Anda di halaman 1dari 3

0 Put the mixed gravel from the pit to the screening and laden them with it unti

l it turns on automatically. The system separates the mixture into fine sand and
coarse gravel. | | Store the material in the respective bearing boxes. Be caref
ul not to mix the sifted material, only pure material will be paid accordingly.
You can get all 3 boxes associated with the fill material and make money.
1 lifting a ditch on the first plot, so that it meets the required course. Be ca
reful not to dig too deep, so that it can be set to be laid waste pipes to the r
equired height.
2 lifting a ditch on the second plot, this corresponds to it the required course
. Be careful not to dig too deep, so that it can be set to be laid waste pipes t
o the required height.
3 lifting a ditch on the third plot, so that it meets the required course. Be ca
reful not to dig too deep, so that it can be set to be laid waste pipes to the r
equired height.
4 lifting the main supply ditch to connect the garden plots off. If you are the
top layer of topsoil and given an extra abtrgst bring storage space, you can earn
more money. | | Be careful not to dig too deep, so that it can be set to be lai
d waste pipes to the required height.
5 Slide the material is in the ditch, that an accumulation occurs above the tren
ch, so that the height markers appear to be white. | | Then condense the materia
l is pushed until the trench is flat to the surrounding area.
6 The plot of the Schmidt family to be prepared for a building project. For this
, the building area is to be brought to the required height level. | | Spread th
e excess material to the ground level and at the required height level. | | Exce
ss material outside of the building area, you can store.
7 condense the plot with the help of the vibrating plate or road roller, so that
it is viable. Drive to repeat uniformly across the surface until no marker is v
isible.
8 Pick up a foundation ditch. You can go to the playground to the excavation, th
ere is required a lot of ground to them even a sledding hill to form for the chi
ldren. | | Dump the charge on the given surface. You recognize a sign to tell ex
actly where the material should be dumped.
9 wealth with the help of concrete pump the trench with concrete evenly. Positio
ning to the concrete mixing pump, so that the pumping boom reaching any position
of the trench. | | Condense the cast concrete material with the help of Flasche
nrttlers until the concrete ground flat and evenly fills the trench.
10 The site of the Miller family to be prepared for a building project. For this
, the building area is to be brought to the required height level. | | Distribut
e the excess material until the bottom level and at the required height level. |
| Excess material outside of the building area, you can store.
11 A civil engineering team has already started digging the pit for the home of
the Miller family. Put the work continues. You can go to the playground to the e
xcavation, there is required a lot of ground to them even a sledding hill to for
m for the children. | | Dump the charge on the given surface (sign) from.
12 solidify the bottom of the basement pit until the density of the material is
everywhere evenly and produces a flat surface. Drive to repeat uniformly across
the surface until no marker is visible.

13 wealth with the help of concrete pump, the casing of the base plate evenly wi
th concrete. Positioning to the concrete mixing pump, so that the pumping boom r
eaching any position of the bottom surface. | | Condense the cast concrete mater
ial using the Flaschenrttlers until the concrete mass has precisely and uniformly
distributed.
14 This apartment building was bungled in the basement insulation. Must now be i
solated later. | | Raise a ditch next to the house wall.
15 specialists in insulation now have subsequently isolated the external basemen
t wall. Sliding the material so that an accumulation in the trench above the tre
nch is formed, so that the height markers appear white. | | Then condense the ma
terial is pushed through the gap to just running around.
16 In this multi-family home was botched in the basement insulation. Must now be
isolated later. | | Raise a ditch next to the house wall.
17 specialists in insulation now have subsequently isolated the external basemen
t wall. Sliding into the ditch the material so that a cluster is formed above th
e trench, so that the height markers appear to be white. | | Then condense the m
aterial is pushed through the gap to just running around.
18 This should result in a large parking lot. To the surface to the required hei
ght level is to bring. | | Distribute the excess material until the bottom level
and at the required height level. | | Excess material you can park outside the
store area.
19 to obtain a sustainable basis, the soil must be compressed for future parking
. Drive to repeat uniformly across the surface until no marker is visible.
20 The top layer gets the gravel parking lot, which must be distributed evenly.
Sliding the material width, until the surface is completely covered with it and
having a uniform height level.
21 A civil engineering team has already begun to dig the pit for a planned pond.
Put the work continues. You can go to the playground to the excavation, there i
s required a lot of ground to them even a sledding hill to form for the children
. | | Dump the charge on the given surface (sign) from.
22 Here is a new wind turbine will be installed. For the foundation is to dig a
pit. Start with the dredging work in the center of the pit and always outwardly
so that the excavator can stay always on top. | | Dump the material into the pit
next to the building site.
23 wealth with the help of concrete pump, the casing of the foundation evenly wi
th concrete. Positioning to the concrete mixing pump, so that the pumping boom r
eaching any position of the bottom surface. | | Condense the cast concrete mater
ial using the Flaschenrttlers until the concrete mass has precisely and uniformly
distributed.
24 A heavy rain has flooded the drainage ditch and the street with soil material
. | | Complete the material from the road. Keep it on the side of the green area
adjacent to the street until the road is completely passable again.
25 To prevent suspensions of soil material on the road, the drainage ditch be cl
eared. | | Remove the material is swept out of the ditch and tipping it sideways
into the deeper green area.
26 A demolition excavator to break up the concrete road under the bridge. In ord
er for this excavator is digging through the gravel was deposited, which will no

w be pushed into the ditch. | | Slide the existing material in the sink until th
e crossing meets the requirements.
27 Tear off the concrete floor under the bridge fully open until the entire surf
ace is broken into pieces.
28 Here is to create a parking lot for visitors to the theme parks. For this, th
e upper is to be removed until a flat and well formed. | | Slide the upper soil
layer in the area between the tracks, so there may be the last joint of the mini
ature railway will be completed.
29 as the upper layer gets the parking lot gravel, which must be distributed eve
nly. Sliding the material width, until the surface is completely covered with it
and having a uniform height level.
30 condense the gravel material until the entire surface is flat and firm. Drive
to repeat uniformly across the surface until no marker is visible.

Anda mungkin juga menyukai