GOST 533-2000

( 34-3-88)
UDC 621 Group E62
INTERSTATE COUNCIL
ON STANDARDIZATION, METROLOGY AND CERTIFICATION
THE INTERSTATE STANDARD
CARS THE ELECTRIC ROTATING.
TURBOGENERATORS
The general specifications
Rotating electrical machinery. Turbo-generators.
General specifications
29.160.20
OKP 33 8300
Date of Introduction 20020101
The foreword
1 it is developed by Interstate technical committee MTK 333 Rotating electric cars, joint-stock
company electric power industry Scientific research institute () and electromechanical
engineering Scientific research institute () the Russian Federation
It is brought by Gosstandart of Russia
2 it is accepted by Interstate Council about standardization, metrology and certification (the report
17 from June, 22nd, 2000)
For acceptance have voted:
State
The Azerbaijan Republic
Republic Armenia
Byelorussia
Republic Georgia
Republic Kazakhstan
The Kirghiz Republic
Republic Moldova
The Russian Federation
Republic Tajikistan
Turkmenistan
Republic Uzbekistan
Ukraine

National standards body

Gosstandart of Belarus

Republic Kazakhstan Gosstandart

Gosstandart of Russia

Gosstandart of Ukraine

3 Sections 1, 5, 6, 7 and 12 this standards represent authentic text 34-388 Rotating electric
cars. A part 3: Special requirements for synchronous turbogenerators
On standardization and metrology from April, 2nd, 2001 157-st the interstate standard of GOST
5332000 is installed by 4 Decision of the State committee of the Russian Federation as state standard
of the Russian Federation since January, 1st, 2002

5 INSTEAD OF GOST 533-85, GOST 533-93


1 Scope
This standard extends on stationary three-phase synchronous generators capacity of 2500 kw and
more with synchronous frequency of rotation of 1500 rpm or 3000 rpm at frequency of a current of 50
Hz and frequency of rotation of 1800 rpm or 3600 rpm at frequency of a current of 60 Hz intended for
development of electric energy at connection with steam and gas turbines (turbogenerators).
Standard requirements concern and the generators used as synchronous engines or jacks.
The obligatory requirements shown to turbogenerators, stated in sections 4-13, except 4.2, 4.8, 6.2,
6.13, 7.14, 10.8, 12.3 and appendix A, positions and which requirements are recommended.
The additional requirements reflecting requirements of a national economy, are italicised.
2 Standard references
In this standard references to following standards are used:
GOST 2 Uniform system of the design documentation. Operational documents
GOST 2 Uniform system of the design documentation. Repair documents
GOST 12 Occupational safety standards system. Fire safety. The general requirements
GOST 12 Occupational safety standards system. Products electrotechnical. General safety
requirements
GOST 12 Occupational safety standards system. Cars the electric rotating. Safety requirements
GOST 12 Occupational safety standards system. Tests and measurements electric. General safety
requirements
GOST 15) System of working out and production statement on manufacture. An industrial and
technological production
___________________
1)

In territory of the Russian Federation operates with GOST 15.

GOST 27 Reliability in the technician. The basic concepts. Terms and definitions
GOST of 183-74 Cars the electric rotating. The general specifications
GOST of 8865-93 Systems of electric isolation. An estimation and classification
GOST of 10169-77 Cars the electric three-phase synchronous. Test methods
GOST of 11828-86 Cars the electric rotating. The general test methods
GOST of 11929-87 Cars the electric rotating. The general test methods. Noise level definition
GOST of 12969-67 Tablets for cars and devices. Technical requirements
GOST of 12971-67 Tablets rectangular for cars and devices. The sizes
GOST 1419296 Marks of cargoes
GOST of 15150-69 Cars, devices and other technical products. Executions for various climatic
areas. Categories, conditions of operation, storage and transportation to parts of influence of climatic
factors of an environment
GOST of 15543 Products electrotechnical. The general requirements regarding firmness to climatic
external influencing factors
GOST 1650481 System of the state tests of production. Tests and production quality assurance.
The basic terms and definitions
GOST of 17494-87 Cars the electric rotating. Classification of degrees of the protection provided
with covers of rotating electric cars
GOST of 17516 Products electrotechnical. The general requirements regarding firmness to
mechanical external influencing factors
GOST of 21130-75 Products electrotechnical. Clips earthing and grounding signs. A design and the
sizes
GOST of 21558-88 Systems of excitation of turbogenerators, hydrogenerators and synchronous
jacks. The general specifications
GOST of 23216-78 Products electrotechnical. Storage, transportation, time anticorrosive protection,
packing. The general requirements and test methods
GOST 2536497 Units the stationary. Norms of vibration of support of
waterpipes and the general requirements to carrying out of measurements
GOST 2594183 ( 34-272, 34-274) Cars the electric rotating. Methods of
definition of losses and efficiency

GOST of 26772-85 Cars the electric rotating. A designation of conclusions and a rotation direction
GOST of 27471-87 Cars the electric rotating. Terms and definitions
3 Definitions
In this standard terms in accordance with GOST 27.002, GOST 183, GOST 16504, GOST 27471
are applied.
4 General requirements

Drawing 1
4.1 If another is not stipulated by this standard turbogenerators and their systems of excitation
should correspond to the general requirements shown to rotating electric cars in accordance with GOST
183 and GOST 21558.
4.2 Key parametres of the turbogenerators connected to steam and gas turbines, are established on
1) taking into account this standard requirements.
Recommended values of parametres of turbogenerators are resulted in steam turbines in appendix
A.
_____________
1)

the agreement between the manufacturer and the basic consumer or the customer Hereinafter means.

4.3 Nominal frequency of rotation 1500 or 3000 rpm at frequency of a current of 50 Hz and
1800 or 3600 rpm at frequency of a current of 60 Hz.
4.4 Cars should suppose long work with rated power and a nominal power factor, and also with the
stipulated agreement, section 7 and appendix A, the maximum loadings, at pressure deviations 5 %
and frequency 2 % of rating values as it is shown by the shaded area in drawing 1.
Limiting excess of temperature or the limiting temperatures specified in table 1, it is necessary to
apply only to an operating mode with nominal pressure and frequency.
Table 1 Limiting temperatures and excess of temperatures
Parts of turbogenerators or the
cooling environment

Temperature measurement, (temperature excess,) a method


sopro Put in pawn
termo sopro Put in pawn termo termopreobra Metre termopreobMetre

razovatelej
resistance
resistance

Class In
1 Cooling environment on an
exit from directly cooled active

Class F

parts:
Gas (air, hydrogen)
Water or oil
2 Winding :
At indirect cooling by air
Hydrogen
with
absolute
pressure, :
To 150 .
St. 150 to 200 .
"200 300
"300 400
400
At direct cooling by gas or a
liquid
3 Winding of a rotor:
At indirect cooling
Air
Hydrogen
At direct cooling by gas (air,
hydrogen) and number of zones
of release of gas:
1 and 2
3 and 4
6
From 8 to 14 .
St. 14
4 Active steel of the core

110
85

110
85

130
85

130
85

(80)

(85)

(100)

(105)

(85)
(80)
(78)
(73)
(70)
120

(105)
(100)
(98)
(93)
(90)
145

(90)
(85)

(110)
(105)

100
105
110
115
120

120 (80)

120
(80)

115
120
125
130
135

140 (100)

140
(100)

Notes
1 Supposed temperature of a winding of the rotor, measured by a resistance method, at direct cooling by a
liquid should be established in the turbogenerator maintenance instruction.
2 Thermoconverters of resistance laid under a grooving wedge, it is supposed to supervise only temperature of
windings with liquid cooling.
3 Ventilation of a rotor at direct cooling of a winding by gas is characterised by number of radial zones of an
exit of gas on all length of a rotor. Zones of an exit of cooling gas from front parts of a winding on the one hand a
rotor should be considered as one zone.
The general zones of an exit of the cooling environment of two axial opposite directed streams should be
considered as two zones.
4 Decrease supposed winding temperatures at indirect air or hydrogen cooling for
turbogenerators with rated voltage from above 11 in accordance with GOST 183.
5 temperatures of a winding Supposed value at direct cooling by a liquid are established in the
turbogenerator maintenance instruction, but no more specified in the table.
Notes
1 In process of increase in a deviation of pressure and frequency from nominal excess of temperatures or
temperature can progressively increase. Long work with rated power in some boundary currents of the shaded area
can lead to growth temperatures approximately on 10 To.
Cars also should provide rated power at a nominal power factor at pressure change 5 % and frequency from
plus of 3 % to a minus of rating values of 5 % as it is defined by external dotted border in drawing 1, however will
take place thus the further increases temperatures.
2 For reduction of reduction of service life because of increase of temperatures or temperatures
work of the car out of limits of the shaded area should be limited on duration and number of cases As far as
possible capacity of the car should decrease or other measures should be undertaken
Turbogenerators should suppose long work with the lowered loading at simultaneous deviations of pressure
over 5 %, but no more than to 10 %, and frequency to 2 % of rating values.
Safe loads depending on their duration and number of cases of work out of the shaded zone should be
specified the manufacturer in the car maintenance instruction
3 Operating modes at the raised pressure in a combination to the lowered frequency or at the lowered pressure
and the raised frequency are abnormal Thus work in the first of modes can lead to increase in excess of
temperature of a winding of excitation. At the operating modes shown in drawing 1, overexcitation or
the car and its transformer is not exceeded by 5 %.
4 it is necessary to consider influence of a deviation of frequency from nominal for work of other elements of a
turbine unit, for example the turbine and auxiliaries the Manufacturer of the turbine should specify limits of change

of frequency and time during which the turbine can work at this frequency. It is necessary to consider also
possibility of work of auxiliaries at pressure and frequency change

4.5 Turbogenerators should be made for long typical operating mode S1 in accordance with GOST
183.
4.6 Turbogenerators should be made a climatic modification At a category 3 in accordance with
GOST 15150. Under the agreement it is supposed to make turbogenerators of other executions and
categories.
Rating values of climatic factors of an environment in accordance with GOST 15150 and GOST
15543.1 at:
To height above sea level no more than 1000 m;
The bottom value of temperature of air 5 (for turbogenerators with water or
heat exchangers).
Environment not explosive, not containing aggressive steams and gases in the concentration
destroying metals and isolation, not sated in water steams and a current-carrying dust.
Concentration of a dust should not exceed 10 mg/m3.
4.7 Direction of rotation of turbogenerators should correspond to the turbine and be specified by the
car or in it to the tablet, the sequence of phases by a designation of conclusions in
alphabetic order, for example, U1, Vl, W1 in accordance with GOST 26772 besides, should be specified.
4.8 It is supposed to connect a winding in a star or a triangle, and if connection in a triangle
winding connection in a star means specially is not specified. In any case if another is not provided by
the agreement, the winding should have not less than six conclusions.
4.9 Nominal are those values of a current and pressure of a winding of excitation at which are
provided nominal full capacity, pressure and a power factor at nominal frequency and pressure of
hydrogen (for cars with hydrogen cooling), and the temperature of a winding of excitation
corresponding to temperature of the primary cooling environment for the above-stated conditions of
loading at the maximum temperature of the final cooling environment, specified in the standard
document on the car.
At presence at the car of contact rings the excitation rated voltage includes also a power failure in
the shchetochno-contact device.
4.10 If the agreement does not stipulate other the systems used for windings, on
should be not below a class In in accordance with GOST 8865.
The maximum temperatures of conductors of windings, an active steel and the constructive parts of
the car adjoining to isolation, at long work with loadings should not be till 4.17 above supposed GOST
of 8865 values, according to a class the applied isolation.
Limiting supposed values temperatures or temperatures of active parts in a nominal
mode depending on methods of their measurement should be specified the manufacturer and to be no
more resulted in table 1.
4.11 Design of a winding a turbogenerator identical electric durability of isolation in
front and grooving parts of a winding should be provided.
4.12 Resistance of isolation of windings a turbogenerator concerning the case and
between windings at temperature 1030 should be not more low 10 on each kilovolt of rated
voltage of a winding (at water cooling after a purge and windings air).
For more heats supposed resistance of isolation decreases twice on everyone 20 differences
between temperature at which measurement is carried out, and 30 .
Resistance of isolation of windings in all cases should not be less than 0,5 .
4.13 Isolation of windings should pass test for electric durability concerning the case of the
car and between windings, and also test isolation in accordance with GOST 183
and GOST 11828.
Isolation of a winding of excitation should be tested for electric durability:
- The test pressure equal to tenfold rated voltage, but not less than 1500 In at rated voltage of a
winding of excitation to 500 In;
- The test pressure equal 4000 In, plus the doubled rated voltage at rated voltage of a winding of
excitation over 500 Century
4.14 In the car the measures interfering course of currents and their short circuit
on the earth should be provided.
The turbogenerator bearing, oil consolidation of a shaft and (in cars with
hydrogen cooling), shaft consolidation (in cars with air cooling) from the party opposite
to the turbine, bearings of directly attached activators and , and also water supplies
to a shaft and reducer bearings (if those are available) should be isolated from base

plates and .
The electric resistance of this isolation measured by pressure 1000 In, should be not
less than 1 . Isolation from currents should be executed so that it could be
supervised in the course of car work.
4.15 Rotors of turbogenerators should pass test at the raised frequency of rotation equal of 1,2
nominal frequencies of rotation, within two minutes if other is not established under the agreement.
4.16 Critical frequencies of rotation of a rotor as a part of a turbine unit should not cause emergency
operation at operation, change of frequency of a current in the limits specified in 4.4.
4.17 Manufacturer in the maintenance instruction should result the loading diagramme showing
limits of work of a turbogenerator on jet loading Q depending on active capacity , caused in
admissible temperatures or temperatures, and in necessary cases also static stability of
the car. The diagramme result for an operating mode with nominal pressure, frequency of a current,
temperatures of cooling environments and pressure of hydrogen (for cars with hydrogen cooling).
On heatings in face zones turbogenerators should suppose work with nominal active
loading in a mode of consumption of jet capacity at a power factor equal 0,95.
The typical diagramme is resulted in drawing 2.

Drawing 2
Diagramme borders are defined by following restrictions:
- The curve And corresponds to work with excitation rated current and consequently is characterised
approximately by constant excess of temperature of a winding of a rotor;
- The curve In corresponds to work with rated current and is characterised approximately
by constant excess of temperature of a winding ;
- The curve With shows a limit caused by local heatings in a face zone or static stability of the car,
or a combination of both effects.
To point there corresponds rated power.
Under the agreement between the manufacturer and the customer it is necessary to result as well
other diagrammes for working conditions at deviations of pressure and frequency according to 4.4 and
parametres of the cooling environments differing from the nominal. The generator should work within
diagramme borders under the set conditions on pressure, frequency, to temperatures of cooling
environments and pressure of hydrogen. Work out of borders can lead to reduction of service life of the
car.
4.18 Turbogenerators should without damages and residual deformations to suppose an overload on
a current frequency rate of 1,5 rated currents during:
Two, minutes at indirect cooling of a winding;
One minute at direct (gas or a liquid) winding cooling.
Rotors of turbogenerators should maintain two-multiple rated current of excitation during not less:

50 with for turbogenerators with indirect cooling of a winding of a rotor;


20 with for turbogenerators capacity less than 800 with direct cooling of a winding of a
rotor;
15 with for turbogenerators capacity from 800 to 1200 ;
10 with for turbogenerators capacity 1200 and more.
Turbogenerators should maintain without damages of an overload with other combination of
frequency rate of currents and their duration provided that additional rise in temperature of
corresponding windings during an overload remains invariable.
Admissible in emergencies of duration of overloads and a rotor depending on frequency
rates of currents in windings should be specified the manufacturer in the car maintenance instruction.
The note At overloads of temperature of windings can exceed reached in a nominal mode,
therefore in a machine design should be considered, that number of overloads of limiting duration on the average
no more than two in a year.

4.19 Turbogenerators should suppose long work at asymmetrical loading if currents in phases do
not exceed rating value, and currents of return sequence do not surpass 10 % of rating value of a
current at indirect cooling of a winding of a rotor and 8 % at direct. Rise in temperature of
active parts of cars on 5 is thus supposed.
4.20 Turbogenerators on thermal firmness of a rotor at short-term work in asymmetrical modes
should maintain thermal influences at values of product of a square of a current of return sequence in
2

relative units on a supposed operating time in seconds in an asymmetrical mode not less I 2 t :
30 with for turbogenerators with indirect cooling of windings;
15 with for turbogenerators with indirect cooling of a winding and direct cooling of a
winding of a rotor;
8 with for turbogenerators capacity to 800 inclusive with direct gas or liquid cooling of
windings and a rotor;
6 with for turbogenerators capacity from above 800 with direct hydrogen or liquid cooling
of windings and a rotor.
4.21 Idling with rated voltage at nominal frequency of rotation the factor of telephone harmonics in
linear pressure should not exceed 3 % for turbogenerators capacity to 5000 kw inclusive and 1,5 %-for
cars capacity more than 5000 kw.
4.22 Turbogenerators should maintain without damage sudden short circuits of any kind on winding
conclusions at a rated load and the pressure equal 1,05 nominal, provided that maximum
current in a phase is limited by external means and does not surpass the maximum current in a phase at
sudden three-phase short circuit. Without damage means, that the damages interfering continuation
of operation of the car though some deformations of a winding can take place should not take
place.
If test for sudden short circuit spend by the new car it should be carried out after check of isolation
of a winding on electric durability full test pressure in accordance with GOST 183.
In a case when the generator is intended for work on the general tyres, test for sudden three-phase
short circuit should be spent from an idling mode at rated voltage. Test for sudden short circuit of
turbogenerators, which join a power supply system through the transformer or a reactor (usually with
the help closed ), spend from a mode of idling by the pressure equal of 70 %
nominal, if are not co-ordinated other its lowered value, proceeding from a condition that the current of
short circuit of the generator was same, as well as in case of three-phase short circuit on conclusions of
the transformer or a reactor from a power supply system at work idling with rated voltage.
Turbogenerator consider passed test for sudden short circuit if the car it is possible at once or after
insignificant repair of a winding to include in a network and if the car has passed test of
isolation by the pressure equal of 80 % of test pressure, provided GOST 183 for the new generator.
Insignificant it is considered small repair of fastening of front parts of a winding or the external
insulation layers, not connected with replacement of cores.
The note Is abnormal high currents and the rotating moments can arise in operation in cases of short circuit
close to the generator or switching-off and repeated inclusion of the car at more remote damage, and also at
erroneous synchronisation. If at such modes splashes in the raised currents it is recommended to check up carefully
the car took place, paying special attention on a winding . Before generator introduction in work it is
necessary to eliminate any easing of fastening of a winding in order to avoid its possible damage caused by
vibration; also it is necessary to check up possible deformations , and bolts .

4.23 Standard minimum values of the relation of short circuit () are resulted in 5.3 and 6.5.
Big minimum values can be established or co-ordinated, but thus some increase in the sizes of

the car usually is required.


4.24 Values transitive xd ' and supertransitive xd "inductive resistance on a longitudinal axis should
be established or co-ordinated with the account of working conditions of turbogenerators in a power
supply system.
It is recommended to establish or co-ordinate the minimum value xd "at the level of saturation
corresponding to rated voltage, and the maximum nonsaturated value xd ' at rated current. As xd" and
xd ' in degrees are defined by the general magnetic streams it is necessary to mean, that xd
"and xd ' are connected with each other and it is impossible to choose the top limit xd" too close to the
bottom limit xd '.
If another is not stipulated, xd "should be not less than 0,10 . A unit at the level of saturation
corresponding to rated voltage.
xd "and xd ' can be established or co-ordinated also at other level of saturation.
If makes a reservation, that xd "and xd ' should be defined by practical consideration tests should be
spent according to GOST 10169.
Thus if:
- The limiting values provided by this standard or other limiting values , xd "and xd ' are
established or co-ordinated, at the co-ordinated minimum value without the negative admission and the
positive admission of 30 %, and at the co-ordinated maximum value without the positive admission and
the negative admission of 30 %;
- , xd "and xd ' are established, but their limiting values , xd" and xd ' it is necessary to
consider as rating values with the admission 15 % are not defined;
- , xd "and xd ' are not stipulated or are not co-ordinated, they are established by the
manufacturer with the admission 15 %.
4.25 Static should not be more low:
1,7 for turbogenerators capacity to 160 ;
1,6 """St. 160 to 800 ;
1,5 """ 800 and more.
Static count

max
under the formula

i j
i j
cos
k

(1)

Where i j an excitation current at a rated load, And;

i jk An excitation current at the established three-phase short circuit and at rated current ,
And;
cos a nominal power factor.
4.26 Vibration ( value of vibrating speed) bearings of turbogenerators and
the activators jointed with them in the operating modes provided by this standard, should correspond
to requirements of GOST 25364.
Norms of vibration of the core and front parts of a winding , contact rings of a rotor are
established in specifications on turbogenerators of concrete types.
4.27 Average level of the sound measured on distance 1 m from an external contour of a
turbogenerator and the activator jointed with it, cooled by gas on the opened and closed cycles, or
from an external contour corresponding casings (at their presence), should not
exceed 90 , and in the absence of the electromachine activator for the closed scheme of ventilation
of the generator 85 if under the agreement more rigid norm is not established.
4.28 Degrees of protection provided with covers of turbogenerators with air filling or cooling,
IP54, with hydrogen cooling IP55, contact rings IP23 in accordance with GOST 17494.
4.29 Turbogenerator should keep working capacity after short-term influences of external
mechanical factors (emergency and turbines with failure of vacuum, etc.) on group
M6 of GOST 17516.1 with restriction of the maximum amplitude of acceleration to 4,9 m/s 2 (0,5 g) and
to maintain seismic influence not less than 7 points on a scale MOSCOW TIME-64 (i.e. Amplitude of
acceleration no more than 0,5 g at installation level).
More rigid requirements are established under the agreement
4.30 Greasing of bearings of a turbogenerator and activator directly connected to it should be
carried out under pressure from the oil pump of the turbine.
Oil giving in oil consolidations of a shaft of a turbogenerator with hydrogen cooling should be

carried out from system turbines or under the individual scheme.


As condensing oil in consolidations of a shaft and lubricant oil in bearings it is necessary to apply
turbine oil.
Under the agreement it is supposed to apply other lubricant liquid in basic bearings and shaft
consolidations.
In systems bearings of turbogenerators by capacity 110 and more,
connected to the turbines which do not have the main oil pump on to a shaft, and in systems
consolidations of a shaft of turbogenerators by capacity 60 and more shortterm reservation of giving of oil should be provided at breaks of its receipt and for maintenance
emergency without heavy consequences at the termination of receipt of oil from sources
.
4.31 In branch pipes of bearings of turbogenerators and activator directly connected to it, and also
the oil consolidations intended for plum of oil, should be observation ports for supervision over a
stream of leaving oil and the device for installation of the temperature indicator. About observation
ports places for installation of fixtures should be provided.
4.32 In bearings and consolidations of a shaft of a turbogenerator devices for remote measurement
of temperature of loose leaves should be established. In bearings of turbogenerators capacity 60
possibility of installation of devices for remote measurement of vibration and the constant control of
isolation also should be more provided.
At turbogenerators with hydrogen cooling possibilities of joining of gas analyzers for the control
over hydrogen leak in bearings and drain shaft consolidations (from the air
party), and also branch pipes for giving of inert gas should be provided.
4.33 Temperature of the oil leaving bearings of a turbogenerator, should not exceed 65 , and
temperature of the loose leaf of the bearing 80 . The temperature of the loose leaf of oil
consolidations should not exceed 80 for face types of consolidations and 90 for ring types of
consolidation.
4.34 For the control over winding temperature in the car should be put in pawn not less
than six thermoconverters of resistance.
The general number laid in thermoconverters of resistance for the control of temperature
of a winding and an active steel should be not less:
9 for turbogenerators capacity less than 32 ;
12 for turbogenerators capacity 32 and more.
4.35 For measurement of temperature of cooling gas the following number of thermoconverters of
resistance should be established:
Not less than two ~ in a zone of an input of cooling gas in the car, brought on pipes or from an
external cooler;
On one or more on an exit of gas from everyone (for turbogenerators with built
in );
Not less than two in a zone of an exit of hot gas;
One or more before or after the compressor.
4.36 Turbogenerators in normal conditions of operation include in a network a method of exact
synchronisation.
4.37 Turbogenerators capacity to 800 (except the cars connected to gas turbines) for all
service life should suppose not less than 10000 start-up (inclusions in a network) and no more than
330 in year, and turbogenerators capacities not less than 3600 start-up and no more than
120 in a year.
4.38 Turbogenerators (except the cars resulted in rotation by gas turbines) should suppose speed of
a set and change of active and jet loadings not less than 6 % nominal in a minute. In emergencies of
speed of change of loadings to the generator are not limited.
And loadings establish supposed number of dumps in specifications on turbogenerators
of concrete types.
4.39 Indicators of reliability and durability of turbogenerators are established in specifications on
cars of concrete types and should be not below resulted in table 2.

Table 2 reliability Indicators

The indicator name


Readiness factor
Time between failures,
Resource between major repairs, years
The full appointed service life, years

Average value of an indicator for turbogenerators


capacity
To 350
More than 350
0,996
0,995
22000
18000
8
5
40
40

5 Turbogenerators with air cooling


5.1 Present section extends on turbogenerators in which active parts are cooled by air directly or
indirectly, or the combined way.
5.2 Standard values of a power factor cos is 0,8 and 0,85 (overexcitation).
The note Other values cos can be co-ordinated, thus it is necessary to mean, that at smaller values the
turbogenerator will have the big sizes.

5.3 Measured values at rated voltage and rated current should be equal not less:
0,45 for turbogenerators capacity to 80 inclusive;
0,40 for turbogenerators capacity more than 80 to 150 inclusive.
For turbogenerators more than 150 value is established by capacity under the
agreement.
5.4 System of ventilation should be closed. If the opened air system of ventilation in order to avoid
a car overheat the measures preventing pollution of its ventilating channels should be provided is
defined or co-ordinated.
If application of contact rings measures on prevention of pollution of the generator and the activator
a coal dust should be taken is provided.
5.5 Requirements to temperature of a primary coolant, except for the turbogenerators resulted in
rotation by gas turbines, in accordance with GOST 183.
If the maximum temperature of air or air temperature on an exit from a cooler air-water (in case of
its use) differs from 40 admissible temperatures or excess of temperatures define in accordance with
GOST 183.
Special requirements to temperature of a primary coolant for the turbogenerators resulted in rotation
by gas turbines, are stated in 7.3 and 7.6.
5.6 If parametres of cooling water are not specified on concrete type of the car air coolers should be
executed on temperature of cooling water on an input to 32 and working pressure of water not less
than 170 .
Test pressure of air coolers should make not less than 1,5 maximum working pressure of cooling
water and should be enclosed within 15 minutes
If pressure of water in an air cooler is supervised by the gate or other device lowering pressure
attached to a source of water where pressure above working pressure in an air cooler the air cooler
should be executed on more high pressure and it is tested if another is not stipulated, at pressure in 1,5
times above pressure of a source. This raised pressure should be defined the customer or the
manufacturer of the car if the system of water supply of air coolers is included into the complete set of
delivery of the generator.
Air coolers should be executed so that at a conclusion from operation of its one part for clearing the
car could bear, at least, 2/3 (or under the agreement a smaller part) a rated load for a long time without
excess of admissible temperature of elements of the car. In these conditions the temperature of primary
cooling air can exceed settlement value.
5.7 Turbogenerators with air cooling (or filling) should be equipped by system
the sprayed water or inert gas (turbogenerators with the hydrogen cooling, supposing work at air
cooling).
Degree of automation of system establish in specifications on turbogenerators of
concrete types.
At manufacturing of turbogenerators from the materials which are not sustaining combustion that
should be specially confirmed by the manufacturer, system do not establish.
6 Turbogenerators with hydrogen or liquid cooling
6.1 Present section concerns the cars which active parts directly or indirectly cool hydrogen or a
liquid, and also at a combination of both ways of cooling. In some designs other gas, instead of

hydrogen then if it is possible, apply the same requirements can be applied.


6.2 Manufacturer should specify pressure of hydrogen in the case at which the car gives out rated
power.
Following values of superfluous pressure are preferable: 100, 200, 300, 400, 500, 600 .
Nominal superfluous pressure of hydrogen in the case should be not less than 50 .
6.3 In turbogenerators with indirect hydrogen cooling cleanliness of hydrogen should be not below
97 %, at direct not below 98 %.
Hydrogen leak a day (led to normal conditions) from the case at nominal pressure should not be
more, 3:
3 for turbogenerators capacity to 32 ;
7 """St. 32 63 ;
10 """110 ;
12 """800 ;
18 """800 .
6.4 Standard power factor on car conclusions accept equal 0,8 for turbogenerators capacity to BUT
and 0,85 or 0,9 (overexcitation) for turbogenerators capacities.
The note other values cos Can be co-ordinated, thus it is necessary to mean, that at smaller values cos the
turbogenerator will have the big sizes.

6.5 Measured values at rated voltage and rated current should be not less:
0,45 for turbogenerators capacity to 200 inclusive;
0,40 """St. 200 800
0,35 """ 800.
With face boards and covers of coolers at use of hydrogen cooling internal explosion of the formed
explosive mix should maintain 6.6 cars Collected the case at atmospheric pressure without danger to
attendants. On request of the customer it is necessary to conduct tests by hydraulic pressure for check
of durability of the case and boards. Such test should be spent at superfluous pressure 800 within
15 minutes
6.7 car insulators at hydrogen cooling should maintain superfluous pressure of gas not
less than 800 .
It is supposed insulators on dielectric durability to test separately from the car. Tests
spend on air during 1 mines at pressure not less than 1,5 multiple test pressure of a winding of the car.
The note - When conclusions have liquid cooling connection of liquid cooling is not obligatory at high-voltage
test.

6.8 Temperature of primary cooling environments (coolants) of turbogenerators, except resulted in


rotation by gas turbines, should correspond to requirements of GOST 183.
The maximum temperatures of primary coolants (hydrogen, a liquid) at nominal or the stipulated
maximum loadings can differ from 40 (for example for application of the optimum heat exchanger
with the set maximum temperature of a secondary coolant). In this case:
- With indirect cooling it is necessary to apply the corresponding points concerning calculation
admissible of temperatures for cars with air cooling to cars;
- With direct cooling the temperatures resulted in table 1 should be applied to cars without changes.
The note to avoid excessive or changes of temperatures, the maximum temperature of a
coolant usually should not deviate from 40 more than on 10 To.

Requirements to temperature of a primary coolant for the turbogenerators resulted in rotation by gas
turbines, are resulted in 7.3 and 7.8.
6.9 Design of a turbogenerator should allow its use at nominal pressure of gas (superfluous) at
height above sea level to 1000 m.
The note Is supposed work of standard cars with rated power at installation at the height exceeding 1000 m
above sea level provided that the system of gas cooling provides nominal pressure (absolute) a primary coolant
(hydrogen) irrespective of installation height. Thus between the customer and the manufacturer agreements
concerning consolidations of a shaft, the case and auxiliary equipment should be reached.

6.10 For cars with direct cooling the temperature measured by built in gauges, does not define
temperature of a hot point of a winding . Thus, if the maximum temperatures of a coolant on an
exit from the cooled active parts, resulted in table 1, are not exceeded, temperature of a winding do not
consider excessive.
The limit of the supposed temperature of a winding on gauges is intended for the
prevention of excessive heating of isolation from the core. Indications of the built in temperature

gauges can be used for the control of work of system of cooling of a winding.
For turbogenerators with liquid cooling of a winding possibility of the control of
heatings of a winding in each parallel branch of a cooling liquid and the control of temperature of the
core not less than in six points should be provided.
The number of the temperature gauges intended for measurement of temperature of the cooling
liquid on an input in the car, should be not less than two.
With direct cooling of a winding the coolant temperature on an exit from a winding should
be measured in cars, at least, by three temperature gauges, thus gauges should be in direct contact to a
coolant:
At gas cooling of a winding gauges should be established so close from exhaust outlets from cores,
how much it is supposed by rules of electric safety;
At water cooling temperature gauges should be established in pipelines in the case of the car or is so
close from a place of an exit of a coolant from the case, how much it is practically realizable to avoid a
considerable difference between temperature in a point of measurement and temperature at which the
coolant leaves a winding.
6.11 Coolers (, heat exchangers) if it is not stipulated differently, should be
calculated on temperature of entering water to 32 and working superfluous pressure of water not
less than 350 .
Test pressure should be in 1,5 times above the maximum working pressure and is enclosed within
15 minutes
If pressure of water in a cooler supervise by means of the gate or other device lowering pressure
which is connected to system of water supply with pressure more than working pressure in a cooler
coolers if another is not stipulated, should be executed on pressure in system of water supply and are
tested by pressure in 1,5 times big this pressure. The raised pressure in water supply system should be
stipulated the customer or is established by the manufacturer if the system of water supply of coolers is
included into the complete set of delivery of the generator.
In some operational modes, and also at operations of filling of the case by hydrogen or its clearings
of hydrogen, coolers can be exposed to pressure of gas in the absence of pressure of water. Therefore
coolers should be carried out taking into account influence of pressure 800 from gas.
Coolers should be executed so that at switching-off of one section, for example for clearing, the
turbogenerator could is long to bear not less than 2/3 rated loads (under the agreement with the customer a
little smaller loading is supposed) without excess of admissible temperatures of active parts of the car.
At work in this mode the temperature of a primary coolant can be above settlement.
6.12 Turbogenerators should be calculated on application of distillate for cooling of windings
and a rotor with electric specific resistance not less than 2000 at temperature 25
and should suppose short-term decrease in electric specific resistance of distillate to 500 .
6.13 For normal work of the turbogenerators considered in section 6, auxiliary systems (the list of
systems is not considered settling, other systems and devices can be applied also) are required:
- System of gas cooling (hydrogen or other gas) with regulators of the control of pressure of gas in
the car, with maintenance of possibilities of connection to systems of gas supply and gas;
- System of inert gas for a case purge (usually dioxide of carbon or nitrogen). Possibility of
connection of this system to system of gas cooling and safe performance of operations of replacement
of hydrogen Should be provided.
If for removal of inert gas after hydrogen replacement use station system of the compressed air
which connection should be executed so that air got to the car only at operation of removal of inert gas,
for example by use of one rearranged branch pipe;
- Devices for the control and the alarm system of degree of cleanliness of hydrogen in the case, and
also cleanliness of inert gas at operations of replacement of hydrogen. It is necessary to use two
independent means for the control of degree of cleanliness of hydrogen;
- The equipment for the control of condensing oil and, in case of need, for removal from gas and
water oil.
The system emergency the consolidations, joining should be provided
automatically at refusal of the basic system ;
- System (or systems) liquid cooling with pumps, coolers, filters and devices of regulation of
temperature of a cooling liquid.
At hydrogen cooling use water supply system with pumps, devices of regulation
of temperatures of water on an input and hydrogen on an exit;
- Devices for detection of reduction of the expense or the termination of course of a liquid through
windings;
- Devices for measurement of electric conductivity of the liquid used for cooling of a winding, and

conductivity maintenance at low enough level;


- Devices for indication and the alarm system of functioning of all auxiliaries and liquid occurrence
in the car. Possibility of removal of a liquid from the car should be provided.
7 Turbogenerators resulted in rotation by gas turbines
7.1 Present section extends on the turbogenerators resulted in rotation by gas turbines, with the
opened system of air cooling, and also with the closed system of cooling by air or hydrogen. As a final
coolant water or air can be used.
Requirements concern also the generators disconnected from the turbine working as synchronous
jacks.
7.2 Generator resulted in rotation by the gas turbine, should bear loading according to its rated
power and loading possibilities under the conditions of operation stipulated by the standard.
7.3 For generators with the opened system of air cooling in temperature of a primary coolant is the
temperature of air entering into the car usually corresponding to temperature of air. Limits of change of
temperature of entering air are defined by the customer, usual limits of change of temperature are from
a minus 5 to plus 40 "With.
For cars with the closed system of cooling, temperature of a primary coolant the temperature of air
or the hydrogen entering into the car from is. Limits of change of this temperature
are defined by the manufacturer for reception of an optimum machine design and the coolers, based on
limits of change of temperature of a secondary (final) coolant (air or water) in accordance with GOST
15543.1 or set by the customer.
7.4 Number of start-up in a year with a loading set should not surpass 500.
7.5 Speed of a set of active loading the generator is defined by the turbine.
Speeds of a set and change of active and jet loadings by the generator are not limited.
At the customer's request turbogenerators should provide start-up installations by
frequency way at a food from the starting arrangement.
7.6 Rated power of the generator is its long full capacity on conclusions to an installation site at
nominal pressure and frequency of a current, a power factor and pressure of hydrogen (for cars with
hydrogen cooling) at the temperature of a primary coolant equal 40 if another is not co-ordinated.
Rated power of gas turbines define at temperature of entering air 15 , and generator rated power
define at temperature of entering cooling air or hydrogen 40 . At identical loading characteristics the
gas turbine and the generator have different rated power.
At rated power should not be exceeded temperature or excess of the temperatures, resulted in table
1.
If other is not co-ordinated, generator parametres define with reference to rated power.
7.7 Loading characteristics define the greatest possible full capacity under the co-ordinated
conditions of operation.
7.8 Basic capacity define long full capacity on generator conclusions to a place of its installation at
nominal frequency of a current, pressure, a power factor and pressure of hydrogen (cars with hydrogen
cooling). The range of change of basic capacity corresponds to a range of change of temperature of the
final coolant defined for an installation site of the car (7.3). Thus excess of temperatures or temperature
should not surpass defined in 7.9.

1 basic capacity; 2 peak capacity; 3 basic and peak capacities for cars with length of an
active part of the core less than 2,5 m; 4 basic and peak capacities for cars with length of an active
part of the core 2,5 m and more, 5 a rated power point; a scale And temperature of cooling air of
cars with the opened system of cooling, a scale In temperature of a final coolant for cars with the
closed system of cooling at use of air or hydrogen as a primary coolant
Drawing 3
Notes
1 For the generator with heat exchangers is not obligatory reduction of a scale for temperature of a primary
coolant. Two scales for a final coolant are resulted to show forms of diagrammes.
2 At temperatures of a primary coolant more low 10 cars with active length of the core 2,5 m and more
work with the fixed limiting excess of temperature. The small increase in capacity of the generator probably
because because of decrease in the general temperature decreases resistance of a winding.

Basic capacity of the generator in watts, on car EFFICIENCY, should be equal or should
exceed basic capacity of the gas turbine in the co-ordinated range of change of temperature of air on a
turbine input on a place of its installation.
The manufacturer of the generator should give a curve of dependence of basic capacity of the car
for the co-ordinated range of change of temperature of a final coolant on a generator installation site.
Typical curves of loading possibilities of the generator are resulted in drawing 3.
For cars with the opened air system of cooling the coolant temperature is close to air temperature on
an input in the turbine (drawing 3, a scale).
As agreed between the manufacturer and the customer it can be accepted, that below some
stipulated temperature of air basic capacity of the generator is a little bit less than capacity of the
turbine at satisfaction of all other requirements to the generator.
In cars with the closed system of cooling by air or hydrogen at use water the
range of change of temperature of water (a final coolant) usually is less, than a range of change of
temperature of air on a turbine input.
Hence, at decrease in temperature of air increase of capacity of the generator will be smaller, than at
the turbine, and the sizes of the generator will be defined by capacity of the turbine at low temperatures
of air that can lead to unfairly overestimated capacity of the generator at usual temperatures of air.
In these conditions the agreement on restriction of loading ability of the generator gets great value
in an establishment of the optimum sizes of the car.
In cars with the closed system of cooling there is no idle time or constant dependence between air
temperature on an input of the turbine and temperature of cooling water. Therefore in drawing 3
loading ability of the generator is presented depending on temperature of a final coolant (water) on a
scale of Century
Taking into account told between the manufacturer and the customer the agreement on degree of
conformity of loading abilities of the generator and the turbine should be reached.
7.9 For cars with indirect cooling of excess of temperatures at generator work on an installation site

with basic capacity should correspond to table 1 with following changes:


- For temperatures of a primary coolant from 10 to 60 to the values of temperatures
established in table 1 to add (40 minus temperature of a primary coolant) To;
- For temperatures of a primary coolant from a minus 20 to plus 10 at length of an active part
of the core;
1) less than 2,5 m to the values of temperatures established in table 1 to add 30 To plus 1/2 (10
minus temperature of a primary coolant) To;
2) 2,5 m and more to the values of temperatures established in table 1 to add 30 To;
- For temperatures of a primary coolant more low a minus 20 or above 60 under the
agreement between the customer and the manufacturer.
For windings with direct air or hydrogen cooling of temperature at generator work on an installation
site should correspond to table 1 with following changes:
- For temperatures of a primary coolant from 10 to 60 without changes;
- For temperatures of a primary coolant from a minus 20 to plus 10 at length of an active part
of the core;
1) less than 2,5 m from values of the temperatures established in table 1 to subtract 1/2 (10 minus
temperature of a primary coolant) To;
2) 2,5 m and more from values of the temperatures established in table 1 to subtract (10 minus
temperature of a primary coolant) To;
- For temperatures of a primary coolant more low a minus 20 or above plus 60 under the
agreement between the customer and the manufacturer.
7.10 Peak capacities define long full capacities on generator conclusions to an installation site at
nominal frequency of a current, pressure, a power factor and pressure of hydrogen (at its application).
The range of change of peak capacities corresponds to a range of change of temperature of the final
coolant defined for an installation site of the car (7.3). Thus excess of temperatures or temperature
should not surpass the values defined at 7.11.
Positions 7.8 concerning a parity between basic capacities of the generator and the turbine concern
also their peak capacities.
7.11 For cars with indirect cooling limiting excess of temperatures for peak capacity can be on 15
To above specified in 7.9.
For cars with direct air or hydrogen cooling of windings limiting temperatures can be on 15 To
above specified in 7.9.
The note Work at peak capacity will lead to service life reduction as thermal ageing of isolation will
approximately occur in 3 6 times faster, than at the temperature corresponding to base capacity of the generator.

7.12 On the tablet of the car the manufacturer specifies all data according to 12.1 and 12.2, and also
peak capacity at temperature of a primary coolant for which the generator rated power is defined.
7.13 Thermal tests should be spent at a rated load and temperature of a primary coolant for which
the car rated power is defined. It is supposed under the agreement to conduct thermal tests at any
temperature of a primary coolant and corresponding base capacity. Temperature or excess of
temperatures should correspond to requirements 7.9 with the amendment, in case of need, a difference
in heights of an installation site and a place of tests it agree GOST 183.
7.14 At the customer's request generators should suppose work possibility at a detachment from the
turbine in a mode of the synchronous jack. Base and peak capacities in modes of delivery and
consumption of jet capacity at work as the jack should be co-ordinated.
8 Safety requirements
8.1 Turbogenerators should correspond to safety requirements of GOST 12.2.007.0, GOST
12.2.007.1 and GOST 12.1.004, including:
8.1.1. Resistance of isolation of windings of the generator should correspond 4.12
8.1.2. Electric durability case and winding isolation in accordance
with GOST 183. Isolation of a winding of excitation should pass test till 4.13.
8.1.3 In a generator design the measures providing levels of vibration and noise till 4.26 and 4.27
should be provided.
8.1.4 Degrees of protection against a touch to the current carrying and moving parts, provided with
covers, - till 4.28 and GOST 17494.
8.1.5 Contact rings and the device should have a protective casing, and at generators
with hydrogen cooling the constructive measures preventing hit of hydrogen from cases of bearings and
consolidations to contact rings should be provided.

8.1.6 Designs the device and its casing should provide convenience and safety of
replacement of brushes and .
8.1.7 Durability of the case, insulators and elements systems of
generators with hydrogen cooling should correspond to requirements 6.6 and 6.7.
8.1.8 Places of a possible congestion of hydrogen (the case of bearings, protective and decorative
casings) should have natural or independent ventilation.
8.1.9 On the clips which have been put in pawn in the car of thermoconverters of
resistance, located on the generator case, protective rated sportsmen should be established.
Resistance of isolation of chains of thermoconverters of the resistance, measured
pressure 500 In, should be not less than 1 .
8.1.10 Case of the generator, base plates and pipelines of systems of cooling should be supplied by
grounding elements in accordance with GOST 21130. The case should have two elements of
grounding located in opposite places.
Resistance between earthing elements and each metal part accessible to a touch which can appear
energised, should not exceed 0,1 Ohm.
8.1.11 Rotors of turbogenerators should maintain the raised frequency of rotation (4.15) without
residual deformations or signs of other defects of its elements.
8.1.12 Fire safety of the generator and its elements should be provided both in normal, and in
emergency operation
Settlement value of probability of occurrence of a fire in (from) the generator () should not exceed
10-6 in a year in accordance with GOST 12.1.004.
8.2 At tests and measurements it is necessary to carry out safety requirements in accordance with
GOST 12.3.019.
9 Completeness
Into the turbogenerator complete set should enter the equipment and devices of systems of
excitation, cooling systems, consolidations, the control and automatics diagnostics,
spare parts and assembly adaptations in the volume established in specifications on turbogenerators of
concrete types and the agreement.
Operational and repair documentation should be enclosed to the complete set in accordance with
GOST 2.601, GOST 2.602 in the volume established in specifications on turbogenerators of concrete
types co-ordinated with the basic consumer or the customer.
10 Acceptance procedures
10.1 For check and acknowledgement of conformity of turbogenerators and activators this standard
requirements should spend acceptance, qualifying, , certified, periodic and
standard tests.
Acceptance, qualifying, , periodic and standard tests should spend manufacturer
on this standard and GOST 15.001.
The test centre (laboratory) accredited on the right of carrying out of specified tests according to
standard documents should carry out certified tests of turbogenerators.
10.2 tests should be spent on each turbogenerator under the following
program:
- Measurement of resistance of isolation of windings, concerning the case and between windings;
- Measurement of resistance of isolation of the put in pawn thermoconverters of resistance;
- Measurement of resistance of windings at a direct current in a cold condition;
- Measurement of resistance of thermoconverters of resistance at a direct current in a cold
condition;
- Definition of the characteristic of the established three-phase short circuit;
- Test of isolation of windings and a rotor concerning the case and between windings on
electric durability till 4.13:
Definition of the characteristic of idling;
Check of symmetry of pressure;
Rotor test at the raised frequency of rotation;
Measurement of vibration of bearings and contact rings;
Measurement of resistance of isolation of bearings;
Measurement of temperature of oil in bearings;
Absence check short circuits in a rotor winding;

Test winding isolation in accordance with GOST 183;


Check of a condition of consolidations of a shaft in gathering and definition of leak of air at
superfluous pressure of air of not less nominal pressure of hydrogen (for cars with hydrogen cooling).
The note Tests spend on manufacturer. Separate tests on 10.2 and 10.4 are supposed to be spent in
coordination with the consumer on a turbogenerator installation site.

Capacity of 32000 kw and more it is necessary to subject 10.3 Turbogenerators


to tests for an installation site upon termination of turbogenerator installation on 10.2, except for rotor
tests at the raised frequency of rotation and tests to isolation. Tests of isolation of
windings concerning the case and between windings on electric durability spend in the
beginning the straightened pressure equal 1,6 from 80 % of th test pressure of an alternating current,
established GOST 183, lasting not more than 1 mines, except for those turbogenerators with water
cooling of a winding which design does not suppose this test. Test of isolation of windings
concerning the case and between windings on electric durability during 1 mines spend the
pressure of an alternating current equal of 80 % of test pressure, established GOST 183.
Isolation of a winding of a rotor concerning the case is tested pressure 1000 In frequency by of 50
Hz within 1 minute
In addition spend:
- Test for heating (at impossibility of carrying out of tests at a rated load it is supposed to conduct
tests at an underload);
- Check of work of system of hydrogen cooling and definition of leak of hydrogen from a
turbogenerator (for cars with hydrogen cooling);
- Check of work of system of liquid cooling (for cars with liquid cooling).
10.4 Acceptance tests should be spent on skilled (head) samples of turbogenerators under the
program (10.2) tests, including:
- Tests for a short-term overload on a current;
- Efficiency definition;
- Tests for heating in symmetric modes, and under the agreement also in asymmetrical modes till
4.19 and 4.20;
- Definition of factor of distortion a curve of linear pressure and factor of
telephone harmonics;
- Skilled definition of inductive resistance and constants of time of windings;
- Measurement of electric pressure between the shaft ends;
- Test of mechanical durability at a shock current of short circuit;
- Measurement of level of a sound;
- Definition of rated current of excitation, nominal change of pressure and the adjusting
characteristic of a turbogenerator;
- Definition of a current of 3rd harmonic if cars are intended for work with winding connection
in a triangle;
- Work check systems of hydrogen cooling and definition of leak of hydrogen (for
cars with hydrogen cooling);
- Check of work of system of liquid cooling (for cars with liquid cooling);
- Measurements of vibrations of the core, the case and front parts of a winding .
10.5 Periodic tests should be spent not less often than an once in 7 on one turbogenerator
under the program 10.4, except for test of mechanical durability at a shock current of short circuit.
10.6 Qualifying tests spend at statement on manufacture of turbogenerators, before mastered on
other enterprise or produced under licences. The program of qualifying tests is prepared by the
manufacturer with attraction of the developer of the car, and it should include tests on 10.4.
10.7 Standard tests are necessary for spending at change of a design, materials or technological
processes under the program providing definition of those parametres and characteristics which thus
can change.
10.8 Certified tests are recommended to be spent on a skilled (head) or serial turbogenerator in
volume of acceptance tests on 10.4.
10.9 Acceptance, , periodic and standard tests of systems of excitation of
turbogenerators spend in accordance with GOST 21558.
10.10 At manufacturing of head turbogenerators it is necessary to provide their equipment
measuring gauges (in addition to the regular control) in the volume co-ordinated with the consumer for
carrying out of acceptance or qualifying tests.
11 Test methods

11.1 Test methods of turbogenerators in accordance with GOST 11828, GOST 10169, GOST
25364, GOST 25941, GOST 17494.
On distance of 1 m from an external contour of the car define 11.2 Average level of a sound a
technical method in a free sound field over a plane in accordance with GOST
11929.
11.3 Indicators of reliability of turbogenerators should be confirmed by results of the statistical
data processing, received of operating experience, with periodicity three years.
11.4 Conformity of turbogenerators to firmness requirements to mechanical external influencing
factors (including seismic stability) should be confirmed by calculations in accordance with GOST
17516.1.
11.5 turbogenerators proves to be true calculations in accordance with
GOST 12.1 004.
12 Marks, packing, transportation and storage
12.1 On each turbogenerator with air cooling the tablet in accordance with GOST 12869 and GOST
12971, containing should be strengthened:
- Manufacturer trade mark;
- Turbogenerator type;
- Turbogenerator serial number on system of numbering of manufacturer;
- Nominal active capacity, kw;
- Power factor;
- Rated voltage , In;
- Nominal frequency of rotation, rpm;
- Nominal frequency, Hz;
- Number of phases;
- Rated current , And;
- Rotor rated current, And;
- Rotation direction (if left);
- Year of release;
- This standard designation.
12.2 On the tablet of each turbogenerator with hydrogen or vodorodno-liquid cooling nominal
working superfluous pressure of hydrogen in should be in addition specified.
12.3 On the tablet of the turbogenerators, passed certification, the conformity Sign can be
placed.
12.4 Marks of container in accordance with GOST 14192.
12.5 If other is not co-ordinated, conditions of transportation of assembly units of turbogenerators
regarding influence of mechanical factors "With" in accordance with GOST 23216, and regarding
influence of climatic factors same, as conditions 8 in accordance with GOST 15150.
12.6 Conditions of storage of assembly units of turbogenerators in accordance with GOST 15150
establish in specifications on turbogenerators of concrete types. A period of storage without
represervation 1.
12.7 Packing and preservation of components of a turbogenerator (details and assembly units) - in
accordance with GOST 23216.
13 Manufacturer's guarantees
The manufacturer guarantees conformity of turbogenerators to this standard requirements at
observance of rules of transportation, storage, installation and operation.
The operation warranty period is established under the agreement, but not less than three years from
the date of commissioning by interstate deliveries or 1 year from the date of commissioning and no
more than three years from the moment of passing through Frontier by deliveries of turbogenerators
to export.

APPENDIX A
(Recommended)
Key parametres of turbogenerators to steam turbines
At a rated load
Active
capacity, kw

Frequency
of rotation,
rpm

2500
4000
6000
1200
3200

Pressure, In
3150,6300

6300, 10500

6300
110000
160000
220000
320000
500000

3000

800000

Full capacity,

3125
5000
7500
15000
4000

Power factor
cos

Efficiency, %,
not less

0,8

97,0
97,3
97,4
97,5
98,2

0,85

98,6

550000

0,9

98,7

10500
15750, 18000
15750
20000
20000

137500
188000
258800
376000
588000

98,4
98,5
98,6

24000

888900
111100

1200000

24000

133000

20000

588000

24000

111100

0,47

0,85

0,35
0,45

98,7

0,9

98,75

0,40

0,40

1500
1000000

Active
capacity,
kw

98,8

98,3

24000

Transitive inductive resistance


on a longitudinal axis
(nonsaturated value),

38400
69300
75000
121000
176000
242000
352000
550000
880000
800000
1100000
1000000
1320000

78750

1000000

500000

At the maximum long loading


The short
circuit
relation,

0,50

1100000
1000000

Power factor cos

0,85 at tox waters 32


0,92 at tox waters 32
0,85 at tox waters 32
0,85 at tox waters 20
0,9 at tox waters 32
0,9 at tox waters 32
0,85 at tox waters 25
0,9 at tox waters 32
0,85 at tox waters 25
0,9 at tox waters 32
0,85 at tox waters 25
0,9 at tox waters 32
0,9 at tox waters 32C
0,85 at tox waters 25

The note-for turbogenerators with hydrogen cooling by capacity of 63000 kw and more at the maximum long loading pressure of hydrogen in the car case can be raised, its value should be specified
in the maintenance instruction

Keywords: turbogenerators, requirements, acceptance, test methods, marks, guarantees