Presupuesto
AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DEL CASCO URBANO SAN RAMON Y SECTORES
ALEDAOS: SAN DIEGO, PUERTA DE ORO, SOL DE ORO, NUEVA ESPERANZA, REYES, PTE VICTORIA SAN ELIAS Y DANIEL ALCIDES
CARRION-SAN RAMON-CHANCHAMAYO
Subpresupuesto
Cliente
Lugar
003
COLECTOR PRINCIPAL DE AGUAS RESIDUALES
MUNICIPALIDAD DISTRITAL DE SAN RAMON
JUNIN - CHANCHAMAYO - SAN RAMON
Item
Descripcin
01
Costo al
Und.
Metrado
Precio S/.
16/06/2012
Parcial S/.
1,936,374.05
01.01
1,750.00
1.29
2,257.50
01.02
Trazo y replanteo inicial del proyecto, para lneas-redes con estacin total
km
2.50
662.13
1,655.33
01.03
km
2.50
334.36
835.90
01.04
50.00
36.52
1,826.00
01.05
76.67
10.88
834.17
01.06
55.94
13.59
760.22
01.07
89.08
16.40
1,460.91
01.08
753.71
24.45
18,428.21
01.09
648.94
30.69
19,915.97
01.10
8.79
30.83
271.00
01.11
81.08
38.06
3,085.90
01.12
389.89
56.28
21,943.01
01.13
34.12
197.96
6,754.40
01.14
89.59
267.21
23,939.34
01.15
270.24
324.96
87,817.19
01.16
Refine y nivel de zanja t-normal para DN 400 - 450 para toda profundidad
1,624.34
5.30
8,609.00
01.17
Refine y nivel de zanja t-con bolonerias para DN 400 - 450 para toda profundidad
479.76
9.61
4,610.49
01.18
Refine y nivel de zanja terr-rocoso p/ tub. DN 400 - 450 para toda profund.
393.95
21.01
8,276.89
01.19
76.67
80.34
6,159.67
01.20
55.94
100.97
5,648.26
01.21
89.08
133.64
11,904.65
01.22
753.71
213.96
161,263.79
01.23
648.94
279.96
181,677.24
01.24
Relleno comp.zanja (pulso) p/tub. t-con boloneria h<2.50m DN 400 - 450 mm.
8.79
202.39
1,779.01
01.25
Relleno comp.zanja (pulso) p/tub. t-con boloneria h<3.00m DN 400 - 450 mm.
81.08
224.83
18,229.22
01.26
Relleno comp.zanja (pulso) p/tub. t-con boloneria h<4.50m DN 400 - 450 mm.
389.89
292.76
114,144.20
01.27
34.12
217.86
7,433.38
01.28
89.59
325.64
29,174.09
01.29
270.24
457.37
123,599.67
01.30
Elim desm (carg+v) t-norm,con bolonera y rocoso Dist.=5km p/tub 400-450mm p/tod prof
2,498.05
13.38
33,423.91
01.31
2,498.05
291.01
726,957.53
01.32
Instalacin de tubera de PVC p/desage DN 450 incl. prueba hidrulica a pie de zanja.
2,498.05
1.06
2,647.93
01.33
2,498.05
1.96
4,896.18
01.34
und
4.00
2,916.74
11,666.96
01.35
und
3.00
3,449.80
10,349.40
01.36
und
16.00
6,663.52
106,616.32
01.37
und
7.00
8,485.81
59,400.67
01.38
und
1.00
3,029.04
3,029.04
01.39
und
1.00
3,583.95
3,583.95
01.40
und
4.00
6,881.04
27,524.16
01.41
und
5.00
8,661.24
43,306.20
01.42
und
1.00
5,038.59
5,038.59
01.43
und
2.00
10,259.45
20,518.90
01.44
und
12.00
60.46
725.52
01.45
und
30.00
37.83
1,134.90
01.46
und
3.00
419.76
1,259.28
02
6,386.40
02.01
m2
48.00
9.20
441.60
02.02
m2
48.00
48.39
2,322.72
02.03
Imprimacin asfltica
m2
48.00
12.19
585.12
02.04
m2
48.00
58.18
2,792.64
02.05
m3
12.00
20.36
244.32
COSTO DIRECTO
SON : UN MILLON NOVECIENTOS CUARENTIDOS MIL SETECIENTOS SESENTA Y 45/100 NUEVOS SOLES