Anda di halaman 1dari 16

5/30/2013

EXPLORATION
PROCESSES

Eksplorasi
Eksplorasi dalam migas adalah semua kegiatan dari permulaan
sampai akhir dalam usaha pencarian dan penambahan cadangan
migas
i
yang baru.
b
Urutan suatu operasi eksplorasi meliputi proses sebagai berikut:
Perencanaan eksplorasi (exploration planning)
Operasi survey lapangan
Penilaian dan prognosis prospek
Pemboran eksplorasi
Pengembangan
P
b
d reevaluasi
dan
l
i daerah.
d
h

5/30/2013

Exploration Review Regional Studies

5/30/2013

Exploration Processes

Exploration Review
Regional Studies

5/30/2013

Exploration Processes

Exploration Review Analog Modelling

Exploration Processes

Exploration Review Regional Studies

Bachtiar, dkk., 2003

5/30/2013

Exploration Processes

Exploration Review Geophysical

Exploration Processes

Exploration Review Prospect Generation

5/30/2013

Exploration Processes

Exploration Review Drilling Proposal

OPERASI
PEMBORAN

Gambar 3.9. Operasi


Pemboran Sumur
Nilam H25-35 Vico
Indonesia;
A. Well proposal
Sumur Nilam H2535; B. Rig pemboran;
C. Rotary table; D.
Bahan untuk
membuat lumpur
pemboran; E. Shale
shaker untuk
memisahkan cutting;
F. Peralatan
pengamatan cutting
dan oil show.

5/30/2013

Exploration Processes

Drilling Operations

z to test the HC potential of the objectives in a safe and reliable


manner
z to acquire data in cost effective manner
Mud Logging
MWD
LWD
Wireline Logging
Formation Testing
Cores
Samples

5/30/2013

Exploration Processes

Exploration Review Classification

z Exploration (wild-cat) Drilling


to test
to acquire date
z Evaluation/Delineation Drilling
to determine (delineate) the extent of a discovery
z Development/ Extraction Drilling
to extract/ exploit
p
of a p
previously
y discovered HC
z Injection Drilling
to inject fluids into subsurface (EOR, dump or HC storage)

5/30/2013

Rig System Circulation 1

1.
1
2.
3.
4.
5.
6.
7.
8.

Sl h pump
Slush
Swivel
Kelly
Bit
Annular space
Mud stream down ward
Shale shaker
(tempat limpahan keratan sumur)
Suction tank

5/30/2013

Rig type

Rig type - Jackups

10

5/30/2013

Rig Type - Submersibles

Rig Type - Drillship

11

5/30/2013

Rig Type Platform (production)

Rig Type - Onshore

12

5/30/2013

Laser Drilling A Concept

RIGSITE CONTRACTOR

13

5/30/2013

WELLSITE GEOLOGIEST: JOB PURPOSES

REFERENCE DEPTH

14

5/30/2013

WELL PROFILES

Drilling Operation - Sequences


30 pile driven until refusal
drill with 17 , enlarge with
26 bit
26

drill with 12 , enlarge with 17


bit

drill with 12 bit

drill with either 8 3/8 or 8 5/8


bit

20 conductor casing 120-150


meter

13 3/8 surface casing surface


logging

9
5/8
intermediate
intermediate logging

7liner

casing

final/TD logging

15

5/30/2013

Well Logging
Process of all recording well/ formation data during drilling and

after drilling of the well

Categories:
Drilling Operation Logs : mud logs
MWD
LWD
After Drilling /Wireline Logs

: electrical
acoustic
radioactive
electromagnetic
l t
ti
Open-hole logging
Cased-hole logging
Production Logging

Well logging - Purposes


To answer the followings:
z
z
z
z
z
z
z
z

existence of the reservoirs


location (depth) of the reservoirs
thickness of the reservoirs
lithology of the reservoirs
properties of the reservoirs (porosity, homogenity)
vertical and lateral distribution of the reservoirs
type of contained fluid in the reservoirs
fluid saturation and p
properties
p
((salinity,
y, temperature,
p
,p
pressure))
Key for well decision

16

Anda mungkin juga menyukai