Anda di halaman 1dari 25

We are providing a Web based System

that allows user to purchase stamps


and keep track of MIS accounts in user
friendly manner

Problem: It is difficult for a person to go


to post office for stamp purchase or

MIS Enquiry. More over it becomes


even hard to keep track of Transactions
that were made

Solution

Provide an Online System where user


can interact with Post Office for the
Services being provided

Scope

Functionality-1
Online Stamp Purchase
Functionality-2
View Transaction History
Functionality-3
View MIS Details

Project Management

Model: Incremental
Reason:
In incremental model the whole
requirement is divided into various

builds. Cycles are divided up into


smaller, more easily managed
modules. Each module passes through
the requirements, design,
implementation and testing phases.
This model can be used when the
requirements of the complete system
are clearly defined and understood.

Major requirements must be defined;


however, some details can evolve with
time.
Disadvantages of Incremental model:
Needs good planning and design.
Needs a clear and complete
definition of the whole system before it

can be broken down and built


incrementally.

Activity

In
Durat Dead Exten Activity
char ion of line
sion
outco
ge
work
me

Databa
se
design

Stud 5
Date
ent1 days

Date+ Databa
2
se
days normal
ized
upto
3NF

View
Design

Databa
se
connect
ivity

Stud
ent2

HTML
Pages
with
Proper
Layout

Controll
ers for
Reques
t
Handlin
g
Integrati
ng
Views
and

Controll
ers
Testing

Cost Estimation
Cost estimation can be defined as the
approximate judgement of the costs for
a project.

COCOMO stands for Constructive Cost


Model, it is a software cost estimation
model
It is an algorithmic approach to
estimating the cost of a software
project. By using COCOMO you can
calculate the amount of effort and the
time schedule for projects. From these
calculations you can then find out how

much staffing is required to complete a


project on time.
The algorithm used is :
K = ( LOC / ( C * t4/3 )) * 3
K is the total life cycle effort in working
years, t is development and the C is
the technology constant, combining

the effect of using tools, languages,


methodology and quality assurance
( QA ). time in years.
The value of technology constant
varies from 610 to 57314. For easy,
xperienced projects technology
constant is high.

it is required to build a Web Development system


consisting of 25,000 lines of code.
person months of effort would this take using just
this equation if the project size was relatively
small
For a relatively small project:
Efforts = Productivity x KSLOC
= 3.3 x 25 = 82.5 Person-Months

Requirement Gathering
Several existing models were studied.
It was realized that an integrated
solution has to be provided where one
can find solution to most services
provided by Post Office
Diagrams

SWOT
Strength
Lower operational costs
Opportunities
We have created a quicker, smoother,
more customer-friendly shopping
experience.

Live chat has enhanced ecommerce


customer service, blunting the
traditional advantage.
Weakness
Security and fraud concerns mean
some people are still reluctant to use
their credit cards online
Threat

Internet availability is a major concern,


Our App may not be accessible to all
potential users

Anda mungkin juga menyukai