Anda di halaman 1dari 3

Ismail Hussain

2A, Camden Row,


Dublin.
Email: ismail.ibrahim@ucdconnect.ie
Mobile no: 0892319051

Personal Statement
An Electrical Engineer with over 4 years of direct power plant and substation experience.
In-depth knowledge of the Electrical Power Industry. Strong Awareness of cultural diversity, a
natural team leader with strong interpersonal and influence skills.

Experience
Testing Engineer
Vectors Contracting and Trading Company
October 2011-August 2014
Reason for leaving: Contract Ended.
AMR Project, Client: Advanced Electronics Company, Jan 2013-Aug 2014.
Primary Responsibilities:
Tested and Commissioned Automated Meter reading System in 132KV, 230KV,
and 380KV substations (around 60 substations).
Configured the Data collection Unit and integrated it with the Revenue meters
(AEC) and Power Quality Meters (SEL).
Familiarized in Omicron CMC 256+, MTE (Meter testing Equipment), and Freja
testing equipments.
Tested accuracy and maximum demand for revenue meter.
Tested the functionality of power quality such as Voltage sag swell interception,
harmonics and flicker.
Done Secondary injection for Current and Voltage Transformer circuits and
energized the revenue meter.
Done Megger test for Insulation check in cables.
Switchgear Project, Client: ABB Electrical Industries CO Ltd, Oct 2011-Dec 2012.
Primary Responsibilities:
Tested factory acceptance test for 13.8KV and 33KV Switchgear.
Tested Current Transformers - Ratio, Winding resistance, Saturation (knee point),

Burden, Polarity test.


Tested Voltage Transformers - Ratio, Winding resistance, Insulation resistance,
Polarity test.
Tested Numerical and Analog Relays function test, over current, Earth fault,
Directional O/C, under voltage, Differential, Trip and Alarms test.

Maintenance Engineer
Mohammed Mansour Al Rumaih Group
February 2011-September 2014
Reason for leaving: Job scope was limited.
Primary Responsibilities:
Tested and Commissioned Emerson Inverters, Rectifier, and Water Leakage
Detection system in Banks and Data center.
Periodic Maintenance of inverters, rectifier and water Leakage detection system.
Tested charging, discharging and specific gravity of battery bank
Tested the function, insulation of inverters, rectifier and water Leakage detection
system.
Familiarized in reading Electrical Drawings.
Graduate Executive Engineer
Neyveli Lignite Corporation Limited
June 2010-Dec 2011
Reason for leaving: Contract End
Primary Responsibilities:

Responsible for the safe and proper operation of a power plant, switchyard and
associated control structures.
Communicate with systems operators to regulate and coordinate transmission
loads and frequencies, and line voltages.
Inspect records and log book entries, and communicate with other plant
personnel, in order to assess equipment operating status.
Receive outage calls and call in necessary personnel during power outages and
emergencies.
Maintains power-plant operating log and prepares power generation and
transmission equipment operating reports.
Prepares equipment malfunction reports, makes inspections and from observation,
determines whether equipment is operating properly.

Training
ABB Automation, Riyadh
Nov2008-Jan2009
Objective: Tested transformer protection panel equipped with RET 541 Numerical relay at ABB
Manufacturing plant. In addition training received in designing, production and testing of EHV
Control and protection panels.

Skills

Mat lab, Gams, Dome.


C, C++.
AutoCAD, Micro Station.

Education Profile
ME
2014-15

Energy Systems Engineering


University College Dublin, Ireland

MBA
2011-2013

Project Management (Part Time)


Sikkim Manipal University, Riyadh, Saudi Arabia

B Tech
2006-2010

Electrical and Electronics Engineering


National Institute of Technology, Trichy, Tamil Nadu

References
Reference available on request.

(Currently pursuing)

First Class
Grade A
First Class
GPA 6.8

Anda mungkin juga menyukai