WORK DONE
Area

Description

UOM

Total scope

Planned for
the day
(2nd)

Actual for
the day
(2nd)

Planned for
next day
(3rd)

Cumulative
planned

Cumulative
actual

2032
2032
2032
2032
2032

completed
completed
completed
completed
completed
90% cable trench marking complete
50% cable trench excavation complete

completed
completed
completed

2027
2027

2027
2027
2027
2014
2004

completed
completed
completed

2037
1990

2037
2037
2037
2000
1986

Remarks

Module System

Block-1

Block-2

Block-3

Block-4

Marking done
Drilling done
Reinforcemnt Cage
Foundation Cast
Pile top Cast with Foundation
Installation of Legs
Installation of Rafters
Installation of Purlins
Installation of Modules
Installation of AJB
Installation of SMUs
Marking done
Drilling done
Reinforcemnt Cage
Foundation Cast
Pile top Cast with Foundation
Installation of Legs
Installation of Rafters
Installation of Purlins
Installation of Modules
Installation of AJB
Installation of SMUs
Marking done
Drilling done
Reinforcemnt Cage
Foundation Cast
Pile top Cast with Foundation
Installation of Legs
Installation of Rafters
Installation of Purlins
Installation of Modules
Installation of AJB
Installation of SMUs
Marking done
Drilling done
Reinforcemnt Cage
Foundation Cast
Pile top Cast with Foundation
Installation of Legs
Installation of Rafters
Installation of Purlins
Installation of Modules

Bolts

Bolts

Bolts

Bolts

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

2032
2032
2032
2032
2032
7*284+4*11
284+11
284+11
11580

2027
2027
2027
2027
2027
7*289+4*1
289+1
289+1
11580

2037
2037
2037
2037
2037
7*279+4*21
279+21
279+21
11620

1926
1926
1926
1926
1926
7*274+4*2
274+2
274+2
11000

62

62

13

13

13
13

0
0

13
13

15
15
50
25

15
15
27
21

0
0
37
51

90% cable trench marking complete


50% cable trench excavation complete

20

20

1926

1926
1926
1926
1926
1906

completed
completed
completed
completed
legs installation is in progress
rafter assembling in progress
cable trenching 90% completed
invertor rafter in process

PROJECT - 5 MW SOLAR POWER PROJECT AT : Location


DETAILED CONSTRUCTION PROGRESS REPORT
Date : 03-12-2011

WORK DONE
Block-4

Area

Block-5

Description
Installation of AJB
Installation of SMUs
Marking done
Drilling done
Reinforcemnt Cage
Foundation Cast
Pile top Cast with Foundation Bolts
Installation of Legs
Installation of Rafters
Installation of Purlins
Installation of Modules
Installation of AJB
Installation of SMUs

UOM
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

Total scope

1849
1849
1849
1849
1849
7*247+4*30
247+30
247+31
10480

Planned for
the day
(2nd)

Actual for
the day
(2nd)

Planned for
next day
(3rd)

Cumulative
planned

Cumulative
actual

1849
1849
1849
1849
1849

Remarks

completed
completed
completed
completed
completed
installation of legs is in progress
rafter assembling in progress
cable trenching 90% completed
invertor rafter in process

Control Room - 1 Nos


RCC work
Cable trench
Back filling
Brick wall masonary
Roof structure
Roof sheeting

Cum
RM
Cum
RM
Sq.M
Sq.M

SEPTIC TANK AND WATER TANK TRENCHING


COMPLETE
shuttering in progress

11 kv switch gears
33 kv switch gears
Auxiliary transformers
Main
Control
room

Distribution panels
Scada panels
Batteries
Cable tray
Earthing strip
Cable laying
HT cable termination
High pot test for HT cable
Control cable
Pre commissioning Testing of individual panels
and relays

completed
super structure work is in progress
trench concrete in process
transformer wall column caste complete

Nos
RM

PROJECT - 5 MW SOLAR POWER PROJECT AT : Location


DETAILED CONSTRUCTION PROGRESS REPORT
Date : 03-12-2011

WORK DONE
Area

Description

UOM

Total scope

Planned for
the day
(2nd)

Actual for
the day
(2nd)

Planned for
next day
(3rd)

Cumulative
planned

Cumulative
actual

Remarks

Inverter System- 5 Nos


RCC work
Brick wall masonary
Cable trench
Back filling
Roof structure
Roof sheeting
Inverters
LT Panels
Room No-1 Transformer
for Block-1 Switch gears
Cable tray
Earthing strip
Cable laying
HT cable termination
High pot test for HT cable
Control cable

Cum
RM
Cum
RM
Sq.M
Sq.M

Pre commissioning Testing of individual panels


and relays
RCC work
Cum
Brick wall masonary
RM
Cable trench
Cum
Back filling
RM
Roof structure
Sq.M
Roof sheeting
Sq.M
Inverters
LT Panels
Room No-2 Transformer
for Block-2 Switch gears
Cable tray
Earthing strip
Cable laying
HT cable termination
High pot test for HT cable
Control cable
Pre commissioning Testing of individual panels
and relays
RCC work
Cum
Brick wall masonary
RM
Cable trench
Cum
Back filling
RM
Roof structure
Sq.M
Roof sheeting
Sq.M

Room No-3
for Block-3

excavation and dressing completed


trench raft completed
transformer wall column casting completed
invertor rafter in process

footing completed

excavation and dressing completed


trench raft completed

footing completed

excavating and dressing completed


trench raft completed
super structure column installed
inverter purlin in process

PROJECT - 5 MW SOLAR POWER PROJECT AT : Location


DETAILED CONSTRUCTION PROGRESS REPORT
Date : 03-12-2011

WORK DONE
Area

Description

UOM

Total scope

Planned for
the day
(2nd)

Actual for
the day
(2nd)

Planned for
next day
(3rd)

Cumulative
planned

Cumulative
actual

Remarks

Inverters
LT Panels
Room No-3 Transformer
for Block-3 Switch gears
Cable tray
Earthing strip
Cable laying
HT cable termination
High pot test for HT cable
Control cable
Pre commissioning Testing of individual panels
and relays
RCC work
Cum
Brick wall masonary
RM
Cable trench
Cum
Back filling
RM
Roof structure
Sq.M
Roof sheeting
Sq.M
Inverters
LT Panels
Room No-4 Transformer
for Block-4 Switch gears
Cable tray
Earthing strip
Cable laying
RM
HT cable termination
Nos
High pot test for HT cable
Control cable
Pre commissioning Testing of individual panels
and relays
RCC work
Cum
Brick wall masonary
RM
Cable trench
Cum
Back filling
RM
Roof structure
Sq.M
Roof sheeting
Sq.M
Inverters
LT Panels
Room No-5 Transformer
for Block-5 Switch gears
Cable tray
Earthing strip
Cable laying

completed
trench raft completed

footing completed

completed
trench raft completed

footing completed

PROJECT - 5 MW SOLAR POWER PROJECT AT : Location


DETAILED CONSTRUCTION PROGRESS REPORT
Date : 03-12-2011

WORK DONE
Room No-5
for Block-5

Area

Description
HT cable termination
High pot test for HT cable
Control cable
Pre commissioning Testing of individual panels
and relays

UOM

Total scope

Planned for
the day
(2nd)

Actual for
the day
(2nd)

Planned for
next day
(3rd)

Cumulative
planned

Cumulative
actual

Remarks

PROJECT - 5 MW SOLAR POWER PROJECT AT : Location


DETAILED CONSTRUCTION PROGRESS REPORT
Date : 03-12-2011

WORK DONE
Area

Description

UOM

Total scope

Planned for
the day
(2nd)

Actual for
the day
(2nd)

Planned for
next day
(3rd)

Cumulative
planned

Cumulative
actual

Remarks

11 Kv Transformers and Ringmain Unit


RCC Qty
11 kv Transformer installations
RMU Installations
LT cable
TR-1,RMU-1 HT Cable
(Block-1) HT cable from Transformer to RMU
Earthing
Cable laying (RMU 1-RMU-2)
Cable laying from RMU-1 to MCR (11 KV
panels)
RCC Qty
11 kv Transformer installations
RMU Installations
LT cable
TR-2,RMU-2 HT Cable
(Block-2) HT cable from Transformer to RMU
Earthing
Cable laying (RMU 2-RMU-3)
Cable laying from RMU-2 to MCR (11 KV
panels)
RCC Qty
11 kv Transformer installations
RMU Installations
LT cable
TR-3,RMU-3 HT Cable
(Block-3) HT cable from Transformer to RMU
Earthing
Cable laying (RMU 3-RMU-4)
Cable laying from RMU-3 to MCR (11 KV
panels)
RCC Qty
11 kv Transformer installations
RMU Installations
LT cable
TR-4,RMU-4 HT Cable
(Block-4) HT cable from Transformer to RMU
Earthing
Cable laying (RMU 4-RMU-5)
Cable laying from RMU-4 to MCR (11 KV
panels)
RCC Qty
11 kv Transformer installations

TR-5,RMU-5
(Block-5)

Cum

RMU TRENCHING COMPLETE

RM
RM

Cum

RMU TRENCHING COMPLETE

Cum

Cum

RMU TRENCHING COMPLETE

Cum

RMU TRENCHING COMPLETE

PROJECT - 5 MW SOLAR POWER PROJECT AT : Location


DETAILED CONSTRUCTION PROGRESS REPORT
Date : 03-12-2011

WORK DONE
Area

Description

UOM

Total scope

Planned for
the day
(2nd)

Actual for
the day
(2nd)

Planned for
next day
(3rd)

Cumulative
planned

Cumulative
actual

Remarks

RMU Installations
LT cable
TR-5,RMU-5 HT Cable
(Block-5) HT cable from Transformer to RMU
Earthing
Cable laying (RMU 4-RMU-5)
Cable laying from RMU-5 to MCR (11 KV
panels)

33 KV Transformers
PCC

Cum

RCC for foundation

Cum

pcc , raft casting and first lift completed

Transformer installation
33kv TR-1

33kv TR-2

Cable tray
Cable laying
HT cable termination
High pot test for HT cable
PCC
RCC for foundation
Transformer installation
Cable tray
Cable laying
HT cable termination
High pot test for HT cable

Cum
Cum

RM

pcc, raft casting and first lift completed

PROJECT - 5 MW SOLAR POWER PROJECT AT : Location


DETAILED CONSTRUCTION PROGRESS REPORT
Date : 03-12-2011

WORK DONE
Area

Description

UOM

Cabling-DC side

Block 1

Block 2

Block 3

CablingModules to AJB

RM

Termination- Modules to AJB

Nos

Cabling-AJB to CB

RM

Terminations-AJB to CB

Nos

Cabling-CB to MJB

RM

Terminations-CB to MJB

Nos

Cabling-MJB to Inverters

RM

Terminations-MJB to Inverters

Nos

Cabling-Inverter to LT panels

RM

Terminations-Inverter to LT panels

Nos

Cabling-LT panels to transformer (.320v to


11KV)

RM

Terminations-LT panels to transformer (.320v


to 11KV)

Cum

CablingModules to AJB

RM

Termination- Modules to AJB

Nos

Cabling-AJB to CB

RM

Terminations-AJB to CB

Nos

Cabling-CB to MJB

RM

Terminations-CB to MJB

Nos

Cabling-MJB to Inverters

RM

Terminations-MJB to Inverters

Nos

Cabling-Inverter to LT panels

RM

Terminations-Inverter to LT panels

Nos

Cabling-LT panels to transformer (.320v to


11KV)

RM

Terminations-LT panels to transformer (.320v


to 11KV)

Cum

CablingModules to AJB

RM

Termination- Modules to AJB

Nos

Cabling-AJB to CB

RM

Terminations-AJB to CB

Nos

Cabling-CB to MJB

RM

Total scope

Planned for
the day
(2nd)

Actual for
the day
(2nd)

Planned for
next day
(3rd)

Cumulative
planned

Cumulative
actual

Remarks

PROJECT - 5 MW SOLAR POWER PROJECT AT : Location


DETAILED CONSTRUCTION PROGRESS REPORT
Date : 03-12-2011

WORK DONE
Area

Block 3

Block-4

Block-5

Description

UOM

Terminations-CB to MJB
Cabling-MJB to Inverters
Terminations-MJB to Inverters
Cabling-Inverter to LT panels
Terminations-Inverter to LT panels

Nos
RM
Nos
RM
Nos

Cabling-LT panels to transformer (.320v to


11KV)

RM

Terminations-LT panels to transformer (.320v


to 11KV)

Cum

CablingModules to AJB
Termination- Modules to AJB
Cabling-AJB to CB
Terminations-AJB to CB
Cabling-CB to MJB
Terminations-CB to MJB
Cabling-MJB to Inverters
Terminations-MJB to Inverters
Cabling-Inverter to LT panels
Terminations-Inverter to LT panels

RM
Nos
RM
Nos
RM
Nos
RM
Nos
RM
Nos

Cabling-LT panels to transformer (.320v to


11KV)

RM

Terminations-LT panels to transformer (.320v


to 11KV)

Cum

CablingModules to AJB
Termination- Modules to AJB
Cabling-AJB to CB
Terminations-AJB to CB
Cabling-CB to MJB
Terminations-CB to MJB
Cabling-MJB to Inverters
Terminations-MJB to Inverters
Cabling-Inverter to LT panels
Terminations-Inverter to LT panels

RM
Nos
RM
Nos
RM
Nos
RM
Nos
RM
Nos

Cabling-LT panels to transformer (.320v to


11KV)

RM

Terminations-LT panels to transformer (.320v


to 11KV)

Cum

Roads and Drains


Survey
Marking

Roads 1

RM
RM

Total scope

Planned for
the day
(2nd)

Actual for
the day
(2nd)

Planned for
next day
(3rd)

Cumulative
planned

Cumulative
actual

Remarks

PROJECT - 5 MW SOLAR POWER PROJECT AT : Location


DETAILED CONSTRUCTION PROGRESS REPORT
Date : 03-12-2011

WORK DONE
Area

Description

UOM

Excavation for roads


Excavation for drains
Profile correction for the road
Back filling for the road
Compaction for the road
Final fininshin of the road

RM
RM
RM
RM
RM
RM

Road 2

Survey
Marking
Excavation for roads
Excavation for drains
Profile correction for the road
Back filling for the road
Compaction for the road
Final fininshin of the road

RM
RM
RM
RM
RM
RM
RM
RM

Road 3

Survey
Marking
Excavation for roads
Excavation for drains
Profile correction for the road
Back filling for the road
Compaction for the road
Final fininshin of the road

RM
RM
RM
RM
RM
RM
RM
RM

Road 4

Survey
Marking
Excavation for roads
Excavation for drains
Profile correction for the road
Back filling for the road
Compaction for the road
Final fininshin of the road

RM
RM
RM
RM
RM
RM
RM
RM

Roads 1

Underground tank

Total scope

Planned for
the day
(2nd)

Actual for
the day
(2nd)

Planned for
next day
(3rd)

Cumulative
planned

Cumulative
actual

Remarks

rst lift completed

PROJECT - 5 MW SOLAR POWER PROJE

Manpower Summary Shee


Type of Manpower
Project Manager
Civil Engineers
Electrical Engineers
Civil Supervisors
Electrical Supervisors
Electricians
Civil Masons
Civil Helpers
Augur Operators
Bar Benders
Excavator Operator
Mechanical Workers
Survey Team
Fork Lift Operator
Helpers with Fork Lift
Manual Rigger Workers

Sub Vendor - 1
BCC

Main vendor SWL


1
1
1
3
1

0
2
0
2
0
8
50
1
10
1
3

80

- 5 MW SOLAR POWER PROJECT AT - Location


Manpower Summary Sheet
Sub Vendor - 2
HEMARAJ

Sub Vendor - 3

New

New

New

Planned
Out Sourced manpower for
the day

4
1
9
60
8
1
3

90

Actual
available at
site
1
3
1
9
1
1
17
110
1
18
2
6
0
0
0
7
0
0
0
0
177

PROJECT - 5 MW SOLAR POWER PROJECT AT - Location


Machines Mobilisations - Working Conditions only
Type of Machine

SW

Vendor-1

RMC Plant
Mechanised Augurs- 300 mm Dia
Hand Augers with Tripod
Total Station for Marking
Tractor Mounted Crane
Tractors
Trolly for Tractor
Concrete Mixers
Site Vehicle - Four Wheelers
Site Vehicle - Two Wheelers
JCB
Vibratory Rollers
Transit Mixers
Welding Machines
Hydra 12 MT
Fork Lift
Dumpers
Pavers
Sprayers
Millers
Dozzer

Total

Vendor-2

Vendor-3

1
1
1

4
2

1
1

3
3

1
1

17

ER PROJECT AT - Location

Working Conditions only


Vendor-4

Vendor-5

Vendor-6

Vendor-7

Actual T&P
at site
1
0
1
1
0
5
3
0
4
4
0
4
0
0
0
0
0
0
0

23

PROJECT - 5 MW Solar(PV) Project - Location


Issues/problems and solution tracker
Date
3.11.2011

PROJECT - 5 MW Solar(PV) Project - Location


Issues/problems and solution tracker
Description of Issue/Accident/Problem

ion
Reason

Impact

Anda mungkin juga menyukai