Anda di halaman 1dari 7

Index of sub-clauses (FIDIC system)

Sub-Clause

Page

Accepted Contract Amount, Sufficiency of the


Access after Taking Over, Right of
Access for Inspection
Access Route
Access to the Site, Right of
Additional Facilities
Addresses for Communications
Adjudication Board
Adjustments for Changes in Cost
Adjustments for Changes in Legislation
Advance Payment
Agreement, Contract
Amicable Settlement
Approvals, Permits, Licences or
Arbitration
Assignment of Benefit of Subcontract
Assignment
Assistance by the Employer
Assistants, Engineers or Employers Representative
Authorities, Delays Caused by
Avoidance of Interference

4.11
11.7
7.3
4.15
2.1
4.13
1.3
20.2
13.8
13.7
14.2
1.6
20.5
2.2
20.6
4.5
1.7
2.2
3.2
8.5
4.14

23
57
39, 118, 150
27, 113, 145, 147
9, 109, 145, 147, 181184
26
4, 107, 147, 178
98, 141, 146, 149, 244246
69, 129, 146, 149
68, 129, 149, 226
71, 130, 146, 148, 149, 228
5
103, 249
10, 109, 145, 147, 185
103
20, 112
6
10, 109, 145, 147, 185
14, 110, 188
46, 120, 149
26

Care of the Works


Certificate, Application for Final Payment
Certificate, Final Payment
Certificate, Performance
Certificate, Taking-Over
Certificates, Application for Interim Payment
Certificates, copies to be sent
Certificates, Interim Payment
Claims Procedure
Claims, Determination of
Claims, Employers
Clearance of Site after Performance Certificate
Clearance of Site after Taking-Over Certificate
Commencement of Works
Communications
Communications, Language for
Completion of Outstanding Work
Completion, Extension of Time for

17.2
14.11
14.13
11.9
10.1
14.3
1.3
14.6
20.1
3.5
2.5
11.11
4.23
8.1
1.3
1.4
11.1
8.4

85
78, 133, 152, 234
79, 133
57, 125, 152
52, 123, 145, 152, 215216
72, 130, 151, 229230
4, 107, 147, 178
75
96, 140
16, 110, 150
11, 187
58, 124, 152
30
42, 119, 149
4, 107, 147, 178
4, 107, 147
55, 125, 152
45, 119

A Contractors Guide to the FIDIC Conditions of Contract, First Edition. Michael D. Robinson.
2011 John Wiley & Sons, Ltd. Published 2011 by John Wiley & Sons, Ltd. ISBN: 978-0-470-65764-5

252

Index of sub-clauses (FIDIC system)

Completion, Statement at
Completion, Time for
Conditions, Unforeseeable
Confidential Details
Contract Price
Contractor to Search
Contractors Claims
Contractors Design if any
Contractors Documents, Employers Use of
Contractors Entitlement to Suspend Work
Contractors Equipment
Contractors General Obligations
Contractors Liability, Limitation of
Contractors Obligations: Tests on Completion
Contractors Operations on Site
Contractors Personnel and Equipment, Records of
Contractors Personnel
Contractors Representative
Contractors Superintendence
Co-operation
Copyright
Copyright in Contractors Documents
Copyright in Employers Documents
Cost, Adjustments for Changes in
Currencies for Payment of Variations
Currencies of Payment

14.10
8.2
4.12
1.12
14.1
11.8
20.1
4.1
1.10
16.1
4.17
4.1
17.6
9.1
4.23
6.10
6.9
4.3
6.8
4.6
17.5
1.10
1.11
13.8
13.4
14.15

77, 132, 152, 233


42
23, 112, 199
7
71, 130, 227
57, 125
96, 140
17, 111, 148
7, 108
82, 135, 236237
27, 113, 152
17, 111, 148
87
50, 122, 152, 214
30
38, 117, 148
38, 117, 150
18, 111, 145, 192
37, 116, 148
20
87
7, 108
7, 108, 150
69, 129, 146, 149
66
79, 133

DAB, Appointment of the


DAB, Failure to Agree
DABs Appointment, Expiry of
DABs Decision, Failure to Comply
DABs Decision, Obtaining
Damages, Delay
Data on Conditions at the Site
Daywork
Default of Contractor, Notice of
Default of Contractor: Termination
Default of Employer: Entitlement to Suspend Work
Default of Employer: Termination
Defective Work, Removal of
Defects Notification Period, Extension of
Defects, Failure to Remedy
Defects, Remedying of
Defects, Searching for Cause of
Definition of nominated Subcontractor
Definitions
Delay Damages
Delays Caused by Authorities
Delegation by the Engineer/Employers Representative
Design Obligations if any
Determinations
Discharge
Disorderly Conduct
Dispute Adjudication Board, Appointment of the
Dispute of the Adjudication Board, Failure to Agree
Dispute Adjudication Boards Appointment, Expiry of
Dispute Adjudication Boards Decision,
Failure to Comply

20.2
20.3
20.8
20.7
20.4
8.7
4.10
13.6
15.1
15.2
16.1
16.2
11.5
11.3
11.4
11.1
11.8
5.1
1.1
8.7
8.5
3.2
4.1
3.5
14.12
6.11
20.2
20.3
20.8

98, 141, 146, 149, 244246


101
104
104
102, 141, 247248
47, 120
22, 112, 145, 148, 198
67, 128, 146, 225
80, 134, 153
80, 134, 153
82, 135, 236237
82, 135, 238
56
56
56
55, 125, 152
57, 125
33, 115, 145
3
47, 120
46, 120, 149
14, 110, 147, 188
17, 111,148
16, 110, 150
78, 133, 152, 235
38
98, 141, 146, 149, 244246
101
104

20.7

104

Index of sub-clauses (FIDIC system)

253

Dispute Adjudication Boards Decision, Obtaining


Disputes, Amicable Settlement of
Disputes, Arbitration of
Disputes, Failure to Comply with Dispute Adjudication
Boards Decision on
Disputes: Obtaining Dispute Adjudication Boards
Decision
Documents, Care and Supply of
Documents, Contractors Use of Employers
Documents, Employers Use of Contractors
Documents, Priority of
Drawings or Instructions, Delayed

20.4
20.5
20.6

102, 141, 247248


103, 249
103

20.7

104

20.4
1.8
1.11
1.10
1.5
1.9

102, 141, 247248


6, 107, 145, 147, 179
7, 108, 150
7, 108
4, 107, 147
6, 107, 147, 180

Electricity, Water and Gas


Electronic Transmission of Communications
Employers Claims
Employers Claims: Currencies of Payment
Employers Documents, Contractors Use of
Employers Entitlement to Termination
Employers Equipment and Free-Issue Material
Employers Financial Arrangements
Employers Liability, Cessation of
Employers Personnel
Employers Risks
Employers Risks, Consequences of
Engineer to act for the Employer
Engineer, Delegation by the
Engineer, Instructions of the
Engineer, Replacement of
Engineers Determinations
Engineers Duties and Authority
Environment, Protection of the
Equipment, Contractors
Equipment, Employers
Evaluation
Evidence of Payments to Nominated Subcontractors
Exceptional Events
Extension of Defects Notification Period
Extension of Time for Completion

4.19
1.3
2.5
14.15
1.11
15.5
4.20
2.4
14.14
2.3
17.3
17.4
3.1
3.2
3.3
3.4
3.5
3.1
4.18
4.17
4.20
12.3
5.4
19.1
11.3
8.4

28, 113, 145, 148


4, 107, 147, 178
11, 187
79, 133
7, 108, 150
81, 134, 153
28, 113, 150
11, 109, 150, 186
79
11
86, 241
86, 242
13
14, 110, 147, 188
14, 110, 148, 150, 189190
15, 110
16, 110, 150
13
27, 113, 148
27, 113, 152
28, 113, 150
61, 126, 150
33
93, 139
56
45, 119

Failure to Pass Tests on Completion


Final Payment, Application for
Final Payment Certificate, Issue of
Finances, Employers
Force Majeure Affecting Subcontractor
Force Majeure, Consequences of
Force Majeure, Definition of
Force Majeure, Notice of
Force Majeure: Optional Termination
Fossils

9.4
14.11
14.13
2.4
19.5
19.4
19.1
19.2
19.6
4.24

51
78,
79,
11,
94,
94,
93,
93,
94,
30,

133, 152, 234


133
109, 150, 186
139
139
139
139
139
114, 203204

Gas, Electricity, Water and


Goods, Transport of

4.19
4.16

28, 113, 145, 148


27, 113, 150, 200

Health and Safety

6.7

37, 116, 148, 207

Indemnities
Inspection

17.1
7.3

85
39, 118, 150

254

Index of sub-clauses (FIDIC system)

Instructions of the Engineer


Instructions, Delayed Drawings or
Insurance Against Injury to Persons and
Damage to Property
Insurance for Contractors Personnel
Insurance for Works and Contractors Equipment
Insurances, General Requirements for
Intellectual and Industrial Property Rights
Intellectual Property Rights in Contractors Documents
Intellectual Property Rights in Employers Documents
Interference with Tests on Completion
Interference, Avoidance of
Interim Payment Certificates, Application for
Interim Payment Certificates, Issue of
Interpretation
Joint and Several Liability

3.3
1.9
18.3
18.4
18.2
18.1
17.5
1.10
1.11
10.3
4.14
14.3
14.6
1.2
1.14

14, 110, 148, 150, 189190


6, 107, 147, 180
91, 138
92, 138
88, 138, 153
88, 137, 146, 149, 243
87
7, 108
7, 108, 150
54, 124, 152, 218219
26
72, 130, 151, 229230
75
3
8

Labour, Engagement of Staff and


Labour, Facilities for Staff and
Language
Law, Governing
Laws, Compliance with
Laws, Labour
Legislation, Adjustments for Changes in
Liability Unaffected by Insurances
Liability, Cessation of Employers
Liability, Joint and Several
Liability, Limitation of
Licenses or Approvals, Permits,
Loan for Mobilisation

6.1
6.6
1.4
1.4
1.13
6.4
13.7
18.1
14.14
1.14
17.6
2.2
14.2

35, 116, 148


36, 116, 148
4, 107, 147
4, 107, 147
7
35, 116, 148
68, 129, 149, 226
88, 137, 146, 149, 243
79
8
87
10, 109, 145, 147, 185
71, 130, 146, 148, 149, 228

Manner of Execution
Materials in Event of Suspension, Payment for
Materials supplied by the Employer
Materials, Ownership of
Materials, Payment for Unfixed
Measurement of the Works
Measurement, Method of

7.1
8.10
4.20
7.7
14.5
12.1
12.2

39,
48,
28,
41,
74,
59,
60,

Nominated Subcontractors, Definition of


Nominated Subcontractors General
Nominated Subcontractors, Evidence of Payments
Nominated Subcontractors, Payments to
Nomination, Objection to
Notice of Intention to Deliver
Notice to Correct
Notices, Addresses for

5.1
5.0
5.4
5.3
5.2
4.16
15.1
1.3

33, 115, 145


32, 205
33
33
33, 115
27, 113, 150, 200
80, 134, 153
4, 107, 147, 178

Obligations, after Performance Certificate


Obligations, Contractors General
Omissions
Other contractors

11.10
4.1
12.4
4.6

57
17, 111, 148
62, 126, 221
20

Payment
Payment
Payment
Payment

16.4
15.4
14.5
13.4

84, 135, 153, 240


81, 134, 153
74, 131, 151, 231
66

after Termination by the Contractor


after Termination by the Employer
for Plant and Materials for the Works
in Applicable Currencies

118
121
113,
118
131,
126,
126,

150
151, 231
146, 150, 220
146

Index of sub-clauses (FIDIC system)


Payment to Contractor after Force Majeure
Payment (by the Employer)
Payment, Application for Final
Payment, Currencies of
Payment, Delayed
Payment, Final
Payments to nominated Subcontractors
Payments, Application for Interim
Payments, Interim
Payments, Schedule of
Payments, Timing of
Performance Certificate
Performance Security
Permits, Licences or Approvals
Personnel and Equipment, Records of Contractors
Personnel, Contractors
Personnel, Disorderly Conduct by
Personnel, Employers
Personnel, Insurance for Contractors
Persons in the Service of Employer
Plant and Materials for the Works, Payment for
Plant and Materials in Event of Suspension, Payment for
Plant and Materials, Ownership of
Programme
Progress Reports
Progress, Rate of
Provisional Sums
Quality Assurance
Records of Contractors Personnel and Equipment
Regulations and Laws, Compliance with
Rejection
Release from Performance under the Law
Remedial Work
Remedy Defects, Failure to
Remedying Defects
Remedying Defects, Cost of
Removal of Contractors Equipment after Termination
Replacement of the Engineer
Reports on Progress
Representative, Contractors
Representative, Engineers
Responsibility for the Works
Responsibility Unaffected by Engineers Approval
Resumption of Work after Suspension
Retention Money, Payment of
Retention, Deduction of
Retesting after Failure of Tests on Completion
Right of Access to the Site
Right to Vary
Rights of Way and Facilities
Rights, Intellectual Property, in Contractors Documents
Rights, Intellectual Property, in Employers Documents
Rights, Patent
Risk and Responsibility
Risks, Employers
Royalties

19.4
14.7
14.11
14.15
14.8
14.13
5.3
14.3
14.6
14.4
14.7
11.9
4.2
2.2
6.10
6.9
6.11
2.3
18.4
6.3
14.5
8.10
7.7
8.3
4.21
8.6
13.5
4.9
6.10
1.13
7.5
19.7
7.6
11.4
11.1
11.2
16.3
3.4
4.21
4.3
3.2
4.1
3.1
8.12
14.9
14.3
9.3
2.1
13.1
4.13
1.10
1.11
17.5
17.0
17.3
7.8

94,
75
78,
79,
76,
79,
33
72,
75
73
75
57,
18,
10,
38,
38,
38
11
92,
35
74,
48,
41,
42,
29,
46,
66,

255

139
133, 152, 234
133
132, 232
133
130, 151, 229230

125,
111,
109,
117,
117,

152
145, 148, 191
145, 147, 185
148
150

138
131,
121
118
119,
113,
210
128,

151, 231

149, 150, 209


148, 150, 201202
151, 224

22, 112, 148, 197


38, 117, 148
7
40
95, 139, 154
40
56
55, 125
55, 125, 152
83, 135, 153, 239
15, 110
29, 113, 148, 150, 201202
18, 111, 145, 192
14, 110, 147, 188
17, 111, 148
13
49, 121
77, 132
72, 130, 229230
50
9, 109, 145, 147, 181184
64, 127, 150
26
7, 108
7, 108, 150
87
85, 136
86, 241
41, 118, 145

256

Index of sub-clauses (FIDIC system)

Safety and Health


Safety Procedures
Samples
Schedule of Payments
Search, Contractor to
Security, Performance
Setting Out
Site Data
Site, Clearance of
Site, Contractors Operations on
Site, Right of Access to the
Site, Security of the
Staff and Labour, Engagement of
Staff and Labour, Facilities for
Statement at Completion
Statement, Final
Statement, Interim
Statutes, Regulations and Laws, Compliance with
Subcontract, Assignment of Benefit of
Subcontractor, Force Majeure Affecting
Subcontractors
Subcontractors, nominated
Superintendence, Contractors
Surfaces Requiring Reinstatement
Suspension due to Employers Default
Suspension of Work
Suspension, Consequences of
Suspension, Payment for Plant and Materials in Event of
Suspension, Prolonged
Suspension, Resumption of Work after

6.7
4.8
7.2
14.4
11.8
4.2
4.7
4.10
11.11
4.23
2.1
4.22
6.1
6.6
14.10
14.11
14.3
1.13
4.5
19.5
4.4
5.1
6.8
10.4
16.1
8.8
8.9
8.10
8.11
8.12

37, 116, 148, 207


21, 112, 148, 196
39, 118, 150, 208
73
57, 125
18, 111, 145, 148, 191
21, 112, 148, 194195
22, 112, 145, 148, 198
58, 124, 152
30
9, 109, 145, 147, 181184
30, 114, 148
35, 116, 148
36, 116, 148
77, 132, 152, 233
78, 133, 152, 234
72, 130, 229230
7
20, 112
94, 139
18, 112, 145, 148, 193
33, 115, 145
37, 116, 148
54, 124, 152
82, 135, 236237
47, 121
48, 121, 211
48, 121
48, 121, 212213
49, 121

Taking Over of Parts of the Works


Taking Over of the Works and Sections
Taking Over: Surfaces Requiring Reinstatement
Termination by the Contractor
Termination by the Contractor, Payment after
Termination by the Employer
Termination by the Employer, Payment after
Termination, Optional: after Force Majeure
Termination, Optional: at Employers Convenience
Termination, Valuation at Date of
Termination: Cessation of Work
Testing
Tests on Completion
Tests on Completion, Delayed
Tests on Completion, Failure to Pass
Tests on Completion, Interference with
Tests, Further
Third Party Insurance
Time for Completion
Time for Completion, Extension of
Time for Payment
Transport of Goods

10.2
10.1
10.4
16.2
16.4
15.2
15.4
19.6
15.5
15.3
16.3
7.4
9.1
9.2
9.4
10.3
11.6
18.3
8.2
8.4
14.7
4.16

53,
52,
54,
82,
84,
80,
81,
94,
81,
80,
83,
40,
50,
50,
51
54,
56,
91,
42
45,
75
27,

Unforeseeable Physical Conditions


Unfulfilled Obligations

4.12
11.10

23, 112, 199


57

123,
123,
124,
135,
135,
134,
134,
139
134,
134,
135,
118
122,
122

145, 152, 217


145, 152, 215216
152
238
153, 240
153
153
153
153
153, 239
152, 214

124, 152, 218219


125
138
119
113, 150, 200

Index of sub-clauses (FIDIC system)


Valuation at Date of Termination
Value Engineering
Variation Procedure
Variations General
Variations, Right to Vary
Variations: Applicable Currencies

15.3
13.2
13.3
13.0
13.1
13.4

80,
65,
66,
63
64,
66

Wages and Conditions of Labour


Water and Gas
Working Hours
Works and Contractors Equipment, Insurance for
Works to be Measured
Works, Contractors Care of the
Works, Measurement and Evaluation

6.2
4.19
6.5
18.2
12.1
17.2
12.3

35
28,
35,
88,
59,
85
61,

134, 153
128, 151, 222
127, 150, 223
127, 150

113,
116,
138,
126,

145, 148
145, 148, 206
153
146, 150, 220

126, 150

257

Anda mungkin juga menyukai