KP4 Seminar

Managing Ageing Assets


via ALE OGRE
28th May 2014

Agenda/Topics Covered

Asset Overview
Operating Management System
MAH Management via Asset Integrity & ALE Process
ALE Process and OGRE Assessment Tool
Asset Integrity Rectification Programme

Asset Overview

Operating Management System

Operating Management System

MAH Management via Asset Integrity & ALE Processes

Asset Safety Cases


Justification for safe operation, minimise risk from

Major Accident Hazards


Through identification of

Safety Critical Elements (SCE)


And establishing

Performance Standards
On which to base effective

Integrity Assurance
Which is required for independent

Verification
To demonstrate

SCEs Integrity
In support of the safety cases

MAH Management via Asset Integrity & ALE Processes


UK-00554 Asset
Integrity Process
Asset Safety Cases
Justification for safe operation, minimise risk from

Through identification of

Safety Critical Elements (SCE)


And establishing

Performance Standards
On which to base effective

Integrity Assurance
Which is required for independent

Verification
To demonstrate

Ageing & Obsolescence

Major Accident Hazards

SCEs Integrity
In support of the safety cases

MAH Management via Asset Integrity & ALE Processes


UK-00554 Asset
Integrity Process
Asset Safety Cases
Justification for safe operation, minimise risk from

Safety Critical Elements (SCE)


And establishing

Performance Standards
On which to base effective

Integrity Assurance
Which is required for independent

Verification
To demonstrate

UK-00555 Asset
Life Extension
Process

Life Extension

Through identification of

Ageing & Obsolescence

Major Accident Hazards

SCEs Integrity
In support of the safety cases

Asset Life Extension Process

By;
Identifying ageing, obsolescence and life
extension issues via systematic assessment
(OGRE)
Fully supporting Safety Case Thorough Review
requirements
Providing key inputs to Basis of Design
documents allowing for planning & execution of
identified actions

UK-00555 Asset
Life Extension
Process

Life Extension

Goal;
Demonstrate fitness for purpose & suitability of
an asset for specified Life Extension period

Oil & Gas Release Elimination (OGRE) Assessment Tool


Ensures Ageing, Obsolescence & Asset Life Extension are managed

Identifies issues associated with maintaining fitness for purpose of an asset for a specified
Life Extension period
Facilitator led assessment carried out by multi-functional team reviewing ~60 ALE
considerations against all SCE, BCE and ECEs
Prioritise issues/gaps:

Red Process/procedure gap and condition issues


Amber Condition issues only
Green No gaps/issues

Issues/gaps validated against ALE strategy of Maintain; Repair; Replace; Remove criteria
Defined scopes implemented via Asset Integrity Rectification Programme

Ageing is not about how old your equipment is; its about what you know about its condition, and
how thats changing over time
10

Oil & Gas Release Elimination (OGRE) Assessment Tool


Ensures Ageing, Obsolescence & Asset Life Extension are managed
Asset Life Extension Considerations

Degradation Mechanisms;

ALE Strategy

SCEs; BCEs; ECEs

Plant & Equipment History & Information ; Programmes & Procedures;

11

SNS Asset Integrity Rectification Programme


Ensures Asset & Operating Integrity fitness for purpose is maintained through to the
end of field life

Programme commenced mid 2012 with scopes executed via 106POB walk-to-work
barge over ~ 60-80 day duration per asset

Key focus areas/workscopes derived from ALE/OGRE process output combined with
existing prioritised defects (100% P1 P2; X% P3)
Decommissioning / Rationalisation of redundant equipment
Construction Fabric Maintenance / Tertiary Steel Scope
Fabric Maintenance (blasting & painting)
Obsolescence
LOS Microwave System, UPS, Navaids, etc
Maintenance
Power Generation, Crane, etc

12

GMS Endurance at SNS NUI

13

Asset Integrity Rectification Programme Status

Completed
Ongoing

Asset Integrity Rectification Programme Key Stats


4 satellite scopes completed over 21
month period (>300,000 man hours)

Completed circa 1300 workscopes


Replaced 12 obsolete systems (UPS,
NAVAID & LOS) from each asset

1 Helideck replacement carried out


Removed circa 480Te of redundant steel
Replaced 3.75km of Unistrut
5000 litres of paint applied
527Te scaffolding erected/dismantled

Helideck Removal/Replacement

16

Plant Optimisation

17

Rationalisation of Process Plant

18

Wellhead/Tree Fabric Maintenance