Agenda/Topics Covered
Asset Overview
Operating Management System
MAH Management via Asset Integrity & ALE Process
ALE Process and OGRE Assessment Tool
Asset Integrity Rectification Programme
Asset Overview
Performance Standards
On which to base effective
Integrity Assurance
Which is required for independent
Verification
To demonstrate
SCEs Integrity
In support of the safety cases
Through identification of
Performance Standards
On which to base effective
Integrity Assurance
Which is required for independent
Verification
To demonstrate
SCEs Integrity
In support of the safety cases
Performance Standards
On which to base effective
Integrity Assurance
Which is required for independent
Verification
To demonstrate
UK-00555 Asset
Life Extension
Process
Life Extension
Through identification of
SCEs Integrity
In support of the safety cases
By;
Identifying ageing, obsolescence and life
extension issues via systematic assessment
(OGRE)
Fully supporting Safety Case Thorough Review
requirements
Providing key inputs to Basis of Design
documents allowing for planning & execution of
identified actions
UK-00555 Asset
Life Extension
Process
Life Extension
Goal;
Demonstrate fitness for purpose & suitability of
an asset for specified Life Extension period
Identifies issues associated with maintaining fitness for purpose of an asset for a specified
Life Extension period
Facilitator led assessment carried out by multi-functional team reviewing ~60 ALE
considerations against all SCE, BCE and ECEs
Prioritise issues/gaps:
Issues/gaps validated against ALE strategy of Maintain; Repair; Replace; Remove criteria
Defined scopes implemented via Asset Integrity Rectification Programme
Ageing is not about how old your equipment is; its about what you know about its condition, and
how thats changing over time
10
Degradation Mechanisms;
ALE Strategy
11
Programme commenced mid 2012 with scopes executed via 106POB walk-to-work
barge over ~ 60-80 day duration per asset
Key focus areas/workscopes derived from ALE/OGRE process output combined with
existing prioritised defects (100% P1 P2; X% P3)
Decommissioning / Rationalisation of redundant equipment
Construction Fabric Maintenance / Tertiary Steel Scope
Fabric Maintenance (blasting & painting)
Obsolescence
LOS Microwave System, UPS, Navaids, etc
Maintenance
Power Generation, Crane, etc
12
13
Completed
Ongoing
Helideck Removal/Replacement
16
Plant Optimisation
17
18