. Kuprenas, PE, AACE Transactions, 2008
28. Labor Productivity Factors for Hazardous Waste Sites, Donald J. Cass, CCE, AACE Transactions,
1989
29. Labor Productivity Impact of Varying Crew Levels, Donald J. Cass, CCE, AACE Transactions, 1992
30. Major Factors Inuencing Craft Productivity in Nuclear Power Plant Construction, John D.
Borcherding; Scott J. Sebastian, AACE Transactions, 1980
31. Management Development Leads to Increased Productivity, Karl W. Haavind, AACE Transactions, 1984
32. Materials Management; Key to Schedule and Productivity, David M. Harper, AACE Transactions,
1982
33. Motivation and Productivity in the Engineering Environment, Gary L. Leach, AACE Transactions,
1981
34. Motivation and Productivity of Craftsmen and Foremen on Large Projects, John D. Borcherding;
Douglas F. Garner, AACE Transactions, 1980

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 11
35. Motivational Theories and Their Application in Construction, Hassan Ali Halepota, PE CCE, Cost
Engineering Journal, 2005
36. Organizational Assessment for Construction Productivity Improvement, Kim Yea-Sang, AACE
Transactions, 1993
37. Productivity - Open vs. Closed Shop, John R. Heizelman, AACE Transactions, 1981
38. Productivity Improvement Through Communications: C O G, A. Larry Aaron, AACE Transactions,
1989
39. Productivity in Construction - With Relation to Union and Nonunion Operation, John P. Trimmer,
AACE Transactions, 1974
40. Productivity Incentive Schemes on Engineering Construction Sites, Don F. Parkinson, Cost Engineering Journal, 1979
41. Project Cost Control - Behavioral Considerations, Dr. Carl Wolf, CCE; Dr. Phillip F. Ostwald, AACE
Transactions, 1980
42. Soft Skill Quantication (SSQ): Human Peformance vs. Metric, Edward Muzio; Deborah J. Fisher,
PE, Cost Engineering Journal, 2009
43. Stang Problems on Large Construction Projects, Frank F. Moynihan, CCC, AACE Transactions,
2004
44. The Eect of Hot Weather on Construction Labor Productivity and Costs, Donn E. Hancher; Hesham A. Abd-Elkhalek, Cost Engineering Journal, 1998
45. The Human Factor I: Attracting, Retaining, and Motivating Capable People, Minnesh Kaliprasad,
CCE, Cost Engineering Journal, 2006
46. The Human Factor II: Creating a High Performance Culture in an Organization, Minnesh
Kaliprasad, CCE, Cost Engineering Journal, 2006
47. The Root Causes of Poor Communication, Sue Dyer, Cost Engineering Journal, 2006
48. Using Pay to Motivate Construction Job Performance, Alexander Laufer; John D. Borcherding,
AACE Transactions, 1981
49. Weather Delays and Impacts, Donald F. McDonald Jr., Cost Engineering Journal, 2000
50. Is Your Schedule Late at the Starting Gate?, Abhi Basu, PE, AACE Transactions, 2005
51. Counter-Productivity: Its Causes and Cures, Richard E. Westney, AACE Transactions, 1988
52. Dollars And Sense Of Productivity, M. R. Goodes, Cost Engineering Journal, 1984
53. Improved Productivity Through Integrating Work Instruction with Progress Control, Stephen G.
Revay, CCE, AACE Transactions, 1978

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 12
54. Increasing the Productivity of System End-Users, Paul J. Brady, AACE Transactions, 1976
55. Ineciency, Zartab Z. Quraishi, PE CCE, AACE Transactions, 2003
56. Labor Productivity Impacts: A Case Study, Robert D. Kelly, AACE Transactions, 2000

1.

2.

3.

4.

5.
6.
7.
8.

9.

10.
11.

12.

13.

14.

15.

Chapter 06: When Construction Productivity is Disputed

Estimating Lost Labor Productivity in Construction Claims, AACE International, Recommended


Practices, 2004
Applying Multimedia Technology to Mitigate Claims, Dr. Liang Y. Liu; John R. Knoke, PE, AACE
Transactions, 1995
Clients Responsibility To Contractor Relative To Labor Usage And Labor Problems, David McIntire, AACE Transactions, 1969
Demystifying the Law of Lost Productivity Claims, Mark A. Sgarlata; Christopher J. Brasco;
Christopher M. Anzidei; Adam M. Tuckman, AACE Transactions, 2010
Forensic Estimating and Impact Cost Determination, Robert H. Pratt, AACE Document, 2000
Loss of Learning in Disruption Claims, David A. Noreet, CCC, AACE Transactions, 2004
Pacing Delays The Practical Eect, James G. Zack Jr., Cost Engineering Journal, 2000
Pacing: An Excuse for Concurrent Delay?, Ronald J. Rider; Thomas E. Finnegan, AACE Transactions, 2005
Practical Issues in Loss of Eciency Claims, Robert A. Dieterle, CCE; Thomas A. Gaines, CCC,
Cost Engineering Journal, 2011
Productivity Claims: Beyond Smoke and Mirrors, John Gerard Boyle, AACE Transactions, 2007
Quantifying the Eect of Change Orders on Electrical Construction Labor Eciency, Dr. Awad S.
Hanna, PE; Dr. Jerey S. Russell, PE; David Thomack, Cost Engineering Journal, 1998
The Link Between Planning and Programming Practice and the Analysis of Delay and Disruption Claims, Nuhu Braimah; Issaka Ndekugri, AACE Transactions, 2006
The Use of Forensic Animations in Resolving Complex Disruption Claims - A Case Study, Keith
Pickavance, AACE Transactions, 2008
Use of Productivity Factors in Construction Claims, Robert Dieterle, CCE; Alfred DeStephanis,
AACE Transactions, 1992
Productivity Loss for Sewer Pipe Installation, Ancizar Portilla, CCE PSP, Cost Engineering Journal, 2010

AACE Internationals Professional Practice Guide to

Productivity

TA b l E o f C o n T E n T s - Page 13
16. Measured Mile Process Project Controls to Support Equitable Recovery of Production Ineciency Claims, Thomas W. Presnell, CCC, Cost Engineering Journal, 2003
17. Measured Mile Analysis and International Mega-Projects, Dan Crowley; John C. Livengood,
AACE Transactions, 2002
18. Measured Mile Labor Analysis, Timothy T. Calvey, PE; William R. Zollinger III, PE, AACE Transactions, 2003
19. Statistical Evaluations of Measured Mile Productivity Claims, Michael Ross Finke, Cost Engineering Journal, 1998
20. The Measured Mile a Better Way of Using an Old Tool, Glen R. Palmer, PSP, AACE Transactions, 2008
21. The Measured Mile: Proving Construction Ineciency Costs, Dwight A. Zink, Cost Engineering
Journal, 1986
22. Mathews Curve - A Model for Evaluating Impact, Paul R. Heather, CCE, AACE Transactions,
1989
23. Delay Analysis Considering Productivity, Jae-Seob Lee, AACE Transactions, 2006
24. Analyzing the Cumulative Impact of Changes, David D. Reichard; Cheryl L. Norwood, AACE
Transactions, 2001
25. Dealing With Cumulative Impact Claims, Emelyn W. Martinez, MRICS CCC, AACE Transactions,
2010
26. How to Prove/Disprove Cumulative Impact Claims, Anamaria Popescu, PE; Jerey L. Ottesen,
PE PSP; Glen R. Palmer, PSP, AACE Transactions, 2007
27. Ibbs and Leonard Curves: Comparing the Impact of Cumulative Change on Labor Productivity,
William Ibbs; Gerald McEniry, CFCC PSP, Cost Engineering Journal, 2008
28. Is the Theory of Cumulative Impact a Provable Reality?, Stephen P. Warhoe, PE CCE CFCC, Cost
Engineering Journal, 2007
29. Labor Productivity, Disruptions, and the Ripple Eect, Dr. H. Randolph Thomas, PE; Dr. Amr A.
Oloufa, PE, Cost Engineering Journal, 1995