Anda di halaman 1dari 8

Expression of Interest

For
Numbering of electric poles

KERALA STATE ELECTRICITY BOARD LTD

Last date for submission of EOI is 13/03/2015 up to 3.00 P.M.

Chief Engineer (IT)


Kerala State Electricity Board Ltd
Vydyuthi Bhavanam, Pattom,
Thiruvananthapuram, Kerala-695 004
Phone no. 91(471) 251 4610, 251 4673. Email: ceitsc@ksebnet.com

KSEBL EOI-Pole numbering

Page 1 of 8

Expression of Interest.
1. Introduction
The Kerala State Electricity Board Limited (hereinafter referred to as either
KSEBL or The Board) is a utility engaged in generation, transmission and distribution
of electricity in Kerala. These are organized under three strategic business units viz.
Generation, Transmission and Distribution. The operations are spread over 26 sites in
the generation business unit, 271 units under transmission business unit and around
750 units under distribution business unit organized under different organizational
structure. The total number of employees who contribute to the output of the Board
exceeds 30,000. The Board carries out capital works involving substantial investments in
the three business units. The 750 units under distribution function under 70 distribution
Divisions and cater to the requirements of more than one crore consumers through
around 67,000 transformers, 55,000 km HT lines and 2,60,000km LT lines. Each of the
sub offices manage large volumes of transactions as part of the day to day operations
and repair and maintenance works.
2. Invitation of Expression of Interest
Kerala State Electricity Board Ltd. has approximately 75 lakhs of electric poles spread
across Kerala. KSEBL intends to adopt new concepts in numbering of all these electric
poles. Towards achieving this objective, a better understanding of the present market
about the technological and commercial benefits of adopting appropriate technology for
numbering of electric poles is inevitable.
This Expression of Interest (EOI) is invited from the firms / suppliers to enable Kerala
State Electricity Board Ltd to gain innovative & cost effective ideas for adopting new
concepts in numbering of electric poles in entire business area of KSEBL.
3. Scope of Work
The selected firms/ suppliers are expected to provide the following services

Kerala State Electricity Board Ltd intends to standardize the design of


pole numbering
To suggest a new methodology for affixing pole numbers in electric
poles of KSEBL.
Providing serially marked pole number in all poles with yellow
background and black characters. The yellow back ground may be
circular in shape having approximate diameter of 20 cm and the size of
black characters may be 2 cm in height x 1.5 cm in width.
Alternate shape and size can be suggested
Deterioration due to environmental conditions should be minimal.

KSEBL EOI-Pole numbering

Page 2 of 8

In the case of a new pole erection due to dismantling/breaking of


existing pole, replication of the original pole number to new pole should
be easy.
The pole numbering system should not interfere with normal electrical
or related works with respect to a pole.
KSEBL presently uses different types of poles like wooden, iron rail,
concrete, A type etc.

4. Terms & Conditions


1.
2.
3.
4.
5.

A Committee formed by KSEBL will carry out the technical evaluation of


the EOIs received based on their viability, feasibility, quality and cost
effectiveness.
As part of the Evaluation Process, KSEBL may invite the Applicant to make
a Presentation before the Committee for the scrutiny of the EOIs received.
After completion of the evaluation, if found suitable, KSEBL may decide
to empanel a set of Applicants for participation in the subsequent selection process.
Time schedule for implementation of the project shall be mentioned in
the proposal.
Previous experience in implementing similar projects will be given
weightage.

5. Documents to be enclosed (as in Form F1 to F4)

Profile of the company


Detailed proposal Describing the solution offered along with the time
schedule for completion.
Commercial terms and conditions for the services offered
Documents proving the bidders credentials
Copies of Work Orders and completion reports from customers in proof
of the project experience

6. Last date of Submission of EOI and samples:


i)
ii)
iii)

Last date and time of receipt of EoI: 13-03-2015; 3.00 p.m.


Date and time of opening of EoI: 13-03-2015; 4.00 p.m.
Last date and time of submission of samples: 20-03-2015; 3.00 p.m.

The EOI addressed to the Chief Engineer (IT), Kerala State Electricity Board,
Vydyuthi Bhavanam, Pattom, Thiruvananthapuram shall be submitted at ITComputerisation Unit (3rd floor), Cabin no. 379, Vydyuthi Bhavanam, Pattom,
KSEBL EOI-Pole numbering

Page 3 of 8

Thiruvananthapuram. Phone no: 0471 - 2514274, 2514624, Email:


ksebccs@ksebnet.com.
7.

The interested suppliers or manufacturers may obtain further details, if any,


from office of the Chief Engineer (IT), KSEB, 3rd Floor, Vydyuthi Bhavanam, Pattom, Thiruvananthapuram - 695 004.
All communications shall be addressed to the Chief Engineer (IT) only.
Expression of Interest documents may be downloaded from the website of KSEB
Ltd www.kseb.in.
KSEB Ltd. reserves the right to cancel /re-tender this process without assigning
any reason.
The empanelment does not in any way constitute any contract of agreement of
any kind what so ever with the firms.

KSEBL EOI-Pole numbering

Page 4 of 8

Standard forms for submission


The following forms are to be used in submitting the expressions of interest
FORM F-1 TECHNICAL PROPOSAL SUBMISSION FORM
[Location, Date]
To:
The Chief Engineer (IT)
KSEB, Vydyuthi Bhavanam,
Pattom
Dear Sirs:
We/I are/am interested in being short listed for the task of Pole numbering
work of electric poles in KSEBL in accordance with your Expression of Interest Proposal
dated 00.00.2015. We/I are/am hereby submitting our proposal in the format desired
by you.
We are submitting our Proposal in association with: [Insert a list with full name
and address of each joint venture partner]
We hereby declare that all the information and statements made in this Proposal
are true and accept that any misinterpretation contained in it may lead to our
disqualification.
We understand you are not bound to accept any Proposal you receive.
Yours sincerely,
Authorized Signature [In full and initials]:
Name and Title of Signatory:
Name of Firm:
Address:

KSEBL EOI-Pole numbering

Page 5 of 8

FORM F-2 ORGANIZATION AND EXPERIENCE

A Firm/ supplier

[Provide here a brief (two pages) description of the background and organization of the
firm and each joint venture partner, if any, for this assignment.]
B Firm/ suppliers Experience
[Using the format below, provide information on each assignment for which your firm
was legally contracted either individually as a corporate entity or as one of the major
companies within a joint venture, for carrying out services similar to the ones requested
under this assignment. Use a maximum of 10 pages.]

Name of
Project

Brief Scope
necessarily
including role
played
by the bidder

KSEBL EOI-Pole numbering

Owner of
the
Project
(Client
Name)

Cost of
Assignment

Page 6 of 8

Date of Award/
Commencement

Date of
Completion

Form No F-3: Company Information

Kindly provide the following details for the Firm and Consortium Members:
1. Name of the Firm:______________________________________
2. Individual and Cumulative Turnover in the Last three audited financial years (in INR):
Firm/consortium
Lead
Member-1
Member-2

Year 2010-11
<Amount in
INR>

Year 2011-12
<Amount in
INR>

Year 2012-13
<Amount in
INR>

Total
<Amount in
INR>

(Please provide Published Annual Account for Balance Sheet and Profit and Loss
statements as Proof)
Signature:
Full Name:
Address:
Company Seal:

Date:

KSEBL EOI-Pole numbering

Page 7 of 8

Form No F-4: Financial proposal


Sl No

Particulars
Numbering of electric pole as detailed in the
scope of work of this EOI document

Unit rate*

* The rate quoted shall be all inclusive charges for numbering of one pole

Signature: