Del:
PARTIDA DE CONTROL UND
12/2/2013
Al:
1- 4 Semana
11/11/2013
TOTAL
CANTIDAD
Piedra chancad
Cemento portla
Arena gruesa
Agua
Alambre negro
Clavos de 3"
Madera tornillo
Alambre n 16
Acero de Refue
Piedra Chancad
m3
Bls
m3
m3
Kg
Kg
p2
Kg
Kg
m3
Del:
PARTIDA DE CONTROL UND
15.97
411.28
19.61
7.87
179.38
179.38
560.25
0.77
16.52
9.42
m3
Bls
m3
m3
Kg
Kg
p2
Kg
Kg
m3
Del:
PARTIDA DE CONTROL UND
m3
Bls
m3
m3
65.63
65.63
331
-
32.5
32.5
65.5
-
12/9/2013
Al:
2- 5 Semana
TOTAL
15.97
411.28
19.61
7.87
179.38
179.38
560.25
0.77
16.52
9.42
65.63
65.63
331
-
32.5
32.5
65.5
-
6.95
265.15
12.66
5.07
0.77
16.52
9.42
12/16/2013
Al:
3- 6 Semana
12/25/2013
TOTAL
CANTIDAD
Piedra chancad
Cemento portla
Arena gruesa
Agua
9.02
146.13
6.95
2.8
81.25
81.25
163.75
-
11/18/2013
CANTIDAD
Piedra chancad
Cemento portla
Arena gruesa
Agua
Alambre negro
Clavos de 3"
Madera tornillo
Alambre n 16
Acero de Refue
Piedra Chancad
15.97
411.28
19.61
7.87
6.95
265.15
12.66
5.07
9.02
146.13
6.95
2.8
Alambre negro
Clavos de 3"
Madera tornillo
Alambre n 16
Acero de Refue
Piedra Chancad
Kg
Kg
p2
Kg
Kg
m3
Del:
PARTIDA DE CONTROL UND
179.38
179.38
560.25
0.77
16.52
9.42
m3
Bls
m3
m3
Kg
Kg
p2
Kg
Kg
m3
0.77
16.52
9.42
81.25
81.25
163.75
-
12/23/2013
Al:
4- 7 Semana
12/25/2013
TOTAL
CANTIDAD
Piedra chancad
Cemento portla
Arena gruesa
Agua
Alambre negro
Clavos de 3"
Madera tornillo
Alambre n 16
Acero de Refue
Piedra Chancad
32.5
32.5
65.5
-
15.97
411.28
19.61
7.87
179.38
179.38
560.25
0.77
16.52
9.42
6.95
265.15
12.66
5.07
0.77
16.52
9.42
9.02
146.13
6.95
2.8
81.25
81.25
163.75
-
65.63
65.63
331
-
S
CONSUMO DE
SEMANA 4
2-diciembre
CANTIDAD
6.95
265.15
12.66
5.07
0.77
16.52
9.42
CONSUMO DE
SEMANA 5
9- dic-13
CANTIDAD
9.02
146.13
6.95
2.8
81.25
81.25
163.75
-
CONSUMO DE
SEMANA 6
16- dic-13
CANTIDAD
65.63
65.63
331
-
CONSUMO DE
SEMANA 7
23- dic-13
CANTIDAD
32.5
32.5
65.5
-
TOTAL
PARTIDA DE CONTROL UND
METRADO
Encofrado Verm2
Vaciado Verti m3
Encofrado Vigm2
Vaciado Vigasm3
Encofrado Losm2
Vaciado Losa m3
125
14.79
37.5
11.4
140
15.44
hh/dia
Dias
68.33
99.92
25.83
46.61
39.2
82.17
HH
4
2
3
1
4
1
273.32
199.84
77.49
46.61
156.8
82.17
TOTAL
PARTIDA DE CONTROL UND
METRADO
Encofrado Verm2
Vaciado Verti m3
Encofrado Vigm2
Vaciado Vigasm3
Encofrado Losm2
Vaciado Losa m3
125
14.79
37.5
11.4
140
15.44
hh/dia
Dias
410
199.8
77.5
46.61
156.8
82.17
HH
4
2
3
1
4
1
1640
399.6
232.5
46.61
627.2
82.17
TOTAL
PARTIDA DE CONTROL UND
METRADO
Encofrado Verm2
Vaciado Verti m3
Encofrado Vigm2
Vaciado Vigasm3
Encofrado Losm2
Vaciado Losa m3
125
14.79
37.5
11.4
140
15.44
hh/dia
410
199.8
77.5
46.61
156.8
82.17
Dias
HH
4
2
3
1
4
1
1640
399.6
232.5
46.61
627.2
82.17
LOOKAHEAD DE PRODUCCI
SEMANA 1
11-Nov-13
RATIO
2.187
13.512
2.066
4.089
1.120
5.322
REND
31.25
7.40
12.50
11.40
35.00
15.44
METRADO
125
14.79
HH
RATIO
273.32
199.84
2.19
13.51
REND
31.25
7.40
SEMANA 2
18-Nov-13
RATIO
13.120
27.018
6.200
4.089
4.480
5.322
REND
31.25
7.40
12.50
11.40
35.00
15.44
METRADO
HH
RATIO
REND
37.50
77.49
2.07
12.50
84.00
156.80
1.87
21.00
SEMANA 3
25-Nov-13
RATIO
13.120
27.018
6.200
4.089
4.480
5.322
REND
31.25
7.40
12.50
11.40
35.00
15.44
METRADO
56.00
HH
156.80
RATIO
2.80
REND
14.00
AD DE PRODUCCIN
SEMANA 2
18-Nov-13
METRADO
HH
SEMANA 3
25-Nov-13
RATIO
REND
37.5
77.49
2.07
12.50
84
156.8
1.87
21.00
METRADO
56
HH
156.8
SEMANA 3
25-Nov-13
METRADO
56.00
HH
SEMANA 4
2-Dec-13
RATIO
156.80
2.80
REND
14.00
METRADO
11.40
84.00
15.44
HH
46.61
156.80
82.17
SEMANA 4
2-Dec-13
METRADO
HH
SEMANA 5
9-Dec-13
RATIO
REND
METRADO
125.0
14.8
11.40
84.00
15.44
46.61
156.80
82.17
4.09
1.87
5.32
11.40
21.00
15.44
HH
273.3
199.8
SEMANA 3
25-Nov-13
SEMANA 4
2-Dec-13
RATIO
2.80
REND
14.00
METRADO
11.4
84
15.44
HH
RATIO
46.61
156.8
82.17
SEMANA 4
2-Dec-13
4.09
1.87
5.32
REND
11.40
21.00
15.44
SEMANA 5
9-Dec-13
RATIO
REND
METRADO
125.0
14.8
4.09
1.87
5.32
HH
RATIO
273.3
199.8
2.2
13.5
REND
31.3
7.4
11.40
21.00
15.44
SEMANA 5
9-Dec-13
SEMANA 6
16-Dec-13
RATIO
2.2
13.5
REND
METRADO
HH
RATIO
REND
31.3
7.4
37.50
77.49
2.07
12.50
84.00
156.80
1.87
21.00