THIS DOCUMENT IS INTENDED FOR USE BY THE NOMINATED CONSULTANTS, CONTRACTORS, MANUFACTURERS AND SUPPLIERS.
Contract -3
CONSULTANT
INDEX
PURPOSE
2.0
SCOPE
3.0
RELEVANT REFERENCES
4.0
5.0
SEQUENCE OF WORK
6.0
RESOURCES
7.0
HSE REQUIREMENTS
8.0
QA/QC REQUIREMENTS
1.0
DOCUMENT TITLE:
MS for Sub-Base
Contract : 3
Record Reference:
NBH/MS/RD/002
REV. 0
DATE: 22/09/2012
PAGE
2 of 7
1 Purpose:
The purpose of this method statement is to define the scope of work and sequence
of construction of sub base layer for road works at Al Dhaher 5. As well the method
statement will set out the minimum HSE and Quality requirements to ensure full
compliance to the approved shop drawings and contract specifications.
2 Scope:
The scope of work includes:
Source approval
Quality tests
Stockpiling
Sub-Base Construction
The contractor reserves his rights to adapt the methods used according to the site needs and
configuration. In case of major changes to the method intended to be used partial revision of this
general method statement will be resubmitted.
DOCUMENT TITLE:
MS for Sub-Base
Contract : 3
Record Reference:
NBH/MS/RD/002
REV. 0
DATE: 22/09/2012
PAGE
3 of 7
4.5 QA QC Engineer
To implement and monitor Quality assurance / Quality control system and procedures
in compliance with contract requirements and Project Quality plan.
4.6 Surveyor
Coordination and management of survey, setting out line, level and keep record of all
actual datas for final measurement, as built drawings and quantity of work activities
at site.
4.7 Site Foreman
To ensure that the concerned work force under his team are completely aware of the
activities and hazards on their respective work. To organize manpower, plant &
materials at job site.
5 Sequence of Work
5.1 General
Granular sub-base used under the carriage way/ foot path consists of hard, durable
natural/screened gravel or crushed stone, having suitable binding quality,
homogeneity and shall comply with the properties stipulated in clause 1.18 of the
project specification. It shall be well graded, delivered to the roadbed as uniform
mixture and shall be spread in layers and compacted.
5.1.2 Prior Activities
5.1.2.1 Source approval shall be obtained from the Engineer and the end user.
5.1.2.2 If more than one source is used, method statement indicating the method of mixing,
stockpiling and delivery of the material to the road bed shall be provided
to the Engineer and prior approval is obtained.
5.1.2.3 The material to be utilized for the Sub base layer shall be tested for the compliance
to the specifications
5.1.2.4 Water for mixing shall be tested for suitability as per project spec. clause 4.2.1.
5.1.2.5 Granular sub base preferably can be supplied from approved as ready mix complying
with the specifications.
5.1.2.6 Preliminary approval of the material shall be obtained from the Engineer through
a technical submittal with copies of the test results.
5.1.2.7 All tests carried out on the Sub-base material shall conform to the given project
specifications.
5.1.2.8 Based on the test results final approval shall be obtained from the Engineer prior
to placing.
5.1.2.9 Tests mentioned in clause 4.2.6 of the project specification Vol. 3A shall be
3
carried out on every 1000 m
2
5.1.2.10 In-situ density tests shall be carried out on every 500 m
5.1.3 Stockpiling
5.1.3.1 A site stockpile shall be prepared within the LOC and approval shall be obtained
for the same from the Engineer.
5.1.3.2 Storage area shall be hard, clean and free from dust and dirt.
DOCUMENT TITLE:
MS for Sub-Base
Contract : 3
Record Reference:
NBH/MS/RD/002
REV. 0
DATE: 22/09/2012
PAGE
4 of 7
5.1.3.3 Control points shall be established and approved by the Engineer prior to stocking
the sub-base.
5.1.3.4 Equipment used for stock piling and removing sub-base shall be approved by
the Engineer.
5.1.3.5 No foreign material or contamination or segregation shall be allowed on the prepared
stock for sub-base.
5.1.3.6 Stockpile shall be made flat without dome and shall maintain a height not exceeding
5 meter.
5.1.3.7 Stored material shall be located in such a manner to facilitate prompt inspection
and control.
5.1.3.8 Proper drainage shall be arranged to control excess moisture in the stock.
5.1.3.9 Sufficient material shall be stored in stockpiles for use without shortage.
5.2 Procedure
5.2.1 Sufficient amount of water shall be added to the Sub-base road material to maintain
the specified percentage of optimum moisture content by approved methods based
on suitable trials without losing the uniformity of the mixture and moisture.
5.2.2 Prior to construction a 100 meter trial area shall be prepared outside the permanent
work to check and confirm the binding quality, homogeneity and compacting effort
required for the sub-base mix.
5.2.3 The final mixed moist material shall be then transported to the laying area on tipper
trucks.
5.2.4 The moisture content of the mix shall be maintained +2% of the optimum moisture.
Care shall be taken to avoid losing moisture while transportation. Necessary covering
with suitable material shall be adopted.
5.2.5 Prior to laying, the roadbed shall be cleaned, sprayed with water and compacted.
5.2.6 Spreading and leveling procedure are carried out using graders and is then
compacted to achieve the required 98% of the Maximum density determined and a
thickness not less than 150 mm + 5mm as stated in the approved drawing /
specification.
5.2.7 In-situ density tests are carried out to check the required degree of compaction. One
in situ density test will be carried out per 500sq.m.
5.2.8 If the compaction achieved is not satisfactory, reshaping, spraying water and rerolling exercises are carried out again to obtain the required compaction.
5.2.9 Maintain road longitudinal slope and cross slope while level checking.
5.2.10 The finished surface of the road sub-base shall be maintained +5 mm of the grade
established by the Engineer.
5.2.11 After completion of sub base layer, levels are checked and recorded.
5.2.12 The surface on completion of the compaction shall be well closed and free from
movement under compaction plant and free from ridges, cracks or loose material.
5.3 References
BOQ Reference
Roads and Pavings - Bill 2 Part 3 Page 2-3/2
Specification
Volume 3A Clause 4.2
DOCUMENT TITLE:
MS for Sub-Base
Contract : 3
Record Reference:
NBH/MS/RD/002
REV. 0
DATE: 22/09/2012
PAGE
5 of 7
Standards
BS 812: Part 103
BS 812: Part 117 ,118
AASHTO T 180
AASHTO T 191
ASTM D 1883
AASHTO T 176
6. RESOURCES
Qty/Nos
Required
1 No.
3 Nos.
1 No.
1 No.
3 Nos.
2 Nos
Equipment Description
1
2
3
4
5
6
Wheel Loader
Tipper Trucks
Graders
Water Tanker
Small vehicles
Steel Roller
7
8
Hand shovels
Tyre Roller (PTR)
6 Nos.
1 No.
9
10
Dozer
Survey Equipment
1No.
1 Set
a
b
c
d
e
Total Station
Aluminum Tripod
Auto Level
Digital Level
Prism with Holder
Measuring Tapes (5 M,25 M &
50M)
11
Safety Equipment
Remarks
6 Wheels
Operating Weight
8.5 Ton
Operating Weight
15.0 Ton
D8
2 Nos.
2 Nos.
2 Nos.
2 Nos.
2 Nos
3 Nos.
As per the
requirement
6.2 Manpower
Sl No.
1
2
3
4
5
6
7
8
Job Description
Site Engineer
QA/QC Engineer/Inspector
Health & Safety Officer
Laborers
Drivers/Operators
Surveyor
Asst. Surveyor
Foreman
No. Required
1No.
1No.
1No.
4 Nos.
13 Nos.
1 No.
1 No.
1 No.
DOCUMENT TITLE:
MS for Sub-Base
Remarks
Trained
Contract : 3
Record Reference:
NBH/MS/RD/002
REV. 0
DATE: 22/09/2012
PAGE
6 of 7
7. HSE REQUIREMENTS
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
Task Risk Assessment shall be carried for all critical activities. Risk Assessment to
address all the hazards and how to mitigate it.
Prior to commence of any activities, related work permits shall be obtained.
All works to comply with relevant Health Safety and Environment requirements
and project safety requirements.
Safety cones and warning tapes shall be provided as required for safety
operation.
All personnel shall adhere to all relevant procedures set out in the HSE plan.
All accidents will be reported immediately to the Site Engineer/site representative and
then as soon as possible to Senior Project Engineer and/or appointed Health and
Safety Officer. First aid treatment to be provided by the sites trained First Aider.
Tool Box Talks will be carried out daily before start of work and shall be activity
specific.
Trained & certified banks men will control the equipment movement/traffic control.
All equipment shall be inspected and approved by the Engineer prior to starting.
Water shall be sprayed regularly to suppress the dust.
A small shed shall be erected and provided with cold water to protect workers from
the sun
8. QA/QC REQUIREMENTS
8.1
8.2
8.3
8.4
8.5
DOCUMENT TITLE:
MS for Sub-Base
Contract : 3
Record Reference:
NBH/MS/RD/002
REV. 0
DATE: 22/09/2012
PAGE
7 of 7