Anda di halaman 1dari 20

POBLACION DE DISEO PARA LA DEMANDA DE AGUA

A.- DATOS POBLACIONALES

POBLACIN ACTUAL ( Po )

15

B.- METODOS DE ESTIMACION ANALITICOS


01.- METODO LINEAL

pi 1 pi
ti 1 ti

P
Pi+1
P

P=P0 +r ( t t 0 )

Pi-1

t i-1 t i

Ao
2013

Poblac (hab)
15

t i+1 t

r
0.0093
0.0093

P2029= 110+0.0084(2,030-2,011)
P2029=

15.1581

hab

P2029=

15

hab

02.- METODO DE INTERES SIMPLE

r=

pi +1 p i
pi ( t i+1 t i )

P= P0 ( 1+ r ( t t 0 ) )
Ao
2013

Poblac (hab)
15

Pi+1-Pi

Pi x(ti+1-ti)
=

P2030= 110x(1+0.0084x(2,030-2,011))
P2030=

17.3715

hab

P2030=

17

hab

r
0.0093
0.0093

POBLACION DE DISEO PARA LA DEMANDA DE AGUA


03.- METODO GEOMETRICO

r=

t i +1t i

Pi +1
Pi

1
( t t 0 )

P= P0 .( 1+r )
Ao
2013

Poblac (hab)
15

t
0

Tasa de Crecimiento Anual

r=

0.00930

0.930% Anual

DE LO ANTERIOR PODREMOS GENERAR LAS POBLACIONES FUTURAS (PARA PERIODO DE DISEO DE 20 AOS )

Ao
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
P2030 =

Poblac (hab)
15
15
15
15
16
16
16
16
16
16
16
17
17
17
17
17
17
18
18
18
18

hab

POBLACION DE DISEO PARA LA DEMANDA DE AGUA


04.- METODO LOGARITMICO

r=
Ao
2013

LnP i LnPi1
t it i 1

Poblac (hab)
15

LnPf =LnP i + r( t f t i )

Ln(i+1)-Ln(i)

ti-ti-1

0.00930

Tasa de Crecimiento Anual


para el cacerio de Chin Chin - Conayca

0.930%

LnP2030= Ln(176)+0.0084x(2030-2011)
P2030= 17.5692497577 hab
P2030=

18

hab

04.- CONCLUSIONES
De los resultados obtenidos de las proyecciones de poblacin se puede concluir que el metodo Logaritmico y
Gemetrico son los que se aproximan mas a la realidad y nos dan un margen de seguridad, por lo que tomaremos
en cuenta el promedio de estos dos criterios.
Poblacin (habitantes)
Geometrico
Logaritmico
2011
15
15
2012
15
15
2013
15
15
2014
15
15
2015
16
16
2016
16
16
2017
16
16
2018
16
16
2019
16
16
2020
16
16
2021
16
16
2022
17
17
2023
17
17
2024
17
17
2025
17
17
2026
17
17
2027
17
17
2028
18
18
2029
18
18
2030
18
18
Poblacin Proyectada al 2030 =
Ao

Promedio
15
15
15
15
16
16
16
16
16
16
16
17
17
17
17
17
17
18
18
18
18.00

habitantes

POBLACION DE DISEO PARA LA DEMANDA DE AGUA

18
18
17
17
16
16
15
15
14

2029

2030

2027

2028

2025

2026

2023

AOS

2024

2021

2022

2019

2017

2018

2015

2016

2013

Column D

2020

Column C

2014

2011

14
2012

POBLACION(Hab.)

POBLACION FUTURA

CALCULO DE CAUDALES PARA LA RED DEL SISTEMA DE AGUA POTABLE


01
02

TIPO DEL PROYECTO


POBLACION ACTUAL

: SANEAMIENTO BASICO
:

03

TASA DE CRECIMIENTO (%)


METODO GEOMETRICO
METODO LOGARITMICO

04

PERIODO DE DISEO (AOS)

20

05

POBLACION FUTURA

18.00

15

0.930%
0.930%

METODO GEOMETRICO
METODO LOGARITMICO

17.71
17.73

06

DOTACION (Lts/ Hab./Da)

150.00

07

CONSUMO PROMEDIO ANUAL TOTAL( lts/seg )

0.03

Qp = Pt x Dot. / 86400
3% Para Lavado de Filtros
0.5% Para Servicio en Planta de Tratamiento
08

09

10

CONSUMO MAXIMO DIARIO (lts / seg) K1 = 1.3


K1 = 1.3 ---------- FIJO
Qmd. = K1 x Qp
CAUDAL AFORADO DE LA FUENTE (m3/seg.) :
Q aforo maximo
Q aforo medio
Q aforo minimo
VOLUMEN DE APROXIMACION DEL RESERVORIO ( M3 )

0.03
0.00
0.00
0.04

25 al 30% del Consumo Promedio Anual


Vr = 0.25*Qp*86400 / 1000
:
25% de Vr de reserva
Nota: El volumen real del reservorio lo determinaremos de acuerdo a la dotacion horaria y la grafica de la curva masa

11

0.10178
0.04448
0.03058
0.02672
0.81

0.65
0.16

VOLUMEN ASUMIDO DEL RESERVORIO ( M3 )

2.50

CONSUMO MAXIMO HORARIO(lts/seg) K2 = 2.4

0.07

1.8<K2<2.5
Qmh. = K2 x Qp
12

CONSUMO TOTAL POR AO (m3)

985.50

Qta = Pt x Dot x N dias


13

CONSUMO TOTAL DIARIA (m3/da)

2.70

Qtd = Pt x Dot
14

CAPACIDAD DE LA TOMA Y DE LINEA DE CONDUCCION (lts/seg)

0.04

Qt = Qmd (caudal maximo diario)


15

CAUDAL DE DISEO PARA LA PLANTA DE TRATAMIENTO DE AGUA POTABLE

0.04

Qt = Qmd
16

CAUDAL DE DISEO PARA LA RED DE DISTRIBUCION


Qt = Qmh (caudal maximo horario)

0.07

DOTACION HORARIA
Consumo Mximo Diario
0.04 lt/s
HORAS

0.00004 m3/s

Consumo
C%

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

% Consumo
%
1
1
1
2
3
4
5
9
6
5
4
3
6
9
7
3
2
4
9
5
4
3
2
1
1
100

C Consumo Promedio S
%
1
0
2
4.167
3
4.167
5
4.167
8
4.167
12
4.167
17
4.167
26
4.167
32
4.167
37
4.167
41
4.167
44
4.167
50
4.167
59
4.167
66
4.167
69
4.167
71
4.167
75
4.167
84
4.167
89
4.167
93
4.167
96
4.167
98
4.167
99
4.167
100
4.167

3.456
Acumulado
Promedio S %
0
4.17
8.33
12.50
16.67
20.83
25.00
29.17
33.33
37.50
41.67
45.83
50.00
54.17
58.33
62.50
66.67
70.83
75.00
79.17
83.33
87.50
91.67
95.83
100.00

m3/d
(S-C)
0
3.17
3.17
2.17
1.17
0.17
-0.83
-4.83
-1.83
-0.83
0.17
1.17
-1.83
-4.83
-2.83
1.17
2.17
0.17
-4.83
-0.83
0.17
1.17
2.17
3.17
3.17

VOLUMEN DEL TANQUE


A.- Volumen por consumo domstico (consumo diario)
1. Tanque superficial:
% consumo medio diario =

18.7

Volumen del tanque

0.65

m3

0.16

m3

2. Volumen de Reserva ( de 25% a 30%) :


1. Tanque superficial 25% =
3. Volumen total del tanque:
1. Tanque Superficial
Volumen =

0.81 m3

Volumen =

2.50 m3

3.456

m3/d

0.144 m3/h
(S-C)
0
3.17
6.33
8.50
9.67
9.83
9.00
4.17
2.33
1.50
1.67
2.83
1.00
-3.83
-6.67
-5.50
-3.33
-3.17
-8.00
-8.83
-8.67
-7.50
-5.33
-2.17
1.00

V%
8.83
12.00
15.16
17.33
18.50
18.66
17.83
13.00
11.16
10.33
10.50
11.66
9.83
5.00
2.16
3.33
5.50
5.66
0.83
0.00
0.16
1.33
3.50
6.66
9.83

DOTACION HORARIA
4. Predimensionamiento del tanque superficial
Volumen del tanque

2.50 m3
Constante de la capacidad del tanque de almacenamiento
V (cientos m3)
<3
4-6
7-9
10-13
14-16
>17

K
2.00
1.80
1.50
1.30
1.00
0.70

De acuerdo con la tabla, la constante de la capacidad de almacenamientodel tanque es:


K= 2
H= V/3+K

SuperficieCuadrada

H=
H=

2.008
1.5

m
m

A=
L=

1.667
1.291

L=

2.00

VARIACION DE CONSUMO HORARIO


10
9
8

C%

7
6
5
4
3
2
1
0

10

Tiempo (Hora)

15

20

25

DOTACION HORARIA

DIAGRAMA DE MASA DE CONSUMO

Volum e n (%)

120

100

80

60

Consumo

C %

Consumo Promedio

40

20

Tie m po (Hora)
0

10

15

20

25

DISEO DE CAPTACION
DATOS

Caudal maximo:

0.04 Lt/seg

Caudal minimo:

0.03 Lt/seg

Calculo de la distancia entre el afloramiento y la camara humeda:


H=

(altura entre el afloramiento y el orificio de netrada), se recomienda valores entre 0.40 y


0.50m se considera velocidades menores a 0.60m/s
adoptamos

V1 =

ho=

0.10 m/s

0.00 m/s

Perdida de carga

Hf=H-ho
Hf =

0.20 m

Distancia entre el afloramiento y la camara humeda:


L=

0.67 m

Calculo del diametro de la tuberia de entrada


donde:
Cd: Coeficiente de descarga, 0.80
A=

0.001 m2

0.025 m

2-1/2"

Calculo del numero de orificios


se asume tuberia de 1-1/2"
NA=

3.78

NA=

4.00

Calculo del ancho de la pantalla


b=

72.39 cm

DISEO DE CAPTACION
b=

0.80 m

adoptado

Altura de la camara humeda


A:
B:

altura de canastilla
Diametro de la tuberia de salida

(0.10m)
(D=1-1/2")

H:

Altura de agua

(H=0.30m, minimo)

D:

Diametro de la tuberia de ingreso

(D=1-1/2")

E:

Altura libre

(0.30m)

Ht=

0.78 m

Ht=

1.00 m

adoptado

CALCULO DE MOMENTOS EN
ELEMENTOS ESTRUCTURALES

CALCULO DE MOMENTOS EN
ELEMENTOS ESTRUCTURALES

CALCULO DE MOMENTOS EN
ELEMENTOS ESTRUCTURALES

b/h

x/h

1.5

y=0

y=b/4

y=b/2

Mx

My

Mx

My

Mx

My

0.000

0.021

0.000

1/4

0.008

0.020

0.004

0.005

0.000

-0.040

0.007

-0.009

1/2

0.016

0.016

0.010

-0.044

0.008

-0.008

-0.042

3/4

0.003

0.006

0.003

0.004

-0.005

-0.026

-0.060

-0.012

-0.041

-0.008

0.000

0.000

Momentos
0

0.000

70.875

0.000

16.875

0.000

-135.000

1/4

27.000

67.500

13.500

23.625

-30.375

-148.500

1/2

54.000

54.000

33.750

27.000

-27.000

-141.750

3/4

10.125

20.250

10.125

13.500

-16.875

-87.750

-202.500

-40.500

-138.375

-27.000

0.000

0.000

COEFICIENTES PARA EL CALCULO DE MOMENTOS EN LOS ELEMENTOS


ESTRUCTURALES

b/h
3

x/h

y=0
Mx

y=b/4
My

Mx

y=b/2
My

Mx

My

0.000

0.250

0.000

0.014

0.000

-0.082

1/4

0.010

0.019

0.007

0.013

-0.014

-0.071

1/2

0.005

0.010

0.008

0.010

-0.011

-0.055

3/4

-0.033

-0.004

-0.018

-0.001

-0.006

-0.028

-0.126

-0.025

-0.092

-0.018

0.000

0.000

y=0

y=b/4

y=b/2

b/h

x/h

2.5

0.000

0.270

0.000

0.013

0.000

-0.074

1/4

0.012

0.022

0.007

0.013

-0.013

-0.066

b/h
2

Mx

My

Mx

My

Mx

My

1/2

0.011

0.014

0.008

0.010

-0.011

-0.053

3/4

-0.021

-0.001

-0.010

0.001

-0.005

-0.027

-0.108

-0.022

-0.077

-0.015

0.000

0.000

x/h

y=0
Mx

y=b/4
My

Mx

y=b/2
My

Mx

My

0.000

0.027

0.000

0.009

0.000

-0.060

1/4

0.013

0.023

0.006

0.010

-0.012

-0.059

1/2

0.015

0.016

0.010

0.010

-0.010

-0.049

3/4

-0.008

0.003

-0.002

0.003

-0.005

-0.027

-0.086

-0.017

-0.059

-0.012

0.000

0.000

CALCULO DE MOMENTOS EN
ELEMENTOS ESTRUCTURALES
b/h
1.75

x/h

y=0
Mx

y=b/4
My

Mx

y=b/2
My

Mx

My

0.000

0.025

0.000

0.007

0.000

-0.050

1/4

0.012

0.022

0.005

0.008

-0.010

-0.052

1/2

0.016

0.016

0.010

0.009

-0.009

-0.046

3/4

-0.002

0.005

0.001

0.004

-0.005

-0.027

-0.074

-0.015

-0.050

-0.010

0.000

0.000

y=0

y=b/4

y=b/2

b/h

x/h

1.5

0.000

0.021

0.000

0.005

0.000

-0.040

1/4

0.008

0.020

0.004

0.007

-0.009

-0.044

1/2

0.016

0.016

0.010

0.008

-0.008

-0.042

3/4

0.003

0.006

0.003

0.004

-0.005

-0.026

-0.060

-0.012

-0.041

-0.008

0.000

0.000

Mx

My

Mx

y=0

My

Mx

y=b/4

My

y=b/2

b/h

x/h

1.25

0.000

0.015

0.000

0.003

0.000

-0.029

1/4

0.005

0.015

0.002

0.005

-0.007

-0.034

1/2

0.014

0.015

0.008

0.007

-0.007

-0.037

3/4

0.006

0.007

0.005

0.005

-0.005

-0.024

-0.047

-0.009

-0.031

-0.006

0.000

0.000

b/h
1

b/h
0.75

b/h
0.75

x/h

Mx

My

Mx

y=0
Mx

My

Mx

y=b/4
My

Mx

My

y=b/2
My

Mx

My

0.000

0.009

0.000

0.002

0.000

-0.018

1/4

0.000

0.011

0.001

0.003

-0.005

-0.023

1/2

0.009

0.013

0.005

0.005

-0.006

-0.029

3/4

0.008

0.008

0.005

0.004

-0.004

-0.020

-0.035

-0.007

-0.022

-0.005

0.000

0.000

x/h

y=0
Mx

y=b/4
My

Mx

y=b/2
My

Mx

My

0.000

0.004

0.000

0.001

0.000

1/4

0.001

0.008

-0.001

0.002

-0.002

-0.007
-0.011

1/2

0.005

0.010

0.002

0.003

-0.003

-0.017

3/4

0.007

0.007

0.003

0.003

-0.003

-0.013

-0.024

-0.005

-0.015

-0.003

0.000

0.000

x/h

y=0
Mx

y=b/4
My

Mx

y=b/2
My

Mx

My

0.000

0.001

0.000

0.001

0.000

-0.002

1/4

0.001

0.005

-0.001

0.001

-0.001

-0.004

1/2

0.002

0.006

0.001

0.001

-0.002

-0.009

3/4

0.004

0.006

0.001

0.001

-0.001

-0.007

-0.015

-0.003

-0.008

-0.002

0.000

0.000

DISEO DE RESERVORIOS RECTANGULARES(MET. DE PORTLAND CEMENT ASSOCIATION)

As Perimetral
As+ Losa Techo

As- Losa Techo

Espesor de
Losa de Techo
Longitud Mnima de Desarrollo Techo

Borde Libre

As Vertical Muro
Altura de Agua

As Horizontal Muro
Longitud Mnima de Desarrollo Muro
S=1%

Espesor de
Losa de Fondo

Espesor de
solado

As Losa de Fondo

Longitud interna
Espesor de muro

1. DIMENSIONAMIENTO
DESCRIPCION

VALOR

Volumen de Reservorio (m3)

2.50

Borde libre adoptado (m)

0.25

Altura de agua sugerida

0.85

Altura de agua adoptada (m)

1.30

Long. Int. Paredes predimensionada:

1.71

Long. Int. Paredes Adoptado (m)

1.40

Relacin altura/ancho

0.93

Volumen Resultante (m3)

2.55

2. ESPECIFICACIONES TECNICAS
DESCRIPCION

VALOR

Resistencia del Concreto f'c (Kg/cm2)

175

Resistencia del Acero f'y (Kg/cm2)

4200

Recubrimiento mnimo losa superior (cms)

Recubrimiento mnimo losa de fondo (cms)

Recubrimiento mnimo muros (cms)

DISEO DE RESERVORIOS RECTANGULARES(MET. DE PORTLAND CEMENT ASSOCIATION)


3. DISEO DE PAREDES
DESCRIPCION

REFUERZO VERT.

Relacin Ancho/Altura agua

REFUERZO HORIZ.

1.08

Max. Coef. Absoluto de Momento

1.08

0.092

0.092

202.50

202.50

10.4

10.4

Espesor adoptado (cms)

15

15

Espesor Util d

13

13

900

900

Relacin modular n

10

10

fc (kg/cm2)

79

79

k=1(1+fs/(nfc))

0.467

0.467

j=1-(k/3)

Mx. Momento Absoluto (Kg-m)


Espesor predimensionado (cms)

fs (Kg/cm2)

0.844

0.844

Area de acero requerido (cm2)

2.05

2.05

Acero mnimo (cm2)

2.87

2.87

Acero adoptado (cm2)

2.87

2.87

Distribucin de Acero con 1/4" (cms)

11.2

11.2

Distribucin de Acero con 3/8" (cms)

24.8

24.8

Distribucin de Acero con 1/2"

45.0

45.0

Dimetro adoptado (pulgadas)

1/2

Distribucin As Adoptada (cms)*

25

Area de varilla adoptada

3/8
20

1.29

0.71

Long. desarr. bsica por rea vlla. (cms)

25

25

Long. desarr. bsica por dim. vlla. (cms)

32

32

Long. de desarrollo mnima (cms)

30

30

Long. mn de desarrollo adoptada (cms)

30
#NAME?

* Para espesores de muro > = a 20 cms. se distribuir el acero en las dos caras del muro.
4. DISEO DE LOSA DE TECHO
DESCRIPCION

VALOR

Luz de clculo (m)

1.55

Espesor predimensionado (cm)

4.3

Espesor adoptado (cm)

12

Peso propio losa (Kg/m2)

288

Carga viva (Kg/m2)

150

Carga sobre losa (Kg/m2)

438.00

Momento Actuante Positivo(Kg-m)

37.88

Momento Actuante Negativo(Kg-m)

12.63

15.59

Espesor til

1.6

Esp. til adoptado diseo (cm) - Chequeo

10

CALCULO DEL As(+) (Abajo)


Acero positivo requerido (cm2)

0.31

Acero positivo mnimo (cm2)

2.20

Acero positivo adoptado (cm2)

2.20

Distribucin de Acero con 1/4" (cms)

14.5

Distribucin de Acero con 3/8"

32.2

Distribucin de Acero con 1/2"

58.5

30

DISEO DE RESERVORIOS RECTANGULARES(MET. DE PORTLAND CEMENT ASSOCIATION)


DESCRIPCION

VALOR

Dimetro adoptado (pulgadas)

3/8

Dist. As Adoptada (cms)

20

Area de varilla adoptada

0.71

Long. desarr. bsica por rea vlla. (cms)

14

Long. desarr. bsica por dim. vlla. (cms)

24

Long. de desarrollo mnima (cms)

30

Long. mn de desarrollo adoptada (cms)

30

Long. min. gancho (cms)

22.90

Long. mn gancho por dim. (cms)

7.62

Long. gancho mnima (cms)

15

Long. de gancho adoptada (cms)

15

CALCULO DEL As(-) (Arriba)


Area de Acero negativo (cm2)

0.10

Acero negativo mnimo (cm2)

2.20

Acero negativo adoptado (cm2)

2.20

Distribucin de Acero con 1/4" (cms)

14.5

Distribucin de Acero con 3/8"

32.2

Distribucin de Acero con 1/2"

58.5

Dimetro adoptado (pulgadas)

3/8

Dist. As Adoptada (cms)

20

CALC. DE LONG. DEL As(-)


Coeficiente a

84.10

Coeficiente b

-37.88

0.00

0.67

Longitud predimensionada de As(-)* (cms)

10

Longitud adoptada de As(-) (cms)

15

*Medida desde el borde interior de muro al extremo interior de la varilla


5. DISEO DE LOSA DE FONDO
DESCRIPCION

VALOR

Luz de clculo
Espesor adoptado (cm)

1.55
25

Peso propio losa (Kg/m2)

600.00

Peso de Agua (Kg/m2)


Carga sobre losa (Kg/m2)

1300
1900.00

Mom. Empotramiento Extremos (Kg-m)

23.77

Momento al Centro (Kg-m)

16.07

Momento Final de Empotramiento

12.58

Momento Final al Centro

0.82

Espesor necesario (cm)

2.59

Recubrimiento (cm)

DISEO DE RESERVORIOS RECTANGULARES(MET. DE PORTLAND CEMENT ASSOCIATION)


DESCRIPCION

VALOR

Espesor total mnimo necesario

6.59

Peralte efectivo de diseo

21.00

Chequeo de Espesor Adoptado

OK

Area de Acero (cm2)

0.08

Acero mnimo (cm2)

4.63

Acero adoptado (cm2)

4.63

Distribucin de Acero con 1/4" (cms)

6.9

Distribucin de Acero con 3/8" (cms)

15.3

Distribucin de Acero con 1/2" (cms)

27.9

Dimetro adoptado (pulgadas)

3/8

Dist. As Adoptada (cms)

25
#NAME?

6. CHEQUEO POR CORTE


DESCRIPCION

VALOR

PAREDES
Fuerza cortante mxima (Kg)

845.00

Esfuerzo cortante nominal (Kg/cm2)

0.74

Esfuerzo permisible nominal mx (Kg/cm2)

3.50

Chequeo por corte

OK

LOSA SUPERIOR
Fuerza cortante mxima (Kg)

306.60

Esfuerzo cortante unitario (Kg/cm2)

0.26

Mx. esf. Cortante unitario permisible

3.84

Chequeo por corte

OK

LOSA INFERIOR
Carga viva losa techo (Kg/m2)

150.00

Peso losa techo (Kg/m2)

288.00

Peso muros (Kg/m2)

3720.00

Presin agua (Kg/m2)

1300.00

Peso propio losa fondo (Kg/m2)

600.00

Carga ltima (Kg/m2)

9132.00

Fuerza cortante actuante (Kg)

8770.37

Fuerza cortante resistente (Kg)

49059.06

Chequeo por corte

OK

7. CHEQUEO DE CAPACIDAD PORTANTE DE SUELO


DESCRIPCION
Carga factorizada (Kg/m)

VALOR
9132.00

Esfuerzo transmitido al suelo (Kg/cm2)

0.87

Capacidad portante asumida (Kg/cm2)

1.00

Chequeo capacidad portante

OK

- El mximo coeficiente de Momento absoluto se obtendr manualmente del cuadro adjunto, de acuerdo

DISEO DE RESERVORIOS RECTANGULARES(MET. DE PORTLAND CEMENT ASSOCIATION)


a la relacin long. Pared/altura de agua.
- La mxima separacin del refuerzo es 3 veces el ancho de losa o muro, sin sobrepasar los 45 cms.

CALCULO DE LA LINEA DE CONDUCCION

TRAMO

Longitud
Corregida con
CAUDAL
Pendiente
Total

Cota de Terreno

Desnivel del
Terreno

Perdida de
Carga
Unitaria
hf

Calculado

Asumido

hf

Hf

inicial

final

P/T

(m)

(m/m)

(pulg.)

(pulg.)

(m/s)

(m/m)

(m)

(msnm)

(msnm)

(m)

Diametro

Velocidad

Perdida de
Carga
Unitaria

perdida de
Carga por
Tramo

cota piezometrica

presion final

Qmd

Inicial

Final

(m)

(l/S)

(msnm)

(msnm)

CAPT 01 - CRP 01

300.000

0.28

859.91

815.00

44.91

0.1497

0.63

1 1/2

0.247

0.002

0.6524

859.91

859.26

44.26

CRP 01 - Reserv.

605.000

0.28

815.00

693.12

121.88

0.2015

0.59

1 1/2

0.247

0.002

1.3156

815.00

813.68

120.56

TOTAL

905.000
905.000
Se utilizar tubera PVC SAP C-7.5 NTP ISO 4422:2007