Slide 1

Assalamualaikum and very good morning to all of you. Today we want to present
our proposal. Our proposal title is Hazard Identification, Risk Assessment and
Control or we call HIRAC.
Slide 2
First of all, let me introduce our group members. My name is Mohd Khairul Imran
and my group member is Nor Farah Alwani.
Slide 3
This is one of the news statements about the construction sector situation.
(baca statement tuu)
Slide 4
In the construction sector, we found that higher accident statistic record by
PERKESO on year 2009. 3643 accident case has been identifying. So, base on the
following statement, we know that safety and health at construction site have
yet to be satisfactory.
Risk management aspects will be taken seriously and will be review in detail by
this study.
Slide 5
Our objective is Identify health and safety risks to construction work 2
storey terrace houses (housing project) based on processes, resources,
facilities and working environment.
Access and analyze risks (HIRARC) to identify critical risks.
Slide 6
Next is our scope,
In this study, we will carry out to assess and analyze risks (HIRARC) for housing
projects.
This study will be conducted in three two-storey housing project.
Slide 7
Literature review
Slide 8
One of our literature reviews is Risk assessment.
This is the step to do the risk assessment
Identifying Hazards
- Identify any unwanted situation that could lead to accidents
Assessing the Risks
- Risk management system is a system that manages the hazards
identified
- Risk assessment should also be done. This aims to identify new hazards
that may not be detected before the accident.
Factors Considered

-Errors that occur immediately act before accidents


Slide 9
This is the factor that we should consider in our proposal
(baca statement tu)
Slide 10
Research methodology
Slide 11
In research methodology section, we have 3 method
First we prepare the questionnaire. Questionnaire form was prepared base in
current research issued from all individual, reading and internet.
The purpose is to collect the data for analysis.
Slide 11
Next method we do the interview. Interview will be made before the
questionnaire.
Interviews conducted randomly to contractors and employees for the purpose of
providing survey form.
Slide 13
Last step is data collection.
The data was collected through questionnaires and interviews will be compiled
for analysis
Slide 14
Flowchart
Slide 15
This is the flowchart that we will carry out in our proposal.
Slide 16
Our conclusion is we expect that our study will flow smoothly through the
planning that has been made. We hope this study will identify hazards and risks
in construction.
Prevent is better than treatment
Thank you for your attention.